Home
Deluxe Dry Vacuum Installation Guide
Contents
1. IT an Lu Foam Sensor Indicator will show red ifthe probe in the intake canister senses foam If the indicator light goes on the system will automatically turn off to prevent any damage to the turbines The system will automatically turn back on once the foam has dissipated 1 800 624 2793 7 DV Series Installation Guide Notes 8 www dcionline com Operation DV Series Installation Guide 2029 DJ a N N N o o o co _ 2026 Turbine v ne w o a E o WV E 2024 Inline Filter jus JE 2025 Check Valve DV Series Installation Guide Electrical Schematic Electrical Schematic INTERNATIONAL DCI International 305 N Springbrook Rd Newberg Oregon 97132 1 800 624 2793 www dcionline com
2. eG El Secure the turbine assembly to the vacuum tank with the 5 16 nuts and washers removed in step 5 Lu C TY Q Step Seven Vacuum Supply 1 Align and tighten the vacuum supply union Union Mounting Step Eight Studs Plug liquid level switch from control panel to level switch on holding tank Liquid Level Switch Connection O O Vacuum Gauge connection 1 800 624 2793 DV Series Installation Guide Installation Installation Step Nine Connect vacuum gauge tubing from control panel to vacuum gauge connector on holding tank Step Ten Connect power Make sure the power supply is 208 230 VAC and connect to power source M LS tl WARNING Ensure the power supply is off before making the the electrical connections 6 www dcionline com DV Series Installation Guide Operation Installation Step Eleven Attach the vacuum hose to the inlet and the on site piping Step Twelve Attach the elbow the check valve and the drain hose The check valve must be installed in the proper orientation to function correctly Make sure the arrow on the check valve is on top and pointing towards the drain To complete the installation piping must be run from the turbine exhaust port to the ex
3. Deluxe Dry Vacuum Installation Guide DV Series DELUXE DRY VACUUM e DV 1203 e DV 2206 e DV 2210 w 3 3 e lt DCL INTERNATIONAL INTERNATIONAL Copyright DCI International All Rights Reserved 92096 C1 8 11 www dcionline com DV Series Installation Guide Vacuum Model Specification Vacuum Dry Vac Heads Tank Power Model Hof Heads Tank Size Voltage DV 1203 Horizontal 15 gal 230V DV 2206 Horizontal 15 gal 230V DV 2210 Horizontal 15 gal 230V All Voltage Ratings 5 o Qeu 2 NPT o 90 EI J 1 5 NPT o e 30 5 9 zs o Space Requirements NOTE Installation of this product should be undertaken only by qualified service technications This product has been factory tested prior to shipment If the product does not function as described in the start up and test procedures in this manual call the number below for assistance 1 800 624 2793 1 DV Series Installation Guide Compressor Installation Kit Installation Kit The DV Series is shipped with the following 5 ft Vacuum Hose split d amp bushing conduit connector Or rep rubber feet 4 Re LY check valve w connector ball valve con
4. nectors 3 You must provide e Fittings bushings and pipping as needed to exhauset the turbines to the exterior of the building Due to the heat generated PVC is not suitable Each turbine has an exhaust port with an 1 5 in threaded female fitting e Earthquake restraints for securing the DV Series Vacuum if required by local codes www dcionline com DV Series Installation Guide Vacuum Site Requirements Site Requirements Clearance e Adequate clearance as shown below for servicing and air circulation room temperature should be maintained between 40 F and 100 F when the motors are running e A flat level floor that provides stable support e Protection from the weather and direct sunlight e A power source within 3 ft of back center that provides a dedicated breaker protected circuit 1 5 NPT 1 5 NPT 33 33 m WARNING Fire Hazard Running motors generate heat Do not store flammable liquids or objects such as clothing mops or brooms near or above the unit gt PLUMBING REQUIREMENTS ELECTRICAL REQUIREMENTS 1 11 2 in 1 D minimum pipe size 1 3 wire single phase 230 vac All voltage ratings 5 2 Pipe connection is to be located within 3 ft of center back of compressor Green Wire is to be grounded to a s
5. terior of the building State or local codes in your area may require securing the DV Series vacuum with earthquake restraints Warning If exhaust plumbing is to run more than 4 feet vertically install a P Trap with a drain fitting in the exhaust piping This will expel any possible condensation NOTE The turbine motors generate heat Do not use PVC piping for the A turbine exhaust 1 800 624 2793 7 DV Series Installation Guide Installation Operation 6 www dcionline com DV Series Installation Guide Operation Operation The control panel located on the cover of the junction box controls various functions e Vacuum Level Gauge keeps accurate measurement of your Vacuum Level vacuum level gt Hour Meter Meter calculates the amount of hours the system has been in use Left Turbine Right Turbine S On On Off Auto In the on position you have power to the left Auto and right turbine switches The off position turns all power off The auto postion will allow Foam Sensor 12 the system to alternate between tubines as e needed For the system to operate correctly meer Some nua FETS CART in the Auto mode the left and right tubine m switches must be in the off position o o Left Turbine TARA AT Switch starts and stops the left turbine D C Right turbine INTERNATIONAL Switch starts and stops the right turbine
6. uitable 3 Install per all Local and State plumbing codes system ground Power supply must be on a dedicated circuit See data tag for appropriate breaker size Power supply connection is to be located Within 3 ft of center back of compressor 6 Install per all local and State electrical codes 1 800 624 2793 3 DV Series Installation Guide Unpacking Step One Unstrap the packaging from the pallets and remove boxes intact Step Two Remove the four bolts that secure the DV Series vacuum tank to the pallet and put them with the other packaging Step Three Move the DV Series vacuum tank off of the pallet and install leveling feet Place tank into position Step Four Remove the three bolts securing the turbine assembly to the pallet and put them with the other packaging NOTE Returns must be in the original packaging Retain the packaging until installation and test are complete 4 www dcionline com DV Series Installation Guide Installation Installation Step Five Remove the three 5 16 nuts and washers attached to the studs on top of the vacuum tank Place the turbine assembly onto the vacuum tank ensuring the mounting studs on the vacuum tank line up with with the mounting tabs on the turbine assembly Mounting Hardware M Step Six
Download Pdf Manuals
Related Search
Related Contents
Samsung PS50A750T1F User Manual Mode d`emploi Microdescendeur microTargeting™ StarTech.com ATC-2000WF User's Manual Ranger RGSE-00 Installation Guide Painel Simulador de Hidráulica Industrial e DM-ND350 Manual del usuario CARACTERISTIQUES 2 L = 0.8 kg MODE D`EMPLOI 取扱説明書(PDF)はこちら SPRAYIT SPRAYIT SP-324 Instructions / Assembly Copyright © All rights reserved.
Failed to retrieve file