Home
Agilent Inlet EPC Leak Test
Contents
1. You can use the stopwatch feature of the 6890 GC to monitor the time Press Time and then Enter to start timing then toggle between the time and the pressure reading with the Time and the Front Inlet Back Inlet keys If there is less than 1 0 psi pressure loss in 10 minutes consider the system leak tight If the pressure loss is greater than 1 0 psi in 10 minutes there is a leak that must be found and corrected See Correcting Leaks for Purged Packed inlets in the 6890 Service Manual for help 10 When the system is considered leak tight set the inlet pressure to zero disconnect the 3 Way Valve from the system and re connect the gas supply line to the inlet supply fitting Now you may reinstall the column restore the column dimension configuration at the keyboard and set the desired inlet pressure he Agilent Technologies Agilent Technologies Inc Printed in USA May 2002 G1545 90100
2. To set these values press Config and scroll to Column 1 or Column 2 depending on inlet position Recommended settings are column length 30 m and column diameter 320 um 3 Set inlet pressure to 25 psi on the 6890 keypad 4 Allow about 15 seconds for pressure equilibration If pressure cannot be achieved check the following Is the carrier gas source pressure at least 35 psi connected to the proper inlet front or back and turned on Is the 3 Way Valve in the correct position with the handle pointed towards the gas supply Is the Purged Packed inlet column nut properly plugged Are the test fixture brass fittings tightened and the O rings under them in good condition If these conditions are all true it is possible that there is a gross leak in the system that must be corrected prior to going to step 5 Instructions Instructions Inlet EPC Leak Test Instructions Turn the inlet pressure OFF at the 6890 keypad Turn the 3 Way Valve OFF by turning the valve handle 180 degrees counterclockwise so that the handle on the valve handle is pointed towards the GC Set the inlet pressure to 40 psi on the 6890 keypad Allow about 15 seconds for the pressure to equilibrate The pressure should drop from 25 psi to a pressure above 10 psi usually between 17 and 24 psi Set the inlet pressure to 10 psi on the 6890 keypad Record the inlet pressure at this time and monitor the pressure for 10 minutes on the 6890 display
3. Inlet EPC Leak Test Fixture attached to a COC inlet Apg Agilent Technologies Inlet EPC Leak Test Instructions Cool On Column inlets Be sure that the preparation steps found in the current 6890 manual for Cool On Column inlets are complete before proceeding with these steps with the exception of the installation of the septum purge vent cap This will be replaced by the Inlet EPC Leak Test Fixture provided 1 Install the Inlet EPC 3 Way Valve Leak Test Fixture G1530 80510 as shown in Figure 1 Be sure O rings are in good condition and that brass knurled fittings are adequately finger tightened Turn the 3 Way Valve to the ON position as pictured in Figure 1 The handle on the valve is pointed towards the gas supply when turned ON pictured The handle on the valve is pointed towards the GC when it is turned OFF not pictured 2 Make sure a length and a diameter for a capillary column are entered on the 6890 keypad To set these values press Config and scroll to Column 1 or Column 2 depending on inlet position Recommended settings are column length 30 m and column diameter 320 um 3 Set inlet pressure to 25 psi on the 6890 keypad 4 Allow about 15 seconds for pressure equilibration If pressure cannot be achieved check the following Is the carrier gas source pressure at least 35 psi connected to the proper inlet front or back and turned on Is the 3 Way Valve in the correct position with t
4. Agilent Inlet EPC Leak Test Gas Chromatographs Instructions a Agilent Technologies Notices Agilent Technologies Inc 2002 No part of this manual may be reproduced in any form or by any means including elec tronic storage and retrieval or translation into a foreign language without prior agree ment and written consent from Agilent Technologies Inc as governed by United States and international copyright laws Manual Part Number G1545 90100 Edition First edition May 2002 Printed in USA Agilent Technologies Inc 2850 Centerville Road Wilmington DE 19808 1610 USA Instructions 00 ee Inlet EPC Leak Test Instructions e Ms Leak Test Kit G1545 60501 e e e Kit G1545 60501 includes the following materials e G1545 90100 Inlet EPC Leak Test Instructions e G1530 80510 Inlet EPC Leak Test Fixture e 0905 1493 Replacement O rings 12 pk While this kit is provided to attain accurate leak tests for Cool On Column inlets the test fixture may prove to be useful for checking other EPC inlets as well In order to turn the 3 Way Valve to the OFF position turn handle 180 degrees counterclockwise until it turns no more Handle will be pointed towards GC not pictured step 6 COC PP or step 8 S SL Valve is in ON position Handle is pointed towards gas supply pictured step 1 To purge vent Connect gas supply line to open fitting of valve step 1 To supply fitting Figure 1
5. d turned on Is the 3 Way Valve in the correct position with the handle pointed towards the gas supply Is the Split Splitless inlet column nut properly plugged Are the Test Fixture brass fittings tightened and the O rings under them in good condition If these conditions are all true it is possible that there is a gross leak in the system that must be corrected prior to going to step 6 Confirm the inlet Mode is SPLITLESS on the 6890 keypad Press Prep Run twice Turn the inlet pressure OFF at the 6890 keypad Instructions Instructions Inlet EPC Leak Test Instructions 8 Turn the 3 Way Valve OFF by turning the valve handle 180 degrees counterclockwise so that the handle on the valve handle is pointed towards the GC 9 Set the inlet pressure to 40 psi on the 6890 keypad Allow about 15 seconds for the pressure to equilibrate The pressure should drop from 25 psi to a pressure above 10 psi usually between 17 and 24 psi 10 Now set the inlet pressure to 10 psi on the 6890 keypad 11 Record the inlet pressure at this time and monitor the pressure for 10 minutes on the 6890 display You can use the stopwatch feature of the 6890 GC to monitor the time Press Time and then Enter to start timing then toggle between the time and the pressure reading with the Time and the Front Inlet Back Inlet keys If there is less than 0 5 psi pressure loss in 10 minutes consider the system leak tight If the pressure los
6. he handle pointed towards the gas supply Is the COC inlet column nut properly plugged Are the test fixture brass fittings tightened and the O rings under them in good condition If these conditions are all true it is possible that there is a gross leak in the system that must be corrected prior to going to step 5 Instructions Instructions Inlet EPC Leak Test Instructions Turn the inlet pressure OFF at the 6890 keypad Turn the 3 Way Valve OFF by turning the valve handle 180 degrees counterclockwise so that the handle on the valve handle is pointed towards the GC Set the inlet pressure to 40 psi on the 6890 keypad Allow about 15 seconds for the pressure to equilibrate The pressure should drop from 25 psi to a pressure above 10 psi usually between 17 and 24 psi Set the inlet pressure to 10 psi on the 6890 keypad Record the inlet pressure at this time and monitor the pressure for 10 minutes on the 6890 display You can use the stopwatch feature of the 6890 GC to monitor the time Press Time and then Enter to start timing then toggle between the time and the pressure reading with the Time and the Front Inlet Back Inlet keys If there is less than 1 0 psi pressure loss in 10 minutes consider the system leak tight If the pressure loss is greater than 1 0 psi in 10 minutes there is a leak that must be found and corrected See Correcting Leaks for Cool On Column inlets in the 6890 Service Manual for he
7. lp 10 When the system is considered leak tight set the inlet pressure to zero disconnect the 3 Way Valve from the system and re connect the gas supply line to the inlet supply fitting Now you may reinstall the column restore the column dimension configuration at the keyboard and set the desired inlet pressure Inlet EPC Leak Test Instructions Split Splitless inlets Be sure that the preparation steps found in the current 6890 manual for Split Splitless inlets are complete before proceeding with these steps with the exception of the installation of the septum purge vent cap This will be replaced by the Inlet EPC Leak Test Fixture provided 1 Install the Inlet EPC 3 Way Valve Leak Test Fixture G1530 80510 as shown in Figure 1 Be sure the O rings are in good condition and that brass knurled fittings are adequately finger tightened Turn the 3 Way Valve to the ON position as pictured in Figure 1 Set the Column Length to zero and the Column Diameter to zero by pressing Config on the 6890 keypad and scroll to Column 1 or Column 2 depending on inlet position Set the inlet Mode to SPLITLESS on the 6890 keypad Set the inlet pressure to 25 psi on the 6890 keypad set the inlet total inlet flow to 60 mL min Allow about 15 seconds for pressure equilibration If pressure cannot be achieved check the following Is the carrier gas source pressure at least 35 psi connected to the proper inlet front or back an
8. s is greater than 0 5 psi in 10 minutes there is a leak that must be found and corrected See Correcting Leaks for Split Splitless inlet in the 6890 Service Manual for help 12 When the system is considered leak tight set the inlet pressure to zero disconnect the 3 Way Valve from the system and re connect the gas supply line to the inlet supply fitting Remove the instrument from Prep Run state by pressing the STOP key on the 6890 keypad Now you may reinstall the column restore the column dimension configuration at the keyboard and set the desired inlet flow and pressure Inlet EPC Leak Test Instructions Purged Packed inlets Be sure that the preparation steps found in the current 6890 manual for Purged Packed inlets are complete before proceeding with these steps with the exception of the installation of the septum purge vent cap This will be replaced by the Inlet EPC Leak Test Fixture provided 1 Install the Inlet EPC 3 Way Valve Leak Test Fixture G1530 80510 as shown in Figure 1 Be sure O rings are in good condition and that brass knurled fittings are adequately finger tightened Turn the 3 Way Valve to the ON position as pictured in Figure 1 The handle on the valve is pointed towards the gas supply when turned ON pictured The handle on the valve is pointed towards the GC when it is turned OFF not pictured 2 Make sure a length and a diameter for a capillary column are entered on the 6890 keypad
Download Pdf Manuals
Related Search
Related Contents
ERASMUS + Programmleitfaden, Version 3 EZPZ IP Kit (Ver. 1.1) User Manual Sprint Nextel OVATION U760 User's Manual Bedienungsanleitung LDX Perfil Lipidico +GLU Garmin GPSMAP 421 Declaration of Conformity Powermate PM0476503.17 Parts list カメラ用無線式 赤外線学習リモコン取り扱い説明書 Copyright © All rights reserved.
Failed to retrieve file