Home
1600XP 8-22kVA Battery Cabinet Manual
Contents
1. 13 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual i TOSHIBA Leading Innovation gt gt gt ii 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt GENERAL SAFETY INSTRUCTIONS Warnings in this manual appear in any of four ways 1 Danger The danger symbol is a lightning bolt mark enclosed in a triangle which precedes the 3 16 inch high letters spelling the word DANGER The danger symbol is used to indicate imminently hazardous situations locations and conditions which if not avoided WILL result in death serious injury and or severe property damage A N DANGER Warning The warning symbol is an exclamation mark in a triangle which precedes the 3 16 inch high letters spelling the word WARNING The warning symbol is used to indicate potentially hazardous situations and conditions which if not avoided COULD result in serious injury or death Severe property damage COULD also occur N WARNING Caution The caution symbol is an exclamation mark enclosed in a triangle which precedes the 3 16 inch high letters spelling the word CAUTION The caution symbol is used to indicate potentially hazardous situations and conditions which if not avoided may result in injury Equipment damage may also occur N CAUTION Attention warnings The attention warning symb
2. 8 4 4 CHARGER CONNECTION tmm 8 5 0 CONNECTION INSTRUCTIONS AND DIAGRAMS 8 10 KVA 9 5 1 BATTERY CONNECTIONS cernere a eee CU ERE Ves ree FERE DE ee 5 2 8 10 KVA ILLUSTRATION 5 3 CONNECTION PROCEDURE LLL deret cope rer wet we rero Peek Ede bv la paw er vue E CE do 9 5 4 CHARGER CONNECTION 55 55 x bx E seas Eu Ru RE uuu asuaka ER E CEN onan dene E F zx RR ce OE ER SEP Fa zx Y EE Cun Eau 9 6 0 PREVENTIVE AND SCHEDULED MAINTENANCE PART REPLACEMENT 10 6 1 PREVENTIVE MAINTENANCE 5 5 rra eroi rera Fo eco rae ue a seas Fs Vor REEF Ee Vea eve Eo ER ER EVER dea ens 10 6 2 PARTS REPLACEMENT icis oi ua Dua vere aes e a eq cv e o RE Rv RE Dh qut v D Dn EB 10 6 3 POWER Se REED N 11 7 0 EMERGENCY POWER OFF EPO wissscccosssoscsosssssstocssoscsosssesssesssesedesscasetecssesedesssesscesssesssesssesstesssesssesseesess 11 7 1 ETE 11 7 2 EPO OPERATION OL 11 8 0 EXTERNAL LAYOUTS DIMENSIONS SHIPPING 5 12 8 1 EXTERNAL LAYOUTS 8 2 DIMENSIONS L RU Eva Ud nn 8 3 SHIPPING WEIGHTS 9 0 1600XP SYSTEM BACKUP RUNTIMIE
3. C recharge the batteries every 3 months Disposal Please contact your state environmental agency for details on disposal of electrical components and packaging in your particular area It is illegal to dump lead acid batteries in landfills or dispose of improperly Please help our Earth by contacting the environmental protection agencies in your area the battery manufacturer or call Toshiba toll free at 877 867 8773 for more information about recycling 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 5 TOSHIBA Leading Innovation gt gt gt 2 0 Precautions 2 1 Installation Precautions 1 Install the unit in a well ventilated location allow at least 10 cm 4 inches all sides for air ventilation and maintenance 2 Install the unit in a stable level and upright position which is free of vibration 3 Install the unit where the ambient temperature is within the correct operating range 4 Do not install the Battery System in a location that is subject to high humidity 5 Do not install the unit at sites that are exposed to direct sunlight 6 Do not install the Battery System in areas which are subject to high levels of contamination by airborne dust metal particles or flammable gases 7 Avoid installation near sources of electrical noise Always make sure that the unit ground is intact to prevent electrical shock and to help reduce electrical noise 8 Do not install where water
4. cccccssssssssssssssssssssssssssssssssssssssssssssssesssssssssssesssssesssssssssssssesees 5 1 1 INSPECTION OF THE NEW BATTERY SYSTEM 5 1 2 STORAGE OF BATTERY EQUIPMENT n nnsssssnssnssssssnssssnsssssssssnssssssssnnsssssssssssssssss 5 1 3 DISPOSA a M 5 2 0 olds ipae E I 6 2 1 INSTALLATION PRECAUTIONS u n odia EE npe Fe Exe Eon Ee E ER MEX EP UE 6 2 2 PRESTART PRECAUTIONS 23 OPERATING PRECAUTIONS 3 0 UPS POWER CONNECTIONS 7 3 1 UPS INPUT m 7 3 2 CONNECTING MULTIPLE BATTERY CABINETS cccccccceccessseececeseceensseececeseaeensseecececeauensseeceeeeeaueneneeeeesetagegeceeceees 7 3 3 BATTERY 8A aec M 7 4 0 CONNECTION INSTRUCTIONS AND DIAGRAMS 14 18 22 KVA 8 4 1 BATTERY CONNECTIONS 2 eset veras ke roseo dX Ro Fea Ca Ryu vv DEO raga RePEc Pea dev ER ERREUR Few rV nin 8 4 2 14 18 22 KVA ILLUSTRATION u aaa asss saa 8 4 3 CONNECTION PROCEDURE RERO NR
5. of batteries should be performed by personnel knowledgeable of batteries and the required precautions Keep unauthorized personnel away from the batteries 2 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt IMPORTANT BATTERY SAFETY INSTRUCTIONS N WARN NG Proper maintenance to the battery system of this unit must be done by a qualified service technician This is essential to the safety and reliability of your UPS system Refer to service manual DANGER The following precautions should be observed when working with batteries Verify that the UPS is off and that the power cord is disconnected from the power source Remove watches rings or other metal objects Use tools with insulated handles to prevent inadvertent shorts Wear rubber gloves and boots Do not lay tools or metal parts on top of batteries Determine if the battery is inadvertently grounded If inadvertently grounded remove source of ground Ire te aH E THE TT EO Ce ke O To TR ET TENTI LET Uds The likelihood of such shock will be reduced if such grounds are removed during installation and maintenance 7 Verify circuit polarities prior to making connections 8 Disconnect charging source and load prior to connecting or disconnecting terminals POON 9 VRLA batteries may emit highly flammable hydrogen gas During charging and operation Do not or spark in the immediate area of
6. or any foreign objects substances may get inside the Battery System 2 2 Prestart Precautions 1 Before connecting the Battery System to the UPS verify that the two are compatible by comparing them to the following chart UPS Model Number Battery Cabinet Model Number Battery Voltage UH3G2L080C61T UH3G2L100C61T UH3G2L140C61T UH31 BC 1825 288VDC UHSG2L180C61T UH3G2L220C61T WARN NG DO NOT attempt to connect if the Model numbers do not match the above chart This will result in damage to the UPS the Battery System or both Call your Toshiba representative if you should have any questions 2 Before connecting the Battery System to the UPS switch the ON OFF switch MCCB2 located on the rear panel of the battery system to the OFF position See Sections 4 amp 5 2 3 Operating Precautions 1 The UPS should not be powered up until the entire operation manual has been reviewed 6 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt 3 0 UPS Power Connections The following illustration shows the wiring connections from the power distribution panel not part of the UPS to the UPS and from the UPS to the battery cabinet This connection diagram is to be used with the UH31 BC 1825 Battery Unit 1600XP UPS 8 22 kVA External Battery Cab UH31 BC 1825 208 VAC Distribution 240 VAC 3 1 UPS Input Voltage If the UPS AC input power is 208 V ra
7. the batteries This includes static electricity from the body 10 Do not attempt to open the batteries in order to add water or sample the specific gravity of the electrolyte The batteries are valve regulated lead acid type and such servicing is not possible without damaging the battery 11 Use proper lifting means when moving batteries and wear all appropriate safety clothing and equipment 12 not dispose of lead acid batteries except through channels in accordance with local state and federal regulations 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 3 TOSHIBA Leading Innovation gt gt gt INSTRUCTIONS IMPORTANTES CONCERNANT LA SECURITE CONSERVER CES INSTRUCTIONS notice content des concernant la s curt ATTENTION Un ees ee un risque de choc lectrique de br lure par transfert d nergie ATTENTION coc LPS utiliser le m me nombre de batteries du mod le Model Capacity Manufacturer Type Quantity UH31 BC 1825 YUASA REW 45 72 ATTENTION p eis est reglement e Consultar les codes 4 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt 1 0 Inspection Storage Disposal 1 1 Inspection of the New Battery System Upon receipt of the Battery System a careful inspection for shipping damage should be made 1 Check the unit for loose broken bent or otherwise damaged parts If damage has occurred dur
8. the battery cabinet through the battery cabinet connection cable between CN14 and CN14A No other battery cabinet connection is needed 7 2 EPO Operation Pressing the EPO will cause the breaker on the battery cabinet and the UPS to switch to the OFF position simultaneously disabling both the battery cabinet and the UPS The DC breaker on the battery cabinet is provided with a shunt trip This device is operated with an applied voltage of 120 Vac supplied from the UPS When the EPO is pressed the UPS applies 120V to the shunt trip causing the breaker to switch to the OFF position 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 11 TOSHIBA Leading Innovation gt gt gt 8 0 External Layouts Dimensions Shipping Weights 8 1 External Layouts E H E E 8 2 Dimensions Model H D 39 1 in 17 5 in 34 6 in DESO Ieee 992 mm 445mm 880 mm 8 3 Shipping Weights Model Pounds Kilograms UH31 BC 1825 780 Ibs 354 kg 12 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt 9 0 1600XP System Backup Runtime The following runtime table gives the approximate combined backup runtimes at different load levels for 1600 UPS models equipped with one and two battery cabinets NOTE These values are approximate and are dependent on many variables including operating environment
9. S Division and any statements contained herein do not create new warranties or modify the existing warranty Any electrical or mechanical modifications to this equipment without prior written consent of Toshiba International Corporation will void all warranties and may void UL CUL listing Unauthorized modifications also can result in personal injury death or destruction of the equipment UNINTERRUPTIBLE POWER SYSTEM BATTERY CABINET SYSTEM If additional information or technical assistance is required call Toshiba s Customer Support Center toll free at 1 877 867 8773 or write to Toshiba International Corporation 13131 W Little York Rd Houston TX 77041 9990 Please complete the following information for your records and keep this manual with the equipment Model Number Serial Number Date of Installation Inspected By 1600XP Series Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt Table of Contents GENERAL SAFETY INSTRUCTIONS 1 IMPORTANT SAFETY INSTRUCTIONS 2 IMPORTANT BATTERY SAFETY INSTRUCTIONS 3 1 0 INSPECTION STORAGE DISPOSAL
10. TOSHIBA Leading Innovation gt gt gt BATTERY CABINET 1600XP SERIES 8 22kVA BATTERY CABINET INSTALLATION AND OPERATION MANUAL SINGLE PHASE 8 10 14 18 22 kVA 288Vdc Part 64024 001 March 2012 TOSHIBA Leading Innovation gt gt gt 1600XP Series Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt 1600XP SERIES 8 22kVA BATTERY CABINET INSTALLATION AND OPERATION MANUAL SINGLE PHASE 8 10 14 18 22 kVA 288 Vdc Part 64024 001 March 2012 0 1600 Series Battery Installation Operation Manual TOSHIBA Leading Innovation gt gt gt IMPORTANT NOTICE The instructions contained in this manual are not intended to cover all of the details or variations in equipment or to provide for every possible contingency to be met in connection with installation operation or maintenance Should further information be desired or particular problems arise which are not covered sufficiently for the purchaser s purposes the matter should be referred to the local Toshiba sales office The contents of this instruction manual shall not become a part of or modify any prior or existing agreement commitment or relationship The sales contract contains the entire obligation of Toshiba International Corporation s UPS Division The warranty contained in the contract between the parties is the sole warranty of Toshiba International Corporation s UP
11. age of the batteries battery temperature and discharge history The load levels are given as a percent of rated load with a 0 7 and 0 85 power factor Table 1 Estimated Runtime of UPS with Battery Cabinet at Various Loads Rated Load 0 7 PF 100 90 80 70 60 50 40 30 20 10 1600XP 8 kVA 50 55 65 70 85 95 120 150 180 gt 300 cc o 1600 10 40 45 50 60 70 80 95 120 180 5900 o i 2 1600XP 14 kVA 35 40 45 55 60 80 90 120 165 gt 300 no w 1600 18 kVA 25 30 35 40 50 60 70 95 135 gt 300 m 1600XP 22 kVA 20 24 28 35 40 50 60 80 110 240 1600XP 8 kVA 90 95 105 120 135 165 180 gt 300 gt 300 gt 300 1600XP 10 kVA 70 80 90 95 110 135 165 240 gt 300 gt 300 1600XP 14 kVA 60 65 75 85 95 110 135 180 gt 300 gt 300 1600XP 18 kVA 45 50 60 70 75 90 110 150 180 gt 300 UPS plus Two Battery Cabinets 1600XP 22 kVA 40 45 50 55 65 75 90 120 165 gt 300 Rated Load 0 85 PF 10096 90 80 70 60 50 40 30 20 1096 1600XP 8 kVA 44 48 53 60 70 82 105 120 180 gt 300 o cc o a 1600XP 10 kVA 35 40 44 50 57 70 82 105 150 gt 300 o i 2 1600XP 14 kVA 30 35 40 45 53 63 78 98 150 gt 300 N s 1600 18 kVA 21 24 28 35 42 50 60 82 112 240 m 1600XP 22 kVA 16 18 21 26 32 42 51 65 98 165 1600XP 8 kVA 72 82 90 105 120 135 165 240 g
12. ce Part Replacement 6 1 Preventive Maintenance Toshiba s 1600XP Series of UPS battery cabinets have been designed to provide years of trouble free operation requiring a minimum of preventive maintenance The best preventive measure that the battery cabinet user can take is to keep the area around the unit particularly the air inlet vents clean and free of moisture and dust accumulations If the atmosphere of the installation site is very dusty use a vacuum cleaner to periodically remove dust accumulations from the air inlet vents Schedule authorized service centers to perform internal parts inspections annually CAUTION Before performing any maintenance the technician should become familiar with and follow the important safety instructions on pages 1 4 Proper maintenance of the battery system of this unit by factory authorized WARN I NG personnel is essential to the safety and reliability of your battery cabinet system Refer to service manual 6 22 Parts Replacement The following list shows intervals for periodic maintenance and replacement of certain UPS parts Batteries VRLA batteries are maintenance free with respect to electrolyte only The charging voltage temperature performance and connection resistance must be checked periodically Necessary corrective actions must be made in order to assure safe reliable power is supplied by the battery cabinet Charging voltage storage operating temperature charging cycles and conn
13. ection resistance all affect battery life The recommended battery replacement interval is 3 to 5 years All of the batteries must be replaced at the same time Monthly Maintenance A Visual Checks 1 Leakage 2 Corrosion on positive terminal B Check battery temperature at the negative terminal C Measure and record the system float charging voltage D Measure and record the individual unit s battery tray voltage Semi Annual maintenance A Repeat the monthly checks B Perform a 10 second high rate e g 100 amp load test on the individual batteries C Re torque all inter battery connecting hardware if applicable D Perform inter battery connector resistance checks Component Function Rating Part No FU1 FU2 Control Power Fuses 500 V 10A 00649 Battery Tray Fuse Internal Battery tray Fuse 500 V 40A 00637 Battery Pack Replaceable Battery Pack 51896 Field Service replaceable parts only 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt 63 Power Cables The three battery cabinet connector cables battery positive battery negative and battery charger are each equipped with individually keyed Anderson connectors to prevent cross connecting the battery cabinet and UPS circuitry 7 0 Emergency Power Off EPO 7 1 EPO Cabling The Battery Cabinet does not have an EPO The EPO on the UPS connects to
14. ing shipment keep all original crating and packing materials for return to the shipping agent The equipment warranty will not apply to units which are damaged during shipment 2 Check to see that the rated capacity and the model number specified on the nameplate conform to the order specifications 1 2 Storage of Battery Equipment 1 3 If the Battery System is to be subjected to long or short term storage the following guidelines should be used Avoid 1 Storage in sites subject to extreme changes in temperature or high humidity 2 Storage in sites subject to exposure of high levels of dust or metal particles 3 Storage on inclined floor surfaces or in sites subject to excessive vibration Before storing 1 Charge the system s batteries 2 Place the Battery System s input switch MCCB C in the OFF position Storing 1 Store within a temperature range of 4 to 104 F 20 to 40 C 2 For best results store the Battery System in the original shipping container and place on a wood or metal pallet 3 The optimum storage temperature is 70 F 21 C Higher ambient temperatures cause UPS batteries to need recharging more frequently 4 If stored in an ambient temperature under 68 F 20 C recharge the batteries every 9 months 5 If stored in an ambient temperature of 68 to 86 F 20 to 30 C recharge the batteries every 6 months 6 If stored in an ambient temperature of 86 to 104 F 30 to 40
15. ld be operated is 104 F 40 C The nominal battery voltage for the battery cabinet is as follows Model Voltage UH31 BC 1825 288 VDC Battery Pack Information Battery Packs Designed for battery acid leakage containment with 6 batteries per pack Battery Pack Size HxWxD max 5 in 127 mm x 7 3 in 185 mm x 18 2 in 462 mm Battery Pack Quantity 12 Battery Manufacturer Yuasa Battery Type REW 45 Toshiba Part Number for 51896 Battery Pack CAUTION Misuse of this equipment could result in human injury and equipment damage In no event will Toshiba Corporation be responsible or liable for either indirect or consequential damage or injury that may result from the misuse of this equipment CAUTION Do not dispose of the batteries in a fire The batteries may explode gt gt gt CAUTION Do not open or mutilate the batteries Released electrolyte is harmful to the eyes and skin and could also be toxic WARN NG This unit contains sealed lead acid batteries Lack of preventative maintenance could result in batteries exploding and emitting gasses and or flame An authorized trained technician must perform annual preventative maintenance WARN NG Failure to replace a battery before it becomes exhausted may cause the case to crack possibly releasing electrolytes from inside the battery and resulting in secondary faults such as odor smoke and fire WARN NG Installation and servicing
16. lustration The following diagram shows the rear view of an 8 10 kVA UPS and a battery cabinet NOTE Use only compatible cabinets See page 6 j O E F 1600XP 8 10 kVA UPS BATTERY CABINET 5 3 Connection Procedure 1 Ensure all power is locked and tagged out 2 Remove the battery connector cover mounted on the UPS back panel 3 Plug the DC Connectors of the Battery unit into the DC Connector socket on the UPS unit see section 3 0 UPS Power Connections 5 4 Charger Connection Battery cabinet model UH31 BC 1825 requires a 240 Vac connection between the UPS and battery cabinet for battery charging This connection is made from CN14A of the battery cabinet to CN14 of the UPS and CN14A of battery cabinet 2 to CN24 of battery cabinet 1 if paralleling cabinets NOTE Without this connection the battery cabinet will not be able to charge its batteries 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 9 TOSHIBA Leading Innovation gt gt gt 6 0 Preventive and Scheduled Maintenan
17. ol is an exclamation mark enclosed in a triangle which precedes the 3 16 inch high letters spelling the word ATTENTION The Attention warning symbol is used to indicate situations and conditions that can cause operator injury and or equipment damage N ATTENTION Other warning symbols may appear along with the Danger and Caution symbol and are used to specify special hazards These warnings describe particular areas where special care and or procedures are required in order to prevent serious injury and possible death 1 Electrical warnings The electrical warning symbol is a lighting bolt mark enclosed in a triangle The Electrical warning symbol is used to indicate high voltage locations and conditions that may cause serious injury or death if the proper precautions are not observed Explosion warnings The explosion warning symbol is an explosion mark enclosed in a triangle The Explosion warning symbol is used to indicate locations and conditions where molten exploding parts may cause serious injury or death if the proper precautions are not observed 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 1 TOSHIBA Leading Innovation gt gt gt IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and maintenance of the Battery System model UH31 BC 1825 The maximum ambient temperature in which a Battery System shou
18. t 42 14 18 22 kVA Illustration The following diagram shows the rear view of a 14 18 22 kVA UPS and an 18 kVA battery cabinet NOTE Use only compatible cabinets See page 6 TULLIA 000000010700001070101 1007 LO s 1600XP 14 18 22 kVA UPS BATTERY CABINET 4 3 Connection Procedure 1 Ensure all power is locked and tagged out 2 Remove the battery connector cover mounted on the UPS back panel 3 Plug the DC Connectors of the battery cabinet into the DC Connector socket on the UPS unit see section 3 0 UPS Power Connections 4 4 Charger Connection The UPS internal multi tap transformer provides 240Vac to the UH31 BC 1825 Battery Cabinet battery charging circuit This connection is made from CN14A of the battery cabinet to CN14 of the UPS and CN14A of battery cabinet 2 to CN24 of battery cabinet 1 if paralleling two cabinets NOTE Without this connection the battery cabinet will not be able to charge its batteries 8 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA Leading Innovation gt gt gt 5 0 Connection Instructions and Diagrams 8 10 kVA 5 1 Battery Connections The following illustration shows the wiring connections between the UPS and the Battery Unit DAN G E R Contacts are not rated with interrupting capacity Ensure the MCCB switch on the rear panel of the Battery Unit is set to the OFF position before connecting the UPS to the battery cabinet 5 2 8 10 kVA Il
19. t 300 gt 300 1600XP 10 kVA 60 65 72 86 98 112 135 180 gt 300 gt 300 1600XP 14 kVA 51 55 63 72 82 98 120 150 240 gt 300 1600XP 18 kVA 40 45 50 55 65 78 90 120 165 gt 300 UPS plus Two Battery Cabinets 1600XP 22 kVA 30 36 42 46 53 63 82 105 150 gt 300 Estimated Runtime Exceeds 300 minutes 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 13 TOSHIBA Leading Innovation gt gt gt 14 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual TOSHIBA TOSHIBA INTERNATIONAL CORPORATION INDUSTRIAL DIVISION 13131 West Little York Rd Houston TX 77041 Tel 713 466 0277 Fax 713 466 8773 US 877 867 8773 Canada 800 872 2192 Mexico 01 800 527 1204 www toshiba com ind Printed in the U S A
20. ted connect a jumper wire between terminals 11 and 12 on the UPS terminal block DO NOT jumper terminal 13 to 11 or 12 The UPS ships from the factory with the jumper in the 208 V position If the UPS AC input power is 240 V rated connect a jumper wire between terminals 12 and 13 on the UPS terminal block DO NOT jumper terminal 11 to 12 or 13 3 2 Connecting Multiple Battery Cabinets Up to two battery cabinets may be connected in parallel to the UPS To connect two battery cabinets to the UPS 1 Connect the first battery cabinet to the UPS as shown in the illustration above 2 Connect cabinet 2 CN12A to cabinet 1 CN22 3 Connect cabinet 2 CN13A to cabinet 1 CN23 4 Connect cabinet 2 CN14A to cabinet 1 CN24 3 3 Battery Cabinet Cabling The battery cabinets ship with a set of six foot long cables Contact Toshiba Customer Support at 1 877 867 8773 if longer cables are required for your application or if additional cables or connectors are required 1600XP 8 22kVA Battery Cabinet Installation and Operation Manual 7 TOSHIBA Leading Innovation gt gt gt 4 0 Connection Instructions and Diagrams 14 18 22 kVA 4 4 Battery Connections The following illustration shows the wiring connections between the UPS and the battery cabinet 2 DAN G E R Contacts are not rated with interrupting capacity Ensure the MCCB switch on the rear panel of the Battery Unit is set to the OFF position before connecting the UPS to the battery cabine
Download Pdf Manuals
Related Search
Related Contents
Atlantis Land I-SEE H191 User's Manual SKEMA 5.indd Visa USA Presentation Template and User Guide VT SMART 45 - M0S11271 - 1P07 DRAFT1:FEV 1000-950 Eglo 85339A Installation Guide Copyright © All rights reserved.
Failed to retrieve file