Home
Technical Specification for High Output Tamping cum
Contents
1. 7 What are lateral clearance of axle box horn wheel flange rail and other locations for the negotiability of the vehicle on curve and turn out enclose Vogels Diagram for negotiability on maximum degree of curve and turn out permitted on Indian Railways of new and worn out wheel 8 Wheel and axle assembly drawings 9 Calculation for flange force 10 Technical specifications of Vehicle supplied 11 4 Calculation of natural frequency 12 Calculation of spring characteristics and critical speed of the vehicle 13 Simulation result showing ride index lateral force and acceleration results 14 A certificate regarding the speed of the vehicle for which it has been designed Spec of HOT with stabilizer 2014 Page 29 of 30 ii ANNEXURE IX The speed potential of the machine offered by the firm should be established based upon oscillation trials conducted in India The tests will be conducted at speed usually 1096 higher than the maximum speed potential indicated by the firm for the machine under consideration and the following criteria satisfy for the same For conducting the tests a section of mainline track will be selected over which there is no temporary speed restrictions and which is considered by the Railway as being in a generally run down condition for mainline standards but without speed restrictions The vehicle will be tested generally for new and worn clearance conditions and where relevant for
2. Wve 39nv99291 XVW PEREN NIW QZII 4 NIW SOE XVW GEZE XVW S92v ozs SNOISNSAWIG ONTIAOW WOWIXVA JONVD ww9797 ec ly ia dl ON AVeaDVIG Page 19 of 30 Spec of HOT with stabilizer 2014 Annexure Il Machine details required for simulation of machine on NUCARS or similar Track vehicle simulation software SL NI Component s Name Parameters required C G of component in x y z direction from rail level in mm Referenced point 1 axle Mass in Kg and Mass moment of inertias in Kg m 2 of component in three dimension space about their C G X Y Z Mass Ixx lyy izz Super structure with vehicle frame machine structure kept on secondary suspension of front and rear bogie Front Bogie frame including brake rigging Rear Bogie frame including brake rigging Transmission system device hydraulic Mechanical or electrical traction motors Wheel axle set including axle boxes which constitute the unsprung mass Mass of Items included in unsprung mass partially or fully along with their Total unsprung mass Spec of HOT with stabilizer 2014 Page 20 of 30 name per axle 1 2 3 4 5 6 in tonnes Frontbodie Bearbodlo Machine Full weight of vehicle 9 9 frame front bogie rear bogie vehicle car body or full assembly full assembly
3. The tamping below the sleepers after the track geometry correction shall be based on vibratory squeeze principle to achieve a durable compaction The ballast depth ranging from 300 mm to 350 mm shall be effectively compacted having zone of influence of tamping of approx 150mm layer below the bottom of sleepers The maximum depth of concrete sleeper is equal to 210mm There should be provision for step less adjustment of the depth of tamping tools to suit different types of sleepers Amplitude of vibration vibration pressure vibration frequency squeezing pressure squeezing time and tamping depth of the tamping tools in tamping unit and vibration frequency vertical load of stabilizing unit should be such that durable compaction under the sleeper is achieved The vibration frequency and vertical load of stabilizing unit should be such that controlled settlement lasting consolidation and substantial increase in post tamping lateral ballast resistance of sleeper is achieved These parameters o achieve a durable compaction shall be specified by the tenderer Details of all the above parameters will be submitted in the offer The machine should be capable of giving the output as stipulated in Clause 3 1 with the following tamping parameters Spec of HOT with stabilizer 2014 Page 5 of 30 3 7 3 8 3 9 3 10 3 11 3 12 a Squeezing time of 0 6 sec or more b Squeezing pressure of 120 kg cm or more c Tamping d
4. 2 10 2 12 2 13 3 0 3 1 It shall be capable of negotiating curves up to 10 degree curvature 175m radius super elevation up to 185 mm and gradients up to 3 in travel mode The supplier shall specify the minimum attainable speed under the above limiting conditions which in any case shall not be less than 40 Kmph It shall be capable of continuous operation during the varying atmospheric and climatic conditions occurring throughout the year in India The range of climatic conditions is as follows Ambient temperature 0 to 55 C Altitude Sea level to 1750m above mean sea level Humidity 40 to 10096 Maximum rail temperature 70 G During transfer from one station to another it shall be capable of travelling on its own at a speed of 80 kmph and at a speed of 100 kmph when hauled in a train formation Since the machine is likely to cover long distances on its own power the travel drive system should be robust to sustain these requirements during the life of the machine The machine should be capable of hauling an 8 wheeler camping coach at a maximum speed of not less than 50kmph It shall be capable of working without requiring power block in electrified sections 25 KV AG power is used for traction through an overhead wire at 5 5 m above rail level On bridges and in tunnels the height is restricted to 4 8m The machine or its any part shall not infringe the adjoining track as per Indian Railways Schedule of
5. Total weight of components in tonnes full structure super structure Suspension stiffness details in Kg mm Primary suspension element stiffness per axle box between bogie and axle box Secondary suspension element stiffness per side between bogie and machine frame Vertical stiff Lateral stiff Longitudinal Vertical stiff Lateral stiff Longitudinal stiff Damping force details If hydraulic damper used give there rating force per meter second 10 Clearance in mm or radian provided for motion between bogie frame and machine frame for relative motion motion stopper Vertical direction Lateral direction direction Longitudinal Rotation abot vertical axis Rotation about lateral axis Rotation about longitudinal axis Spec of HOT with stabilizer 2014 Page 21 of 30 11 Dimension of location suspension elements Detail of location of suspension springs and dampers and shock absorbers with support drawing Detail of location of suspension springs and dampers and shock absorbers with support drawing Details of centre pivot 12 arrangement working Provide detail arrangement drawing and description location serodios and Concerning with general arrangement of vehicle bogie general arrangement suspension arrangement 13 9 details suspension clearances drawing detail written description of configurat
6. along with his offer submit the list of tools to be supplied along with Spec of HOT with stabilizer 2014 Page 13 of 30 14 2 14 3 14 4 14 5 14 6 14 7 15 0 each machine The list of tools to be provided shall include all tools necessary for maintenance and repair of the entire machine including specialized equipment All special tools shall be listed and catalogued illustrating the method of application The list can be modified to suit the purchaser s requirement while examining the offer Detailed operating maintenance and service manual shall be specifically prepared in English language and four copies of each of the same shall be supplied with each machine The supplier shall also supply circuit diagrams of electrical hydraulic pneumatic and electronic circuits used on the machine Trouble shooting diagram table shall also be supplied In addition the supplier shall provide dimension drawings with material description of items like rubber seals washers springs bushes metallic pins etc Main features such as type rpm amp discharge etc of items like hydraulic pumps motors and such other bought out components assemblies shall be furnished by the tenderer These shall be specially prepared in English language and four copies of these shall be supplied with each machine While offering the machine for first inspection the supplier shall submit one copy of complete technical literature in English language includ
7. bogie and axle Height of centre of gravity from rail level Height of floor from rail level Type of coupler provided Indian Railways Standard Coupling Buffer Any infringement to the moving dimensions Sketch provided in the Indian Railways Standard Schedule of Dimensions Chapter IV A Spec of HOT with stabilizer 2014 Page 28 of 30 Annexure VIII Following information as detailed below is also required along with the information required for processing the case for issue of provisional speed certificate for new vehicles S No Item 1 a Brake System details b Gross Braking Ratio 2 Brake rigging arrangement drawing and calculation of braking force 3 Maximum Braking Effort at start and at the speed of operation a at working drive at start at operation speed i b at transfer drive at start at maximum speed 4 Characteristics of springs used in suspension indicating free height working height dynamic range stiffness and locations etc 5 Characteristics of the dampers if used and over all damping factors and locations of dampers Calculation of the following frequency of the vehicle to be attached Bouncing ii Pitching iii Rolling Wave length of free axle and bogie 6 Write up and salient design calculation on suspension system type of laminated bearing springs and double link suspension suspension whether it is of coil suspension with or without dampers and
8. lube oil pressure shall be direct reading type mounted on the engine backed up by electrical mechanical gauges in the operators cabin showing the absolute readings along with safe limits suitably coloured There shall be audiovisual warning safety mechanism to the operators in case of any of these parameters exceeding the safe limit and engine shut down circuit in case of operator s failure to respond Suitable and rugged mechanism should be provided to start the prime mover at no load and gradual loading after the start of the prime mover Spec of HOT with stabilizer 2014 Page 9 of 30 4 7 5 0 5 1 5 2 5 3 5 4 5 5 5 6 5 7 5 8 5 9 6 0 The engine power take off shall be coupled to the main gearbox through a flexible coupling cardon shaft propeller shaft The engine shall be mounted on suitable Anti Vibration Mountings Drive Mechanism The machine should be provided with an efficient traction drive system for traction during the operation The machine s driving system shall be through hydro dynamically coupled power transmission arrangement capable of achieving full speeds in travel mode in both the directions However the system should be so designed that all the driving wheels work in synchronization and there is no slippage skidding of the wheels during the work drive The driving mechanism in working mode shall be adequately designed to handle the acceleration and braking forces at each t
9. reduced and time lost in entry exit to and from yard to block section is reduced A combined machine improves safety in movement vis vis two machines following each other Track possession is utilized optimally Reduces number of operating staff and also saves on fuel consumption thus lowering operational cost This specification is laid down for a robust and sturdy high output track lining lifting levelling and tamping cum stabilizing machine hereinafter called the machine which should be suitable for track geometry correction at maintenance and renewal construction sites The machine shall be capable of improving the track geometry up to mainline high speed standards and continuous tamping and stabilizing operation for high and durable output The technical specifications have been drafted to reflect the performance and quality requirements of the machine in a neutral manner without bias to any specific manufacturer Bidders are requested to carefully study the Spec of HOT with stabilizer 2014 Page 1 of 30 2 0 2 1 2 2 2 3 specification and ensure that their machines fully comply therewith If a bidder feels that his machine can substantially meet the performance and quality requirements but does not fully satisfy a particular system specification he should immediately seek clarification from the purchaser prior to submission of bids as to whether such deviation is substantive or not The Bidder shall mention t
10. 1 The machine shall be self propelled bogie type vehicle The profile of the machine longitudinally and in cross section during transfer as self propelled vehicle or towed in train formation shall be within the Indian Railways schedule of Dimensions 1676mm Gauge BG revised 2004 with the latest corrigendum and up to date correction slips issued The minimum and maximum moving dimensions are enclosed at Annexure l The tenderer shall submit the sketches of machine in plan and shall give calculation for moving dimension on 10 curves to show the extent of lateral shift at the ends centre and any other relevant cross sections It shall be ensured that the machine does not cause infringement while moving on a 10 curve Spec of HOT with stabilizer 2014 Page 2 of 30 2 4 2 9 2 6 2 7 Adequate clearance shall be allowed so that no component infringes the minimum clearance of 102 mm from rail level while travelling Axle load shall be lesser than 20 32t with minimum axle spacing of 1 83m Load per metre shall not exceed 7 67t Axle loads upto 22 82t and lower axle spacing may be permitted provided the load combinations do not cause excessive stresses in the track and bridges of IR Stresses in the track and bridges shall be calculated by IR RDSO based on design data submitted by the firm as per Annexure ll and decision of IR RDSO shall be final in this regards It shall have a minimum wheel diameter of 914mm new wheel profile Ho
11. Dimensions 1676mm gauge BG Revised 2004 with the latest corrigendum and up to date correction slips issued while opening and closing the work During working also it shall not infringe the adjoining track and it shall be possible to permit trains at full speed on that track Minimum spacing of track is 4 265 m centre to centre It shall be possible to drive the machine in both directions at the same speed Driving cabin for the purpose should at both end of the machine Working Mechanism The machine shall consist of a tamping portion and stabilization unit The stabilizing unit can be in the form of trailer linked with the tamping portion of machine by suitable coupling The stabilizing unit shall be operated by same operator who is operating the tamping unit No separate operator for stabilizing unit shall be required Stabilizing unit shall be so synchronized with the tamping unit that stabilization can be made to automatically start from the first sleeper tamped and stop at the last sleeper tamped The Spec of HOT with stabilizer 2014 Page 4 of 30 3 2 3 3 3 4 3 5 3 6 machine should be capable of performing both function of tamping and stabilizing independently also At the parameters specified against clause 3 6 for achieving durable compaction the machine shall be capable of carrying out automatic lifting levelling tamping lining along with simultaneous stabilization of the tamped track at the peak rate of 3500 sle
12. R DESPATCH OF MACHINES STRIKE OUT WHICHEVER NOT APPLICABLE This is to certify that have inspected the machine type bearing SI No from date to at Place for its conformity non conformity with respect to the laid down Technical Specifications in contract Agreement No dated between President of India through Director Track Machines and M s Name of Supplier The detailed Inspection Note regarding its conformity non conformity to the laid specifications is enclosed along with as Annexure A Itis observed that strike out whichever is not applicable The Machine conforms to all the laid down specifications The machine conforms to all the laid down specifications except those at SI No The above deviations are minor major affecting not affecting the performance of the equipment in substantial way The following T and P manuals drawings are to be supplied alongwith the machine Based on the above the Machine is certified not certified to be conforming to the specifications The machine is approved not approved for despatch to Consignee Indian Railway SIGNATURE AND DATE For M s INSPECTING OFFICIAL NAME AND DESIGNATION for and on Behalf of President of india Spec of HOT with stabilizer 2014 Page 26 of 30 Annexure VII Particulars Required in Respect of the Rolling Stock Under Consideration A diagram showing elevation salient dimensions a Wheel spacing Wheel diameter bogie centres and a
13. Technical Specification for High Output Tamping cum Stabilizing Machine capable 1 0 a b c d 1 2 of 3500 sleepers per hour peak output for B G 1676mm Specification No TM HM HOT STAB Spc 01 Rev 01 of 2014 General Due to increasing traffic on Indian Railways the availability of time period Traffic Block for working of track maintenance machines is reducing There is a need for high output machines with continuous operation so that even smaller traffic blocks can be effectively utilized for maintenance of track Conventional tamping machines are used for levelling tamping and lining work of track These maintenance operations result in reduction in lateral stability of track thus rendering track unsuitable for high speeds immediately after maintenance particularly if the temperature are high With the increased quantum of traffic moving at high speeds it is very essential to restore the stability of track as early as possible Controlled consolidation of track by stabilization following the tamping would also lead to longer retention of maintenance work Presently separate stabilizing machine is used behind the tamping machines for the purpose Need was felt to have a machine which would combine both these activities and simultaneously execute both the jobs in the same sequence Some of the advantage expected of having combined machine for the purpose instead of two separate machine are Operation of shunting is
14. along with description part number quantity cost whether imported or indigenous The expected life of components shall be advised along with their condemning limits The supplier shall be responsible for the subsequent availability of spare parts to ensure trouble free service for the life of the machine 15 years For indigenous parts and brought out components and assemblies the relevant technical details shall be supplied while offering the first machine for inspection Maker s test certificates Copies of marker s certificate guaranteeing the performance of the machines should be supplied in duplicate along with the delivery of each machine Operators The number of operators and allied staff for working of the machine under normal working condition emay be indicated specifying their duties and minimum qualifications Service Engineers The contractor shall provide at his own expense the services of competent engineers during the warrantee period for warrantee related issues The service engineers shall be available for the commissioning of the machine for regular service and for training to the operating repairing and maintenance staff of the machine The engineers shall also advise the Railways on appropriate maintenance testing operating repair and staff training facilities that are necessary for the efficient performance of the machines During the warrantee period of the machine the supplier must ensure trouble
15. amping cycle A suitable synchronization circuit to control the synchronization of lifting lining tamping process with the machine drive braking system in working mode shall be provided to prevent any damage to the machine systems on account of non synchronisation Suitable differential systems may be provided between coupled wheels on the same bogie Suitable flow divider throttling arrangement may be provided to equalize the tractive effort amongst different bogies Adequate gauges shall be provided to indicate the power overstressing of any traction bogie orits components The tenderer shall provide the necessary technical details including circuit diagrams to confirm the above requirements Adequate gauges and solenoid valves shall be provided near linkage assembly for indication flow control and carrying out necessary adjustment in the field To the extent possible hydraulic and pneumatic component assembly should be fixed at suitable location preferably on the side frame of the machine so as to avoid the need of going on top of the machine for day today maintenance schedules The pneumatic circuit should be provided with air dryer for the smooth working of pneumatic components Cooling System Spec of HOT with stabilizer 2014 Page 10 of 30 6 1 6 2 7 0 7 1 7 2 7 3 7 4 7 5 8 0 8 1 The cooling system shall be efficient and designed for a maximum ambient temperature of 55 C Suppl
16. cation the technical details as per Annexure VII and VIII shall be Spec of HOT with stabilizer 2014 Page 16 of 30 c 23 0 23 1 23 2 23 3 23 4 23 5 23 6 supplied for processing of provisional speed certificate for the machine so that it can be permitted to move on track on case to case basis more technical details other than mentioned in Annexure VII and VIII can also be asked for issue of provisional speed certificate for the machine The firm will also submit the technical details as per performa placed at Annexure ll for NUCARS vehicle dynamic simulation New supplier whose models are new The technical details shall be supplied as detailed in para b above Acceptance Test In addition to verification of the various items of specifications covered earlier the purchasers nominee shall carry out the following tests in India at the purchaser s premises at the time of commissioning of the machine The pre commissioning tests shall be completed and the machine shall be commissioned within 90 days of its arrival at the premises of the final consignee The Dimensional check of loading gauge i e maximum moving dimensions buffer heights clearances length of machine bogie distance etc Testing for negotiability 10 curve and1 in 81 2 turnouts Running speed tests on the Indian Railway main line track on the first machine in accordance with procedure outlined in annexure IX with the machine running upto spe
17. ck centre at a distance of 305 metres away on a clear dark night at each end and with two front and rear parking lights which can be switched to red or white according to the direction of the travel Powerful swivelling flood light shall also be provided to illuminate the working area sufficiently bright for efficient working during night The amber colour flasher Spec of HOT with stabilizer 2014 Page 12 of 30 12 0 13 0 13 1 13 2 13 3 13 4 13 5 14 0 14 1 lights shall be provided on the both ends of the machine to give indication to the train arriving on other line about any impending danger Chassis and under frame The chassis shall be fabricated from standard welded steel sections and of steel sheets so as to permit transportation of the machine in train formation without endangering safety of the train The under frame shall be constructed with rolled steel section and or plates and shall be designed to withstand a horizontal squeeze load of 102t at buffers i e 51t at each buffing point The under frame shall be sufficiently robust for safe travel of the machine in train formation and not necessarily as the last vehicle Cabins The machine shall be equipped with fully enclosed air conditioned and pressurized cabins with safety glass window at both ends In view of the high ambient temperature prevailing in India special attention should be paid to free circulation of air and ventilation in the driver s cab
18. d by the manufacturer in the offer The stabilizing unit shall be equipped with a frequency modulation measuring unit for optimum regulation of frequency The machine shall be equipped with display units for monitoring vibration frequency and degree of settlement on both rails To avoid damages on the rail surface by excess friction and force by the rollers and to achieve a force free resettlement of the ballast grains only lateral vibrations shall be permitted and those lateral vibrations by stabilizing unit shall be created without any vertical impact on ballast The tamping tool holding arrangement in tamping arm of tamping bank should be cylindrical compressible type with bolting and dowel arrangement Spec of HOT with stabilizer 2014 Page 8 of 30 3 29 4 0 4 1 4 2 4 3 4 4 4 5 4 6 such that no hammering is normally required for fixing and removing the tamping tools The machine shall be warranted for 1200 working hours or 500000 tamping insertions with stabilization or 18 months from the date of commissioning and proving test of equipment or 24 months after delivery at ultimate destination in India which ever shall be earlier Working hours for this purpose will be traffic block time during which machine is deployed for tamping work Diesel Engine The machine shall be powered by diesel engines preferably indigenous with proven record of service in tropical countries with wide service network in India Robus
19. d track and lateral force and derailment coefficient of accelerations as the case may be Spec of HOT with stabilizer 2014 Page 30 of 30
20. ed 10 higher than the maximum speed mentioned in Para 2 10 above Construction and engineering of the machine and its ability to perform all the functions as laid down in the specifications above Actual output and performance test to be conducted on the first machine These tests shall be conducted under field conditions on Indian Railway An electrified section shall be chosen for this test The general conditions of tests and test parameters shall be as follows a Machine crew shall be either trained personnel of Indian Railways or the staff of the supplier Dry weather ambient temperature between 0 C to 55 C Plain Track or curve of radius not less than 1000 m Gradients up to 1 200 Rails and sleepers in good conditions and properly fastened Concrete wooden steel sleepers Clean ballast cushion of minimum 100 mm in sufficient quantity below the bottom of the sleepers and generally not cemented LWR track 2 o oo0o0c0 Spec of HOT with stabilizer 2014 Page 17 of 30 i Regular sleeper spacing of 60 65 cm with a tolerance of 3 cm on straight track j Formation good k General lift during working up to 20mm Maximum slew during working up to 10 mm m Amount of lowering up to 20 mm by stabilizing unit maintaining track parameters within permissible range n Lifting of track in non working mode of 150 mm in one go to be conducted at manufacturer s premise siding o Slewing of track in non working
21. el track shall not be more than 600m Design calculations for the braking effort and EBD at the maximum design speed of the machine on level track amp at falling grade of 1 in 33 should be provided by the supplier Brake design details are to be submitted as per annexure V Mechanical brakes shall also be provided in addition for use as parking brakes Clearly visible brake lights shall be provided at both the ends of the machine which will be automatically operated when brake is applied and switched off when brake is released This will be to alert the operator of machine following this machine when the machines are working in groups Horn Hooters and safety switches The machine shall be provided with electric pneumatic horns facing outwards at each end of the machine at suitable locations for use during travelling and to warn the workmen of any impending danger at the work spot The horns shall be distinctly audible from a distance of at least 400 m from the machine Spec of HOT with stabilizer 2014 Page 11 of 30 8 2 8 3 8 4 8 5 9 0 9 1 10 0 These horns shall be operated by means of push buttons provided in the cabins Adequate numbers of safety stop switches should be provided all around so that in case of any danger to worker during working the working can be stopped immediately Safety equipments like jacks pullers and other such equipments specific to the machine for restoring failed units of the mach
22. epers or more per hour over a period of not less than 10 minutes and an average of not less than 2700 sleepers in an effective hour of working on all type of track structures in Indian Railways with uniform sleeper density which may vary from 55 to 75cm The time shall be counted from start to finish of tamping work at work place Stoppage of work not attributable to machine shall be discounted The setting up time and winding uptime shall be measured and the total time taken by the two operations of setting up and winding up of the machine together shall not exceed 10 minutes The setting up time shall be counted from the time machine arrives at site to the time work is started The winding up time will be counted from the time the work is stopped to the time machines starts moving away from the work site The tenderer shall furnish the full details of the working cycle of the machine its timings and other operational details The machine shall be provided with automatic tamping equipment Separate tamping units have to be provided for each rail Each unit comprising of tamping tools shall be operated hydraulically The necessary work units may shall be positioned on an under frame separate from the main frame capable of cyclic movement from sleeper to sleeper independent of the main frame to facilitate continuous working for high output so that the operator does not get undue fatigue due to acceleration pull braking jolt in each tamping cycle
23. epth upper edge of tool blade should be 10 12mm below the bottom of the sleeper The tamping tools should come to rest automatically after they encounter the resistance from the ballast to pre selected squeezing pressure and hold the squeezing pressure for pre set time It shall be possible to vary the squeezing pressure squeezing time to suit varying track structure and ballast conditions The lifting system shall be such that the track can be lifted without bearing on the ballast The machine frame and the lifting system shall be strong enough to bear the track lifting forces for all types of track structures for 150 mm lifts in one go The free rail length between the two bogies of the main machine shall be long enough to permit the track lifting up to 150 mm in one go having 60 Kg rails on concrete sleepers without excessive stresses in the rail or on the lifting mechanism The lifting system should hold the rail continuously rather than releasing and re lifting the rail at every tamping cycle However the lifting lining system and actual tamping should be so synchronized that the track is stiffly held in position and there is no movement in the track when the tamping tool is inserted for tamping This is required to ensure that the lift and slew are not altered during the process while track is being tamped The machine shall be provided with automatic levelling equipment which will permit correct levelling of the track including pr
24. free availability of the machine in good working condition for at least 90 96 of the time and accordingly they must ensure availability of spares amp services of competent service engineers at prompt disposal of user railways Optional equipment Tenderer is expected to quote for optional equipment separately for each item giving the advantages functions of such optional equipment Tenderer shall also indicate whether such equipments are already in use on machines elsewhere indicating the user Railway system Spec of HOT with stabilizer 2014 Page 15 of 30 20 0 20 1 21 0 22 0 a b Inspection of the Machine While inspecting the machine before dispatch from the supplier s premises the inspecting officer shall verify the conformity of the machine with respect to individual specification as above The machine s conformity non conformity with respect to each item shall be jointly recorded before issue of the inspection certificate and approval for dispatch of the machine as per Annexure V enclosed Guarantee In addition to the special conditions of contract dealing with warranty the following will apply Should any design modification be made in any part of the equipment offered the period of 24 months would commence from the date of the modified part is commissioned in service for the purpose of that part and those parts which may get damaged due to defects in the new replaced part The cost of such modification
25. he deviations if any in the statement of deviation from the specifications giving the details how the functional requirements are going to be met with The bidder shall specify the model offered and furnish a detailed technical description of the same Systems sub systems of the working mechanism of the machine as per para 3 0 in particular and all the items of the specifications in general shall be described in details in the Technical Description along with sketches to show the manner in which the requirements of the specifications are accomplished by the machine model offered Photograph of the type of machine offered in work mode shall be enclosed with the offer These shall also show the close ups of various working assemblies systems The tenderer shall furnish a compact disc or DVD or USB showing the working of machine in real time under field conditions Tenderer shall also submit the names of countriesy amp Railways where the offered machines are working and their working can be seen if felt necessary by the purchaser Dimensional and operating requirements The machine shall be diesel powered vehicle which shall be robust of latest design reliable and suitable for working on plain track transitions and curved tracks up to 109 on the Broad Gauge 1676 mm of Indian Railways The design and dimensions of the machine and components shall be to metric standards Quality assurance during manufacturing shall be as per ISO 900
26. ible to control the target track geometry parameters in infinitely variable steps from operators front cabin To suit this suitable proportional servo control systems shall be provided On Indian Railways rail top to sleeper bottom depth may vary from 260mm to 420mm The machine shall be provided with a computerized unit for the overall control of its working system for all possible track geometry The system shall be so designed that for working on tracks with pre decided target geometry the standard track geometry data as well as correction values can be entered prior to work either directly on system or via USB CD or DVD For working on tracks with unknown target geometry it shall be possible to determine the correction values by making a measuring run and subsequent geometry compensation of the recorded data considering obligatory point and constrains of lifting and lining etc Interactive processing of the target profile by the operator shall be possible Track parameters shall be displayed in graphic as well as text form on a colour monitor It shall be possible to guide the working system of the machine continuously and automatically by this unit The software shall be Windows based The hardware shall be sturdy for operations under conditions of shock vibrations dust electromagnetic influences from outside and interruption of power supply The unit shall have adequate memory to keep records of minimum 100 km of work performed ne
27. ier shall note that the machine shall be working under extreme dusty conditions and the cooling mechanism shall be maintainable under these conditions Adequate heat transfer arrangement for the hydraulic system shall be designed and provided so that under extreme heat conditions as mentioned in Para 2 9 above the system oil temperature does not go beyond 85 C Brakes The machine shall be fitted with compressed airbrake system applying brakes equally on all wheels and provision shall be made to connect air brake system of the machine to that of camping coach when the machine is hauling it The brakes shall be protected from ingress of water grease oil or other substances which may have an adverse effect on them The brake lining shall be suitable for high ambient temperature of 55 C The force required for operating the brake shall not exceed 10 Kg at the handle while applying by hand and 15 Kgs on the pedal when applied by foot Machine shall be equipped with suitable arrangement of braking so that while attached in train formation machine can be braked by traction vehicle having compressed air braking system There should be provision of emergency brake application in the machine either travelling alone or coupled with the camp coach in addition to the normal braking system of the machine using the compressed air The emergency braking distance EBD of the machine on the Indian railway track at the maximum designed speed on a lev
28. in It shall be possible to have a clear view of the track ahead while driving the machine in both the directions from the cabins at either end The cabin layout shall be such that before leaving the machine the operating staff has full view on both the sides to avoid any danger to them from trains on the adjacent tracks Additional driver s cabin shall be provided if the view while driving is not clear for safe travel in both directions The gauges warning panel and controls shall be suitably located in the operator s cab so that they can be observed without undue fatigue to the operator Screen wipers preferably operated by compressed air or electrically operated shall be provided on the wind screen Suitable number of fire extinguisher dry chemical type shall be provided in all the cabins The machine shall be provided with well designed space for keeping the tools and spares required for onsite repairs of the machine to attend the breakdowns and other working requirements The operator s cabin shall be ergonomically designed to have easy access to all the controls The operator shall have a full view of the working area from the operating seat to have full control over the work The stabilizing unit shall also be controlled from the main machine Tools and Instruction Manuals Each machine shall be supplied with a complete kit of tools required by the operator in emergency and for normal working of the machine The tenderer shall
29. ine during working shall be provided on the machine Machine shall be provided with emergency backup system to wind up the machine quickly in the event of failure of prime mover or power transmission system of the machine Pneumatically operated hooters shall be provided facing outwards at each end of the machine at suitable locations operated by means of push buttons provided in the cabins to warn the staff working on around the machine about approaching train on adjoining track Hooks and buffers The machine shall be fitted with hooks and buffers of IRS design on both ends for coupling it with camping coach or other vehicles and running in train formation and for attachment with the camping coach Suspension system The suspension system shall be preferably of two stage type with suitable spring and damping arrangement Spring for primary and secondary suspension shall be designed to cater for actual service conditions Effective measure shall be adopted to minimize the weight transfer while starting stopping and during runs Electric equipment and lighting The electrical equipment to be provided shall conform to relevant standard specifications and shall be suitable for Indian climatic conditions The machine shall be equipped with latest twin beam headlight assembly conforming to RDSO specification No ELRS SPEC PR 0024 revision 1 September 2004 with the amendments ensuring a light intensity of 3 2 lux at ground level at tra
30. ing operation service and field maintenance manual instructions and complete electrical hydraulic amp pneumatic circuit diagrams trouble shooting charts component drawings description and other relevant technical details as a reference documents for the inspecting officer One portable diesel operated D C welding generator of reputed make preferably made in India with minimum 5 KVA capacity along with sufficient length of cable or lead shall be provided with the machine for day to day repairing of machine and its wearing parts The firm shall provide detailed technical drawings and specifications of wheels and axles used in the machine The above details shall be provided in four sets with each machine One set of all the manuals and diagrams should also be sent to the Principal IRTMTC Allahabad one set to ED TMM RDSO Lucknow one set to DTK MC Railway Board and one set to Director IRICEN Pune along with supply of first machine of similar group In case there is any subsequent amendment in above documents based on field performance the amendment amended documents should also be sent to above mentioned authorities Spare parts Spec of HOT with stabilizer 2014 Page 14 of 30 15 1 152 16 0 16 1 17 0 17 1 18 0 18 1 18 2 19 0 19 1 The tenderer should quote apart from main equipment separately for the mandatory spares as well as for recommended spares required for two years of operation
31. ion and loading pattern design description accompanies design particular of vehicle bogie Spec of HOT with stabilizer 2014 Page 22 of 30 Annexure Ill 91 328 9 poe 9 NOTE PROCEDURE OF DRAWING 1 DRAN A VERTICAL LINE X Y 2 DRAN SEMI CIRCLE OF 14 5R TANGENTIAL TO INE X Y 3 DRAW LINE 1 2 5 TANGENTIALLY TO 145R SEM CIRCLE 4 DRAV A HORIZONTAL LINE AT 28 5mm FROA THE TOP OF THE FLANGE AND LOCATE Pt A AT 63 5mm FROM THE LINE X Y 5 FROA Pt A LOCATE CENTRE B OF ARC OF 330R ON A VERTICAL LINE AT 9imm FROR X Y 6 DRAY ARC OF 330R FROM CENTRE B 7 LOCATE CENTRE C ON VERTICAL LINE AT HORIZONTAL DISTANCE OF 65 5mm FROM THE LINE X Y SUCH THAT BC 33C 100 ie 230mm DRAV ARC OF 100R WIH CENTRE AS Cc DRAV ARC OF RADIUS 14mm TANGENTIA LLY TO 100R ARC AND LINE 1 2 5 10 DRAV LINE 1 20 TANGENTIALLY TO 330R ARC 11 DRAY A VERTICAL LINE AT A DISTANCE OF 30mm FROM THE FLANGE END SO SUPERSEDED BY CO ORDINATES OF POINTS B amp C ARE BASED ON NOMINAL DIMENSION OF 28 5mm SUPERSEDES 1 1 9 04 E ci Sje REVISED amp REDRAWN 3 94 as CO ORDINATES OF ARGS SHOWN 3 92 l i ec Page 23 of 30 Spec of HOT with stabilizer 2014 Annexure IV Specifications of Heavy duty Industrial Quality Water proof amp shock proof Lap
32. mode of 150 mm in one go to be conducted at manufacturer s premise siding p At the parameters specified against clause 3 6 for achieving durable compaction by tamping unit and controlled settlement lasting consolidation and desired increase in lateral ballast resistance of sleeper by stabilizing unit the machine shall be able to tamp and stabilize 2700 sleepers in one effective hour of working The time shall be counted from start to finish of tamping work at work place The machine shall also be able to achieve a peak tamping and stabilizing rate of 3500 sleepers or more per hour over a 10 minutes period at the above prescribed parameters Stoppage of work not attributable to machine shall be discounted The setting uptime and winding uptime shall be measured and the total time taken by the two operations of setting up and winding up of the Machine together shall not exceed 10 minutes The setting up time shall be counted from the time machine arrives at site to the time work is started The winding up time will be counted from the time the work is stopped to the time machines starts moving away from the work site 24 0 Should any modification be found necessary as a result of the tests these shall be carried out by the supplier at his own expenses kkkkkkkkkkkkkkkk Spec of HOT with stabilizer 2014 Page 18 of 30 Annexure l Br aes ie NNMOHS SSIMSSHLO 383H 14d32X3 SAYLAWTITTWW NI 38V SNOISNSWICd Tv 31 UN NIW 201
33. operation in the forward and backward directions The vehicle selected for tests will be one in average condition for normal maintenance The criteria applicable for establishing speed potential will be as follows A lateral force lasting more than 2 metres should not exceed the Prud Homme s limit of 0 85 1 P 3 where P is the axle load Isolated peak values exceeding the above limit are permissible provided the record shows establishing characteristics of the vehicle subsequent to the disturbances iii A derailment coefficient should be worked out in the form of ratio between the lateral force hy and the wheel load Q continuously over a period of 1 20 second the value HY Q shall not exceed 1 iv The values of acceleration recorded in the cab at location as near as possible to the bogie pivot as near as possible to axle in case of four wheelers shall be limited to 0 55 kg both in vertical and lateral directions The peak values upto 0 6 g may be permitted if the records do not indicate a resonant tendency in the region of peak value In the case of such vehicles where measurement of forces is not possible the evaluation shall be in terms of ride index based on the accelerations measured as detailed in Para 2 iv above which shall not be greater than 4 5 but a limit of 4 25 is preferred vi A general indication of stable running characteristics of the vehicle as evidenced by the movements of the bogie in straight and curve
34. ovision of super elevation along with tamping Tolerance achievable shall be as follows Unevenness 1 mm on 3 6 m Chord Cross level 1mm Alignment 2mm on 7 2m Chord Twist 1 mm m The machine shall be fitted with automatic lining equipment capable of carrying out lining simultaneously with levelling The machine shall also have the ability to slew 60 Kg concrete sleeper track up to 150 mm in one go for all type of track structures The machine shall be capable of tamping lifting lining and stabilization of track with up to 60 Kg long welded rails or short welded rails or fish plated rails laid on pre stressed concrete sleepers steel trough sleepers CST 9 and wooden sleepers The normal sleeper spacing in different track structures on Indian Railways is 55 cm to 75 cm The working cabins of the machine shall be air conditioned The air conditioning provided shall be of robust industrial design capable of operating in highly dust laden environment However the electronic Spec of HOT with stabilizer 2014 Page 6 of 30 3 13 3 14 3 15 3 16 3 17 3 18 3 19 equipments should be so designed that the machine shall be able to work without air conditioning under the climatic conditions described in para no 2 9 The tenderer may be required to show working of his machine under field conditions The tenderer shall indicate the name of the Railway system where the types of machines offered are working It shall be poss
35. rack To achieve a controlled settlement and a lasting consolidation of such heavy track it shall be equipped with minimum two independent stabilizing units applying suitable and variable vertical load upto12 tonnes or more each The stabilizing unit shall be capable of pre loading the track While pre loading the track by stabilizing unit the driving wheels should provide adequate adhesion to avoid wheel slippage loss of traction and risk of derailment The horizontal and vertical force and frequency of vibration shall be adjustable so as to carry out effective stabilization on various types of track structures The machine shall be equipped with suitable mechanism to control the degree of settlement of the track which shall copy the pre stabilizing geometry by automatically increasing relieving the vertical load on the stabilizing units For optimum results mechanism shall work independently for the left and right hand rail It shall be possible to steplessely pre select the frequency of stabilizer vibrations which shall be between 0 45 Hz for optimum adjustment to suite the various kinds track structure During work near fixed structures like bridges it shall be possible to pre select a frequency within that range which is beyond the natural frequency of the structure In this context it is also essential that the vibrations be automatically cut off when the machine working speed reduces below prescribed cut off speed to be prescribe
36. should be borne by the supplier Issue of Provisional Speed Certificate Whenever a new rolling stock is introduced in Indian Railways a provisional speed certificate is issued by RDSO based on certain design parameters of the vehicle Final speed clearance of the vehicle is given after conducting detailed oscillation trials of the vehicle which is a time taking process Therefore issue of provisional speed certificate for the vehicle becomes a necessity and based on the same the approval of running of the vehicle on Indian Railway track is taken from Commissioner of Railway Safety For issue of provisional speed certificate following actions are required to be taken by the suppliers Current supplier whose models are approved The supplier shall give details of the model year of introduction in Indian railway details of speed certificate issued etc The supplier shall certify that no change has taken place in the model being offered with respect to design of under change i e suspension system arrangement wheel amp axle assembly bogie braking arrangement loading pattern of the vehicle etc and the distribution of axle loads lateral forces unstrung mass and braking force coming on rail is the same if there is any change in above respect the action shall be taken as detailed in Para b below Current Supplier whose models are not approved or new As soon as the supplier completes the design of the machine as per specifi
37. t construction and low maintenance cost are of particular importance Adequate allowance shall be made for de rating of diesel engine under the most adverse climatic conditions mentioned in the specification elsewhere High speed diesel oil to Indian standard specification shall normally be used A minimum fuel tank capacity sufficient for continuous operation for 8 hrs will be desirable Sight glass type fuel measuring gauge shall be provided on the fuel tank For starting the engine storage batteries of well known indigenous make with wide service network in India shall be provided The engine shall normally be push button start type The supplier should furnish the information regarding make and model of the engine proposed to be used and details of agency which will provide after sales service support and availability of spares in India Since the engine is to work outdoor under extreme dusty conditions the air intake system shall be designed suitably so as not to allow dust through air intake system There is a likelihood of dust deposition over the engine body and surrounding area over the lubricants spills over These should be easy to access for daily cleaning and routine maintenance In case air cooled engines are proposed by the supplier maintenance equipment for cleaning and maintenance of the air cooling fins shall be provided by the supplier along with the machine The engine parameter monitoring gauges like temperature rpm and
38. top Tough book CPU Intel Core i 5 processor speed 2 4 GHz or higher version Operating System Windows 7 professional or higher version RAM 2 GB or more and expandable upto 8GB Storage Shock mounted flex connect hard drive with quick release 500 GB or More Display Minimum 13 high definition LED or better with anti reflective and anti glare treatment Keyboard Backlit 61 key QWERTY keyboard Touchpad with virtical scrolling support Wireless Integrated Gobi 2000 mobile broadband or better Bluetooth V 4 0 or better Durability features Product shall be durable and meet the latest MIL standard Moisture and dust resistant screen Key board and touch pad Pre Loaded Softwares Antivirus software for 18 months validity Microsoft office 2007 complete bundle Power supply Long life Li ion battery minimum 5400 m AH Warranty 3 year warranty Spec of HOT with stabilizer 2014 Page 24 of 30 Annexure V BRAKE DESIGN DETAILS OF THE MACHINE FOR CALCULATION OF EMERGENCY BRAKING DISTANCE Tare amp gross weight of the machine in Kilograms Brake power in Kilograms Type of Brake blocks Brake block area in Square Centimetres Brake Rigging Diagram Type of Brake system Spec of HOT with stabilizer 2014 Page 25 of 30 ANNEXURE VI INSPECTION CERTIFICATE CERTIFICATE OF INSPECTION OF TRACK MACHINE BY INSPECTING OFFICIAL AND APPROVAL FO
39. w track geometry obtained and enables transfer of the data via USB CD or DVD as required In addition to the computer system provided on the machine for its own controls the machine shall be provided with an industrial quality heavy duty portable computer Laptop tough book for keeping record of overall aspects of working spares management and reporting The detailed specifications of the laptop are enclosed as annexure lV The machine shall be capable of measuring and recording the unevenness alignment and cross level in real time on a print out before and after the tamping and stabilization by the machine It shall also record progress vis a vis time The stabilizing unit shall be an integral part of the machine It shall achieve effective and continuous stabilization of the track and shall be able to match the working speed of the tamping portion without loss in stabilizing quality Spec of HOT with stabilizer 2014 Page 7 of 30 3 20 3 21 3 22 3 23 3 24 3 25 3 26 3 27 3 28 During the operation the stabilizer unit shall be capable of lowering the track in a controlled manner while maintaining the pre stabilized geometry Proper longitudinal and cross level control mechanisms shall be provided to achieve this The manufacturer shall clearly explain the mechanism in its offer The stabilizing unit shall be capable of continuous stabilization of track including typical Indian Railway heavy concrete sleeper t
40. wever lesser diameter up to 730 mm new wheel profile can also be considered provided it meets the condition laid down in clause 2 4 at its condemnation limit also rail wheel stresses for 72 UTS rails are within permissible limits Forged wheels to Indian Railways profile shall be provided on the machine It is desirable that 50mm margin between new and permitted worn wheel diameter should be available but this should not be less than 20mm The worn out wheel diameter condemning worn out diameter based on the criteria of rail wheel contact stresses for various maximum axle loads are as under Maximum axle load tonne Minimum worn out wheel diameter 22 82 908mm 22 00 878mm 21 50 860mm 21 00 841mm 20 32 816mm 20 00 805mm 19 50 787mm 19 00 768mm 18 50 750mm 18 00 732mm 17 50 713mm 17 42 710 00 Permitted worn out wheel diameter should be specified by the manufacturer The diameter of Wheel for assessment of permitted axle load will be the worn out wheel diameter Permitted worn out wheel diameter should be specified by the manufacturer The diameter ofwheelfor assessment of permitted axle toad will be the worn eut wheel diameter The new wheel profile in the machine shall be as per Indian Railway standard drawing attached as Annexure lll which is titled as WORN WHEEL PROFILE wheel profite provided in Annexure Ht Spec of HOT with stabilizer 2014 Page 3 of 30 2 8 2 9
41. xle load i Over all length of the vehicle ii Length over head stock iii Length over buffers iv Distance apart for Centre of buffers v Max Min height of centers of buffers above rail level i Wheel base ii Axle load max iii Bogie Centres Wheel dimension i New ii Worn out i Tread and flange profile of the wheel indicating clearly whether it is Indian Railway standard profile or differs from standard flange profile ii Wheel gauge dimension back to back of tyre flange Whether the stock is designed to be used as a general purpose or in a closed circuit in specified sections under defined conditions Maximum design speed i Own Power ii In train formation Unsprung weight per axle in tonnes i Driving axle ii Running axle Expected lateral force in tonnes per axle At maximum design speed Increase in the impact load during motion Dynamic Augment Method of operation Whether single only or coupling together is possible If coupling is possible the number which can be coupled and what is trailing load Maximum tractive effort at start and at the speed of operation i at working drive at start at operation speed ii at transfer drive at start at maximum speed Spec of HOT with stabilizer 2014 Page 27 of 30 11 12 13 15 Maximumbraking force coming on to the rails per wheel at working axle at transfer axle Drawing indicating suspension arrangement details of
Download Pdf Manuals
Related Search
Related Contents
PORTES SECTIONNELLES Xilinx ML310 User's Manual CATALOGO DE ITEMS Operating Instructions MAGSTOP Barriers Type: MTS 6/8 Service Manual TM-L90 詳細取扱説明書 No.11 - 秋田県鍼灸師会 Samsung SGH-U600 Инструкция по использованию LBT 90234.indd 3ウェイ電源装置 TDF-101 Copyright © All rights reserved.
Failed to retrieve file