Home
RT-200C Plus Chemistry Analyzer Service Manual
Contents
1. Exhaust waste liquid To waste liquid trough Structure diagram of cleaning trough 5 5 Calibration the Pumped Liquid Amount of Flowcell Calibration for the pumped liquid amount of flowcell is very important it can affect the aspirate amount and the position where the reaction liquid passes through the flowcell and decide whether air or reaction liquid reaches the flowcell during color comparison so it affects the test result directly It can be carried out according to the procedures below 1 Start up the analyzer to enter the backdoor program 2 Calibration the aspirate amount of pump first move X axis to one reaction after adding 450ul water to the reaction position feed Z axis probe and click Quantitative Aspirate after reaching the position of quantitative aspiration When the aspiration is complete observe the amount of residual liquid in reaction cup which should be less than 50ul If it is more than 50ul the designation factor of pump can be increase for increasing the aspiration amount If air is aspirated during aspirating liquid the designation factor can be reduced 3 And then calibration the additional liquid amount You should calibration according to the minimum reagent amount of the analyzer Now we designate as 400ul After adding 400ul high concentration Page 41 of 47 pages RT 200C Plus Service Manual color solution generally we use K2Cr207 solution or Cre reagent to a reaction position mo
2. 1 2 owitch off the analyzer and lift the rear cover of the analyzer Move the Sampling head to the original position the sample probe just faces towards the waste liquid hole At this time observe the positions of X axis positioning optical coupler and limiting baffle the limiting baffle should just block the middle of the optical coupler If not you can adjust the position of limiting baffle After the adjustment start up the analyzer to check the X axis position during start up self test If an offset exists you should go on adjusting If the probe feed position is accurate the regulation is complete close the rear cover of the analyzer 4 15 Regulation of X axis Zero Point The positioning of Y axis zero point can be carried out by limiting baffle on Y axis together with Y axis positioning optical coupler on Z axis control board When it moves to the limiting baffle and block the detecting optical coupler Z axis control board detects the voltage change feedbacked by optical coupler and determines the zero point is reached and stops moving Regulation of Y axis positioning is mainly for limiting the position of the baffle Page 34 of 47 pages RT 200C Plus Service Manual Y axis positioning optical coupler Y axis positioning Y optical coupler Y axis limiting 7 per og l i baffle Y axis limiting baffle Fig 1 shows the installation method of Z axis control board of the old version Fig 2 sho
3. adding Sample adding tube 2 Remove the joint at the right of injector three way as shown in figure above 3 Lift the rear cover of the analyzer and remove the joint replace the joint with a new one of the same type and fix it securely in the same way Please ensure securely fix the tube to ensuring the leakproofness Page 28 of 47 pages RT 200C Plus Service Manual 4 8 Replacement of Flexible Cable for analyzer of new version 1 Switch off the analyzer lift the rear cover of the analyzer you can see the flexible cable as shown in figure below QR a Meee ac Flexible cable c 8 aauas or A A es sev er aw pre EN ae 2 Remove the flexible carefully replace it with a new one and fix it in the same way 4 9 Replacement of Small Ribbon Cable for analyzer of old version 1 Switch off the analyzer lift the rear cover of the analyzer you can see the small ribbon cable as shown in figure below 2 Remove the small ribbon cable carefully replace it with a new one and fix it securely in the same Way Note The analyzer of old version adopts small ribbon cable and the analyzer of new version adopts flexible cable Page 29 of 47 pages RT 200C Plus Service Manual 4 10 Replacement of Large Ribbon Cable 1 Switch off the analyzer lift the rear cover of the analyzer you can see the large ribbon cable as shown in figure below Large ribbon l cable 2 b
4. 9 Pre amplifier gPlug to J2 Radiator Spring regulator Raise the cell outwards to remove it easily 4 6 Replacement of Sampling Tube Connect the sampling probe to flowcell 1 Switch off the analyzer remove the plastic cover on sampling head according to the figure below You can see two plastic tubes the pin close to the inside is for connecting Sampling tube pull out the Sampling tube from sampling probe Sampling tube 2 Lift the rear cover of the analyzer you can see the flowcell as shown in figure below the thin tube is sampling tube Pull out the Sampling tube from the flowcell and replace it with a new one and then installed it securely in the same way Note Since the bore of sampling tube is very small the Page 27 of 47 pages RT 200C Plus Service Manual tube may not easily be installed into the flowcell easily a sharp substance is necessary to enlarge a section of tube mouth for setting the tube into the flowcell This section should not be used with switching tube because that may affect the result Sample intake tube Thin and hard 4 7 Replacement of Sample adding Tube Connect the sample probe to the injector 1 Switch off the analyzer remove the plastic cover on sampling head according to the figure below You can see two plastic tubes the pin close to the outside is for connecting sample adding tube pull out the sample adding tube from sample adding probe Sample tube
5. m n amp RA A A a i sida ra n dud u A oe E yey TEEI des roer or r np Lag A 2 d ERII m ay mu Ao i ie uei A rimi rF y ore aa bit a in pim de 17 cra y Fo ri ar SIT IILLLLS de E i pr r T 1 are E LI v J13 Faninterface m EL er i 4 us 5 J2 Connect to front sinite IL ee ZEE CPU board J4 em 113 J10 Connect to flowcell EN eristaltic pump drivin Hm alts usd z EE i q A un TP8 je um x Lu EA pus werd AA le J3 Connect to front a IE SM oop ek AARRE y Traga Vg 1 wl ri 4 TA x CPU board JIDMA n LS IH Heind uds 9A i dad ud ge mit ESERIES A A J4 Connect to filter wheel optical coupler J9 Chopper J14 Manual J8 Lamp motor DC12V aspirate key 3 2 8 Alarm Board The alarm board is connected to front CPU board directly and controlled by the front CPU board The switch signal of AC motor is connected to MCU interface of front CPU board It is mainly for switch control and power driving of three pumps motors and hardware alarm The switch control of alarm board adopts three pieces of optical coupler switches K3022P for switching among waste pump pump for cleaning sample probe and pump for cleaning trough In addition hardware alarm is implemented by a piece of NE555 which has timing function for detecting the level of waste liquid and cleaning fluid And this function isn t interrupted by software Page 19 of 47 pages
6. N amp 2 Remove the large ribbon cable carefully replace it with a new one and fix it securely in the same way Pull the cable to the Sampling head by hand move it along the X axis direction back and forth and observe the movement of the large ribbon cable The movement of the large ribbon cable should be free and should not be blocked by the other cables 4 11 Replacement of Sample adding Probe Sampling Probe for analyzer of old version 1 Switch off the analyzer lift the plastic cover on Sampling head you can see two metal probes the outer one is sample adding probe the inner one is sampling probe Sampling probe Sample adding probe Screw Page 30 of 47 pages RT 200C Plus Service Manual 2 Pull out the Sample adding tube on the sample adding probe remove screw 1 on sample adding probe to remove the probe 3 Replace the sample adding probe with a new one fix it in the same way and fix the screw 4 Close the cover for the probe Note The same to the method to replace the sampling probe 4 12 Replacement of Sample Probe Aspirate Probe for analyzer of new version 1 Switch off the analyzer remove the plastic cover on Sampling head you can see two metal probes the outer one is sample probe the inner one is aspirate probe EDT SS Aspirate probe Sample probe o Hexagon socket head cap screw 2 Pull out the Sampling tube on sample probe loosen the hexagon socket head cap sc
7. Raise spring regulator 6 with flat blade screw driver outwards slightly shake the flowcell forwards and backwards and then pull out the flowcell remember the installation direction of the flowcell Loosen the screw for flowcell temperature sensor and remove the temperature sensor Apply some thermal grease on the hole which is close to the Peltier direction of the flowcell install the temperature sensor in the hole fix the screw and check if the sensor line is loose or short circuit Raise spring regulator 6 with flat blade screw driver outwards slightly and insert the new flowcell into the installation hole You should press the flowcell until the bottom of hole and the height of flowcell should be just equal to the height of Peltier Insert the temperature sensor connector into J6 insert the sample inlet tube into sample inlet joint and insert the sample outlet tube into sample outlet joint Start up the analyzer and enter the monitoring program to monitor the water blank value At this time you can insert a screwdriver into the hole on the flowcell and raise the flowcell forwards and backwards slightly to observe the water blank value You can stop when the water blank value is the minimum value because the position is correct Fix the rear cover of the analyzer securely Page 26 of 47 pages RT 200C Plus Service Manual DFlow cell Plug to J6 S Peltier Plug to J6 Screw Spring regulator Fixing lock Fixing block
8. and information storage 4 lt is applicable in the End Point Kinetics Two Points Dichromatic and Differential Spectrophotometry Dichromatic and Differential Spectrophotometry all belonging to the End Point 5 The measurement can be carried out by using standard or factor 6 Itis able to select optionally 8 standard filters 340nm 405nm 492nm 510nm 535nm 546nm 578nm and 620nm More over there is one reserved position available to settle the special filter to meet the requirements of user of different characteristics 7 The system carries out the detection and control constantly during the period of operation preventing the creation of error If there is any abnormal condition it will send out a signal and it will display the error information on the screen in the meantime and guide the user to select the button and operation correctly 1 2 Instrument Structure The instrument is composed mainly of the wash system display reaction chamber sample chamber reagent chamber aspirate system rinsing system diluting system spectrophotometer and drainage system Page 4 of 47 pages RT 200C Plus Service Manual 1 2 1 Cleaning System After opening the back cover it is found that the left side is equipped with three peristaltic pumps and a small chamber is found inside for settling the lotion bottle and the waste liquid Fig 4 Two peristaltic pumps rotate the aspirateed distilled water and rinse the inside of instrument
9. they are connected each other by hexagon socket head cap screw P e 1 Wetec o rrom XYZ teres The regulation method is as follows 1 Switch off the analyzer lift the rear cover of analyzer and remove the plastic cover on sampling head 2 Loosen the hexagon socket head cap screw for connecting the Z axis encoding disc to Z axis remove the Z axis encoding disc 3 Adjust the Z axis until it is perpendicular to the plane as shown in Fig 2 4 Install Z axis encoding disc to the Z axis in the same way the surface with a gap should be upwards perpendicular to the horizontal plane fix the hexagon socket head cap screw for fixing the encoding disc to Z axis fix the encoding disc securely 5 Turn the Z axis encoding disc at the rear of the analyzer by hand and check if the sample probe and stirring rod move freely If they move freely the next procedure can be carried out if not you should reinstall them 6 Install the plastic cover on sampling head and install the rear cover of the analyzer 7 Startup the analyzer and enter the backdoor program to test the probe feed concentration of Z axis the probe feed concentration of Z axis can be adjusted by fine adjustment of Z axis Page 36 of 47 pages RT 200C Plus Service Manual Note The installation direction of Z axis control board of new version is just opposite to the one of the figure Before carry out the procedure 4 you should let the surface with a gap dow
10. to J2 Connect to front GND GND and 12V J3 Connect to XYZ X axis motor CPU board J1 interface board J1 Connect to X axis encoding board rM Mo O A A A AA A O OMM DO TN IM M X IM ODA PR1 TPAX PR2 TPGND PR3 TP4Y PR4 3 2 4 Injector Driving Board The injector driving board is connected to front CPU board directly and is controlled by front CPU board its motor clock signal is offered by 82C54 with Timer counts IC which controls the speed and rotation position of the motor Motor direction signal motor Enable signal motor low consumption switching signal motor reset signal etc are connected to MCU interface of front CPU board Page 16 of 47 pages RT 200C Plus Service Manual The main functions it implements are to control the injector motor drive the power and switch between low consumption and operating mode The logic control of injector driving board adopts a piece of L297 the driving chip adopts a piece of L298 of which operating voltage is 24V driving current reaches 4A In addition for protecting the motor during motor driving a discharge diode is added to the circuit and the protection is implemented by L6210 Diagram of a real injector driving board board No 08 Injector route positioning optical coupler o lt E q oa x o e lt Supply the injector motor with Connect to front l DC24V CPU board J2 Power input DC 24V 3 2 5 Z axis Control Board The Z axi
11. without intermission such as aspirate probe flow cell stirrer and diluter injector etc The other pump drains the waste liquid into the waste bottle The lotion bottle and the waste bottle are located inside the cupboard Cleaning pump Waste ay dem Cleaning liquid Waste liquid Note The instrument of new version has already cancelled the waste pump and the waste liquid is drained toward the waste bottle directly from the waste liquid trough 1 2 2 Display Rayto 200C Plus adopts a color liquid crystal display LCD WINDOWS software The picture is sharp and vivid and the operator may operate according to the instruction of display 1 2 3 Reaction Chamber The reaction chamber is constructed from a special alloy material and is divided into 4 small sections with each section containing 30 reaction holes totaling 120 reaction holes altogether Fig 5 The reaction can be controlled under three kinds of temperatures 25 C 30 C and 37 C It is able to replace the reaction tray during the period of work and after 120 reaction position are exhausted the display screen will ask the operator to replace the reaction tray The replacement of reaction tray is carried out in the rinsing process between two reactions so it will not affect the normal operation Disposable reaction tray is made of inert plastics resisting low heat with each tray containing 30 reaction holes Fig 6 While settling the reaction tray it shoul
12. 200C Plus i E p a i ARII jun is paa 5 s I SWITCHIW POWER l Basic block diagram of fully auto chemistry analyzer z gal 3 2 Functions of electronic Boards 3 2 1 Power Control Board Power control board is connected to the front CPU board directly and the temperature selection is controlled by the front CPU board indirectly It is mainly for precise temperature control of flowcell and its power driving tungsten halogen lamp control and its power supply refrigeration position control and its power supply incubator and its power supply Flowcell temperature control module on power control board adopts a set of relatively independent system to the front control system based on front CPU board It is provided with a 8 bit CPU PIC16C711 and is driven by CMOS power switching diode together with temperature sensor LM335 it becomes a set of typical temperature control system Tungsten halogen lamp control and its power supply module adopt optical coupler TLP595 as switch and PWM controller MC34167 as DC DC converter chip Refrigeration position and its power supply adopt LM311N as comparator and 76129P as CMOS power switching diode Incubator control and its power supply adopt SG3524N as controller Page 13 of 47 pages RT 200C Plus Service Manual which integrates voltage comparison power driving and other circuits and SSR solid state relay MP240D
13. 200C Plus Service Manual Fine 4 B Screw plate oa Screw plate j Structure diagram of peristaltic pump Diagram of a real peristaltic pump 3 Peristaltic pump pipe 4 4 Replacement of Injector 1 Loosen the screw and remove the injector 2 and piston D 2 Replace them with a new injector and piston and check if the gasket is installed Caution Do NOT dissemble the diluter for normal problem except a leakage or breaking of diluter occurs The following three points should be aware during replacement of injector 1 Replace with a new injector and install O ring 3 securely for good leakproofness 2 The new injector should be installed strictly according to 3 point 1 line i e the fixing screw 5 at the center of injector installation block should be at the same line of original position 2 and rinsing position 1 of injector piston It is very important Page 25 of 47 pages From sampling pum A On RT 200C Plus Service Manual Ge MB Injector fixing holder K Nae Joint i 7 why Wren sample probe pipe 9 3 O ring Injector tube Fixing screw 4 Pist A Iston D X Structure diagram of injector Picture of a real injector 4 5 Replacement of Flowcell Shut down system and lift the rear cover of the analyzer Remove the sample inlet and outlet tubes of flowcell and remove the temperature sensor connector 4 from the flowcell
14. 200C Plus Service Manual 2 Installation amp Adjustment 2 1 Unpacking the reader Unpack and remove materials for transportation Keep the package box and materials for repackaging 1 Take out the analyzer from the package N Remove the packing materials and take out the analyzer from the plastic bag 3 Check the articles in the package box and the following article should be included e RT 200C Plus main unit User s Manual Packing list Warranty certificate Accessories Power cable printer printer cable LCD mouse keyboard RS 232 serial cable and spare fuse Note If any loss of part or difference from the packing list is found please contact the distributor 2 2 Installation Environment Rayto 200C Plus Chemistry Analyzer should be installed by professional And it should be installed in a clean operating room without dust Avoid shock moist strong magnetic field and direct light The operating environment should be 15 C to 33 C and the relative humidity should be 18 85 no dewing The power supply should be 220V 50Hz and should be securely grounded If the voltage fluctuation of lab is more than 10 an external stabilizer of more than 1 000W is recommended Since the analyzer is controlled by computer completely it is equipped with UPS uninterrupted power supply of more than 500W For ensuring the normal operation of the analyzer please do not install the analyzer at the following places Pl
15. 4 as switch Figure of a real power control board Board No 15 J8A J8B J9 J7 J5 J2 PR TP26 TP13 PR9 The six potentiometers from left to right are PR10 PR8 PR7 PR6 PR5 and PR4 TP10 PR11 The corresponding test points are TP23 TP22 TP21 TP20 TP19 and TP18 Voltage of each connector J8A Power input interface connect to DC 5V and 12V outputted from PC power supply From left to right DC 12V GND DC 5V and GND J8B Power input interface connect to the DC 5V and DC 12V outputted from PC power supply and to DC 24V outputted from power board From left to right DC 24V DC 24V GND GND DC 12V GND DC 5V and GND J9 Voltage output interface outputs DC 24V for X and Y axis motors injector motor Input DC 12V for Z axis motor From left to right DC 24V GND GND and DC 12V Page 14 of 47 pages RT 200C Plus Service Manual J7 Refrigeration position control Pins 1 2 at the left output DC 12V for refrigerating chamber Pins 3 4 output DC 12V for Peltier in refrigerating chamber Pins 5 6 are connected to temperature sensor of refrigerating chamber J5 48V for heating wire of incubator J2 J1 Outputs AC48V for rinsing pump and injector pump Power input interface is connected to AC48V and AC18V outputted from transformer Pins 1 2 3 Incubator control Pins 1 2 3 are connected to temperature sensor Pin 4 is idle Pins 5 6 output AC from up to down are two gr
16. 500uL Page 7 of 47 pages RT 200C Plus Service Manual 1 2 9 Spectrophotometer The photometer of Rayto 200C Plus is composed of multiple filters so that the stability is high The affect of current thermal drift and external scattered light can be compensated by light source regulator The total volume of flow cell is 7OuL and the temperature can be controlled under 25 C 30C and 37 C 0 2 C by Peltier effect The flowcell should be cleaned and filled with distilled water before every shut down Before test the analyzer will check automatically if the system is in normal state rinse the flow cell and adjust each filter to the zero position Optical system diagram 1 2 10 Drainage System There is a drain hole at the middle bottom of the analyzer which connects to the waste trough inside Generally the waste liquid is discharged into the waste trough first and then discharged into the waste bottle by peristaltic pump so that the waste liquid can t flow out from the drain hole When the operator executes an illegal operation or a program error occurs which lead to the misoperation of analyzer the waste liquid inside the waste trough may overflow and flow out from the drain hole at the analyzer bottom Page 8 of 47 pages RT 200C Plus Service Manual 1 3 Specifications Filter 8 piece of optical filter 340 405 492 510 535 mh PS Ambient 25 C 30 C 37 C Sample position BO Page 9 of 47 pages RT
17. C Plus Service Manual Structure diagram of flow cell Inlet of flowcell 2 Outlet of flowcell 3 Temperature sensor 4 Colorimetry window 5 Temperature sensor Fixing screw 5 2 1 Cleaning of Flow Cell After testing the system will rinse the flowcell once automatically to avoid bacterium in the flowcell Daily cleaning of the flow cell by sanitizer for glassware Tween 20 of 1 20 can be used too is recommended Procedures 1 Start up the system 2 Run system maintenance program or backdoor program of the analyzer insert the probe to sanitizer and then press MANUAL PUMP key to aspirate sanitizer to the flowcell by pressing down the key for 10 seconds 3 Keep the sanitizer in the flowcell for 15 minutes 4 Repeat procedures 2 and 3 once 5 Rinse the flowcell by distilled water for 1 minute and exit 5 2 2 Method for Handling the Blocked Flowcell If the sample serum isn t processed well and the sample contains fibrinogen the sampling sample adding probe and flowcell will be easily blocked so that the analyzer can t aspirate normally The unblocking method is as follows 1 Switch off the analyzer and remove the rear cover of the analyzer 2 Pull out the connecting tube between flowcell outlet tube and flowcell peristaltic pump pull out from Page 39 of 47 pages RT 200C Plus Service Manual the end that the peristaltic pump is connected as shown in the figure below 3 Prepare a 10ml injector to aspirat
18. IBLE CABLE FOR ANALYZER OF NEW VERSION eese 29 4 9 REPLACEMENT OF SMALL RIBBON CABLE FOR ANALYZER OF OLD VERSION 29 4 10 REPLACEMENT OF LARGE RIBBON CABLE sesccceccccecceceecuccecsececseaecesaecessuceeseuteseuneseeaeseas 30 4 11 HEPLACEMENT OF SAMPLE ADDING PROBE SAMPLING PROBE FOR ANALYZER OF OLD VERSION AA C RURSUS IRR 30 4 12 HEPLACEMENT OF SAMPLE PROBE ASPIRATE PROBE FOR ANALYZER OF NEW VERSION 31 4 13 REPLACEMENT OF Z AXIS CONTACT SPRING uceccccecceceececcecuececuececesaecesseeeeneeneseeesuuaeseeas 31 4 14 REGULATION OF X AXIS ZERO POINT coooococconccconcononcoconcnconcnnoncnncncancnconcnnoncnconanconanceninnos 33 4 15 REGULATION OF X AXIS ZERO POINT regina a EA A E AE EA 34 4 16 REGULATION OF Z AXIS ZERO POINT 0ceccccececcececeecececececeeesecneseceneueseeeueseneuaeseneuneneness 35 5S MAN ENA N ais 38 5 1 BASIC MAINTENANCE sassis a a 38 5 2 MAINTENANCE OF FLOW CELE ti A A A A TA A AR E EEE 38 5 2 1 Cleaning Of FIOW Caldas 39 5 2 2 Method for Handling the Blocked Flowcell esses 39 5 3 METHOD FOR HANDLING THE BLOCKED SAMPLING PROBE eese nnns 40 5 4 CLEANING THE PROBE AND TROUGH u scccoccccouceccuceccucuececsececsscecssteccsseccuseccuseccusuteusuteecuses 41 5 5 CALIBRATION THE PUMPED LIQUID AMOUNT OF FLOWCELL eene nnne 41 5 6 BACKDOOR PROGRAM DEBUGGING soie vero Urn epe a nea
19. LECTRONIC BOARDS id 13 3 2 1 Power Control BOarG a a senses id Cu ve Duns A a Lace aae e e Eaa a aoaaa aeiae 13 32 2 FON LOPU BOATO A aa a a 15 9 29 AY DIVINO BO ANG eet a 16 3 2 4 Injector Driving BOLO a iaa 16 3 2 5 Z AXIS Gontrol BOM ista de 17 3 2 0 XYZ SWHCMING BO di ido 18 321 Photomeler EON d e cien 19 3 2 0 Alarm SO AU lia ia 19 3 2 9 Flowcell Peristaltic Pump Driving Board cccssceceeseeeeeecenseeensesenseecesesensesensesenseseeenes 20 322 10 SIGN al RECEIVING Board mi ac 20 3 2 11 CI ENCOGING DO aa 21 3 212 Y 4XIS Encoding BOATA iras doo 21 3 2 13 Liquid Level Detecting Board oooccooncconocicocnccnocconnnccnnnocnnaronnnnnonnncnnnrrnnnn ron nrnnn remar nne nennen nnns 21 4 REPLACEMENT OF ACCESSORIES cococcccocononnononcnnonononnonononronononronononranononrananonrnannnnes 22 4 1T DISASSEMBLING dd do o el ol 22 4 Z REPLACEMENT OF LAMP sires a asesoras be honesta E AREE cotton nt 23 4 3 REPLACEMENT OF PERISTALTIC PUMP TUBE ccccecececcececececeseecenececueesaeaenenennentesaenenenes 24 44A REPLACEMENT OF INJECTOR ideis vio Ears dene aveu ze SUP DU SPI MUR Rib Pa P RIO CR P DDeSL Df OE DE 25 Page 2 of 47 pages RT 200C Plus Service Manual 4 5 REPLACEMENT OF FLOWOGCELL ni a a ad 26 4 6 REPLACEMENT OF SAMPLING TUBE CONNECT THE SAMPLING PROBE TO FLOWCELL 27 4 7 REPLACEMENT OF SAMPLE ADDING TUBE CONNECT THE SAMPLE PROBE TO THE INJECTOR Y 28 4 8 REPLACEMENT OF FLEX
20. RT 200C Plus Chemistry Analyzer Service Manual Kayto Rayto Life and Analytical Sciences Co Ltd Telephone 86 755 88832350 Telefax 86 755 86168796 E mail support rayto com Website www rayto com Version 1 1e RT 200C Plus Service Manual CONTENT 1 INTRODUC HON 4 1 1 OPERATION PRINCIPLE AND APPLICATION SCOPE uucscecsccccecceccecsecsecnececsecsuenectesecsuueseuaeenes 4 LZINSTRUMENT O TRUCTOURE ues seedo to ossa Dept oce ooo ose OLIM SM EU EEE EN EEA EEE EE 4 pn Eel nheEtiliM e 5 MSZ 2 Bri 5 1 23 REACTION Gham DOP P ERE a AEAEE 5 124 Sample Chamber o iba 6 1 2 5 Vire indere ct aa 6 t2 6 Cui Lire m E 6 tA FRINSING SUSTO co 7 1 28 DILO Ec Cir et mtt 7 PA aio eet 8 1 210 Drainage SM o iraccd 8 LO OPEC ECA TON uds UD lodo lue putre Lo S 9 2 INSTALLATION amp ADJUSTMENT eeeeeeeee enne nene nnne nenne nenne nua nn 10 2 1 UNPACKING THE HEADER vise desse eyes oee eene saxo ida cevdaeledavedevedsvedeueedelddudausdavedevidevascuvess 10 Ze INSTALLATION ENVIRONMENT erase 10 2 3 CONNECTION OF THE ANALYZER cooccccococcncnconcncononnnn cnn 11 SFUNC ON S c G 13 3 1 FUNCTION BLOCK DIAGRAM OF RT 200C PLUS cccccecceccececneceececceeaecneceesesaueneceenesseenes 13 3 2 FUNCTIONS OF E
21. RT 200C Plus Service Manual Diagram of a real alarm board board No 11 J6 Sensor J5 C T m IET connector left1 2 J4 Voltage e TM 2 J1 Injector pump J2 Distilled water J3 Waste liquid are distilled water input AC48V power AC48V pump power pump power AC alarm 3 4 are waste SES AC48V 48V liquid alarm d ita SU HIDE S umm i had 4 SMH Er ni SUR lI og Sekt MI PH fe e e ei A ID a Tq LT T a mu ms m4 Erps i E n gm did I E DE CE TON EL A n A AS a es a TT tet eh I a 1 E ng y i a 5 L n d aS ar 9 m na Ys T 7 da 5 rt au Roll 4 E rra A a b Bu e a 2m m A I z a a T i tes mj a rj ubi rb era 2I 14724 exu ot ITI I a Tre ES pre Enik TEF Litt i bae q 3 2 9 Flowcell Peristaltic Pump Driving Board The flowcell peristaltic pump driving board is connected to the front CPU board through photometer board and is connected to the front CPU board Its motor clock signal isn t controlled by front CPU board for controlling speed and rotation position The clock signal is supplied after shaping of RC circuit on flowcell peristaltic pump driving board But motor Enable signal motor fast slow switching signal etc are connected to the MCU interface of front CPU board It is mainly for peristaltic pump motor control of flowcell peristaltic pump driving board and drives the power lt is provided with manual and automatic modes lts logic control of flowcell peristaltic pump ado
22. aces where extreme variation in temperature exists e Extremely hot or cold places Places where large amount of dust exists e Places in the vicinity of electromagnetic equipments that generate magnetic field Page 10 of 47 pages RT 200C Plus Service Manual Cautions e The AC power supply should be securely grounded N to G voltage should be 5V The AC power supply should be stable and should not be used together with a high power electric apparatus A UPS stabilized power of 700W is recommended When unplugging the power cable grasp the plug instead of the cord If smoke peculiar smell or strange sound is found on the analyzer you should switch off the analyzer and contact to the maintenance center 2 3 Connection of the Analyzer TCON Temperature control RS 232 Standard RS 232 port Com TOON COM 1 Serial port o PCON Power supply control O O o Rinse Connection of rinsing pipe RS 232 LpoverI 16PIN Waste Connection of waste liquid pipe a 4 Lpowerl 16PIN 16 pin power supply port B A Rinse Vaste LpowerlI 20PIN Lpowerll 20PIN 20 pin power supply port USBI USBII USB port TCON Temperature control LAN Network interface E ee a OS CRT Monitor interface TCON con CON nis O Dc OT COM1 COM2 Serial port m USBII CRT O o Mouse Mouse interface esee ES Printer O i o jo D Keyboard Keyboard interface Mouse Rinse Connection of rinsing pipe o o o
23. ad 42 6 TROUBLESHOOTING cis cci nu RO qu Ua exa Ux Vo xu E auk YET Yeu yCuEx 2 cus cux uu cus cuseu eu vue x eaae ze kx Eee due EE 45 Page 3 of 47 pages RT 200C Plus Service Manual 1 Introduction 1 1 Operation Principle and Application Scope The instrument adopts operation principle of optical colorimetry applicable to clinic conventional bio chemical test The equipment has no energy output and is free from the risk of overheat and excess radiation The only precaution is given to the mechanic movement risk and electric shock It is required to cut off the power supply and turn off the main system when dismantling the housing for repair or for other reasons Rayto 200C Plus is simple in operation having unique screen interface and perfect information communication system being an ideal analysis instrument of the clinical chemistry laboratory Rayto 200 C Plus system is able to carry out the following operations 1 Powerful software function with a routine work table an STAT work table calibration and quality control work table In addition it is able to create 9 independent and different work tables with each work table able to accept 60 samples Note The STAT work table accepts 30 samples only 2 The instrument contains two reagent frames total 36 reagent positions with the single reagent and the dual reagent position combined optionally 3 It displays and prints result in different ways including the patient s report
24. all section of air and 100 u L distilled water into the flow cell 8 The liquid aspirating probe aspirates reaction liquid of 80uL and a small section of air into the flow cell rinse the flowcell to avoid pollution by different samples 9 The liquid aspirating probe aspirates the residual reaction liquid to the flow cell for measurement 10 The mechanical arm returns to the original position i e cleaning pool for cleaning the probe and then the next sample aspiration circulation is carried out Generally the mixing time can be set as 1 2s for measurement by using End Point or Double reagent 1 2 7 Rinsing System For avoiding cross pollution of the system continuous fresh cleaning fluid is injected into the rinsing pool to rinse the probe flow cell stirrer and pipeline The diluter will be cleaned by system after sampling and the volume of cleaning fluid is set by parameters of methodology 1 2 8 Diluting System The diluting system of Rayto 200C Plus is controlled by computer so it is highly accurate and has excellent repeatability The injector of diluter only contacts the cleaning fluid so that the reagent can t enter the injector After every diluting the cleaning fluid is injected from injector to rinse the sample probe and pipeline For ensuring the accuracy of result it is recommended that the volume of a sample should not be less than 5uL and the total volume for measurement should not be less than 450uL best in
25. ation the screen will display the required position of each reagent and will automatically calculate the total volume amount of the required reagent for the operation The reagent position in the reagent rack can be set by the system automatically and also can be set manually 1 2 6 Aspirate System Rayto 200C plus adopts the smart X Y Z 3D system driving two probes and a stirrer The probe with the function of liquid sensor contacts slightly with the liquid and absorbs the volume needed When it is short of reagent or sample the instrument will display the prompt information automatically Probe 1 is the Page 6 of 47 pages RT 200C Plus Service Manual sample aspirating probe which aspirates the reagent and the sample to the reaction hole for hatch Probe 2 is the liquid aspirating probe which absorbs the reaction liquid to the flow cell for measurement The aspiration period of probe during Rayto 200C Plus operation is as shown in follows 1 The sample aspirating probe gets into the reagent bottle and aspirates the amount of reagent as settings and a small section of air 2 Clean the probe at cleaning pool 3 The sample aspirating probe aspirates sample and a small section of air 4 Clean the probe at cleaning pool again 5 The sample and reagent are moved into the reaction hole 6 The mechanical arm returns to the cleaning pool and the probe and blender are cleaned 7 The residual sample inside is cleaned by adding a sm
26. d ensure that each hole is not broken The reaction Page 5 of 47 pages RT 200C Plus Service Manual tray is a type of disposable application Q F Y a a uw ha e ALAA T am Ma PAPA PA OOO RAS AS yoyo wey LAU i 5 SY a ear DONNA NA A NE HO OCE C COCOCOGD MOOC Tz x i z gt ISI e f ue Reaction chamber Reaction tray Note The instrument of the early version had 180 reaction holes while the instrument of new version contains 120 reaction holes 1 2 4 Sample Chamber The sample chamber contains three sample racks and among them Rack3 is the STAT sample rack only for the STAT application Each sample rack is available for 30 samples including the standards or quality control The sample rack is optional for setting small cuvette 12mm X 75mm or small plastics sample cup 700yl 1 2 5 Reagent Chamber The reagent chamber contains two reagent racks and is available for three kinds of reagent bottles i e small medium and large bottles It is available to settle at the left side of reagent rack 18 small reagent bottles 16ml or 9 large medium reagent bottles 46ml 32ml The second reagent rack is available to settle 9 large or medium reagent bottles 32ml or 18 small reagent bottles volume 16ml and available for composite usage of large medium and small reagent bottles The system can configure automatically the position of each working reagent Each time before oper
27. e distilled water install it with a pipette fill in the outlet tube be pulled out just now push the injector to inject the water into flowcell repeat the procedures above until water flow out from sampling probe of Sampling head freely If water flows in from the flowcell bottom quartz piece of the flowcell has dropped the flowcell should be replaced Pull out outlet pipe from here 5 3 Method for Handling the Blocked Sampling Probe 1 Switch off the analyzer and lift the rear cover of the analyzer 2 Remove two hexagon socket head cap screws on pump baffle remove the pump baffle and pull out one end of the pump tube as shown in figure 3 Prepare a 10ml injector to aspirate distilled water install it with a pipette fill in the outlet tube be pulled out just now push the injector to inject the water into flowcell repeat the procedures above until water flow out from sampling probe of Sampling head freely de y Dilution pump connect to Distilled water pump connect to cleaning trough Pull out pump pipe from here Page 40 of 47 pages RT 200C Plus Service Manual 5 4 Cleaning the Probe and Trough Clean the cleaning trough once each month Fill the cleaning trough with 5 1000 bleaching agent and keep the agent for 15 20 minutes and then rinse the trough with a large amount of distilled water Waste liquid hole Clean the stirrer Clean the probe Distilled water in
28. eport Data Search Standards Methodologies Cali Settings OC Settings Shut down e gt Maintenance Printer Settings Temperature Back door vol Hospital hole Dir Move x Y Diluter Select Z Select Mixer y Select Wav Select Ter Home XY Home Diluter Home Z Home Mixer Home Filter Filter Factor flowcell fast Diluterpump or W ashpump or Wastepump er flowcell slow Calibrate 250 1 000 Diluterpump off ashpump etl Wastepump otl flowcell off Inhale Area X Direction Y Direction Add 1 Reagent 0 5 zi Add 2 Sample Bo ij p mx Read Reaction fo y D Print Parameters Emergency p p ee ow zl Exit gt 4 Ue H Update 1 To water Function of each menu is as followings Hole Input hole position here click move XY to move the Sampling head to the hole Note Hole position of waste liquid hole of cleaning trough is 0 hole position of distilled water hole is 299 hole position of No 1 reagent position is 1 sample hole position No is increased from reagent hole position e g No 1 sample position is 37 if the analyzer only has 27 reagent positions No 1 sample hole is 28 The reaction hole is increased from sample hole position STAT position hole is increased form reaction hole position XY axis reset Reset the Sampling head to the original position Liquid amount Control the liquid amount of register aspiration Di
29. fluid in lotion bottle Ils the peristaltic pump in normal state Check the delivery tube Ils the peristaltic pump in normal state Check the connections of aspiration probe flow cell inlet etc The aspiration tube is too long or too short A section of aspiration tube is aging it should be replaced The flow cell is dirty ls the bulb of photometer lit Try another wavelength for reading Clean the flowcell Check the cleaning fluid Check the bulb of photometer Ils the aspiration probe blocked Page 45 of 47 pages Bad repeatability of result The aspiration of flow cell is not constant Quality control is not in target range Bubble in flowcell Bubble in injector Polluted sample RT 200C Plus Service Manual The reaction disk is dirty it should be replaced There is bubble in the flowcell it should be cleaned Check the aspiration of the flowcell The reagent amount is less than 400ul increase the reagent amount Replace the bulb of the photometer The aspiration probe isn t connected well The reaction liquid is polluted IlIs the sample amount is enough ls the reagent amount enough ls the aspiration probe blocked The peristaltic pump may be replaced Check if the reaction disk isn t damaged and install it securely Check the effective period of quality control fluid and check if it is polluted Check the item settings to
30. nal liquid amount is the intaken air amount for adjustment to let the reaction liquid to the best position of the flowcell Designation factor Adjust the aspiration time of flowcell peristaltic pump to measure the aspiration amount and reduce the residual amount in reaction tray Quantitative aspiration Control the amount of intaken liquid of flowcell peristaltic pump the aspiration amount can be inputted in the input box followed Area fine adjustment Adjust the horizontal levels of reagent position sample position reaction position and STAT position and the height of Z axis probe feed the less the value is the lower the probe feeds Click Update to save the parameters after adjustment Page 44 of 47 pages Failure The analyzer cant be started The bulb of photometer can t be lit Can t program download The printer cant be started up The printer can t print No liquid in cleaning pool No liquid in flow flowcell No reading on photometer The water blank valve is too high RT 200C Plus Service Manual 6 Troubleshooting Solution ls the plug loose Check the fuse Check the voltage Replace the bulb before checking the power supply lf the computer and analyzer are normal replace the bulb Shut down the analyzer for 10 seconds and restart it ls the plug loose Check the ON OFF button Check the fuse Is the connection in normal state ls there no cleaning
31. nwards perpendicular to the horizontal plane and install to the Z axis However the other procedures are the same Page 37 of 47 pages RT 200C Plus Service Manual 5 Maintenance RT 200C Plus is a precision clinical analyzer For ensuring its good conditions daily maintenance should be done Maintenance of RT 200C Plus is very simple but it should be carried out carefully 5 1 Basic Maintenance Cleaning of the analyzer surface 1 Keep the operating environment of the analyzer clean 2 Neutral detergent and wet cloth can be used for cleaning the surface of analyzer 3 Please use a soft cloth to clean the LCD Daily maintenance 1 Empty the waste bottle 2 Fill the lotion bottle 3 Check if the printer paper is sufficient Half year maintenance 1 Replace the pump tube for the peristaltic pump 2 Rinse the cleaning flowcell add several milliliter of dilute bleaching agent 5 1000 3 The minimum design life of photometer bulb is 2000 hours you should replace the bulb with a new one when the time comes 5 2 Maintenance of Flow Cell The flowcell installed inside is made of stainless steel of which precision is high temperature rises quickly and constant temperature is accurate Temperature conversion is carried by Peltier which ensure the internal temperature of flow cell is constant quickly Characteristic Volume 50uL Window diameter 7 5mm Optical path 10mm Weight 10g Page 38 of 47 pages RT 200
32. o PCON Lpowerll 20PIN Keyboard Waste Connection of waste liquid pipe m Printer Printer interface PCON Power supply control Lpowerl 16PIN 16 pin power supply port Lpowerll 20PIN 20 pin power supply port Page 11 of 47 pages RT 200C Plus Service Manual IM LA A COND USBI e Jo pe p USBIT Printer UU LpowerlI 20FIN Analytical Unit control Unit Connect the white plastic connector from rack to the white connector on the cover of distilled water bottle insert its sensor into the Wash interface on the rack Insert one end of the thick catheter into waste outlet inside the rack and insert the other end into the waste bottle Insert one end of the thin catheter into the Rinse interface of the main unit and insert the other end into the Rinse interface of the rack Insert one end of the printer data line into the Printer interface at the rear of the rack insert the other end into the data interface of printer and connect the power supply of the printer Insert one end of the display data line into the CRT interface at the rear of the rack insert the other end into the LCD data line interface and connect the power supply of LCD Insert the mouse line into the Mouse interface at the rear of the rack and insert the keyboard line into the Keyboard interface at the rear of the rack Page 12 of 47 pages RT 200C Plus Service Manual 3 Functions 3 1 Function Block Diagram of RT
33. of absorbency value wavelength 347 mABS Water blank value Manual Automatic Volume Hole Inhale Move J o lo 8 Press MANUAL PUMP key for aspirating distilled water to the flow cell 9 Adjust the positioning button 3 for adjusting the lamp vertically and observe the value on screen simultaneously and then adjust the positioning button 4 for adjusting the lamp transversely until the absorbency value reaches the minimum value it should be less than 300mAbs 10 Tighten the fixing button and close the rear cover 11 Shut down the system Caution Do NOT expose your eye to direct ultraviolet ray of 340nm to avoid eye injury during adjusting the lamp position Page 23 of 47 pages RT 200C Plus Service Manual Fig 69 Lamp DLamp 2 Pin of lamp 3 Vertical positioning button Level adjuster Fixing button Lamp holder Lens SH Motor Level converter of lamp 4 3 Replacement of Peristaltic Pump tube 1 Lift the rear cover you can see the peristaltic pump on the right as shown in below figure Remove two hexagon socket head cap screws Remove the fixing board Remove the pump tube 3 and replace it with a new pump tube of the same size a Qe I9 Reassemble and start up the system to check whether it is normal Note There is two peristaltic pumps at the left rear of the analyzer the replacement method of pump tube is the same as the method above Page 24 of 47 pages RT
34. oups of AC 18V Pin 4 is idle Pins 5 6 are one group of AC 48V 3 2 2 Front CPU Board The front CPU board is the control center of the whole analyzer it is connected to rear control board through J6 to implement the rear control command the smallest sub system is consisted of H8S 2350 memory chip U29 and U30 of front CPU control signal is implemented by IO interface of H8S 2350 and outputted to each control board after driving the logic control of the board is implemented by the on board EPLD element clock signal of X Y axis and injector motors is generated by chip 8254 the board also implements data collection for analog signal which is inputted through interface J2DMA and be used for A D conversion by ICL7109 and collection by H8S 2350 after signal amplification and log conversion Diagram of a real front CPU board board No 02 J7 RS 232 ra TU A d im rm e P2 E te icit diu unii m i Li IM n abe ba Bs ak e rd ide Pelis ZUM idi ii 2285 Ir J6 RS 232 D PR6 ei x Lini ses LL ad T L B t MA ET as A Lat F PE inu amp DTE uE r T T Fae ET Fi y gio c dai CUu LI E INTE IT T A P ie E ATT bn af i cipi ain us P mL G urs Hi tiima E z lL E HIM mm a H EHE BL TT i dol d d a 3 LET PET F IILERTETI Lis parara a J2 Connect to injector driving board J1 Connect
35. own in Fig 6 and then install the installation block carefully The column CD on Z axis should be set in groove D of the installation block and the column 2 on pendulous reed should be set in groove of the installation block Install the metal pole 7 Turn the black disc on Z axis control panel at the rear of the analyzer Z axis encoding disc by hand and check if the sample probe and stirring rod move freely If they move freely the next procedure can be carried out if not you should reinstall them 8 Install the metal panel for the sample probe 9 Install the two metal probes and close the plastic cover for Sampling head Note It is the same as the method to replace the contact spring of stirring rod 4 14 Regulation of X axis Zero Point The positioning of X axis zero point can be carried out by limiting baffle on X axis together with X axis positioning optical coupler on XYZ switching board When it moves to the limiting baffle and block the detecting optical coupler XY driving board detects the voltage change feedbacked by optical coupler and determines the zero point is reached and stops moving Regulation of X axis positioning is mainly for limiting the position of the baffle Page 33 of 47 pages RT 200C Plus Service Manual Ezi l X IL XYZ switching E T j y Large ribbon cable board k A at rfoce Control E E Ss X axis limiting baffle The regulation method is as follows
36. probe reaches the level of the measured liquid by contacting the mechanical contact Page 21 of 47 pages RT 200C Plus Service Manual 4 Replacement of Accessories 4 1 Disassembling RT 200C Plus is a complicated high precision analyzer In case a failure that can t be solved according to the method above the analyzer should be repaired by professional personnel who can find out the problem and part should be repaired or replaced Please disassemble the analyzer according to the following procedures 1 Switch off the power switch 2 Remove four screws of the rear baffle with screwdriver 3 Lift the rear cover of the analyzer Now we can see the internal structure of the analyzer clearly for repair Page 22 of 47 pages RT 200C Plus Service Manual 4 2 Replacement of Lamp 1 Shut down the system and lift the rear cover of the analyzer Pull out pin P1 of lamp from PCB Remove the positioning button 3 Loosen the fixing button and remove the lamp carefully a X Jo Insert a new lamp and screw the positioning button 3 but not fix the button Pay attention to your hand to avoid touching the bulb the bulb can be wrapped up by plastic film Insert pin P1 of the lamp into socket J8 on PCB 6 Startup the analyzer and enter the System Monitoring program 7 Select wavelength 340nm measured mean value of water blank will be displayed on the screen continuously as shown in figure below 1 Monitoring
37. pts a piece of programmable logic component GAL16V8B driving chip adopts two pieces of L6202 of which operating voltage is 12V and driving current reaches 1 54 The driving chip is integrated with CMOS power switch diode and motor braking protection circuit 3 2 10 Signal Receiving Board The signal receiving board is connected to AD part of front CPU board directly through a coaxial cable of which characteristic impedance is 50ohm It sends photoelectricity signal to AD module on front CPU board for processing It is mainly for sampling luminous intensity Its function is implemented by photoelectric cell KHS14 and the signal is converted into voltage analog signal by I V conversion chip LF356N Page 20 of 47 pages RT 200C Plus Service Manual Diagram of a real signal receiving board board No 12 From left to right DC 15V GND signal receiving and DC 15V 3 2 11 X axis Encoding Board X axis encoding board is connected to front CPU board through XY driving board and feedbacks signal to the front CPU board 3 2 12 Y axis Encoding Board Y axis encoding board is connected to front CPU board through XYZ switching board and XY driving board and feedbacks signal to front CPU board 3 2 13 Liquid Level Detecting Board The liquid level detecting board is connected to front CPU board through Z axis control board XYZ switching board and XY driving board and feedbacks signal to front CPU board It detects whether the sample
38. rection Two operating state 0 and 1 0 means injector aspiration and 1 means injector injection Injector operation Let the injector aspirate or inject according to the inputted liquid amount Injector reset Let the injector reset to the original position Injector debug Control the state of sample probe there are several states as follows the other states are not used To cup bottom Feed the sample probe to cup bottom To level surface Feed the sample probe to level surface Page 43 of 47 pages RT 200C Plus Service Manual To liquid injected position Feed the sample probe to liquid injected height Z axis reset Reset the Z axis to the original position Stirring rod debug control the state of the stirring rod Generally the stirring rod has ON OFF state the other states are not used Stirring rod reset Reset the stirring rod to the original state Wavelength selection Select the desired wavelength Filter wheel reset Reset the filter wheel to the original state Temperature setting Select the desired temperature of the analyzer Filter factor Set the correction factor of the filter Generally it is not used Peristaltic pump state debug Test the operating state of peristaltic pump switch on off the peristaltic pump Addition liquid amount After a aspiration of a certain amount of reaction liquid a certain amount of air is required to send the reaction liquid into the flowcell The additio
39. rew on sample probe as shown in figure above remove the sample probe 3 Replace it with a new one fix it in the same way and fix the hexagon socket head cap screw 4 Close the cover for the probe Note You should connect the sampling probe to the installation holder first and install it on Sampling head for replacement of sampling probe As shown in the upper right figure Note The sample probe structure of analyzer of old version is different from that of the new version 4 13 Replacement of Z axis Contact Spring 1 Switch off the analyzer lift the rear cover of the analyzer and remove the plastic cover on sampling head Page 31 of 47 pages RT 200C Plus Service Manual 2 Remove screws D and in the Fig 1 below and remove two metal probes 3 Remove screw 3 in Fig 1 below remove the metal cover you can see the structure as shown in Fig 2 4 Remove the metal rod as shown in Fig 3 and remove the installation block for Sampling head as shown in Fig 4 Groove 2 5 Remove the contact spring replace it with a new one fix the new contact spring in the same way Page 32 of 47 pages RT 200C Plus Service Manual Small column column Bit 6 Remove the Sampling head of installation block of sampling head as shown in Fig 5 During installation of installation block of sampling head adjust the Z axis to the position that is perpendicular to the plane first as sh
40. s control board is connected to front CPU board through XYZ switching board and XY driving board and is controlled by front CPU board The motor clock signal is controlled by timer TPU integrated in MCU of front CPU board which controls the speed and rotation position Motor direction signal motor Enable signal and motor reset signal are offered by interface on MCU of front CPU board It is mainly for controlling and power driving the Z axis motor of XYZ 3D mechanical arm Logic control of Z axis control board adopts a piece of programmable logic component GAL16V8B the driving chip adopts two pieces of L6202 of which operating voltage is 12V and driving current reaches 1 5A The driving chip is integrated with CMOS power switch diode and motor braking protection circuit Diagram of a real Z axis control board board No 07 Page 17 of 47 pages RT 200C Plus Service Manual J2 Z axis motor 43 Liquid level detection from left to ower DC12V right connection to level sensor ae connection to stirrer GND and D id porel optical coupler EIA CNO a ALA O gt Hit SA ul I i Rayto Electronics inc CON V 21 3 2 6 XYZ Switching Board It is mainly for controlling Z axis motor signal for long wiring driving and detecting X axis motor reset signal The signal driving of Z axis control board is implemented by 74L S244 and reset signal of X axis motor is implemented by optical coupler Diagram of a real XYZ
41. see whether the parameters are needed to changed Retest in another way Check the temperature of flow cell and incubator use new reagent or quality control to measure again The tube between sample probe and flow cell is damaged or not connected well The tube is too long or too short ls the connection of the tube in normal state Check the sealing of the piston and leakage of gas Use Tween 20 solution to clean the injector 2 drops L of distilled water Replace the O ring inside injector Check the tubeline connected to injector A leakage occurs to sample probe resulting from bad connection Clean it properly or replace the probe Clean the rinsing trough ls there residual liquid on the probe ls the cleaning fluid new or not polluted Clean the flow cell Page 46 of 47 pages RT 200C Plus Service Manual Rinse it twice when item setting The_ reaction tray is dirty replace it with a new one The sample cup is dirty replace it with a new one The temperature of Check the temperature setting and adjust it to 37 C incubator is too low A leakage of liquid Is the outlet tube for waste liquid inserted into the waste occurs to the bottom of bottle the analyzer Overflow from waste bottle The rinsing trough is blocked If a failure occurs please contact to agency or Rayto in time to get technical support RT 200C Plus Calculation item settings For calc
42. switching board board No 04 J1 Connect to XY X axis positioning driving board J3 optical coupler E Le e log niuis iie i poe fI J3 Connect to Z axis J4 Connect to Y axis control board J1 J2 Supply Y axis motor with DC24V encoding board Page 18 of 47 pages RT 200C Plus Service Manual 3 2 7 Photometer Board The photometer board is connected to front CPU board directly and controlled by front CPU board lts motor signal is controlled by the timer TPU integrated in MCU of front CPU board which controls the speed and rotation position Motor direction signal motor Enable signal and motor reset signal are offered by interface on MCU of front CPU board In addition it is connected to power control board through external 25PIN cable The power control board is for precise control of flowcell temperature offers signal interface and power interface It is mainly for control and power driving of filter wheel motor in light path system and offers temperature control interface of flowcell lts logic control adopts a piece of programmable logic component GAL16V8B driving chip adopts two pieces of L6202 of which operating voltage is 12V and driving current reaches 1 5A The driving chip is integrated with CMOS power switch diode and motor braking protection circuit Diagram of a real photometer board board No 09 J7 Connect to J6 Connect to J5 Filter wheel J12 Voltage input DC12V Peltier temperature sensor motor
43. to X Y axis driving board J2 IMAN A fa TR 7 COPE as ad ft a ct PR Ck he he a F J3 Connect to pump alarm board J5 J4 Connect to J5 Connect to photometer TCOM interface board J2 Page 15 of 47 pages Connect to AD receiving board J1DMA Connect to photometer board J3 PR1 PR5 TP3 TP4 PR2 PR3 Voltage input from up to down Idle GND GND and DC 5V RT 200C Plus Service Manual 3 2 3 XY Driving Board One end of the injector driving board is connected to front CPU board the other end is connected to XYZ switching board It is controlled by front CPU board and its motor clock signal is offered by 82C54 with Timer counts IC which controls the speed and rotation position of the motor Motor direction signal motor Enable signal and switching signal to low consumption of motor are offered by front CPU board The main functions it implements are to control the X and Y axis motor drive the power and switch between low consumption and operating mode The logic control of XY driving board adopts a piece of L297 driving chip adopts a piece of L298 of which operating voltage is 24V and its driving current is set by the reference voltage of L297 Y axis motor is connected by XYZ switching board In addition the board only offer switching for the control signal of Z axis motor Diagram of a real XY driving board board No 03 Power input from left to right DC24V Connect
44. ulation item its name and number code should be write according to the codes below otherwise the calculation item can t be displayed 1 GLB TP ALB ALB GLB ratio 2 TBILI DBILI IBILI 3 AST ALT J AST ALT ratio 4 LDH AST LDH AST ratio 5 GGT AST GGT AST ratio 6 ApoA ApoB ApoA ApoB ratio 7 LDL CHOL HDL TRIG 2 2 Note This manual may cover other ownership statement and copyright information you should observe and conform to their clauses Technical information or misprint might exist on the manual Further notice might not be made if any change or renew is made for the manual Further notice might also not be made by Rayto if any improvement and or change is made for the product and or program described in the manual Page 47 of 47 pages
45. ve X axis to the reaction position and feed Z axis click Quantitative Aspiration after adding 400ul at quantitative aspiration position After the aspiration is complete observe the position where the liquid reaches after passing through the flowcell A section of liquid without bubble should be kept at both ends of the flowcell 1 2 or 2 3 of liquid should pass through the flowcell If there is less liquid at the first half there is more liquid at the second half so you can reduce Additional Liquid Amount to adjust if there is more liquid at the first half there is less liquid at the second half so you can increase the Additional Liquid Amount to adjust 5 6 Backdoor Program Debugging Click left button several times at bottom left corner of the main menu backdoor password input window pops up After inputting password 888888 the backdoor program can be accessed d 4 205 PLUS Auto air alzar Worksheet Results Configuration Information System Help ADA Test ST AT Report Data a Standards Methodologies Cali Settings QC Settings gt Maintenance Printer Settings Temperature Shut down Input passw Common users are not permited to enter backdoor Password 9999980 Click here several times and input password Page 42 of 47 pages RT 200C Plus Service Manual Worksheet Results Configuration Information System Help 192 ups Test STAT R
46. ws the installation method of Z axis control board of the new version Comparing with Fig 1 the installation directions of the two methods are opposite but the regulation principle is the same The regulation method is as follows 1 Switch off the analyzer and lift the rear cover of the analyzer 2 Move the Sampling head to the original position the sample probe just faces towards the waste liquid hole At this time observe the positions of Y axis positioning optical coupler and limiting baffle the limiting baffle should just block the middle of the optical coupler If not you can adjust the position of limiting baffle 3 After the adjustment start up the analyzer to check the Y axis position during start up self test If an offset exists you should go on adjusting If the probe feed position is accurate the regulation is complete close the rear cover of the analyzer 4 16 Regulation of Z axis Zero Point The positioning of Z axis zero point can be carried out by Z axis encoding disc on Z axis together with Z axis positioning optical coupler on Z axis control board Z axis control board detects the feedbacked voltage signal change and determines the operation of sample probe or stirring rod Z axis positioning is mainly for regulation of Z axis encoding disc position Page 35 of 47 pages RT 200C Plus Service Manual j Ves e Z axis positioning optical coupler NOOZ 7C Z axis encoding disk Z axis in the middle
Download Pdf Manuals
Related Search
Related Contents
AGEFOS PME Aquitaine AirMagnet Directional Antenna User's Manual 富士イメージングプレート FOCUSED PHOSPHOR PLATE-200 エコキュート Samsung Galaxy manual de utilizador GP-PRO/PBIII C-Package02 Setup Guide - Pro CR-3306 BT Rádio FM com Bluetooth® MANUAL DO USUÁRIO Document OmniPage sans titre Copyright © All rights reserved.
Failed to retrieve file