Home
Mentor EI-65 Service Manual
Contents
1. HG 1 SYSTEM MALFUNCTION nn oc OMEN URBE 1 SYSTEM DESCRIPTION nissen ee 1 2 WARNINGS H 2 3 TROUBLESHOOTING USING THE ANALOG VALUES 3 4 TROUBLESHOOTING FLOW 4 4 1 GENERAL FLOW CHART nenne nein 4 4 2 NO DISPLA f ee 5 4 3 ANTI TWO BLOCK PROBLEM 4 oni v ak a 6 4 4 ANGLE READING PROBLEM in in in i naar nennen 8 4 5 LENGTH READING PROBLEM 5 nn iR oni 9 4 6 LOAD READING PROBLEM une 11 5 ERROR CODE TABLE 13 6 SYSTEM DRAWINGS E 15 6 1 DRAWING 1 SYSTEM WIRING DIAGRAM 16 6 2 DRAWING 2 SYSTEM WIRING DIAGRAM LINKBELT 21 6 3 DRAWING 3 CONNECTION BOARD 424 2440 23 6 4 DRAWING 4 ANGLE SENSOR 24 6 5 DRAWING 5 LENGTH SENSOR oki v ka n v no 25 6 6 DRAWING 6 LINERIDER CIRCUIT v 26 6 7 CAN BUS COMMUNICATION inne 26 6
2. woos Z M 32 1 11303133 0 SNOLVTIVISNI 301 371 6126 www skyazul com SkyAz l Equipment Solutions MENTOR El65 SERVICE MANUAL 18 s jog suonnjos jueuidinb3 inzyAys LIM LI4O0O4LIY 8913 YOLNAW HOSIA 110 090 200 160 ZL azv WOOG 9EL 001 010 1 0 91 AIanassv 318 2 00 90 029 900 MOSN3S 8 4 3 s t 111111 vZ 001 00 1 0 1334 318 2 9 1 001 010 1 0 3SvB MOO8 301 371 6126 www skyazul com SkyAz l Eguipment Solutions 19 SYSTEM DRAWINGS gjo p X suonnjos jueuidinb3 Inzy xs LIM LI4OY LIY 89134 YOLNSW HOSIA 110 090 200 160 71 azv 9 1 001 010 1 0 91 18 355 718V2 6 8 4 9 s 2 Z 001 00 1 0 1338 9 1 001 010 1 0 291 090 00 1 0 967 001 006 LEO 3SvH WOOS NOLLONAP NVO OL 301 371 6126 www skyazul com SkyAz l Eguipment Solutions MENTOR El65 SERVICE MANUAL 20 6 05 eBed suonnjos juawdinb3 nzy xs LIM 114039138 893 YOLNAN OSIA 5 31545 0350 5 10 0 2 NMOHS SY 2 5 431 03 2 ONY G3LVINSNI OTJIHS AUNO 03491 430 110 OT3IHS lt lt NMOHS SY 200 0
3. U u OAD 8 LENGTH SENSOR 10 K TURNS MINIMUM AND MAXIMUM VOLTAGES ARE MEASURED BETWEEN THE SENSOR AND TERMINALS 0 200V MIN SIGNAL RETRACTED BOOM 1 800v MAX SIGNAL 10 TURNS ON POT SkyAzul Equipment Solutions RETRACTED BOOM O MAXIMUM SIGNAL 1 8V 3 3 2 00V SUPPLY LENGTH SENSOR CODE 200V MIN WORKING RANGE 1 800V ERROR Nz N CODE 5 CAH 2 00V www skyazul com 301 371 6126 26 MENTOR El65 SERVICE MANUAL 6 5 DRAWING 6 LINERIDER CIRCUIT MAIN OR AUX TRANSDUCER CONNECTION BOARD O an 71 FORCE TRANSDUCER 4 d V VDC mm C on i 2 A SIG DL 1 gt P4 SIG 5 64 GND KMD 1 Lil cc FORCE TRANSDUCER MEASURING FORCE IN se INERIDER OPERATING WINDOW 2 00V DIFFERENTIAL OUTPUT SIGNAL pini E81 83 MEASURED BETWEEN SIG 0 00V AND SIG P4 WORKING ZERO FORCE 0 00V 25mV RANGE MAX RATED FORCE 2 50V 2 50V ERROR EBD CODE L L 2 2 5 00 6 6 CAN BUS COMMUNICATION The System measures the length of the main boom the angle of the main boom the pressures of the lift cylinder and the A2B state of the machine via a CAN Bus connection Since this is a digital bus connection it is not possible to me
4. 21 ___ LOAN Ave 00 Alddns iusOuSND vO 6 TWNOSS 1 vols 9 ____ ___ Kos ______ 2 9 Ll AMS v 68 TWNOISSIdIONV v AlddnS NINY HLOND Ed NISHINI 2959 2 Alddns 3 ONv HIONS 620 1 3957 31809 woos 318 WOOS8 LL OL AlddNS 53 AZL Zt OL AlddNS S3NVHO 29 OL 295 WOd4 S3NVHO NO 304 2 H3OIS3NIT AlddNS Z Aldd NS Z 21 HO Aldd STONY JwNOIS ___ 5 NINY _______ 1ON _______ 82 _______ 5 82 _____ 5 31849 WOO M3QlJ3NIl M 11303138 96 3 INSIS 2059 WNOISZ3IONV 1965 AlddhS ____ 1 6 AlddhS 31ONV cos 8 ONIO 2 1 9 Pp AS Sey v 8S IWAS AIONA VAS v INSIS Lu 9 5 b AINN vo Z 314405 APO 21 SO AZU 39 80
5. y T EQUIPMENT SOLUTIONS Mentor El65 SERVICE MANUAL NOTICE SkyAz l makes no warranty of any kind with regard to this material including but not limited to the implied warranties of merchantability and or its fitness for a particular purpose SkyAzul will not be liable for errors contained in this manual for incidental or consequential damages in connection with the furnishing performance or use of this manual This document contains proprietary information which is protected by copyright and all rights are reserved No part of this document may be photocopied reproduced or translated to another language without the prior written consent of SkyAzul SkyAzul reserves proprietary rights to all drawings photos and the data contained therein The drawings photos and data are confidential and cannot be used or reproduced without the written consent of SkyAz l The drawings and or photos are subject to technical modification without prior notice All information in this document is subject to change without notice SkyAz l Inc wall 200 W Main Street Suite 2A Middletown MD 21769 EQUIPMENT LUTIONS Fax 301 371 0029 A info skyazul com SkyAz l Equipment Solutions www skyazul com 301 371 6126 MENTOR EI65 SERVICE MANUAL Table of Contents 1 GENERAL INFORMAT ION xta ra 25250000820 40 undue onera auia acu put sz n t ag E Pneu oz 1 REFERENCE M
6. When these faults occur contact your authorized dealer or service organization 90000 1b 47 7 MAIN 3 If the operator identifies a possible problem in the system perform the pre operation inspection Section 5 in the Operator s Manual to define the problem SYSTEM DESCRIPTION The Length Angle Radius Load Indicator System Mentor EI65 has been designed to provide the crane operator with the essential information required to enable the machine to be used within its design parameters The Mentor El65 System indicates the length and angle of the boom tip height working radius and the total weight being lifted by the crane Using the various sensors and the limits set by the operator the Mentor El65 System warns the crane operator of certain approaching hazardous conditions which could occur during the operation of his crane WARNING Always refer to operational instructions and load charts provided by the crane manufacturer for specific crane operation and load limits SkyAzul Equipment Solutions www skyazul com 301 371 6126 MENTOR EI65 SERVICE MANUAL WARNINGS The Mentor EI65 is an operational aid which warns a crane operator of certain approaching hazardous conditions which could cause damage to equipment and personnel The device is not and shall not be a substitute for good operator judgment experience and use of accepted safe crane operating procedures The responsibility for the safe operation of the crane shal
7. diagram or connection board designations this manual Check system power supply voltage No Complete to Section 4 2 No Display Check the voltage at line rider between connector pins A V and GND Voltage 12 to 20 Refer to Drawing 7 in Section 5 and the Installation Manual for system wiring diagram On a 12V crane jumper out the zener diode Cable defective replace cable or cable assembly Refer to Installation Manual for system wiring diagrams Next Page SkyAzul Equipment Solutions www skyazul com 301 371 6126 12 MENTOR EI65 SERVICE MANUAL PREVIOUS PAGE Remove hoist rope so there is no load on the load cell of the linerider Check the zero point of the linerider on connection board between Main SIG4 and SIG4 Aux 51624 and SIG2 if there is no length sensor 51614 and SIG1 if there is no second angle sensor or If length sensor and second angle sensor are being used then another board will be needed Aux 51614 and SIG1 Voltage 0 0 025V Refer to Drawing 6 Linerider Circuit in Section 5 and the Installation Manual for system wiring diagrams With no load on the load cell of the linrider Check the zero point of the linerider in the boom tip junction box or as close to the linerider as possible Check the Main and signal and or check the Aux and signal at Voltage 0 0 025V Refer to Drawing 6 Linerider Circuit in Section 5 and the Installation Manual for system wiring di
8. power 12VDC or 24VDC GND Crane ground OVDC CAN L CAN bus low signal CAN H CAN bus high signal For the second converter possibly used for a second force sensor if the length and second angle sensor are used the Module ID switches need to be set as shown below not the same as shown above unum SkyAzul Equipment Solutions www skyazul com 301 371 6126 24 MENTOR 65 SERVICE MANUAL 6 3 DRAWING 4 ANGLE SENSOR CIRCUIT A ANGLE SENSOR PENDULUM WG 203 E FIXED RESISTOR PART OF THE ANGLE POTENTIOMETER i s MINIMUM SIGNAL H ANGLE 4 2 SENSOR lt MAXIMUM SIGNAL 1 250V 0 ANGLE FIXED RESISTOR PART OF THE ANGLE POTENTIOMETER YV 0 750V 90 ANGLE 3 NOTE MINIMUM AND MAXIMUM VOLTAGES ERROR ER ARE MEASURED BETWEEN THE CODE SENSOR AND TERMINALS 90 MINIMUM SIGNAL WORKING 0 750v 90 ANGLE RANGE MAXIMUM SIGNAL ne 1 250v 0 ANGLE i CODE E941 E96 1 E x SkyAz l Equipment Solutions www skyazul com 2 00V SUPPLY 0 00V 0 750V MIN x N 7 TERMINAL 1 250 2 00V 301 371 6126 SYSTEM DRAWINGS 25 6 4 DRAWING 5 LENGTH SENSOR CIRCUIT 1 4G2 0 00V GROUND FIXED RESISTOR 92 CABLE REE ASS Y ZERO ADJUSTN 9 RETRACTED BOOM 2 42 Ar 5 6 x
9. 3193NNOO ONY Q31V1nSNI OTJIHS NINNI YOLIINNOO 1v 085 GOING and S xog NOLLONNP Y3LAVOW NVI OL 1 1 Tas JA 319V1d303M 14X905 9 al 301 371 6126 www skyazul com SkyAz l Equipment Solutions 21 SYSTEM DRAWINGS DRAWING 2 SYSTEM WIRING DIAGRAM LINKBELT 210 jueuudinb3 jpzy xs LIJOSL33 LIZEYNIT S93 HOLNJW YOSIA HOSNIS JI9NY NOOB OL a 301 371 6126 www skyazul com SkyAz l Eguipment Solutions 22 MENTOR EI65 SERVICE MANUAL ACH 270 iVISOR MENTOR 65 LINKBELT RETROFIT SkyAz l Equipment Solutions Page 2 of 2 d 2 EHE i je 031 300 100 417 12 INSERT FOR COMPACT SIRAN REUEF GROUND AT CLAMP SOLDER AN INSULATED WIRE TO INNER 3 ANO CONNECTED AS S OWM 048 500 060 005 7 87 OR 048 500 060 006 17 031 300 100 417 127 A28 031 300 100 507 127 031 300 100 507 127 SkyAz l Eguipment Solutions www skyazul com 301 371 6126 SYSTEM DRAWINGS 6 2 DRAWING 3 CONNECTION BOARD LAYOUT Baud Modul ID P1 P2 P3 2 0V supply G1 G2 G3 G4 Sensor Ground Sensor input Sensor input V Crane
10. 7 1 Troubleshooting TEXT CAN BUS ERROR 27 6 8 DRAWING 7 LINERIDER SUPPLY 5 28 6 9 SPARE PARTS LISTINGS tg E Oa Few EVE iii 29 SkyAz l Equipment Solutions www skyazul com 301 371 6126 SkyAz l Eguipment Solutions www skyazul com 301 371 6126 GENERAL INFORMATION 1 1 GENERAL INFORMATION The purpose of this service manual is to provide additional information to assist a service or maintenance person in identifying malfunctions or system problems with the Mentor El65 System A digital voltmeter and regular maintenance and service tools will be required to troubleshoot the system Note Knowledge of how to use a digital voltmeter is assumed REFERENCE Operator s Manual 190231 Calibration Manual 190232 Installation Manual 190233 SYSTEM MALFUNCTION In case of a malfunction of the system a code that identifies the system malfunction will be displayed in the upper right portion of 88780 lb the display The error codes are listed in Section 5 Error Codes The table identifies various faults that can occur with the Mentor El65 explain each fault and describe the action which shall be taken to correct the fault Faults within the electronic microprocessor shall be repaired by factory trained service personnel
11. agrams Check cable continuity Replace cable if necessary Replace Load Cell or Linerider Assembly Lift test load and verify linerider output voltage increases after lifting the test load Check the zero point of the linerider on connection board between Main SIG4 and SIG4 Aux 51624 and SIG2 if there is no length sensor or 51614 and SIG1 if there is no second angle sensor or If length sensor and second angle sensor are being used then another board will be needed Aux 51614 and SIG1 Voltage 0 0 025V Refer to Drawing 6 Linerider Circuit in Section 5 and the Installation Manual for system wiring diagrams Complete steps 4 1 4 2 4 3 4 11 Main or 4 1 Aux through 4 16 in the Calibration Manual Do NOT select Default in section 4 4 or all other calibration data will be lost and you will have to complete the entire calibration procedure No Replace Load Cell or Linerider Assembly SkyAzul Equipment Solutions www skyazul com 301 371 6126 SYSTEM DRAWINGS 5 ERROR CODE TABLE Error code Reason Action adjust operating data incorrect defective 96 ADG Measuring value WG2 voltage too high Check luffing angle sensor circuit e Limit set by the operator refer to Operator s Manual Section 4 3 Activating and Setting Preset Limits SkyAzul Equipment Solutions www skyazul com 301 371 6126 SkyAz l Equipment Solutions www skyazul com 301 371 6126 SYSTEM DRAWINGS 15 6 SYSTEM DRAWINGS The Men
12. al and pin 1 ground Retract boom 0 Potentiometer turn 0 2V 10 Potentiometer turn 1 8V Refer to Drawing 5 Length Sensor Circuit Replace length potentiometer assembly Remove slip ring body from shaft and remove gear wheel from potentiometer axle Unscrew mounting plate and remove potentiometer assembly from mounting plate Remove assembly wires from terminal block Connect new assembly to terminal block Reinstall mounting plate gear wheel and slip rings With boom fully retracted reset potentiometer by turning counter clockwise until it stops Measure signal from length transducer at console connection board between G2 ground and P2 signal 0 2V and 1 8V Refer to Installation Manual for system wiring diagram or connection board designations this manual Cable defective replace cable or cable assembly No Refer to Installation Manual for system wiring Connection board defective Yes SkyAz l Equipment Solutions www skyazul com 301 371 6126 LENGTH READING PROBLEM 11 4 6 LOAD READING PROBLEM PROBLEM Displayed Load is out of tolerance The displayed load should be egual to or 10 greater than the actual load START Complete Pre Operation Inspection in Section 5 of the Operators Manual Before changing calibration information complete the following steps Check the Main Aux voltages on connection board between Crane Power V GND 12V or 24V Refer to Installation Manual for system wiring
13. asure the signals on the bus with a multimeter Instead the Mentor El65 provides you with error codes that give you an indication of the bus state The error codes are one of the following CAN BUS ERROR Error in the CAN bus data transfer for all CAN units SkyAzul Equipment Solutions www skyazul com 301 371 6126 SYSTEM DRAWINGS 27 Block Diagram Mentor Console CU Sensors CAN Bus Converter The block diagram tries to clarify that If the CU does not see any CAN Bus component it will report a CAN BUS ERROR 6 6 1 Troubleshooting TEXT CAN BUS ERROR In case of a CAN BUS error ensure that the CAN bus cable from the Mentor El65 to the Analog to CAN converter is connected When power is correctly applied to the CAN converter one or both of the LEDs on the converter board will be lighted If the converter board has power but is not communicating with at least one other CAN device on the bus including a second CAN converter module the ON CAN LED will switch between flashing green and red Connector M12 5 contacts Pin Layout CiA DR 303 1 7 2 Pin 1 Shield 5 Pin2 U Pin 3 Ground Pin 4 CAN High Go Pin5 Low Measure between pins 3 and 2 for crane voltage If you see voltage check all pins for continuity The central unit must be replaced if this cable is functioning correctly Use the Ohm meter to check the connector in the cable reel Either the connector has failed or the can bus co
14. etween 2V and G3 ground Refer to Installation Manual for system wiring diagram Check system power supply voltage Refer to Section 4 2 No Display this manual Check the voltage at angle sensor between connector pins A AGND and C 2V Refer to Installation Manual for system wiring diagrams Cable defective replace cable or cable assembly Refer to Installation Manual for system wiring diagrams Check the voltage between G3 ground and SIG signal output voltage Voltage should be 1 25V 09 1 0V 459 0 75V 90 9 Refer to Drawing 4 Angle Sensor Circuit in Section 6 Replace Angle Sensor Refer to Installation Manual Section 5 Mechanical Adjustments of Cable Reel Sensors Complete steps 4 1 4 2 4 3 4 8 4 8 1 and 4 14 through 4 16 in the Calibration Manual Do NOT select Default in section 4 4 or all other calibration data will be lost and you will have to complete the entire calibration procedure SkyAz l Equipment Solutions www skyazul com 301 371 6126 LENGTH READING PROBLEM 4 5 LENGTH READING PROBLEM PROBLEM Length reading incorrect Crane is not in out of load chart condition START Check mechanical adjustment of length potentiometer in cable reel Refer to Installation Manual Section 5 Mechanical Adjustments of Cable Reel Sensors If unable to adjust replace length potentiometer assembly Remove slip ring body from shaft and remove gear wheel from potentiometer axle Unscrew m
15. l remain with the crane operator who shall ensure that all warnings and instructions supplied are fully understood and observed Prior to operating the crane the operator must carefully and thoroughly read and understand the information in the operator s manual to ensure that he she knows the operation and limitations of the indicating system and crane SkyAzul Equipment Solutions www skyazul com 301 371 6126 Troubleshooting Using The Analog Values Screen 3 3 TROUBLESHOOTING USING THE ANALOG VALUES SCREEN For a sensor error or problem with a sensor look at the output voltage of the linerider and angle sensors and compare the reading with the following Angle sensor 1 875 at 0 2 5 at 45 or 3 125 at 90 Linerider under no load is 0 to 15mV not to exceed 2500 mV To access the analog output screen use the following procedure 1 Power up the system The screen will display Mentor El65 with the software version and date 2 When the startup screen shows MENTOR El65 and the startup version press the i button to enter the service mode The screen will change to CALIB PASSWORD 3 Enter the calibration password 0815 Use the UP and DOWN buttons to select the number and the OK button to confirm each entry Enter 0 OK 8 OK 1 OK 5 OK 4 Scroll to the ANALOG VALUES screen by pressing the UP or DOWN arrows pressing OK to select and show the following screen All Analog input voltages shown i
16. n millivolts received from the sensors will be displayed here as described below The values shown in the screen below are random SkyAzul Equipment Solutions www skyazul com 301 371 6126 4 MENTOR EI65 SERVICE MANUAL 4 TROUBLESHOOTING FLOW CHARTS This section explains how to handle a problem that may arise with the Mentor EI65 Load Indicator System The procedures are easy to follow and are given in flowcharts on the following pages Start with the general flowchart below that will guide you to one of the detailed flowcharts shown in this section Section 6 contains the necessary drawings needed for troubleshooting 4 1 GENERAL FLOW CHART What s wrong No display Go to Section 4 2 Anti Two Block Problem Go to Section 4 3 Angle Reading Problem Go to Section 4 4 Length Reading Problem Go to Section 4 5 Load Reading Problem Go to Section 4 6 SkyAz l Equipment Solutions www skyazul com 301 371 6126 NO DISPLAY PROBLEM 4 2 NO DISPLAY PROBLEM Blank console display with no warning light shown Measure crane voltage and verify to be between 12V and 30V Check crane power supply for faulty crane electric or if supply is too low Yes Replace console SkyAzul Equipment Solutions www skyazul com 301 371 6126 6 MENTOR EI65 SERVICE MANUAL 4 3 ANTI TWO BLOCK PROBLEM PROBLEM Function of Anti Two Block System is faulty START Check to see whether or not crane is in two block condition N
17. nverter boards must be replaced SkyAz l Equipment Solutions www skyazul com 301 371 6126 28 MENTOR El65 SERVICE MANUAL 6 7 DRAWING 7 LINERIDER SUPPLY VOLTAGES The supply voltage can be checked directly at the cannon connection Using a digital voltmeter measure between pins and A Crane Power B Ground This must be at least 11 0V but not more than 27 0V If this voltage is not correct refer to the system wiring diagram and verify all cable connections and the zener diode in the terminal box SkyAzul Equipment Solutions www skyazul com 301 371 6126 SYSTEM DRAWINGS 29 68 SPARE PARTS LISTINGS CONSOLE ASSY W RAM MOUNT PART NO 031 300 060 648 NO PART QTY DESCRIPTION 1 024 183 100 201 FRONTFACE HIRSCHMANN 2 050 000 100 294 LCD UNIT 3 024 183 100 008 HOUSING PRE ASSEMBLED 4 024 000 100 103 BREATHER ELEMENT 5 031 300 060 382 MOUNTING ARM 6 092 000 060 391 CONNECTOR CAN M12 5 PIN 7 024 183 260 010 CONNECTOR 23 19 POL 8 024 183 290 001 CONNECTOR SUB D 9 PIN de SkyAz l Eguipment Solutions www skyazul com 301 371 6126 SkyAz l Inc 200 W Main Street Suite 2A Middletown MD 21769 Phone 301 371 6126 EQUIPMENT SOLUTIONS Fax 301 371 0029 www skyazul com info Gskyazul com
18. o Lower hook down into safe position Check weight position Refer to Operator s Handbook Section 5 Pre Operation Inspection item 1 2 and 3 for switch weight positions for the main boom and extension No Position the weight properly Check the A2B circuit at the boom tip junction box With power off measure A2B signal boom tip junction box With the bypass plugs and switch weight in position the ohm meter reads 4 7K ohms No Replace Anti Two Block switch SkyAz l Eguipment Solutions www skyazul com 301 371 6126 ANTI TWO BLOCK PROBLEM PREVIOUS PAGE With power off measure the AZB signal at the connector to the console Pin 1 and 6 With the switch weight in position the ohm meter reads 4 7K ohms Refer to Installation Manual for system wiring diagrams Fault in cable assembly Check cable assemblies and replace defective cable Refer to Installation Manual for system wiring diagrams Replace Console Yes End SkyAz l Eguipment Solutions www skyazul com 301 371 6126 8 MENTOR EI65 SERVICE MANUAL 4 4 ANGLE READING PROBLEM PROBLEM Displayed Angle Incorrect Actual measured angle is different from displayed angle START Use a calibrated inclinometer to measure the actual main boom angle and compare with displayed angle on console Refer to Installation Manual Section 5 Mechanical Adjustments of Cable Reel Sensors Check the supply voltage to angle sensor on connection board b
19. ounting plate and remove potentiometer assembly from mounting plate Remove assembly wires from terminal block Connect new assembly to terminal block Reinstall mounting plate gear wheel and slip rings With boom fully retracted reset potentiometer by turning counter clockwise until it stops Refer to Installation Manual for system wiring diagrams and Section 5 Mechanical Adjustments of Cable Reel Sensors Yes Check out clutch in big gear wheel of length transducer Extend and retract boom to ensure that clutch is not slipping on potentiometer axle Replace the gear wheel clean potentiometer axle Reset length potentiometer Refer to Installation Manual Section 5 Mechanical Adjustments of Cable Reel Sensors Check 2 0V power supply to length transducer on connection board Refer to Installation Manual for system wiring diagram or connection board designations in this manual Check system power supply voltage Refer to Section 4 2 No Display this manual Yes NEXT PAGE SkyAz l Equipment Solutions www skyazul com 301 371 6126 10 MENTOR EI65 SERVICE MANUAL PREVIOUS PAGE Measure supply to length transducer in cable reel between Pin 1 ground and Pin 3 2V Refer to Installation Manual for system wiring diagram Cable defective replace cable or cable assembly No Refer to Installation Manual for system wiring Measure signal from length transducer in cable reel at terminal between pin 2 sign
20. tor 165 System drawings in this section are provided as reference material for the troubleshooting flow charts Use the drawings in conjunction with the flow charts to help understand the operation of the Mentor EI65 system Refer to the Operators Manual for basic component layout on the crane and console drawing The Mentor El65 console connection board has the following terminal designations SkyAz l Eguipment Solutions www skyazul com 301 371 6126 MENTOR El65 SERVICE MANUAL 16 6 1 DRAWING 1 SYSTEM WIRING DIAGRAM s jo Inzv xs LIM 1140391338 89134 YOLNSW HOSIA a y ISI CX 75 __ 7 13 malo 5 LV LE CS A A TN NMOHS Z 319NY pm 05 z 20804 NO lt 26 5 N3143ANOO 301 371 6126 www skyazul com SkyAz l Eguipment Solutions 17 SYSTEM DRAWINGS gjo 2 suonnjos jueuudinb3 LIM 11409138 593 HOLN3IA HOSIA 1102011 ed __ 295 2 03513 8 e9 b 318 2 WOOS SOVSYNSLNI lt i 2 19S iWNOIS CH3ORISND 95 Alddns zW3OB3ND 19 Zo AlddnS
Download Pdf Manuals
Related Search
Related Contents
3A0359S Gf,kgjogùfjopùjophblkgmù jkhgùf johpù jop - Plateforme e Hama 00095586 stereoscopic 3D glasses National Instruments 371685C-01 Network Card User Manual User manual M-URI.DA-C_2-3_IT IB MF-5 X Set 1_MF-8 X Set 1 II Euphonix SH612 User's Manual Faultless D266-F Instructions / Assembly 仕様書 - 放射線医学総合研究所 Copyright © All rights reserved.
Failed to retrieve file