Home

Short Operating instruction EcoStar 545 DM

image

Contents

1. Now the dosage pump will be activated and the remaining running time will be indicated You can leave this level by pressing the O key The ventilation will be interrupted off Should the ventilation process be insufficient repeat the process Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 26 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m The function vent detergent pipe is not existing with machines including detergent dosing system type ADT Advanced Dosing Technology with depression dosing The i detergent dosing pipe is vented automatically when the first cycle is running after filling of the detergent reserve container 16 3 4 Resetting the TE degree of depletion display ri N I k this display by pressing the accept key If the option Display degree of depletion is active during operation with partial deminer alization cartridges the counter has to be reset using the function above after the car tridge has been changed You can leave this level by pressing the 0 key again 16 3 5 First time filling of boiler this display by pressing the accept key After emptying the boiler repair of descaling it must be filled with water again before the heater
2. P IMPORTANT gt IMPORTANT gt IMPORTANT gt IMPORTANT gt IMPORTANT gt IMPORTANT gt IMPORTANT Datei 1_EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc m MEIKO 5 General safety information 5 1 Operator s duty of care The dishwashing machine has been constructed based on a risk analysis and after careful selection of the applicable harmonized standards as well as additional technical specifications lt therefore corresponds to the latest technology and is guaranteed to provide maximum safety This level of safety can only be achieved in practice however if all the necessary meas ures are taken The operator of the installation has an obligation of care to ensure that these measures are scheduled and also to check that they are correctly executed Measures to ensure the safe machine operation The operator must ensure in particular that the washing machine is only used in accordance with the regulations Should it be used in any other way damage or danger may occur for which we accept no liability see the chapter on Use for the Purpose Intended In order to preserve the operational and safety guarantees whenever required only original parts supplied by the manufacturer are used the user will lose the right to any possible claims if the appliance is modified using any parts other than original parts only appropriately qualifi
3. 49 781 203 1121 Operating instructions EcoStar 545 D M Figure 2 Information display Information displays can be cleared by pressing the confirmation key Provided that the machine function is restored the next program sequence will begin The information display can also be deleted by pressing the Off key Information indicator extract Description Possible cause Emergency program active No boiler tank heating Restricted washing possible No fresh water supply Check system Hood not closed Check connection S1 Change microswitch Check microswitch adjustment Replacing a defective I O circuit board 122 Incorrect password Enter code once again no authorization Factory setting parameter list Switch power supply ON OFF within 5 and set parameters back to factory settings This will be rejected and parameters will be re Information 123 will disappear Shortage of rinse aid If the machine is ready for operation a shortage of rinse agent will be signalled only if there is a built in warning sys tem Shortage of detergent If the machine is ready for operation a shortage of detergent will be signalled only if there is a built in warning sys tem Shortage of detergent with dosing Impulses of the flow meter are recog system ADT nized although the detergent dosing is not approached Valve of the dosing unit is not closing Error in the dosing system ADT Impulses of the flow meter are recog
4. ml Liter Value can be read from the rinse water aid container label dependant on water quality 104 Rinse agent Parameters Dosing quantity ml Liter Value can be read from the deter water gent container label dependant on water quality Parameters O 50 dH 30 The quantity of soft water available KH between two regenerations de pends onthe hardness of the wa ter for partial demineralisation TE too 107 Beep ON OFF Parameters 1 Switch on off acoustic ready mes sage 109 Partial full de Parameters 0 1 2 Partial full desalination available salination avail 0 NO able 1 partial demineralisation TE 2 full desalination VE 110 Hardness litres Parameters 0 250 1000 L 120 When the cartridge s capacity is per cartridge type reached hardness litres degree of hardness Replace Cartridge will be displayed INFO 725 only in the case of TE 111 Total Operation Indication 5 figures h Operation time time query only Indication 112 Total number of Indication 5 figures Wash cycles loads wash cycles query only Total number of Indication 5 figures Wash cycles loads wash cycles since re setting possible last reset Condition Indication O 100 Only for partial full desalination Remaining car TE indication in tridge capacity VE 100 OK 0 replace 119 Beep ON OFF Parameters 0 1 1 It is possible to shut off communi cation via IR interfaces 0 Datei 1_EcoStar545D M_9662798_
5. zl O OO OO P WIOD KR P G G G GA G G GO G W W N MM ND ND ND ND ND NO ND A a A 62 1 sch 2 2 dl sch SP AS SP A AA A A ch sch ch sch sch sch sch sch sch O O oO O OO OO O Go Go O QO Go Go h HA HH OO C O O OO OO OO O d d OO O O OO 0 Go QO Q YN M N N OO CH 2 42 MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 1 Introduction and general information Dear Customer We are delighted about the confidence you have shown in our products It is very important to us that you should obtain significant use from MEIKO products and that they should make your work easier If you follow the instructions in this document carefully your dishwashing machine will always give you total satisfaction and will have a long service life The cleaning and disinfection machine has been assembled by us at the factory and has undergone a thorough inspection This provides us with the certainty and you with the guarantee that you will receive a fully developed product We would therefore ask you to read these operating instructions carefully before using the installation These operating instructions inform users of this installation about e the installation its operating methods lts use the safety instructions and the maintenance This information will help y
6. D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 63 Operating conditions It is taken for granted that the planning of the system as well as installation setting in operation and maintenance works are executed by sufficiently instructed staff and that these works are checked by responsible specialists The indications on the name plate of the machine must correspond to the technical sheet and the local connection conditions Conditions to be provided by the customer e Frost free storage and installation area Electrical connection in accordance with the technical sheet Fresh water connection in accordance with the technical sheet Waste water connection in accordance with the technical sheet Anti slip floor coverings should be provided around the washing appliance 6 3 1 Requirements for the installation area e Ensure that the storage and installation area is permanently frost free The machine is only frost resistant in the state it is delivered or when provided with DM special features option frost drainage If the appliance is installed in an area where the surrounding temperatures are below freezing point the water freezing inside can damage the internal water components such as pump solenoid valve boiler etc 6 4 Requirements for the electrical connection Work on the electrical part of the machine may only be undertaken by specialist per AN sonnel The customer mu
7. e g AU 30 has been reached The dripping phase and final rinse begin when the wash time set in the programme is reached or ex ceeded The display indicates the AO value 12 1 4 Disinfection machine with Thermolabel control Thermolabel measuring tape that changes colour after 4 seconds at 71 C and shows the required hygiene value The tank water is heated up to 71 C during washing After a brief stop time the dripping pause and the final rinsing starts as long as the washing time set in the programme has been reached or exceeded Both method makes it possible to achieve disinfection levels higher than the standard e g in hospitals The tank temperature falls when the programme begins depending on the washware The time needed to reach the set disinfection parameters could exceed the set pro gramme time High washing temperatures and long retention times in the wash tank can lead to glass corrosion and premature peeling of the decor 12 1 5 Detergent dosage The detergent dosing unit option is designed for the automatic adding of liquid alkaline detergent into the wash water The detergent is transported out of the container into the wash tank by means of a hose line The dosing unit is self priming The dosing is effected during each filling cycle and at the beginning of each programme cycle using timer control Normally a dosing of approx 2 ml of detergent per liter of tank water is the correct concentration
8. vonyelado E O LLL 31 JO ases y u juo SZZ OdNI eGpuuey s9ejday sseupseu paAejdsip aq Wi 10 1B p s 1 i ssaupey payoeal si poedeo s abpuued y USy Mm SA uoeuesap n Z 3 uonesiessuiwap seed ON 0 lqelieAe uolyeuljesap Wm feed ra 4 ad 1 0001 OST 0 19194188 d Dpulo 19d Som SS9SUPIBH obessau Ape l1 daaq 9SNOIE JJ0 UO Uu91IAS Za qe rene Z 1 0 1 tueJed uoleuljesap IIN eed 194 7 uu id E Wa muenb Buisop 1lu Bi 1 dq GOL JOJEM 1 Lu SEH muenb Dusop pre asuly azar Os I j Ae auuwelbold esuly JOJEM y JO ss up ey y uo spu d p suo je 1ausbal om UBOBMI9Q age rene Jajem yos jo Allluenb ay NS BSUL y pue ss u DIEU Jajem ey uo Buipu d p paj9a1109 eq ISNW y uay UOUEUUOL uI SJOINJOeJNUeW o Hulpsoooe jejewixoldde jas aq 1snui anjeA IINSOJ su y pue ss u DIEU Jayem ey uo Buipuadap paj9a1109 eq ISNW y u u UOUEUUOL uI SJOINJOeJNUeW o Hulpsoooe jejewixoldde jas aq 1snui anjeA qe sn p uoge out Bwes ay ye Buissald z sy 0 OU auuuelbold asu ubIssy gjqeisnipe uoleoy an z y o OU auuelbold asu uBissv gjgeisnipe uoeayuaa Ae 0 OU auuuelbold asu uBissv a Bue1u suondo anjea unas Susjowesed S A19S PITEAUI BWUODAQ IAA swej ueuenB euuosiad peziuouineun Aq s1ajaeweJed jo uoneopow Aege JO ases uj auiyoew ay JO vorjelado eiar pas ay asn
9. 12 18 MRL 9662798 23 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 16 Settings modifications on site adaptation 16 1 Using the keyboard for programming Increase value Decrease value Accept Exit Start Pro move forward move backwards modifv gramming 0000 Function field Value field Access codes for various user levels have been defined Once the complete code has been entered the entered code is compared with the internal code table Depending on the code entered the corresponding user level will be accessed 2 access codes are available for each user level the first is for restricted access i e no modification of pa rameters is possible viewing mode and the second gives access to the entire range of functions viewing and modification In the short programming instructions accompanying every machine in the series this is described in condensed form For control programming the power supply must be available but the machine must be completely switched off no LED must be illuminated Code input View service data CODE 10000 Modify service data CODE 10001 View configuration data CODE 20000 View dosing technology CODE 40000 Modify dosing technology CODE 40044 The code numbers for the further levels can be found in the Service
10. 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 9 Shutting down the dishwasher e Press the OFF key The machine is switched off when all the lights are out 0 e Remove the stand pipe Machines without built in drain pump e After the water has been drained from the tank the tank is sprayed with clean hot water by pressing the Program Start button The hood must remain closed El Machines with built in drain pump IN e Press the program start key to drain the tank e The tank interior is sprayed with clean hot water after the tank water has been drained The hood must remain closed The waste water pump switches off auto matically 10 Care and maintenance 10 1 Care general The appliance has been designed to minimise the need for cleaning care and mainte nance However for a reliable safe and permanent function of the appliance and in the in terest of hygiene and cleanliness a correct care and maintenance is necessary To facilitate this procedure a maintenance contract can be concluded with the manu facturer or the manufacturer s agent Works repairs which were not correctly executed and the use of unauthorised parts by unqualified personnel endanger both operators and the appliance and will invali date the warranty ATTENTION 10 2 Refilling of detergent External container The container is located next to the appliance e Check the filling
11. 44 4 CO OQ NO CO OSO O O 21 85 194 210 NO NO N N N O ININ A Ql OD N OIN ojo NID LA O O 224 240 N dl N N O s CO E OININININININININ IN N e a ajaja m o m e ajajaja a w K O O N N N N N O The dosage times will be adapted to the rinse time so that the correct concentration remains if the rinse time is modified 17 Operating errors Despite being expertly designed the machine may develop minor faults which are usually easy to eliminate This section explains a number of possible problems and how you can deal with them yourself Before carrying out work on the open appliance it MUST be disconnected from the A power supply The local main switch must be switched OFF or the local main fuse must be removed Should any of the operational faults described arise repeatedly their cause must be established in each case Faults not described here can in general only be eliminated by a technician or electri cian Please contact the agency responsible or the authorised dealer 17 1 Information reporting and troubleshooting Confirmation key Off key Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 34 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax
12. MRL 9662798 41 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M Product range overview 2 2 Washing machines with stationary wash process Dishwashing machines pot and container washing machines glass washing machines universal washing machines salad and vegetable washing machines Washing machines with transport systems Dishwashing machines with automatic conveyor transport dishwashing machines with automatic basket transport Special washing systems Fully automatic washing systems for dishware trays and cutlery Flight catering systems for disposing cleaning and preparing dishware and equipment for providing onboard meals while in flight industrial washing machines for specific types of washware washing machines for trolleys and containers Conveyor systems Tray and dishware transport conveyors dishware sorting and stacking equipment vertical conveyors 2 A 2 m MEIKO Food waste systems Machines and systems for handling food waste for environmentally friendly disposal industrial kitchen equipment Equipment and furnishings for central and local kitchens trolleys tray and dish stackers tables cabinets and shelves made of high grade steel diverse organisational items Cleaning and disinfection equip
13. Manual 16 2 Code entry To get into the code entry mode you should keep the key 0 pressed for around 3 sec onds until you see M duu Fl VW PRIMA on the display unit By pressing the key 0 once again you can leave the programming area at any time The digit to be modified will flash Sk Press the I key to increase the value code indicated on the display unit or press the Il key to decrease it or press the accept key to save it The next value will then flash and will be the only one visible Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 24 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M If your entry is incorrect you will exit the code entry procedure and the information code 122 will be displayed If you enter all the digits correctly you will arrive at the chosen level either service con figuration or machine data 16 3 Service level The list of service parameters can be found on this level parameter numbers 1xx Here you can view these or modify them or you can also call up the ventilation of the rinse and wash hoses On the service level you will first see the display below This corresponds first time filling of boiler see 15 3 5 Press
14. SI Aug INOA y p 1 lu jejejdwos useq sey sapos au un 1ayjo au 191Je suo em SIU u SUD y JO yea Daag p noys no y 1daso9e ay Buisn Ag paldaxoe aq IIIA yolym sen JEAN lun ejdsip ay aseayou1 IIIA la Ae dy Buisn uselJ WW payipow aq o WHIP ay aun Aue ye ese Bunuuesbold ay eves ueo noA uree a9uo ay 0 y Buissald Ag Jun ejdsip ay uo 23pO 99S no nun spuosas puno JO passald Aoy O ey desy p noys no apow 1ua apo au ojul 196 o Koy EIED SOIAJOS MINA Aug apor PSTEUILUN I eq gnu 37 OU Jio payojms 1 9 duuo5 sq isnu aulyoeu y mq ajge rene aq 1snui Ajddns Jamod au Buluuwelbold O MUO9 104 819U95 LOOOL 3000 eyep 9IAJ9S JIpolN 0000 3009 Dau anjen p a1 uonloun3 0 0 8 0 Ajlpow decoy SDIEMGIOEO SAOW jenjen asea 9ag PIJEMO SAOW jenjen esesJou Duuugiboid 10 pieoq y ay Buisn IN GtG 1e1So33 W 4 08S 121S09F suononssul buruiwesboid YOINO iSUBIp 1se ay YIM uolle o1 u p eldsip aq Uu syBIp S 18114 ay uonuapy Jequinu suyas Ayojoe BuiAlanb Jo Ayjiqissod jenas selnBu g uo1 eoIpu J9aquinu jenas YLL s 1 158 JUIS jq ssod DBu 118s 1 speoj sajoAo ysem SOINBI G uoeoIpu saj9 9 ysem jo Jaquinu eJ0 LL saj9 o USeM IO Jaquunu Jejo sayo Ajuo Asanb speoj sajoAo ysem SOINBI G UOITEDINU AO USEM Jo 1 quinu e10 CLL UONBaIpu Ajuo lanb aun Bunelado Soin G UOUBOIDUI uul
15. de vidange sprachig DOG Prescrizioni di collegamento per la pompa scarico Prescripciones para la conexion de la bomba de vaciado Reguta instalacji pompy spustowej Aansluitschema voor machine met afvoerpomp Druckleitung durchgehend steigend verlegt Freier Ausl uf Pressure pipe continuously ascending Air gap Tuyau de pression continuellement ascendant Syst me anti refoulement avec Dee 1 pressione n oe salita Sen disconnecteur atmosph rique E SEN Geen Air gap Uktad cisnieniowy wznosz cy w pionie Sistema air gap Drukleiding stijgend gemonteerd System wolny wlot air gap Vrij uitloop Max 800 Ablaufverrohrung mit Siphon bauseits Drain pipework with siphon locally Tuyauterie de vidange avec siphon sur place Scarico con sifone a cura del committente Tuber a de desague con sif n a cargo del cliente Orurowanie kanalizacyjne z syfonem przez klienta Afvoer met sifon bouwkundig Laugenpumpe Drain pump Pompe de vidange Pompa di scarico Bomba de vaciado Pompa spustowa Saugleitung Afvoerpomp Suction pipe Tuyau d aspiration Tubo d aspirazione Tubo de aspiraci n Uk ad ss cy Aanzuigleiding Geschirrsp lautomaten Sonderwaschanlagen Gl sersp lautomaten Forderanlagen Topfwaschautomaten Speisereste Anlagen Universalwaschautomaten K cheneinrichtungen Salat u Gem sewaschautomaten Pflegeeinrichtungen Vollautomatische Sp lanlagen Reinigungs und Desinfektionsautomaten CE K
16. heating element and sieves must be removed with a brush e Disassemble the wash arms and rinse them with flowing water e Wash nozzles must be cleaned daily e The cleanliness of final rinse nozzles must be checked weekly and if necessary clean under running water The inserts for the final rinse nozzles must be inserted with the prongs facing the water flow 10 4 1 Safety instructions for cleaning The tank heating element may still be hot after the tank has been emptied There is therefore the danger of burns when the machine is cleaned manually The machine switch cabinet and other electrical components must NOT be sprayed with a hose or a high pressure cleaner 10 5 Maintenance of stainless steel surfaces The appliance is made of high quality stainless steel Nevertheless under certain con ditions corrosion may appear To maintain stainless steel surfaces permanently free from corrosion use e only cleaning products which are properly Use only products which do not attack the material build up a film or cause discolora tion Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 17 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 10 6 De scaling If the appliance was operated with hard water the boiler and was
17. level of the container and if necessary replace it by a full one Only non foaming alkali detergents pH gt 7 suitable for commercial dishwashers may be used ATTENTION Detergent dosing units must be checked to see if they are functioning properly if there is reason to believe that they are malfunctioning Carry out a visual inspection Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 16 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m ATTENTION ATTENTION ATTENTION A ATTENTION MEIKO 10 3 Refilling with rinse aid External container The container is located next to the appliance e Check the level and if necessary replace the container by a full one Only non foaming acid rinse aid pH lt 7 suitable for commercial dishwashers may be used Detergent dosing units must be checked to see if they are functioning properly if there is reason to believe that they are malfunctioning Carry out a visual inspection 10 4 Cleaning After the tank has been drained proceed as follows e Do not use a foaming detergent for dish washing by hand for pre cleaning close to the dish washer Foam can cause malfunctions in the dish washer and a poor wash e Food residues sticking to the tank tank
18. AA au Buiuuni Bulurevwa ay pue pazibiaua aq IIAA dund Dusop paj9ajas ay onbe noA vonisod ay 199 8S 19 Ul JU9B I1919p 1e imu A 19 U1 DIS Sul 1 938 1494 Liv Buisop uoiss id p yum Bullsixe jou s Ae 0 eu Buisn Ag ana SNOIASJd y 0 y9eq OB pue ana juana ay anea upo no Aen Jdeooe ay Buisn anes pue Ady IL out 10 Ady L y Buisn Ag anjen ay 199 98 USE IM SALA y u J d900e ay Buisn Aq 1 10919s siajewesed ay JO auo Jipou o ep sones JIPOUL 10 SPOI BIA SI SSADIB INQ HUIMSIA U UA se s1ajaeuesed jo a910y LL suajowesed JIDOIN jaaaj uo YOR OD 0 Ady 0 24 BSN UBD noA yl 0 BuiBuo q an en ay 1uyBu sy uo pue p e ldsip aq WA XxXxqd 1919ulpipd y Ya out UO slajeweJed ay S 0 s Sy IL JO JL out asn Jo y Jde00e ay Buisn uollisod ay We S 19JQU1eJ1ed MINA Ja 1oq ay Bu Iduu seye Jajroq Jo Bulll J uul 1S11d Ae dsip uoneuiesap jeiued y Bunosay out JusB ajep WIU AN 9 u pre asull E IIUSA s19 ulpupd JIDOUUI ASIA A 3911195 y UO q IPAEB ae suonisod urew BuIAojjo ey Sop N3 BunuajuelanuwelbBoldziny IN GSrS L IN 30 8S1819093 OMIZSU out Buisn spsemyoeg pue Ady l u Buisn Spem A0u UPD NOA A BOIAIOS ay Je anule IAA NOA 1994102 subip au je 1 lu NOA J pa ejdsip aq IW ZZ po uol guuojJui ay pue np ooud Aua apos y anea IA no 9aJo9u1
19. Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 30 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 105 Rinse program Parameters Dosing quantity 106 Hardness degree Operating instructions EcoStar 545 D M m Configuration value Factory Note options range setting Total number of Parameters 0 1 0 Effective only upon power supply wash cycles Indi reset ON OFF cation ATTENTION All changes to ser vice parameters will be reversed Power supply reset must be car ried out within 5 minutes other wise factory settings will not be loaded Without power supply reset the information 123 will be displayed 103 101 EcoStar E A1 with FA EW 102 EcoStar E A2 minimuml 103 EcoStar E A1 with new dos ing technology ADT 104 EcoStar with TL or AO ATTENTION Attention Only as signment list and machine se quences change no parameters Must be tank Parameters temperature 10 82 60 Standard for all the rinse programs on one appliance Output depend ent on definition Precrinse time rinse time Parameters 0 See pre rinse process step 3 rinse time Parameters 4 0 25 0 10 0 Duration of final rinse time running time limited by P306 1 Definition of the information which is to be switched via the poten tial free contact 0 no i
20. DV 120 2 EcoStar 430 F OR50H RE FV 28 GiO FV 250 B DV 80 2 DV 200 2 EcoStar 530 F M GK 60 Lave vaisselle mod le FV 40 2 FV 130 2 DV 125 2 DV 200 2 PW EcoStar 545 D M Peleas FV 40 2 G FV 250 2 DV 270 B Modelo de lavavajillas FV 60 2 DV 270 2 Vaatwasmachine model FV 70 2 Konformitatserklarung Declaration of Conformity D claration de conformit Dichiarazione di conformit Declaraci n de conformidad Conformitetsverklaring Hiermit bescheinigen wir in alleiniger Verantwortung die Konformitat des Erzeugnisses mit den grundlegenden Anforderungen der folgenden EG Richtlinien harmonisierten Normen nationalen Normen We hereby declare at our sole responsibility that the product conforms to the essential requirements of the following EC Directives harmonized standards nation standards Par la pr sente nous certifions sous notre seule responsabilit la conformit du produit avec les exigences fondamentales des directives CE normes harmonis es et normes nationales suivantes Con la presente dichiariamo sotto la nostra responsabilit la conformit del prodotto con i regolamenti basilari delle seguenti direttive CE normative armonizzate e normative nazionali Por la presente declaramos bajo nuestra sola responsabilidad que nuestros productos estan en conformidad con las exigencias basicas de las siguientes directiv de la CE normas homologadas y normas nacionales Hiermee verklaren wij onder geheel eigen verantwoordelijkheid de con
21. F _ Evocare m www evocare com au mEIKO Ph 07 3355 8000 Fax 07 3355 5043 Email sales evocare com au Operating instructions Dishwashing machine EcoStar 545 D M Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 1 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M Contents Introduction and general information 1 1 Storage 1 2 Name and address of manufacturer 1 3 Description of the type of equipment 2 Explanation of the safety symbols used 3 Use of the appliance for the purpose intended 4 CE Declaration of Conformity 5 General safety information 5 1 Operator s duty of care 5 2 Basic safety measures 6 Delivery shipping installation and assembly 6 1 Delivery 6 2 Transport installation and assembly 6 3 Operating conditions 6 4 Requirements for the electrical connection 6 5 Requirements for the fresh water connection 6 6 Requirements for the waste water connection 6 7 Emergency off 6 8 Chemicals for the operation of the appliance 6 9 Instructions for the disposal of the packaging material 7 Settings for initial commissioning by the service engineer 7 1 Commissioning 8 Washing with dish washer 8 1 Operating panel 8 2 Preparation for washing and rinsing 8 3 Manual dosing of detergent 8 4 Automatic dosin
22. KEE O O 00 N gt LL 0 00 N gt LL EcoStar 430 F EcoStar 530 F M FV 40 2 FV 60 2 EcoStar 545D M DV 80 2 DV 120 2 DV 125 2 DV 200 2 DV 200 2 PW Component faulty am Component replaced fovea ES 11 Test run E NEE Check results of test wash and rinse Brief instruction for new personnel 19 Environmentally acceptable measures Disposal of the installation Each discarded appliance is to be made immediately unserviceable to avoid later acci dents e Therefore set the local main switch to OFF or switch off the local main fuse When you eventually dispose of the installation dismantlement scrapping the parts and their corresponding materials should preferably be re used Here is a list of the materials that most frequently occur when dismantling e Chrome nickel steel Aluminium Copper Brass Electrical and electronic parts PP and other synthetic materials 20 Documentation Installation drawing technical sheet Technical data sheet Wiring diagram Programming instructions Datei 1_EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 40 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18
23. O nfo rm l ta IS e rk a ru na g Datum 2009 12 29 Update CE Declaration of Conformity D claration de conformit CE Dichiarazione di conformit CE Declaraci n de conformidad CE CE conformiteitsverklaring Firma Company Soci t Ditta Empresa Fabrikant MEIKO Maschinenbau GmbH amp Co KG Adresse Address Adresse Indirizzo Direcci n Adres Englerstra Be 3 D 77652 Offenburg E mail info meiko de Auftrag Nr Order no No de commande No d ordine No de pedido Opdracht nr Sp lmaschine Typ FV 28 G FV 130 B DV 80 T DV 120 2 EcoStar 430 F OR 50 H Dishwasher model FV28GiO FV250B DV 80 2 DV 200 2 EcoStar 530 F M GK 60 E EEN FV 40 2 FV 130 2 DV 125 2 DV 200 2 PW EcoStar 545 D M las FV 40 2 G FV 250 2 DV 270 B Modelo de lavavajillas FV 60 2 DV 270 2 Vaatwasmachine model FV 70 2 Konformitatserklarung Declaration of Conformity D claration de conformit Dichiarazione di conformita Declaraci n de conformidad Conformitetsverklaring Hiermit bescheinigen wir in alleiniger Verantwortung die Konformitat des Erzeugnisses mit den grundlegenden Anforderungen c folgenden EG Richtlinien harmonisierten Normen nationalen Normen We hereby declare at our sole responsibility that the product conforms to the essential requirements of the following EC Directives harmonized standards national standards Par la pr sente nous certifions sous notre seule responsabilit la conformit du produit avec les ex
24. This can be increased reduced acc to the water quality items to be washed and degree of soiling to 5 ml l or to1 mit 12 1 6 Rinse aid dosing The rinse aid dosing unit is designed to automatically add liquid final rinse aid into the fresh water The rinse aid is transported out of the container into the fresh water supply line by means of a hose line The dosing unit is self priming The dosing takes place during each filling cycle Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 20 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m The correct dosing results in a smooth even water film In case of overdosing there are bubble and stripe formations reduce dosing In case of under dosing water drops remain on the washed items increase dosing 12 1 7 Airbox AktivAir After the wash is finished the extraction fan is switched on for three minutes The time can be set using a time relay Times shorter than three minutes should not be set because oth erwise residual moisture would stay in the housing and possibly damage the fan motor 12 2 Noise level Work place noise level Lpa lt 70 dB 12 3 Data reg the electrical and hydraulic equipment See attached technical sheet 12 4 Dimensions technical data installa
25. ace the items in the basket Place the basket in the appliance Close the hood Program for normal soiled dishes Program II for normal soiled dishes Program lll press I Il for heavily soiled dishes Press the program start key or press down the hood rod The appliance washes and rinses automatically and switches off the wash program after completion When the light goes out open the hood and remove the basket VV VV VV V V Shutting down the appliance gt Press the 0 button Off button The machine is switched off when all the lights are out gt Open the hood and remove the stand pipe gt Ifthe appliance has a built in waste water pump the program start button must be pressed to empty the tank gt The tank interior is sprayed with clean hot water after the tank water has been drained The hood must remain closed The waste water pump switches off automatically gt Clean tank strainers and wash arms Regeneration gt Ared lamp indicates that the capacity of the water softener is nearly exhausted gt Carry out the regeneration process according to the operating instructions 9IAJ S JOWOISNS AJILON qissod jensn SI voelado asull JOYUIN OU Bess ui 10119 UL AI92591 NOA y qissod IQ US JIM UOneJado asul ay suolonulsu y AOUOL snwu no SBessau UOIeEWUOJUI ue OAI NOA y e dsip 10119 uoneuuiojuj Ae 1x9 ay Buisn Ag aunuelbold uollp ilu A 3y 1x3 paAejdsip aq II
26. actory When the service engineer installs or commissions the appliance he should adjust this value depending on the actual water hardness Should there be any further changes in the water hardness this parame ter must be adjusted accordingly as set out in the Short Programming Instructions 11 3 Capacity of the built in water softening device 2000 1800 1600 1400 3 1200 E 3 1000 800 600 400 200 0 5 10 15 20 25 30 Wasserh rte in dH Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 18 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 11 4 Regeneration Press the OFF key Remove the stand pipe empty the tank Fill the salt solution container with 0 8 kg regenerating salt A funnel can be used for this if necessary By regenerating salt we mean here sodium chloride with a grain size of 0 3 to 1 mm The seal and the thread of the salt solution container must be cleaned before closing the container Carefully lock the salt solution container cover The penetration of wash water can reduce the capacity of the built in water softening device pla ATTENTION e Press the regeneration button e The regeneration process starts automatically and lasts for about 25 minutes The machine cannot be used
27. basket appliance with stationary basket 12 1 2 Wash principle The appliance has one wash and one final rinse cycle The temperature regulator keeps the wash temperature A centrifugal pump circulates the water out of the cleaning tank into the clean nozzles The water jets reach the items to be cleaned out of differing directions Therefore an even washing result can be guaranteed Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 19 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m ATTENTION MEIKO The cleaning cycle is followed by the fresh water final rinse The items are rinsed via a separate nozzle system with hot fresh water 80 83 C Thus heating up the items for the following drying process At the same time the final rinse water serves for the regenera tion of the wash water the level of soil of the wash water thus being reduced 12 1 3 Disinfection machine with AO control The standard factory setting is AO 30 The tank temperature for washing is 74 C Tank heating is active while washing After every second as of 65 C in the wash tank the measured tank temperature is allocated one factor the higher the temperature the higher the factor These factors are continu ally added until the desired hygiene value
28. during this time The hood must remain closed The regeneration process is indicated by a yellow light The machine can be filled again when the light has gone out e Even if the red light has not come on to indicate that the water softener is ex hausted the regeneration process can be started by pressing the regeneration but ton for at least 3 seconds We recommend that you fill the machine immediately after the regeneration process in order to dissolve and remove from the wash tank any salt particles that have been spilled If the salt remains in the wash tank for a lengt hyperiod this can result in corrosion and even pitting corrosion in the bottom of the tank gt vm it ATTENTION 12 Basic information on the appliance Each dishwashing machine is manufactured acc to the latest state of the art technol ogy Operation is safe Dangers could arise from this model if it is not correctly operated by unsuitable operat ing staff or if it is not used acc to it s purpose gt ATTENTION Liability We accept no responsibility for damage of the appliance and other objects caused by op erating faults resp non observance of the operating instructions Any modifications to the appliance especially technical modifications inside undertaken by unauthorised persons without the written permission of the manufacturer will invalidate the warranty 12 1 General description of the washing machine 12 1 1 Execution Square
29. ectrical equipment may only be carried out by a qualified electrician ATTENTION Check the electrical equipment regularly Tighten any loose connections Replace any damaged leads cables immediately Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 9 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m ATTENTION ATTENTION ATTENTION MEIKO 6 Delivery shipping installation and assembly 6 1 Delivery Check that the delivery is complete immediately after receiving it by comparing it to MEIKO s contract confirmation and or the delivery note If necessary complain about any missing parts immediately to the shipping company and notify MEIKO Examine the appliance for possible transit damage Should you suspect any damage has occurred during shipping you should inform e the shipping company e and MEIKO in writing and also send a photo of the damaged parts to MEIKO Damaged appliances must not be commissioned 6 2 Transport installation and assembly In order to avoid damage or life threatening injuries during shipping of the installation the following points must be observed e The shipping operations may only be carried out by qualified persons who ob serve the safety instructions e Observe t
30. ecution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 65 Requirements for the fresh water connection Each appliance carries the DVGW test symbol and does not require an extra safety valve in the water feed e Fresh water connection must be made according to EN 1717 or according to lo cal regulations The minimum flow pressure of the clean water supply upstream of the solenoid valve must be 0 6 bar and if water softening equipment EW 10 is incorporated into the machine 3bar The maximum pressure must not exceed 5 bar ATTENTION e f the flow pressure is below the minimum increase the flow pressure with a booster pump if the maximum pressure is exceeded limit it with a pressure re ducer e Suitable protective measures must be taken to ensure that no iron particles can enter the appliance via the mains water supply Similarly precautions must be taken to prevent the entry of other metal particles for example copper turnings Corresponding instructions are contained in the installation drawing Therefore suitable measures must be taken e A dirt trap must be fitted into the fresh water supply to protect the solenoid valve 6 6 Requirements for the waste water connection e Build an odour trap into the waste water connection if this is not already built in further information about this is in the I
31. ed and authorized personnel use maintain and repair the installation the relevant personnel is regularly trained in all questions relating to safety at work and environmental protection and in particular that they are familiar with the operating instructions as well as with the safety information provided in them the installation is only operated in perfect operationally efficient condition all safe guards and cladding panels are installed and in particular that the safety systems and switch elements are regularly checked for their operational efficiency machines accessible only from behind may be operated only with rear panel cladding the required personal protective equipment is made available to maintenance and repair personnel and is worn by them teen a functional test on all safety systems of the machine installation is carried out during every regular maintenance the operating instructions are always kept in legible complete condition at the place where the installation is installed and are always at hand any necessary initial tests to parts supplied by sub suppliers must be carried out More detailed information if required can be found in the relevant Instructions for Use Once the Multi washer has been installed put into service and handed over to the cus tomer operator no modifications electricalOnce the Multi washer has been installed put into service and handed over to the cust
32. eo Aew slejewesed jas A107098 JO UOI POIJIDOUI ay UONUSTY ge 1019e4 pouu JelaupIged OCL 1 1deu2o suononiulsu 9IAJ9S au u uani6 sue s wwepod oasuu p ulijJ p id J 8ulni JO Seq 3 gt 0QB paS sanjen ay pue SWeIGOJd Bulsul ey jo SHuljes A107928 au U39M19Q 2u818 lip e aq uso 1 u srmyeladua paajul ay pue Jamod Buljesy paesu ay uo Buipuadag an en 19618 Sun ysem a njesadula Ja 10g welBold asuly pa ejdsip aq Uu CSL uol puuojui ay Iesel iddns Jamod noullAA papeoj aq ou Uu SHullles 10 9e siwu8 u o s nului G ululiA ino pales aq snw 18s i jddns 1 MOd D S1 A 1 OQ JIM SI9JSWEIed BOIAJOS 0 SODUBYI V juou yy s 9 9weJed 33J0 NO 13991 jddns samod uodn juo 311199113 L 0 IECH a91119s Bulnes 10 981 peo7 a9e dal 0 MO 00 3A ul uo epui 3L Ayoedes Dpiuuso Buluimui u uoleul es p n eed 104 AO OU 0 UONeSIpuU UO IPUOD Bun s a6buel suoido 1019e4 n A Bu 11 s s1i91 uueied S A19S Saugleitung fur Reiniger bzw Klarspuler Suction line for detergent resp rinse aid Conduite d aspiration pour d tergent resp produit tensio actif Tubo d aspirazione per detergente e brillantante Tubo de aspiraci n para detergente y abrillantador Uk ad ss cy p ynu do mycia lub nab yszczacza Aanzuigleiding voor zeep resp naglansmiddel 9 006 926 Klarsichtschlauch f r Reiniger ransparent hose for detergent cz Tuyau transparent pou
33. eshwaterinstallation LI py Check level regulation LL Check valves clean dirt trap TER Check that all connections incl hand spray are watertight J 1 J Check settings of built in water softener if fitted JTT Check operation of complete or partial water softener if fitted Check water hardness LL A eT 3 6 Waste water equipment CT PY Check if watertight j III Check pressure hose position and operation of drain pump III NAAA E ee EES CENAS a eS 7 Electricalinstallation TT LI Y Check of all fuses ee pp o pop Tighten all electrical connections LL L L Check tank and boiler heating TP Check thermostat and stop switch ppp _ 0 2 za S sa 8 Detergent dosing tT S Check dosage adjust if necessary LL Ji J i Ooo j GD 9 Rinse aid dosing LL Y Check dosage adjustifnecessary LL pp EE E O Datei 1_EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 39 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 eee eee ss PL component ok PL component tautty EC CH Component replaced Operating instructions EcoStar 545 D M Maintenance procedures 10 Operation check of the complete machine Pp Check machine for correct interaction of all functions a
34. ff appliance Cycle interruption Table 1 Program key function items to be washed 8 2 Preparation for washing and rinsing The preparatory work described below must be carried out before each opera tion e Open the hood e Place the screen and stand pipe in position e Close the hood Danger of crushing Close the appliance with both hands e Switch on the appliance by pressing one of the program pre selection keys During the filling and heating phase the light above the pre selection key will flash When the light remains constantly lit the machine is ready for operation The time until the operation readiness is reached depends on the temperature of the supplied water and the installed boiler resp tank heating capacity In the case of cold water supply the time taken is about 25 minutes 8 3 Manual dosing of detergent If there is no detergent dosing pump the detergent must be added manually to the wash ing water To obtain a concentration of 2 g l an initial amount of 40 g and a later addition of 30 g after each of 5 cycles should be added If the detergent is in powder form the powder should be scattered evenly on the water in the tank and dissolved after the tank has been filled This will prevent discolouration of stainless steel parts 8 4 Automatic dosing The required detergent detergent dosing pump option and rinse aid is transported out of the containers into the tank resp boiler via electronical
35. formiteit van het product met de fundamentele en gestelde eisen volgens EG richtliinen geharmoniseerde normen en nationale normen EG Richtlinie EC Directive Directive CE Regolamento CE Directiva CE EG richtlijn 2006 42 EG Offenburg 18 12 2009 Dokumentationsverantwortlicher Responsible for documentation Responsable de la documentation Responsabile della documentazione Responsable de la documentaci n Voor deze documentatie verantwoordelijk Daniel Ratano MEIKO Maschinenbau GmbH amp Co KG Englerstr 3 77652 Offenburg Germany Unterschrift Signature Signature Firma Firma Handtekening Konstruktion Design Engineering Department Dpt Construction Reparto Costruzione Depto de dise o Constructie MEIKO Maschinenbau GmbH Co KG Keen 7 aw ESTA WS Dr Thomas Peukert EE Leiter Entwicklung und Konstruktion Head of Development Design Responsable D veloppement Construction Direttore Sviluppo Costruzione Jefe de la secci n de desarrollo y dise o Chef Ontwikkeling Constructie Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 6 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M A IMPORTANT A IMPORTANT P IMPORTANT A IMPORTANT
36. g 8 5 Operation during washing and rinsing cycle 9 Shutting down the dishwasher 10 Care and maintenance 10 1 Care general 10 2 Refilling of detergent 10 3 Refilling with rinse aid 10 4 Cleaning 10 5 Maintenance of stainless steel surfaces 10 6 De scaling 11 Machine with built in water softening device EW10 11 1 General 11 2 Adjustment of water hardness 11 3 Capacity of the built in water softening device 11 4 Regeneration 12 Basic information on the appliance 12 1 General description of the washing machine 12 2 Noise level 123 Data reg the electrical and hydraulic equipment 12 4 Dimensions technical data installation instructions 13 Tips for self help in the case of faults 14 Staff training 15 Authorized user of this documentation 16 Settings modifications on site adaptation 16 1 Using the keyboard for programming 16 2 Code entry 163 Service level 16 4 Parameter list 16 5 Assignment list View inputs control outputs 16 6 Rinse program parameter update 01 05 2009 17 Operating errors 17 1 Information reporting and troubleshooting 17 2 Error messages and troubleshooting 18 Maintenance 18 1 Basic safety measures during normal operation 18 2 Dosing units 1833 Maintenance plan 19 Environmentally acceptable measures Disposal of the installation 20 Documentation Datei 1_EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 We reserve the right to change execution and construction U o md O O
37. g ADT 225 Power supply mode detergent dosing pump Parameters I o 0 4 228 Water softener 0 1 0 1 Parameters 0 1 0 1 0 1 0 1 10 Sa DE EW 10 incorpo rated In case of incorporated water softener set to 1 240 Detergent pump activation mode 0 Effective only upon power supply reset ON OFF ATTENTION All changes to ser vice parameters will be reversed Power supply reset must be car ried out within 5 minutes other wise factory settings will not be loaded Without power supply reset the information 123 will be displayed 241 Air gap FA in 0 0 FA not available final rinse over Y1 1 FA available Plug connector 0 0 LP not incorporated 1 LP incorporated 0 0 no effect Tank filling before Heating 321 Rinse agent Parameters 1 3 Rinse agent pump pump output Output definition 322 Detergent pump Parameters 0 20 8 5 Detergent pump output Output definition 326 pipe vent time Parameters 0 255 sec 180 Activate rinse agent pump tempo Rinse agent rarily to remove air from pipe 327 pipe vent time Parameters O 100 30 Activate detergent pump temporar Detergent ily to remove air from pipe 346 Indication Parameters 0 1 1 0 LED2 with LEDs LED 2 or LED 1 1 LED1 with temperature display 347 Desinfection tem Parameters 10 80 SE 0 Only with disinfection machine perature no 4 in parameter 201 348 Desinfection tem Parameters 10 sec 0 Only with disinfection machine pe
38. ging to the instal lation have been removed Check whether any escaping liquid is removed Activate all the safety systems and hood switch before commissioning Check that all screw connections are tight Please also read the chapter on General safety instructions Commissioning and instructions will be provided by technicians specially trained by Meiko The operator may only use the installation after training has been provided ATTENTION 8 Washing with dish washer The appliance must not be used without a thorough knowledge of the Operating In structions Incorrect operation could result in injuries to personnel or damage to the appliance 8 1 Operating panel Program is running Program is running appliance is switched on gt Program start key Off key Temperature display tank boiler Fault display Information display Code display Illustration 1 Operating panel Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 13 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M A E Short program Wash programme Normal program Wash program ll Intensive program Wash program lll SS Final rinse temperature Program start Tank drain Self cleaning cycle Switch o
39. h tank could have lime scale deposits De scaling of the tank interior boiler housing tank heating boiler heating and wash and final rinse system then becomes necessary For de scaling the appliance use only products suitable for industrial dishwashers ATTENTION Please observe the instructions of the manufacturers of such products After de scaling the appliance e Remove the de scaling agent completely from the appliance 1 or 2 rinse cycles with fresh water are necessary to achieve this Even small residues of de scaling agents can be sufficient to destroy plastic parts and sealing materials If the appliance is heavily scaled you should ask a service engineer from the agency responsible to de scale the boiler 11 Machine with built in water softening device EW10 Not in case of machines with air gap 11 1 General If the red lamp lights up the capacity of the water softener has been almost ex E hausted About a further 10 program cycles are possible before the water softener is completely exhausted It is therefore possible to delay the necessary regeneration until a time when the machine is not in use It is important to note that if the machine continues to be used when the water sof tener is exhausted capacity can be reduced and the machine may even become ATTENTION unusable 11 2 Adjustment of water hardness The water softening device is pre set to 30 Gh in the f
40. hine main power switch must be in the OFF position and locked in this position Existing safety systems may not be removed A functional test on all safety systems of the machine installation is carried out during every regular maintenance We recommend that you take out a maintenance contract with our manufacturer s agent in order to ensure a long service life 18 1 Basic safety measures during normal operation Observe the maintenance periods prescribed in the operating instructions Observe the maintenance instructions given in these operating instructions for individual components Before carrying out any maintenance or repair work prohibit access to the operating area to any unauthorized persons Provide or display a sign drawing attention to the maintenance or repair work Before carrying out any maintenance and repair work switch off the electrical power at the main electrical power switch and secure the switch with a padlock The key for this lock must be kept in the hands of the person carrying out the maintenance and repair work Failure to observe these precautions can result in severe physical injury or dam age to property Before carrying out any maintenance and repair work ensure that all the parts of the machine that may be touched have cooled down to room temperature Carefully dispose of any cleaning products that could harm the environment 18 1 1 Before starting operations following maintenance or repair work Bef
41. igences fondamentales des directives CE normes harmonis es et normes nationales suivantes Con la presente dichiariamo sotto la nostra responsabilita la conformita del prodotto con regolamenti basilari delle seguenti direttive CE normative armonizzate e normative nazionali Por la presente declaramos bajo nuestra sola responsabilidad que nuestros productos estan en conformidad con las exigencias basicas de las siguientes directivas de la CE normas homologadas y normas nacionales Hiermee verklaren wij onder geheel eigen verantwoordelijkheid de conformiteit van het product met de fundamentele en gestelde eisen volgens EG richtlijnen geharmoniseerde normen en nationale normen EG Richtlinie EC Directive Directive CE Regolamento CE Directiva CE EG richtlijn 2006 42 EG Offenburg 17 12 2009 Dokumentationsverantwortlicher Responsible for documentation Responsable de la documentation Responsabile della documentazione Responsable de la documentacion Voor deze documentatie verantwoordelijk Daniel Ratano MEIKO Maschinenbau GmbH amp Co KG Englerstr 3 77652 Offenburg Germany Unterschrift Signature Signature Firma Firma Handtekening Konstruktion Design Engineering Department Dpt Construction Reparto Costruzione Depto de dise o Constructie MEIKO Maschinenbau GmbH amp Co KG Eege 7 Z wy gt d Dr Thomas Peukert Ee KEE 001 Leiter Entwicklung und Konstruktion Head of Developme
42. instructions EcoStar 545 D M j 18 3 Maintenance plan Maintenance procedures O co N gt LL O co N gt D N o O LL N gt CH Q wz Se N LO CO N O vr O gt LI a FV 130 2 FV 250 2 DV 270 2 ess gr N O o cO N N Si gt lt S N lt gt gt LL a i 3 2 lt PE O O LI BE CT Or ME T u CH fa LO st pl 2 S 2 O O LL Ww DV 200 2 PW Check pumps for watertightness pump rotor noise rotation di rection and function Web Check pump suction LL Check pump sieves correctly fitting and operating correctly Check sliding ring washer contra rotation ring LL was w A AAN 2 Wash systems Check water level in tank Check that wash water pipe is watertight Check washing system is complete and produces correct spray pattern Check wash arm hubs LL IL li TTT EE E ti E EA 3 Freshwaterrinse Lil Pp Check flow pressure waterpressure LL pl III Check rinsing system is complete and produces correct spray pattern Check that system is watertight OOOO A CT O O TI A ll KE eG 4 Housing and mounting parts Ettel Check housing tank sheet metal cover hood doors and cover NOS ing of machine base for damage and correct operation Check tank cover sieves E Wee Check boiler hoses clamps plastic parts and seals ea Check operation of raising and lowering equipment EE II O A ANA EME We ee Ki SE 5 Fr
43. is switched on This is achieved using this parameterization You can leave this level by pressing the 0 key again 16 3 6 Configuration level You can find the list of configuration parameters on this level parameter numbers 2xx Here you can view these and modify them You can also call up the status of the inputs and outputs or set the outputs for testing On the service level you will first see the display below This corresponds to viewing and setting the status of outputs see 15 3 9 P Press the I key to move forwards or the II key to move backwards or the accept key to make a selection You are now at the current level Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 27 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m You can leave this level by pressing the 0 key 16 3 7 Viewing modifying parameters depending on the code en tered Indication this display by pressing the accept key Now the first parameter will be displayed with a value Far Fran Press the I key to move forwards or press the II key to move backwards until the pa rameter you require is displayed Confirm the parameter to be modified by pressing the acce
44. is technical documentation free of charge Further copies are available against the payment of a fee MEIKO very much hopes that you will enjoy our product and use it successfully Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 3 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 1 1 Storage Always store the operating instructions close to the installation The operating instructions must always be kept within easy reach 1 2 Name and address of manufacturer Please address any queries technical problems etc directly to MEIKO Maschinenbau GmbH amp Co KG PO Box 2040 D 77652 OFFENBURG Phone 49 781 203 0 Fax 49 781 203 1121 Export http www meiko de EVOCARE AUSTRALIA PTY LIMITED A B N 98 078 566 604 Trading as EVOCARE and L amp M EQUIPMENT P O Box 1144 Stafford Qld 4053 anno Ph 07 33558000 Fax 07 3355 5043 a o Website http www evocare com au 3 Email sales evocare com au workshop evocare com au warehouse evocare com au Global Mark com au accou nts evocare com au 1 3 Description of the type of equipment Please provide the following information on any query and or when ordering spare parts Please provide the following information on any query and or when ordering spare part
45. ively been designed for the washing of dishes cutlery and glasses DANGER The washing machine must be used only in accordance with regulations Other uses are prohibited The items to be washed must be suitable for washing in dish washing 1 machines The EcoStar 545 D M dishwashing machine is a technically based piece of equipment and is not a consumer product within the meaning of the provisions of the Equipment and Product Safety Act It is intended solely for use in commercial i e non domestic situations Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 5 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M MEIKO 4 CE Declaration of Conformity _ K O nfo rm ta tS e rk a ru ni g Datum 2009 12 29 Update CE Declaration of Conformity D claration de conformit CE Dichiarazione di conformit CE Declaraci n de conformidad CE CE conformiteitsverklaring Firma Company Soci t Ditta Empresa Fabrikant MEIKO Maschinenbau GmbH amp Co KG Adresse Address Adresse Indirizzo Direcci n Adres Englerstraf e 3 D 77652 Offenburg E mail info meiko de Auftrag Nr Order no No de commande No d ordine No de pedido Opdracht nr Sp lmaschine Typ FV 28 G FV130B DV80T
46. le security measures to prevent the switch from being switched on Only specialist personnel may carry out repairs and rectification work on the electrical part of the machine The Health and Safety Regulations must be observed The machine may be used again only after all cladding panels have been installed by the user of the machine The machine may not be sprayed with a water hose or high pressure cleaner The machine must only be operated under the supervision of instructed staff IMPORTANT AN The water in the wash up area is non potable and can t be used for food preparation If you are unsure about the operation of the machine the machine must not be used IMPORTANT Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 8 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m Do not place any solvents or other easily flammable substances in the wash up area as this increases explosion hazard The appliance must not be used to transfer waste water from other sources into the drain ATTENTION Steel scrub pads are not to be used for the pre scouring nor for cleaning the items to be washed ATTENTION Do not wash any metal items in the machine which are not made of stainless steel The in coming of me
47. ly empty wash tanks between uses Rinse water quantity too low Detergent or rinse aid product not suitable Temperatures too low lt 40 C Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 22 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 14 Staff training Only trained and instructed personnel are allowed to work on the dishwashing machine Staff responsibilities for the installation s operation maintenance and repair must be clearly defined Any personnel undergoing training are only allowed to work on the dishwashing machine installation under the supervision of an experienced person Trained operating Trained Trained in house personnel in house techni technician or instal lation engineer Installation and assembly Commissioning Operation use Cleaning Checking safety devices Fault finding Troubleshooting mechanical Troubleshooting electrical Maintenance Repairs Training should be recorded in writing 15 Authorized user of this documentation The works described in this booklet chapter 14 18 may only be carried out by specialists of the manufacturer the responsible agency or an authorized dealer Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009
48. ly controlled dosing units The dosing is effected automatically acc to the requirements arising during the wash process Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 14 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m ATTENTION Program start key A mEIKO If unsuitable products are used the life of the dosing equipment will be significantly shortened We therefore recommend that detergents should have a pH value greater than 7 and that rinse agents should have a pH value between 7 and 2 8 5 Operation during washing and rinsing cycle The following fundamental principles must be observed when placing the items to be washed in the baskets e All hollow containers must always to be loaded upside down Otherwise the water will be trapped inside and they will not dry to a brilliant finish e Plates trays and big plates should always stand at a slight angle in the basket The inside faces pointing upwards e When using cutlery baskets ensure that cutlery is always inserted handle down e Load the cutlery baskets with a mixture of spoons knives and forks as identical items of cutlery can be too close together e Do not overload the baskets e Do not stack the dishes in the wash basket directly on top of each
49. ment for hospitals and homes Cleaning and disinfection machines for bedpans and other medical washware in the form of floor mounted wall mounted and built in equipment sluice units installation units for sanitary areas in hospital rooms complete furnishings for unclean workrooms MEIKOLON cleaning and hygiene products for glass dishwashing machines and universal dishwashers as well as for cleaning and disinfection machines Complies with the hygiene requirements of DIN 10511 H for commercial class washing DIN 10510 for commercial dishwashing and DIN 10522 for commercial washing of reusable crates and containers 42 42 Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Short Operating instruction EcoStar 545 D M MEIKO 0000 br iw f FRU Operating panel Preparation for washing and rinsing Open the hood Place the screen on suction and stand pipe in position Close the hood Switch on the appliance by pressing one of the program pre selection keys Check level and if necessary refill detergent and rinse aid reservoirs Y VV VV WV The machine is ready for operation when flash light of pre selector button stops Operation during washing and rinsing cycle Place the items in the ba
50. nformation 1 Filling Heating ready for wash ing washing or draining 2 Filling Heating ready for wash ing washing 3 Filling Heating 4 ready for washing 5 Washing 6 Draining 7 Error 8 Not status machine OFF and draining 9 EW active 10 not status Machine OFF 0 Only with LED1 If 0 no AO calcula tion otherwise sum up and display up to the set value Machine type Parameters 205 indica Parameters tor u A0 value Parameters Shortage of rinse Parameters 0 Monitoring aid Indication 219 Shortage of de Parameters 0 Monitoring tergent Indication Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 31 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m Par Configuration value Factory No options range setting 224 Power supply Parameters mode Parameters 1 Definition Energizing rinse aid pump 0 no signal 1 energizing according to calcu lated running time 2 energizing as final rinse 3 energize as wash pump 1 Definition Energizing detergent pump 0 no signal 1 energizing according to calcu lated running time 2 energizing as final rinse 3 energize as wash pump 4 Option detergent pump using negative pressure dosin
51. nized although the detergent dosing is not approached Valve of the dosing unit is not closing Regeneration in progress Regeneration program has started and is in progress It is possible to pause the program but not cancel it 123 Regeneration necessary The user must start the regeneration empty tank add salt Table 2 Information displays Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 35 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M 17 2 Error messages and troubleshooting Figure 3 Error messages Error messages will disappear automatically when the fault has been rectified Error messages extract Description Possible cause EEPROM plug in fault EEPROM not available incorrectly defective Empty or incorrect EEPROM Replace EEPROM with correct parameter set Boiler level not reached during Fresh water inlet insufficient 1st filling only FA machines water faucet closed Entering hose kinked Inlet filter soiled Solenoid valve defective Boiler switch defective Boiler level during filling not See 201 reached early enough only FA machines No change detected by the Plug Boost pump defective connector emptying only FA Plug connector loosened Machine Start capacitor defecti
52. nstallation drawing Technical Sheet The drain hose must be connected to the waste water pipe in the building e A grease trap may be needed depending on the machine application 6 7 Emergency off e Set the local main switch to OFF or switch off the local main fuse 6 8 Chemicals for the operation of the appliance Only alkali detergents and acid rinse agents suitable for use in commercial dish washers may be used Corresponding information is submitted by the manufacturers of such products ATTENTION MEIKO recommends brand cleaning products from leading manufacturers clean ing and hygiene products WoW are an excellent choice If unsuitable products are used the life expectancy of the dosing units can be re duced considerably Observe the dosing instructions of the manufacturer Detergents and rinse aids can present a health hazard if they are not correctly used Please observe the manufacturers instructions on the original packing and on the safety data sheets If a de scaling agent is used please strictly observe the manufacturer s instructions reg handling and safety After having used such an agent the product must be completely removed from the machine as even small residues are sufficient to de stroy plastic parts and packing materials Chemical product settings The correct settings for the quantity of detergent and rinse agent depend on the prod uct used The relevant chemical supplier can install the cor
53. nt Design Responsable D veloppement Construction Direttore Sviluppo Costruzione Jefe de la secci n de desarrollo y dise o Chef Ontwikkeling Constructie Postanschrift Postal Address Adresse postale MEIKO Maschinenbau GmbH amp Co KG Deutsche Bank AG Offenburg BLZ 664 700 35 0416800 Englerstr 3 77652 Offenburg Postfach 2040 77610 Offenburg Germany BIC DEUTDE6F664 IBAN DE13 6647 0035 0041 6800 00 Telefon 49 781 203 0 Telefax 49 781 203 1179 http www meiko de email info meiko de Volksbank Offenburg eG BLZ 664 900 00 189103 MEIKO Maschinenbau GmbH amp Co KG Offenburg HRA Offenburg 470 603 BIC GENODE610G1 IBAN DESS 6649 0000 0000 1891 03 Komplement r GmbH MEIKO Verwaltungs GmbH HRB Offenburg 470 421 Sparkasse Offenburg Ortenau BLZ 664 500 50 00 012112 Gesch ftsf hrer Dipl Kfm Burkhard Randel Dr Ing Stefan Scheringer BIC SOLADES10FG IBAN DE15 6645 0050 0000 0121 12 Ust IdNr DE 142540206 StNr 14073 21602 Postgiro Karlsruhe BLZ 660 100 75 31522 752
54. omer operator no modifications electrical or location modifications for example may be made Once the Multi washer has been installed put into service and handed over to the customer operator no modifications electrical or location modifications for example may be made Once the Multi washer has been installed put into service and handed over to the customer operator no modi fications electrical or location modifications for example may be made Update 2009 12 18 MRL 9662798 7 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m equipment for optimising energy consumption must not be used to reduce essential operating temperatures as set out in DIN 10511 10512 and 10522 If you the client install equipment for optimising energy consumption any possible reduction in the qual ity of the wash and hygiene is your responsibility IMPORTANT 5 2 Basic safety measures Danger can arise from the improper use of the machine or if it is used for purposes for which it was not intended IMPORTANT Parts carrying electric current as well as moving or rotating parts can cause e Dangers to the user s life and limb and e Material damage entstehen The machine may only be operated by adequately qualified staff who have been trained by the operating c
55. ompany and who have been trained about the Hazard and Safety Instructions Qualified staff as defined by the Operating Instructions are persons e who are over 14 years of age e who because of their training experience instruction and knowledge of the relevant standards regulations accident prevention instructions and operating conditions have been authorised by the person responsible for the safety of the machine to carry out the necessary activities and who therefore are aware of the possible dan gers and how to avoid them e who have been trained in first aid and in the on site rescue arrangements e who have read and who observe the safety instructions e who have read and who observe the Operating Instructions or the part applicable to the work to be carried out IMPORTANT The machine operates with hot water Temperature of wash water 58 60 C by Clean ing and disinfection machine must be 74 CThe machine operates with hot water Avoid all contact with the rinse water Danger of scalding burning Please observe ap propriate protective measures Observe all the instructions posted on the machine Warning When electrical equipment is in operation it is inevitable that certain parts carry a dan gerous current ALL current to the whole machine MUST be switched off before the machine s cladding or electrical equipment is opened PLACE THE ON SITE MAIN SWITCH IN THE OFF POSITION and install suitab
56. ore starting operations following maintenance or repair work all initial tests must be carried out as described in Machine Settings for Initial Commissioning by the Service Engineer 18 1 2 Observe the environmental protection regulations Legal obligations relating to the avoidance of waste materials and to their recy cling removal in accordance with applicable regulations must be observed In particular during installation repair and maintenance work materials that could pol lute water such as Grease and oils Cleaning fluids containing solvents must not pollute the ground or run into the sewerage system These materials must be stored shipped collected and disposed of in suitable containers 18 2 Dosing units The dosing units themselves are maintenance free in principle but the working life of the wearing parts peristaltic tube is largely dependent on the chemical used 18 2 1 Change of products Change of product means that one rinse aid or detergent product is replaced by another The use of differing products alongside each other can result in break downs gt Hose lines and dosing units must always be rinsed out with warm water Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 38 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating
57. other As the wash water could not strike the items directly and unnecessarily long wash times would have to be selected Short wash times with baskets which are not overloaded are much more economical 8 5 1 Start the wash cycle e Pre wash the dishware major food residues serviettes tooth picks etc and place in the basket e Place the basket in the appliance ensuring that it is correctly centred e Close the hood e Press the program start key or press down the hood rod The appliance washes and rinses automatically and switches off the wash program after completion The program cycle is indicated by a light on the program start key The wash time can differ from the set program time if the boiler heating capacity is not sufficient for heating up the fresh water to the pre set boiler temperature during the program time In this case the automatic wash time extension is activated 8 5 2 Remove the cleaned items e When the light goes out open the hood and remove the basket In case of Airbox AktivAir After the wash is finished the extraction fan is switched on for three minutes The steam coming from the tank partially condensates and goes back into the tank The rest mixes into the air so that steam formation is minimised Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 15 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach
58. ou to get to Know the installation fully and to use it properly It will also enable you to avoid repairs and the related loss of operational time In the event of any damage caused by non observance of these operating instructions any guarantee claims are invalid We accept no liability for any consequential loss or damage arising as a result MEIKO is constantly working on the further development of all its models We would therefore ask you to understand that because of this we must reserve the right to make modifications at any time to any items covered by the contract in terms of their shape fittings and technical characteristics No claims may therefore be based on the details the images or the descriptions con tained in these operating instructions Should you require any further information or in case any particular problems not dealt with in great detail in the operating instructions should arise you may contact the relevant MEIKO branch to obtain the information you require We should also like to inform you that the contents of these instructions do not form part of or amend any earlier or existing agreement statement or legal position All MEIKO s obligations arise from the relevant purchase contract which also contains the entire and only valid guarantee provisions These contractual guarantee rules shall be neither extended nor restricted as a result of any explanations given in the instructions You receive all th
59. pro Fresh water supply insufficient gramme the tank level S3 does water faucet closed not fall on time Drain pump soiled defective Only with built in drain pump Rotor loose Drain pump plug connector loose Start capacitor defective Tank level analysis disrupted No signal from ON OFF circuit boards Tank temperature not reached Tank heating defective thermal fuse after max heat time P 314 Radiator Temperature sensor defective incorrect Installation position Tank protection defective performance switch loose 310 Temperature sensor short circuit See 210 311 Temperature sensor interruption See 211 312 Actual Tank temperature too high See 212 gt 85 C Table 3 Error messages Should information or fault numbers not shown in the tables be indicated or should the suggested measure not lead to the elimination of the fault please no tify a customer service technician Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 37 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m ATTENTION ATTENTION A A ATTENTION ATTENTION ATTENTION MEIKO 18 Maintenance Maintenance work may only be carried out when the dishwashing machine is shut down In addition the dishwashing mac
60. pt key the value will flash Increase the value using the I key or reduce it using the II key and confirm with the Accept key You can leave this level by pressing the 0 key See 15 4 for list of parameters 16 3 8 Viewing input status Indication this display by pressing the accept key Now the first digital input will be shown with status l ki ANER P Press the the input you require key to move forwards and the II key to move backwards until you reach Display input set You can leave this level by pressing the 0 key Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 28 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M The direct value here the boiler temperature is displayed for the analog inputs Use the IF to go forward and the Il to go backward until the desired input is displayed Assignment details for the inputs are given on the assignment list for each machine see 15 5 16 3 9 Viewing modifying output status according to code entered Indication this display by pressing the accept key Viewing Now the first output will be shown with status Je Press the I key to move forwards and the II ke
61. r d tergent Reinige Del lavage 8 005 393 Flessibile trasparente per detergente 8 005 372 Tubo flexible transparente para detergente Wezyk przezroczysty do ptynu do mycia Transparante slang voor zeep Produit ringage 9 006 928 Schlauch blau fur Klarspuler Hose blue for rinse aid Tuyau bleu pour produit tensio actif Flessibile blu per brillantante Tubo flexible azul para abrillantador Wezyk niebieski do nabtyszczacza Slang blauw voor naglansmiddel O 7 mm Deckel Reiniger bzw Klarsp lerbehalter Lid for detergent resp rinse aid container Couvercle pour conteneur de d tergent resp produit tensio actif Tappo per canistre detergente o brillantante Tapa del dep sito de detergente o abrillantador Nakretka kanistra z ptynem do mycia lub z nabtyszczaczem Deksel zeep resp naglanscontainer ACHTUNG Saugleitung von Warmequellen fernhalten ATTENTION Keep away suction line from heating sources ATTENTION Ecartez la conduite d aspiration de toute source de chaleur ATTENZIONE Tenere il tubo d aspirazione lontano da fonti di calore jATENCION Mantenga el tubo de aspiraci n alejado de las fuentes de calor UWAGA Uktad ssacy nalezy trzymac z dala od zrodet ciepta LET OP Aanzuigleiding van warmtebronnen verwijderd houden Saugleitung 7 sprachig_2009 09 doc 15 09 2009 BP Anschlussvorschrift f r Laugenpumpe m Connection prescription for drain pump IKO Prescription de connexion pour pompe
62. ransport instructions on the packing e The appliance must be moved with great care Unpack the machine In order to ensure safe shipping the installation parts are placed on a special four sided wooden frame Incoming goods should only arrive on these wooden frames Incoming goods should only arrive on these wooden frames The packing is specifically designed to allow the appli ances to be moved safely and securely using a pallet truck The enclosed technical sheet indicates the connection and consumption ratings of the appliance Small quantities of steam may escape from the hood of the appliance Furniture and equipment situated near the hood must be protected An engineer from your local MEIKO Service Centre can install the appliance at the correct point and connect the tables upon request An engineer from your local MEIKO Service Centre can install the appliance at the correct point and connect the tables upon request The following must be observed during the installation of the dishwashing machine e The complete unit must be levelled in both directions using a water level e Compensate for an uneven floor by adjusting the feet e Table joints must be sealed with detergent resistant sealing compound e g sili cone Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 10 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040
63. rature no 4 in parameter 201 Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 32 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 corporated 242 Drain pump LP Parameters incorporated 243 Frost drainage Parameters without FA 9 o I h h HER i D z Operating instructions EcoStar 545 D M 16 5 Assignment list View inputs control outputs Indication Input output other Conditions Right cp D Common L Hood closed dln 0 1 Tank level none dr 4 dn 9 OM Levelrinse ad option mn ie i K L eee out 3 1 0 1 Filling valve No leak water out 32 No leak water LA 34 Ot No leak water Leak water switch condition Leak water switch must not have operated 16 6 Rinse program parameter update 01 05 2009 Boiler temperature target Wash time target value Program no value Washing Total 83 x A o 83 S a o _ 83 83 83 83 83 224 240 83 254 270 83 83 65 65 65 240 Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 33 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M j LA O O
64. rect setting Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 22222 9GGZ7IB AA We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 6 9 Instructions for the disposal of the packaging material e The four sided wooden frame consists of untreated raw wood Special country specific import regulations may also stipulate the use of wood which has been treated against pests The plastic sheeting PE sheeting may be recycled The cardboard packaging material used to protect the edges can also be recycled The steel tensioning strap made of strip steel may be recycled with the steel scrap The plastic tensioning strap of plastic PP can be recycled 7 Settings for initial commissioning by the service engi neer 7 1 Commissioning In order to avoid damage to the installation and the injury and death of persons when commissioning the installation the following points must be observed without fail Any necessary initial tests to parts supplied by sub suppliers must be carried out More detailed information if required can be found in the relevant Instructions for Use e The installation may only be commissioned by suitably qualified persons ob serving the safety instructions e Before initial startup check that any tools and parts not belon
65. s Machine type Order number Position Serial number Year machine constructed This information can be found on the plate Datei 1_EcoStars45D M_0662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 4 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH Co KG Postfach 2040 D 77652 Offenburg Tel 49 7 81 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m 2 Explanation of the safety symbols used The following safety symbols will appear throughout these operating instructions The purpose of these symbols is to draw the reader s attention to the text of the adjacent safety information This symbol warns that there is danger to human life and health ATTENTION This symbol warns that there is danger to the installation to ma DANGER x terial or to the environment This symbol denotes information that helps you to understand the Installation s operation Warning of dangerous electrical current Warning of possible hand injuries No splashing water prohibits the use of a high pressure hose Danger of explosion indicates a potential explosion hazard Non potable water The water is not for drinking Health can be endangered by drinking Danger of burning indicates possible hazard due to hot sur faces or media 3 Use of the appliance for the purpose intended The dishwashing machine EcoStar 545 D M has exclus
66. sket Place the basket in the appliance Close the hood Program for normal soiled dishes Program II for normal soiled dishes Program lll press I Il for heavily soiled dishes Press the program start key or press down the hood rod The appliance washes and rinses automatically and switches off the wash program after completion When the light goes out open the hood and remove the basket VV VV VV V V Shutting down the appliance gt Press the 0 button Off button The machine is switched off when all the lights are out gt Open the hood and remove the stand pipe If the appliance has a built in waste water pump the program start button must be pressed to empty the tank gt The tank interior is sprayed with clean hot water after the tank water has been drained The hood must remain closed The waste water pump switches off automatically gt Clean tank strainers and wash arms Yy Short Operating instruction EcoStar 545 D M MEIKO 0000 br iw f FRU Operating panel Preparation for washing and rinsing Open the hood Place the screen on suction and stand pipe in position Close the hood Switch on the appliance by pressing one of the program pre selection keys Check level and if necessary refill detergent and rinse aid reservoirs Y VV VV WV The machine is ready for operation when flash light of pre selector button stops Operation during washing and rinsing cycle Pl
67. st guarantee the following points relating to the connection e The correct voltage and type of current must be available e Mains supply lines must be protected according to regulations and provided with a main switch e Appliances must have a fixed connection and equi potential bonding e lf an unearthed neutral N is used with threephase current the main switch must have 4 poles with alternating current 2 poles e For connection to three phase current a 5 pole terminal strip L1 L2 L3 N PE must be used e Electricity supply without neutral conductor N when connecting to three phase current use a 4 pole clamping strip L1 L2 L3 PE e Conductor colors live conductor L1 black 1 L2 brown 2 L3 black 3 neutral conductor N blue 4 protective earthing conductor PE green yellow Protective measures as well as the connection of the equi potential bonding must be carried out according to DIN VDE 0100 540 and conform to the local power utilities ATTENTION regulations Do not protect by fuses any additional consumers together with the dishwashing ma chine e All conductor fixing screws must be re tightened before commissioning the appli ance The wiring diagram is behind the front panel resp front cladding of the appliance The enclosed wiring diagram must remain in the appliance Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 11 42 We reserve the right to change ex
68. tal parts especially iron tinplate copper must absolutely be avoided The appliance must not be used to transfer waste water from other sources into the drain Warning risk of corrosion and blockage Only use suitable products for cleaning the stainless steel surfaces which do not at tack the material form any deposits nor cause any discolorations The hood MUST be closed Open the hood very carefully during the programme cycle as otherwise wash water could splash out ATTENTION The tank heating element may still be hot after the tank has been emptied There is therefore the danger of burns when the machine is cleaned manually Only detergents and rinse aids suitable for the use in industrial dishwashers may be used ATTENTION Corresponding information is submitted by the manufacturers of such products Detergents and rinse agents can be injurious to health The manufacturers hazard instructions on the original packaging and in the safety data sheets must be observed The main switch must be turned off when operation has finished The accompanying Operating Instructions must be observed for accessory devices e g water treatment installations ATTENTION WE ACCEPT NO LIABILITY FOR DAMAGE OR INJURY ARISING FROM FAILURE TO OBSERVE AND ABIDE BY ATTENTION THESE SAFETY INSTRUCTIONS 5 2 1 Working on electrical equipment Any repair work and repairs to the power supply on the installation s el
69. the I key to move forwards or the Il key to move backwards or the accept key to make a selection You are now at the current level You can leave this level by pressing the 0 key Datei 1_EcoStar545D M_9662798_Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 25 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M 16 3 1 View modify parameters Indication this display by pressing the accept key Now the first parameter will be displayed with a value SR Press the I key to go forwards and the Ill key to go backwards until the parameter you require is displayed Confirm the parameter to be modified by pressing the accept key the value will flash Increase the value using the I key or reduce it using the II key and confirm with the Accept key You can leave this level by pressing the 0 key See 15 4 for list of parameters 16 3 2 Ventilating the rinse aid inlet this display by pressing the accept key Now the dosage pump will be activated and the remaining running time will be indicated You can leave this level by pressing the O key The ventilation will be interrupted off 16 3 3 Ventilating the detergent inlet this display by pressing the accept key
70. tion instructions See attached technical sheet 9662798 21 42 Datei 1_EcoStar545D M_9662798 Betriebsanleitung EN _2009 05 doc Update 2009 12 18 MRL We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M 13 Tips for self help in the case of faults Machine does not fill No water available Dirt trap blocked Level switch defective Solenoid valve defective Hood safety switch defective Rinse water does not No water available spray Dirt trap blocked Solenoid valve defective Booster pump has failed with air gap Fresh water rinse system furred Stripes and smears on the Rinse water mineral content too high see operating dishes instructions If this is observed only at particular times check water softener for regeneration This must not carried out during the dishwashing operation Water pre treatment defective or not carried out Different water type depending on the waterworks Unsuitable rinse aid products or wrong dosage quan tity Formation of a significant Detergent for dish washing by hand enters the wash amount of foam in the tank because of pre cleaning the dishes wash tank Daily cleaning is carried out with foaming cleansing agents which afterwards enter the machine Improve pre wash as too much food residue is enter ing the tank Alternative
71. ve Plug connector loosened Plug connector loosened Boiler level switch defective No boost pump signal to from in put output circuit boards Check boost pump DSP S2 using manual control Following the end of final rinse See 203 time still no change detected only FA Machine Boiler temperature not reached Boiler heating defective thermal fuse after max Heat time P 310 radiator Temperature sensor defective incorrect installation position Boiler contactor defective performance switch loosened No signal from ON OFF circuit boards Temperature sensor short circuit Check sensor cable plug contacts Replace sensor Install sensor correctly 211 Temperature sensor interruption See 210 Actual boiler temperature too Contactor sticking high gt 95 C Incorrect sensor defective sensor Check sensor cable Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 36 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m ge Description Possible cause 301 Number of final rinse cycles for Feeding water pressure too low tank filling exceeded Sieve in feeding valve is dirty Tank level analysis disrupted Rinse jets soiled Air trap soiled Condensate in level pipe Hose kinked loose not watertight During the self cleaning
72. y to move backwards until you reach the output you require Modifying Press the accept key to confirm the modification of the output the value will flash Press the I key to modify the value and press the accept key to save it The output is now set You can leave this level by pressing the 0 key Assignment details for the outputs are given on the assignment list for each machine see 15 5 16 3 10 Viewing modifying dosing technology level By entering code 40000 read only or 40044 read enter the user can access the 4th parameter level summarizing all the dosing technology parameters P104 P105 P218 P219 P224 P225 P321 P322 P326 P327 See 15 4 for list of parameters Datei 1 EcoStar545D M_9662798 Betriebsanleitung_EN_2009 05 doc Update 2009 12 18 MRL 9662798 29 42 We reserve the right to change execution and construction MEIKO Maschinenbau GmbH amp Co KG Postfach 2040 D 77652 Offenburg Tel 49 781 203 0 Fax 49 781 203 1121 Operating instructions EcoStar 545 D M m Factory setting Allocate the wash program to the key Assignment adjustable 16 4 Parameter list Par Configuration No options 101 Wash program Key 1 Parameters 102 Wash program Parameters Key 2 Allocate the wash program to the key Il Assignment adjustable 103 Wash program Parameters Key 3 Assign rinse programme no of the key I II pressed together Assignment adjustable

Download Pdf Manuals

image

Related Search

Related Contents

Installation manual  VPCJ11AFX/B  SCADALINX HMI パッケージ取扱説明書 - M  votre semaine sur viastella du samedi 30 août  Pratique et Hébergements 2013 - Office de Tourisme de Turckheim  HP Compaq nc6140 Notebook PC    StarTech.com 5.25in Front Bay Mount Dual Fan Hard Drive Cooler - dual fan hard drive cooling kit - Hard drive cooler - black  Indesit 3D AA NX  Sélection thématique : « Danse»  

Copyright © All rights reserved.
Failed to retrieve file