Home

Rion Hobby Gardener Assembly Instructions

image

Contents

1. Final Touches Go inside your new Greenhouse and seal any gaps between the PN2 and PN2A panels and the profiles using SF soft foam insulation Cut pieces of SF soft foam insulation 2 5 cm 1 long remove the adhesive backing and place where shown making sure that the area is clean and dry Congratulations Your Greenhouse is now completed You will find it easy to clean and maintain Put this manual in a safe place so you can refer to it if you decide to add options or need to make a repair For your safety and convenience please take note of the following e Examine your Greenhouse for sharp edges and trim with a razor knife if necessary e tis important to clear your Greenhouse of snow in the winter e If you live in a hot climate where outside temperatures exceed 46 C 115 F in the sun or 36 C 99 F in the shade this may cause the temperature inside the greenhouse to exceed 55 C 131 F Such conditions may harm your plants and will damage the greenhouse by warping structural profiles In order to prevent damage e Ensure good ventilation during hot days e Install a shading screen such as the Rion ShadeNet available as an option e Always close roof vents in high winds Rion offers a wide range of options for your new Greenhouse including modular shelves irrigation systems additional windows automatic window openers and others See our web page at ht
2. P A 7 ITDA vaye HG 8 x 12 UA VEY A HGM HGB HGF aN FA TE S HG 8 x 16 M S ey WV K L HS A ES gt Y HG 8 x 8 OL 1G WO OLL 9 V U 07 Hobby Gardener Assembly Instructions The part code is stamped on each connector Profiles are listed in order by size largest to smallest Panels are Note Do not proceed with assembly if any parts are missing identified with stickers Take a minute to make sure you have everything you need Exact dimensions can be found in the packing list The drawings in this manual are designed for the greenhouse owner who has purchased a Greenhouse 8 x 8 which consists of one front unit HGF and one back unit HGB and one HGM Middle unit If you have purchased additional Middles the instructions are indicated in the text Front Middle Part Code Description Corner Frame Connector Frame Connector Doorway Frame Connector Left Rib Connector NO 5 Ww gt D gt JJ gt gt Right Rib Connector Rib Connector UI gt o Left Pediment Connector o N gt Right Pediment Connector Top Pediment Connector T Oval Connector Oval Junction Conn
3. 21 Hang the Doors ews are needed using the glazing tool all pins where scr Remove Seal the Doors Assemble Door Latches Remove all pins where screws are needed using the glazing tool A INSIDE 24 Attach Door Holder
4. Assemble Roof Framework Note Assemble the roof in an area not too far away from the completed base O First assemble the first arch Slip one end of the CAB40 cable through the 6 mm 14 channel on the underneath side of the 5A connector You may use the GT1 pin and glazing tool to assist you The cable does not go through the central hole of the connector Screw an AS70 screw using the AW5 Allen wrench through the CAB40 cable and the pin holes in both sides of the connector Note The end of the screw should not extend beyond the outside channel of the E2 profile so it won t interfere with the placement of the RB1 glazing element page 13 O Repeat the previous two steps for the 5A connector on the other side of the arch Lock the parts in place using pins Repeat steps through for the rest of the arches according to the number of HGM Middles you have purchased Grasp the center of each CAB40 cable with the Hook1 Top Catch and slide it into the top 5A connector as shown Add E2 profiles to the front pediment and lock the parts in place using pins O Add E2 profiles to the completed ribs according to the number of Middles you have purchased and lock them into place with pins Complete the roof by attaching the back pediment Lock it into place with pins 12 Hobby Gardener Assembly Instructions Cover the Greenhouse Roof O Step in the RA framework of the lower wi
5. 19 Seal The Door 21 Assemble the Door 20 Hang the Door 22 Assemble Door Latches 24 Assemble the Door Holders 25 Final Touches 26 Hobby Gardener Assembly Instructions 2 Prepare a Foundation for Your Greenhouse Before assembling your new Greenhouse a proper foundation must be prepared A number of anchoring options are possible based on wind and ground conditions in your area Make sure that you have checked with your local authorities regarding any required building permits Decide at this time the final orientation of your Greenhouse We recommend that you place your greenhouse in a spot where it will receive direct sunlight and will be protected from the wind as much as possible The door should not face prevailing winds It is important to clear your Greenhouse of snow in the winter Modular Base Option If you have purchased the optional Greenhouse Modular Base follow the assembly instructions in the packaging The Greenhouse Modular Base can be placed in an excavated hole or on the ground In either case you will require sufficient gravel earth or other suitable material to fill the base see table below All required hardware is included Rion Resin Greenhouse Base If you have purchase
6. TOOL Germany CLEMENS HOBBYTEC GmbH Rudolf Diesel Str 8 D 54516 Wittlich Germany T 49 0 6571 929 222 Fax 49 0 6571 929 198 info clemens hobbytec de www clemens hobbytec de South Africa Easy Greenhouses CC 8 Sherwell Avenue Boskruin Ext 5 Johannesburg South Africa 2154 Sales and Support Linda Hill T 27 11 792 7583 Mobile 27 82 777 6681 linda easygreenhouses co za www easygreenhouses co za Scotland 54 CLEMENS Lomond Horticultu ral Products Ltd The Oaks Balfron Station Glasgow Scotland G63 OQN T 44 0 1360 449042 info lomondhp co uk www lomondhp co uk New Zealand Bear Forest Po 404059 Puhoi Auckland 1095 THE GREEN T 64 0 9 889 0839 HOUSE SHOP Mobile 64 0 27 682 5265 www thegreenhouseshop co nz salesothegreenhouseshop co nz RION garden and gardening Safety First e Please read these Assembly Instructions completely before assembly and keep them in your records so you can refer to them if you wish to add options or make repairs e The instructions in this manual lead you through each step in the assembly process It is important for you to follow them closely e We recommend that you use gloves during assembly e Hobby Gardener is not responsible for the misuse of tools or parts e If local building codes require permits or licenses make sure that they are acquired before beginning e Your Greenhouse should be secure ly anchored to the prep
7. Note The Roof Vent cannot be inserted in the outside spaces O Assemble the two WINH31 handles to the WIN33 Roof Vent using the included pins Insert the Roof Vent in one of the remaining central spaces by sliding one corner into the RD1 glazing element Note Additional Roof Vents are available as an option Install the remaining PN40 panels and remove the ID strips from the panels Caution Closewindows in high winds Automatic window openers are available as an option 14 Hobby Gardener Assembly Instructions O Lock the sides of the Roof Vents and the PN40 using RC5 glazing elements Make sure that the end of the RC glazing elements are in line with the bottom of the RD elements Finish locking the panels into place by placing RC3 glazing elements across the top of the roof Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained on page 2 Snap the roof caps in place on the top rib intersections Note Ifyou need to remove the roof caps push them on one side and then lift O Making sure that the plastic ID strip faces out slide a PN2A panel in the lower RD1 element Bend the panel until it enters the upper RD1 element Continue with the rest of the PN2 and PN2A panels O Lock the lower panels into place using RC1 glazing elements Make sure that the end of
8. reserves the right to discontinue or change any of its products including colors without notice Should a Greenhouse or a part thereof covered by this Warranty be unavailable Rion reserves the right to substitute a Greenhouse or part thereof that is of equal value according to Rion s sole discretion or to provide Purchaser with a refund which reflects the cost of the Greenhouse or the part thereof Taxes shipping costs inconvenience loss of use installation fees incidental or consequential damages are not covered by this Warranty
9. 3 V e V po ve U gt O Lo m ASSEMBLY INSTRUCTIONS Hobby Gardener RION garden and gardening Authorized Rion Distributors USA Backyard Living Source Inc BLS 149 S Adkins Way Suite 101 Meridian ID 83642 BL backyard LMING source T 208 287 6601 Fax 208 898 9518 info ecogreenhouse com www ecogreenhouse com Australia Oldfields Pty Ltd 8 Farrow Road Campbelltown N S W 2560 61 2 4627 0777 Fax 61 2 4627 0999 sales oldfields com au http www oldfields com au treco index htm i Korea Dowin Polychem Co Ltd 1031 2 Banbaehomestel 209 Bangbae dong Seocho gu Seoul Korea T 82 2 583 8511 Fax 82 2 583 8512 dowin polygal co kr www rionkorea com Dowin Co Ltd EZ GREE Czech Republic Lanit Plast S R O Hlubocinka 809 Sulice T 420 251 562 734 Fax 420 251 560 278 praha lanitplast cz www lanitplast cz B anitPlast England Palram Applications UK Unit 15 Delta Court Sky Business Park Finingley Doncaster DN9 3GN 01302 380775 customer service palram com Two Wests amp Elliott T 01246 451077 Fax 01246 260115 sales twowests co uk www twowests co uk amp Elliott amp Canada Footprint Tools Canada Limited Corporate Headquarters 1745 Bonhill Road Unit 1 Mississauga ON L5T 1C1 T 1 800 866 5749 T 905 564 6007 Fax 905 564 0059 sales footprint tools ca a FOOTPRINT
10. 8 cm 2 93 RB aang erent 80 cm 2777 RB Glazing Element 62cm TB AV KK lh DON f a RC Glazing Element 95 5 cm 3 1 Ro E E O 66 6 cm 2 214 RC Glazing Element 58 cm 1 101546 e o fF fF ee i P A RC Glazing Element 6 Hobby Gardener Assembly Instructions Middle Description Part Code Back ME Soft Foam Roof Insulation roll Latch k Po 1 1 eo po deee Se al co v Philips Screw 6x25 7215 7217 SUPP1 2 STA a po a ee sa Prepare Your Parts for Assembly Remove everything from your packages and sort them according to part type Since assembly is done from taking parts from every box it is best to put everything together The boxes are printed with a ruler to help you distinguish between profiles Note Protect unassembled panels from thesun to prevent identification stickers from adhering to the glazing Lay Out the Greenhouse Frame Decide in which direction the door will face and place the parts on the prepared foundation or wood deck Note Ifyou are using a modular base or other foundation option see page 3 assemble the base on a flat surface such as a driveway or a garage and them move it into position when you are done O Slide the SR1 profiles into the two B2 frame profiles that will be used for the doorway Note Arrange all 2D connectors with the stamp
11. Pediment O Put ST7 couplers on the PN8R and PN8L pediment panel halves with the ID plastic strip facing out The tops of each coupler are trimmed to match the angle of the panel Slide the two pediment panel halves together Assemble all parts of the back pediment except for the 7A connector and the R8 profile and slide the assembled PN8R PN8L pediment panel into the open space of the pediment Complete the back pediment taking advantage of the flexibility of the profiles Lock the pediment in place using pins and remove the ID strips from the panels Holda 10 connector with the identifying 10 on top and insert two GSC10 strengthening bars at an angle as shown from each side They overlap inside the connector with their ends flush with the far end Note The strengthening bars cannot be inserted all the way if the identifying 10 is not on top Slide two E2 profiles over the GSC10 strengthening bars The ends of the strengthening bars extend beyond the E2 profiles Complete the back pediment support with 10 connectors E2 profiles and 4A and 3A connectors as shown Put the remaining profiles on the back pediment top Slide the back pediment panels in as shown Make sure that the plastic ID strip faces the outside Put the back pediment support in place taking advantage of the flexibility of the profiles Lock everything into place using pins and remove the ID strips from the panel 8000
12. ared foundation using the recommended hardware If you prepare a concrete foundation do not ex cavate and pour concrete in frozen ground e Exercise caution when lifting heavy assemblies e Do not attempt to assemble your Greenhouse in high winds e We recommend that you place your Greenhouse in a spot where it will receive direct sunlight and will be protected from the wind as much as possible The door should not face prevailing winds e When your Greenhouse is fully assembled examine it for sharp edges and trim with a razor knife if necessary e Close all roof vents in high winds e tis important to clear your Greenhouse of snow in the winter e If you live in a hot climate where outside temperatures exceed 46 C 115 F in the sun or 36 C 99 F in the shade this may cause the temperature inside the greenhouse to exceed 55 C 131 F Such conditions may harm your plants and will damage the greenhouse by warping structural profiles In order to prevent damage e Ensure good ventilation during hot days e Make sure that the temperature inside the green house never exceeds 55 C 131 F by providing a shading screen such as the Shade Net available as an accessories option Note Hobby Gardener is not responsible for any damage due to high temperatures Important Make sure that you check the contents of the greenhouse packaging against the packing listand the required parts for your model on page 4 and following Do not beg
13. asing invoice of the greenhouse 2 Notification of Claims If Purchaser believes that the Greenhouse is defective in material or workmanship then written notice providing details of the alleged defect must be sent by Purchaser to the local representative as per our website s contact list at www rion com within 30 days after discovery of alleged Product defect and in any event within the warranty period Any such notice must note Purchase Date and include documentary evidence thereof such as invoice or receipt in order to establish warranty eligibility Repair or replacement of any Product or part thereof will not extend the warranty period as to the entire Product Repaired or replaced parts shall be subject to a specific warranty for a period of 90 days following repair or replacement or the remaining period of the Product part s warranty whichever is greater 3 Exclusions from Warranty Coverage This warranty provides a remedy only for defects reported in accordance with section 1 4 above In addition this warranty does not provide a remedy in any of the events specified below a This warranty does not cover Greenhouses larger than 8 or 6 foot by 16 foot b This warranty does not cover Greenhouses in climates in which the temperature exceeds 50 fifty degrees Celsius 122 degrees Fahrenheit or have a load exceeding 50 kg 110 Lb per 1 Sq Mr 10 89 Sq Ft c This warranty does not apply to Product exposed to wind speed exceedin
14. d the optional Rion Resin Greenhouse Base follow the assembly instructions in the packaging The Greenhouse Modular Base can be placed in an excavated hole or on the ground In either case you will require sufficient gravel earth or other suitable material to fill the base see table below All required hardware is included Treated Wood Base Build a framework composed of 4 x 6 9 and 2 x 12 treated lumber using deck screws or galvanized lag bolts and fill it with gravel or earth or other suitable material to fill the base up to the top surface of the 4 x 6 0 Attach the greenhouse frame through the connectors using screws that are 6 mm 4 in diameter and no less IN than 70 mm 2 long not supplied FT Quantity Screw Lagbol HG 8 x 8 2 65 meter 8 8 6 2 65 meter 8 8 6 0 68 cubic meters 24 Cubic teet 20 HG 8 x 12 2 65 meter 8 8 46 3 90 meter 12 9 e6 1 02 cubic meters 36 Cubic feet 28 HG 8 x 16 2 65 meter 8 8546 5 14 meter 16 10 1 36 cubic meters 48 cubic feet Note You may assemble the greenhouse on its base on a hard surface and move it to its final position when you have finished Make sure that there are no obstructions between the assembly area and the final position Other Foundation Options Wood Deck Your Greenhouse can be secured to a wood deck with screws not supplied through the frame connect
15. e to connect to the Greenhouse In no event shall Rion be liable whether in contract or tort including negligence for damages in excess of the purchase price of the Greenhouse or for any indirect incidental special or consequential damages of any kind including but not limited to personal physical injuries to any person compensa tion reimbursement or damages on account of loss of revenue or profits loss of business loss of information or data or other financial loss arising out of or in connection with the ability or inability to use the products to the full extent these damages may be disclaimed by law or for breach of any expressed written or oral or implied warranty on Greenhouses 5 Remedies This section provides for the sole remedy available to the Purchaser from Rion for any defect in the Greenhouse proven to be defective in material or workmanship under normal use during the relevant Warranty Period In the event of any defect covered hereby or any implied warranty Rion at its sole discretion shall replace the defective Product or any part thereof which requires replacement or pay the replacement cost Rion reserves the right to make substitutions for warranty claims if parts or the Greenhouse are unavailable or obsolete Purchaser s failure to make a claim as provided in section 2 above or continued use of the Greenhouse shall constitute an unqualified acceptance of such Greenhouse and a waiver by Purchaser of all claims thereto Rion
16. ector O go Base Profile 50 cm 1 7146 iaa Corner Oval Connector 00 DoorH33 Door Handle Round Profile 113 cm 3 81 2 Round Profile 80 2 cm 2 7 s Round Profile 53 4 cm 1 9 Oval Profile 116 2 cm 3 934 Oval Profile 113 cm 3 81 2 Oval Profile 85 cm 2 9 46 Oval Profile 54 cm 1 9V4 Oval Profile 39 4 cm 1 3 2 Oval Profile 13 4 cm 5 Oval Profile 30 cm 111346 Oval Profile 46 5 cm 1 6 6 Inner Round Profile 40 cm 1 334 JJ m m TI m m Ul NN oo aaa S S ST e Na 00177 TParecode Fom bak Middle Deserpti n O Z D2 1 2 Middle Cap SFr eto o lt gt PN2A PoP Lower Roof Panel side 61 7 x 66 7 cm 2 6 x 2 24 SE PNSL SO AN JN Side Panel Left 58 1 x 44 9 cm 1 1074 x 1 516 SE gt PN5R NS Side Panel Right 58 1 x 44 9 cm 1 107 x 151 xo o po po CN A eft fh ARO Ecol e PN40 Top Roof Panel 60 5 x 97 6 cm 1 111346 x 32 M PN40A Pr ro Top Roof Panel outside 61 7 x 97 6 cm 2 s x 32 gt PN123 PPP Top Door Panel 52 2 x 35 cm 18 x 11 PN124 PPP Lower Door Panel 52 2 x 118 3 cm 181 x310 6 lt S k eP p S j o 110 GSE12 Front Pediment Strengthening Bar inside E12 4 IS a IS IO Poff oe RAI RA Glazing Element 57 3 cm 1 10 6 RB Glazing Element 84
17. ed word OUT facing the outside of the greenhouse Place the other parts of the frame in place and push them together Make sure that the channel of the 2D connectors faces outward Each base connector is stamped with an arrow pointing to the outside direction Lock the frame together with pins O Make sure that the frame is perfectly rectilinear by measuring the diagonals and verifying that they are the same Use a spirit level to make sure that the frame is level 8 Hobby Gardener Assembly Instructions Secure the Frame to the Foundation Make sure you have the proper hardware before beginning this step See page 3 Note f you are using a modular base and filler you may assemble the greenhouse on a hard surface and move it to its final position when you have finished Make sure that there are no obstructions between the assembly area and the final position Rion Resin Greenhouse Base Wood Deck or Treated Foundation Insert screws into the frame connector holes and secure them to the base Note f you have purchased the optional Rion Resin Greenhouse Base all necessary hardware is included Concrete Foundation O Mark the foundation through each connector using a scribe or screw 9 Carefully move the frame and then drill holes using an appropriate masonry bit Insert concrete anchors or expansion anchors not supplied in each hole O Move the frame back into place Make sure that it is still perfectl
18. g 90 KM HR 55 Miles HR d Rion shall have no liability or obligation to Purchaser with respect to any Greenhouse covered by this Warranty which is subjected to any of the following abuse improper use or operation incorrect handling use of force negligence or accident modification alteration impact from foreign objects vandalism pollutants set up on an un level foundation painting fading assembly not in accordance with the users manual failure to follow the instructions outlined in the users manual failure to follow the maintenance procedures in the service manual for the Greenhouse where a schedule is specified for regular replacement or maintenance of certain parts based on usage and Purchaser has failed to follow such schedule failure to erect the Greenhouse according to the instructions provided by Rion defects or damage that result from purchaser constructing the Greenhouse using components other than original Rion components supplied by Rion attempted repair by non qualified personnel defects or damages resulting from service testing adjustment installation maintenance alteration or modification in any way by someone other than Rion or anyone authorized by it operation and or use of the Greenhouse outside of the published parameters and for purposes other than those defined by Rion in this manual or if such Products original identification trademark serial number markings have been defaced altered or removed normal wea
19. in assembly if any parts are missing Required Tools Before you start assembly have the following available e Power drill e Measuring tape e Level e Scissors e Gloves e Awl e Razor knife e Sponge and soapy water Note You may find some parts easier to assemble if you first moisten them with soapy water Accessories Hobby Gardener offers a wide range of accessories for your greenhouse from modular bases for the foundation automatic window openers and shelving for your plants Hobby Gardener Assembly Instructions 1 RION garden and gardening Introduction Congratulations on purchasing an EcoGrow We are certain that it will give you many happy years of pleasure in your garden Hobby Gardener has been designed to be as easy to put together as it is beautiful to look at Most of the work can be done by a single person Only attaching the roof requires the help of a family member or neighbor for a short while Easy assembly methods eliminate the need for tools or special expertise Connect the specified parts O Match the holes in the profiles and the connectors Place a pin on the pin tool and push the pin through the lined up holes to lock the parts in place Many connections require pins on both sides Note Extra pins are included If you wish to disassemble the parts at any time remove the pins using the pin tool Place the end into the exposed hole and lever the pin out If a hole in the connector i
20. ndow to reach the top of the roof conveniently O Place RA1 glazing elements on the top of the roof by placing one end in the top channel and pushing it down along the length of the profile Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained on page 2 Place RB1 RB4 and RB6 glazing elements along the arches where shown Place one end of the RB elements in the channels of the profiles and slide them down the length of the profile Note Ifyou have difficulty inserting the top of the RB1 glazing element slightly loosenthe AS70 screw holding in the CAB40 cable Tighten the AS70 screws holding the CA B40 cables with the AW5 Allen wrench O Place RD1 elements where shown by placing one end in the channel and pushing it down along the length of the profile Note You may find it easier to insert RD elements into profiles by pushing them in from the top while rolling the element downwards Important Inorder to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained on page 2 Place the four PN40A side panels in place by sliding one corner into the RD1 glazing element Continue until they are fully inserted Decide which of the inner Middles to use for the Roof Vent
21. ors Use screws that are 6 mm 4 in diameter and no less than 70 mm 2 4 long Make sure that the wood deck itself is securely anchored to the ground See hardware quantities and foundation measurements above Excavated Trench Your Greenhouse can be placed in an excavated trench to anchor it to the ground See the foundation measurements above for dimensions Concrete Foundation Prepare a poured concrete foundation according to local building codes Do not excavate and pour concrete in frozen ground Make sure that there is a slight slope for drainage Pour your foundation according to the size of the greenhouse model you have selected Make sure that the foundation is at least 10 cm 4 larger than the size of the greenhouse The Greenhouse is secured to the concrete foundation using screws and concrete anchors or expansion anchors not supplied Use screws 6 mm Y in diameter and no less than 70 mm 2 long A drill with an appropriate masonry bit is required HG 8 x 8 HGF HGB HGM 2 70 meter 8 10 2 70 meter 8 10 120 HG 8 x 12 HGF HGB HGM 2 2 70 meter 8 10 3 95 meter 12 11 HG 8 x 16 HGF HGB HGM 3 2 70 meter 8 10 5 20 meter 177 Because of the Greenhouse modularity you may purchase additional HGM double Middles to fit your needs Note HGM single Middles are also available Identify Greenhouse Parts N o NS C
22. ound the greenhouse and lower the roof into place Use the GT1 glazing tool to guide the corners of the PN1 panel into the channels O Lock the roof in place with pins 18 Hobby Gardener Assembly Instructions O Take the roll of GF sealer divide it as shown and pull out enough for one side of a PN1 panel Note If the GF Sealer is not divided it will not fit in the channel of the column profile Cut it to length Align it with the channel of the column profile with the double ridge facing the panel O Push it in to seal the panel using the GT1 glazing tool if needed Repeat for the other PN1 panels and the panels in the front and back pediments Seal Panels Al IN LL O 19 Assemble the Doors O Assemble the profiles and connectors of the lower portion of the doors Use the DoorH33 handle where shown on the left door Put the PN124 panel in place with the plastic ID strip facing outwards Assemble the upper portion of the door Put the PN123 panel in place with the plastic ID strip facing outwards E101 E1 Hinges amp Pins N SS E1 20 Hobby Gardener Assembly Instructions Seal the Door
23. r and tear defects or damage that result from the use of Non Rion branded or certified Greenhouse or other peripheral equipment acts of God such as earthquakes tornados floods hail storms hurricanes blizzards floods fire effects or other similar severe weather or similar natural phenom ena any other act which is not the fault of Rion is excluded from coverage Rion excludes from warranty coverage Greenhouses sold AS IS and or with ALL FAULTS and excludes used Greenhouses which have not been sold by Rion or by those authorized to do so by Rion to the Purchaser 4 Exclusion of Implied Warranties No other Expressed Warranties Except for the foregoing warranty and without derogating from provisions of Section 3 Exclusions from Warranty Coverage above Rion hereby disclaims and excludes all other warranties express or implied including but not limited to any and or all implied warranties of merchantability fitness for a particular purpose or any other warranties otherwise arising from a course of dealing ora usage of trade or advertising except where such warranties arise under applicable consumer product warranty laws and cannot lawfully be disclaimed in which event such warranties are limited to their minimum applicable scope and to the shortest period permitted or required under applicable law Rion hereby disclaims any representation or warranty that the Greenhouse is compatible with any combination of non Rion products Purchaser may choos
24. s missing drill a hole with a 6 mm 14 drill bit through the assembled profile and then insert the pin 8 In extremely rare cases connectors will not slip into some round or oval profiles In this case place the affected part into10 cm 4 of boiling water for 15 seconds before connecting Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely O Moisten the glazing element with soapy water Insert one end of the glazing element into the profile until it snaps into place Push the glazing element along its length O Continue until the end of the glazing element snaps in place The callout shows an enlarged cross section of the profile and glazing element when it is seated correctly Greenhouse assembly is done in the following steps Prepare a Foundation for Your Greenhouse 3 Identify Greenhouse Parts 4 Prepare Your Parts for Assembly 7 Lay Out the Greenhouse Frame 8 Secure the Frame to Foundation 9 Assemble the Roof Pediments 10 Assemble Roof Framework 12 Cover the Greenhouse Roof 13 Cover the Walls 17 Raise the Roof 18 Seal Palnels
25. the RC glazing elements are in line with the bottom of the RD elements Note You may now remove the plastic ID strips from the panels Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained on page 2 16 Hobby Gardener Assembly Instructions Cover the Walls O Put the R1 round profiles in place Insert two pins in each R1 profile to lock them in place Do not insert pins in the inner R1 panel channels Add the E1 oval profiles until the frame is completed Secure the E1 profiles with pins Take a PN1 panel with the plastic ID strip facing out and put the panel in place by gently curving it so that it enters the side channels of the columns Lower the panel towards the frame and insert the lower end into the frame channels Continue with the rest of the PN1 panels Remove the ID strips from the panels Raise the Roof O Make sure that the roof is in the same orientation as the base and door Lift the roof from both edges and walk through the door towards the back wall Note You will need the help of another person for a short while to lift the roof and put it in place O Place the roof on the columns and circle around the greenhouse and insert the first 1 cm 1 of the roof connectors into the columns Panel by panel circle ar
26. tp www rion com for a complete listing Thank you for your purchase We wish you many years of pleasure with your greenhouse Please feel free to contact us with any questions comments or suggestions Rion Hobby Assembly Instructions V1 6 Aug 2012 26 RION 0 Warranty 1 Warranty Coverage Subject to the exclusions set forth below Rion Ltd warrants that the greenhouse covered by this warranty the Greenhouse or the Product is warranted to the original purchaser only Purchaser against damage or breakage caused through normal use for the purpose intended by Rion Ltd and in accordance with its instructions by any defects in material or workmanship for the following periods a With respect to the Product s structure i e the profiles of the Greenhouse for a period of 5 years from the original date of purchase Purchase Date b With respect to Discoloration and or fading of the Greenhouse s panels caused through normal use for a period of 10 years as of the Purchase Date For the removal of doubt this warranty does not cover discoloration caused by use of chemicals and or any other reason other than exposure to the sunlight c With respect to malfunction and or possible distortions of the Greenhouse s jointers for a period of 7 years as of the Purchase Date d The purchaser s exclusive remedy is as set forth in section 5 Remedies below and valid only upon presentation of the original purch
27. y rectilinear Secure the screws anchors in place Assemble the Roof Pediments O Put ST7 couplers on the PN8R and PN8L pediment panel halves as shown The tops of each coupler are trimmed to match the angle of the panel Note The outside surface of the panels have special UV protection indicated by the logo and the plastic identification strip Remove plastic ID strips as panels are locked in place Slide the two pediment panel halves together Assemble the left half of the front pediment O Attach the E12 profile to the 09 connector The GSE12 Strengthening Bar which is inside the profile slides into the 09 connector Assemble the second 09 connector to the E12 profile O Slide the assembled PN8R PN8L pediment panel into the open space of the pediment Complete the front pediment taking advantage of the flexibility of the profiles O Lock the pediment in place using pins and remove the ID strips from the panels Complete Doorway Pediment O Attach an E4 and R2 profiles to the lower right pediment Slide the PN5R panel in place Make sure that the plastic ID strip faces out Connect the 4A and 09 connectors to an E2 profile and put it in place taking advantage of the flexibility of the profiles O Lock the panel with pins O Assemble the lower left pediment in the same way Remove the ID strips from the panels 4A Hobby Gardener Assembly Instructions Back

Download Pdf Manuals

image

Related Search

Related Contents

Projector Digital MX660/MX615/MS614 Manual do Utilizador  TDG 東京電気技術工業株式会社  Samsung Lò vi sóng đối lưu ủ bột đa năng 28L (MC28H5015AK) Hướng dẫn sử dụng  H 65SC - hitachi    Bedienungsanleitung  Voltage Freeride - s3.amazonaws.com  DDR User's Guide  Samsung SCX-4300 用戶手冊  Fellowes Powershred® P-55C  

Copyright © All rights reserved.
Failed to retrieve file