Home

installation and service manual nil – d - 69 wc flusher

image

Contents

1. INSTALLATION AND SERVICE MANUAL NIL D 69 WC FLUSHER Installation and Operating Instructions WC Order Approval Connection Flow Flush flusher no Test Reg No Thread size Pressure pipe diam D 69 122 DIN DVGW DN 20 1 2 4 0 bar 28 x 26 514 34 mm INSTALLATION Riser pipe According to the regulations for the calculation of cold water pipes in plumbing systems as set out by the DVGW Please also observe local regulations Purge the water mains before installation of flusher Install flusher with a 27mm spanner Please use a straight or cranked flush pipe with diam 28 x 26 mm according to DIN 3267 We recommend to fasten the flush pipe to the wall with a flush pipe clamp Water saving made easy Adjustment of the flush rate A Factory pre setting 1 0 I s 1 3 I s at a flow pressure of 2 5 bar 4 0 bar To increase the flush rate or adjust to a lower flow pressure Turn the throttle screw 12 by approx 1 turn counter clockwise To reduce the flush rate or adjust to a higher flow pressure Turn the throttle screw 12 by approx 1 turn clockwise Adjustment of the flush volume Factory pre setting 6 0 6 5 at a flow pressure of 2 5 bar and operating time of 1 second a E s WIN iy To increase the flush volume turn the adjustment screw 10 clockwise One full turn is equivalent to approx 1 litre more flush volume W z To decrease the flush vol
2. of Seals Servicing and Trouble Shooting 1 Flusher flows continuously Remove and clean the main piston Unscrew cover cap 2 unscrew auxiliary valve 8 and then take the main piston out of the flusher body Now clean all parts thoroughly Clean the pressure balance bore with a NIL bore cleaning needle 2 Flusher does not supply enough waiter or operating time is too short Adjust throttle screw 12 Replace piston sleeve 19 The efficient way to carry out repairs NIL spare part sets FRIEDRICH GAMPPER KG METALLWARENFABRIK D 71534 MURRHARDT P O Box 1164 Phone 49 0 7192 971 0 Fax 49 0 7192 971 105
3. ume turn the adjustment screw 10 counter clockwise One full turn is equivalent to approx 1 litre less flush volume Proportioning of the flush volume To decrease the flush volume only press the operating lever 3 down lightly and for a short time To increase the flush volume press the operating lever 3 down for a longer time 0 Pressure Balance Bore Jet Bore Operation and Operating Principle The operating lever 3 is pressed This causes the lifting sleeve to rise and the auxiliary valve 8 to open and be pushed against the piston spring This in turn relieves the areas above and inside the piston of pressure The operating lever causes the piston to be pushed fully upwards The flushing process has now begun The operating lever is now released This causes the auxiliary valve to close the piston chamber This now fills with water via the pressure balance bore this process causes the piston to be pressed down against the valve seat the pressure in the piston chamber now gradually builds up to the prevailing mains pressure The flushing process is now complete Spare parts 122 6K Complete Piston piston 6 piston nipple 9 piston lip seal 19 piston seal 21 lip seal retaining ring 24 122 8K Complete Auxiliary Valve auxiliary valve 8 auxiliary valve seal 20 122 14K Complete Outlet Fitting outlet nut 14 tail pipe 15 seal 22 122 24 Set of Spare Parts 122 25 Set

Download Pdf Manuals

image

Related Search

Related Contents

KE101CR-BX 取扱説明書  Tripp Lite SMART550USBWD User's Manual  P 122 - P 125  VAPORIZADOR DE ROUPAS - STEAMER  Wenrick Shih Tzu Owners Manual  StarTech.com USB 3.0 to 4-Bay SATA 6Gbps Hard Drive Docking Station w/ UASP & Dual Fans - 2.5/3.5in SSD / HDD Dock  エンジン取扱説明書 目 次  La FISF, mode d`emploi … (par Daniel Fort) La plupart des licenciés  adaptat on nstruct ons SM6-36  istruzioni oh/gsm inglese  

Copyright © All rights reserved.
Failed to retrieve file