Home

Instruction,Operation and Maintenance Manual

image

Contents

1. Ko 12 13 14 15 16 17 18 Slide fitting nuts into place and finger tighten Remove the fitting nuts and ferrules from the fittings on the right side of the heat exchanger and the filter Slide them onto the L shaped tubing Insert the L shaped tube into the right side of the heat exchanger and the filter Verify tubing ends are the correct length Cut to fit if required Proceed to the next step once the tubing is the correct length Slide tube fitting nut and ferrule onto each end of the tubing Insert tubing into the fittings on the heat exchanger and filter Slide fitting nuts into place and finger tighten Square the mounting brackets with the manifold block See Figure 4 Tighten the mounting bolts and the U bolt nuts Do not over tighten Figure 4 mounting bracket 7 heat tubing and fittings 19 Hold tubing into position and tighten each nut with a wrench until tight Do not over tighten 20 Disconnect the existing cooling media lines from the reservoir s internal heat exchanger 21 Apply Teflon tape and or Jomar pipe dope or equal to the 1 2 NPT plug threads Start no closer to the end of the threads than the 2nd thread 22 Thread the plugs into the reservoir s internal heat exchanger and tighten Do not over tighten 23 Installation is complete 24 It is the responsibility of the customer to connect to the heat exchanger cooling media ports Note For
2. Clean any dirt or debris from the 1 4 NPT connection on the bottom of the manifold block Remove the 1 4 NPT plug from the bottom of the manifold block Thread the pressure switch assembly into the mani fold block finger tight Place an open end wrench on the ball valve and tighten into the manifold block Tighten connections until ball valve handle is facing away from the circulator Do not over tighten See Figure 1 Rotate the ball valve handle to the off position Ball valve is off when handle is rotated 90 to the ball valve ports Installation is complete It is the responsibility of the customer to wire and set the pressure switch The pressure switch can be put into service once the unit is restarted and the customer has verified the circulator is running normal Rotate the ball valve handle 90 to allow flow to the switch ball valve adapter pressure switch Option 2 13 Hold tubing into position and tighten each nut with a The safety feature kit includes wrench until tight Do not over tighten Accumulator 1 1 4 NPT 1 1 4 NPT pipe nipple 14 Clean any dirt or debris from cartridge connections 1 4 tubing and tube fittings l Remove cartridge plugs from manifold block See Figure 2 Kit Installation Instructions 10 11 12 15 Do not use Telfon tape or pipe dope on cartridge Apply Teflon tape and or Jomar pipe dope or equal to valves 1 1 4 pipe nipple threads Start no
3. on the left end of the manifold 3 4 4 Start the circulator and allow to run long enough to remove any air from the system All fluid flow should be through the pressure con trol valve through the heat exchanger and back into the reservoir 3 4 5 Slowly close the pressure control valve on the left end of the manifold until the desired System pressure is achieved 3 4 6 Shut down the circulator and return any piping to its original normal operating configuration The pressure control valve is now set to the proper pressure 3 5 Pressure relief valve reset procedure The pressure relief valve on the right end of the mani fold is factory set at 450 psig 3103 kPa and should not require adjustment If however the relief valve setting has become suspect or the seal requires a lower setting follow these steps to reset the pressure relief valve Do not exceed 450 psig 3103 kPa 3 5 1 To prevent accidental over pressurization of the seal connect the seal supply port directly to the seal return port This will protect the seal from high pressures during valve adjust ment 3 5 2 Completely close the pressure control valve on the left end of the manifold 3 5 3 Completely open the pressure relief valve on the right end of the manifold 3 5 4 Start the circulator and allow to run long enough to remove any air from the system All fluid flow should be through the pressure relief valve and into the reservoir 3 5 5 Ca
4. Worn Pump If the circulator pump wears the discharge flow rate will decrease This will be more apparent at higher pressures Measure the flow rate at normal operating pressure and again at 1 2 normal operating pressure If the flow increases more than 20 then the pump may need to be replaced Note pump wear can be accelerated by poor quality barrier fluid and or failure to maintain system filtration and prevent ingression Section B Piping and Instrumentation Diagram Customer specific drawings can be found in Appendix 1 Key Optional pressure switch kit UKDPU9802 o contained in manifold block 2 contained in optional kit e I Optional accumulator kit 1 f UKDPU9806 Uy Optional heat exchanger kit UKDPU9806 Test Port RV 1 Factory set at 450 psig 3103 kPa PCV 1 Factory set at 200 psig 1379 kPa 3 Reset PCV 1 as required a 1 2 P L m m E 5 8 Optional level switch kit UKDPU9805 1 i 3 4 ii l MP I y 1 e Bod 4t 4 3 4 3 Schedule of connections connection size service 1 1 2 NPT seal supply 1 2 NPT seal return 3 4 NPT drain plugged 1 2 NPT cooling water supply plugged 1 2 NPT cooling water return plugged 3 8 NPT cooling water supply option NN OD on amp oo p 3 8 NPT cooling
5. additional cooling capacity run cooling media through both the internal and external cooling coils in series Figure 5 cooling port orientation mounting bracket Section D Customer Drawings Note The following documents are typically provided as part of the order documentation package along with this IOM Appendix 1 Order Drawings Piping and Instrumentation Diagram General Arragement Bill of Material Electrical Appendix 2 Component Information Catalog Component IOMs FLOWSERVE we FIS187eng ORG 4 10 Printed in USA To find your local Flowserve representative and find out more about Flowserve Corporation visit www flowserve com Flowserve Corporation has established industry leadership in the design and manufacture of its products When properly selected this Flowserve product is designed to perform its intended function safely during its useful life However the purchaser or user of Flowserve products should be aware that Flowserve products might be used in numerous applications under a wide variety of industrial service conditions Although Flowserve can provide general guidelines it cannot provide specific data and warnings for all possible applications The purchaser user must therefore assume the ultimate responsibility for the proper sizing and selection installation operation and maintenance of Flowserve products The purchaser user should read and understand the Installati
6. and manifold block Do not over tighten See Figure 2 7 accumulator tubing and fittings Remove tube fitting nut and ferrule g Insert tubing into fittings on accumulator and manifold block Verify tubing ends are the correct length Cut to fit if required Proceed to the next step once tubing is the correct length nipple needle Slide tube fitting nut and ferrule onto each end of valve tubing check valve Insert tubing into fittings on accumulator and block manifold pilot to open check Slide fitting nuts into place and finger tighten ie Option 3 The level switch kit includes Level switch 3 4 NPT Kit Installation Instructions 1 Apply Teflon tape and or Jomar pipe dope or equal to level switch threads Start no closer to the end of the threads than the 2nd thread 2 Clean any dirt or debris from the reservoir connection Remove 3 4 plug from reservoir coupling next to the level gauge 3 Thread in level switch Tighten with flats on the shaft in the vertical position See figure 3 4 Installation is complete 5 Itis the responsibility of the customer to wire the level switch Figure 3 level switch shaft position Option 4 The heat exchanger kit includes Heat exchanger Heat exchanger mounting brackets U bolts with nuts and mounting pad quantity 2 Tube fittings quantity 3 Tubing quantity 3 Kit Installation Instructions Apply Teflon tape an
7. should be applied no closer than two threads from the end of the fitting to avoid contamination 2 4 7 1 Do not remove plugs from ports until you are ready to make a final connec tion 2 4 7 2 Refer to the circulator drawings in Section B for connections to be made Start up Operation 3 1 3 2 Initial start up 3 1 1 Check all field connections in piping tubing to see that the joints are tight Also check and tighten circulator fasteners which may have become loose during transit 3 1 2 Verify the correct barrier fluid type with the seal manufacturer before filling Fill the reservoir to the top of the level gauge through the filler port provided 3 1 3 The pump motor assembly does not require alignment 3 1 4 Before connecting the motor power source Disengage the pump motor coupling Connect the motor power source Jog the motor 3 5 seconds to check rotation against the rotation arrows Reconnect the pump motor coupling Replace the coupling guard cover plate All instruments must be tied into the customer s control panel to operate the main process equip ment Functions listed on the circulator drawings are the minimum requirements necessary to insure proper operation The manufacturer may place more stringent requirements on sequencing of the main process equipment It is recommended the customer contact the seal manufacturer to obtain a list of all operational sequences and interlocks to insure safe and e
8. closer to the end of the threads than the 2nd thread 16 Insert and finger tighten the needle valve cartridge into the cavity on the front of the manifold block Thread pipe nipple into the accumulator finger tight 17 Insert and finger tighten the check valve cartridge into Clean any dirt or debris from the 1 1 4 NPT connec the bottom of the manifold block tion on the top of the manifold block Remove the 1 14 NPT plug from the topat the manifold block 18 Insert and finger tighten the check valve cartridge into the top of the manifold block Thread the nipple accumulator assembly into the manifold block Tighten assembly until the 1 4 NPT 19 connection in the accumulator is facing the front of the manifold block With wrench placed on the connection end of the accumulator tighten assembly Do not over Tighten valves with open end wrench or socket wrench Do not over tighten tighten See figure 2 20 Installation is complete Clean any dirt or debris from the 1 4 NPT connection 21 It is the customer s responsibility to pre charge the on the top of the manifold block Remove the 1 4 NPT accumulator plugs from the and accumulator and the top of the manifold block Figure 2 Apply Teflon tape and or Jomar pipe dope or equal to tube fitting NPT threads Start no closer to the end of the threads than the 2nd thread Thread tube fittings into the accumulator and manifold block Tighten into accumulator
9. d or Jomar pipe dope or equal to the 4 tube fittings threads Start no closer to the end of the threads than the 2nd thread Remove tubing from the manifold block to the filter and discard Attach heat exchanger mounting brackets with two 2 1 2 18 mounting bolts through the holes provided in the top of the manifold block and finger tighten bolts See Figure 4 Place a mounting pad on each mounting bracket between the mounting holes Place the heat exchanger on the mounting pads Shell connection should be facing up with the cooling media connections facing the drain side of the reservoir See Figures 4 and 5 Install the U bolts over the heat exchanger and through the mounting pads and brackets and finger tighten nuts Install and tighten tube fittings into the heat exchanger shell connections Do not over tighten While facing the unit from the block side position the heat exchanger approximately 4 1 2 inches 114 mm from the right side of the reservoir See Figure 4 Level the heat exchanger across the cooling media ports See figure 5 Remove the fitting nuts and ferrules from the fittings on the left side of the heat exchanger and the mani fold block Assemble the short piece of tubing 90 union tube fitting and the short 90 bent tube into the heat exchanger and the manifold block Verify tubing ends are the correct length Cut to fit if required Proceed to the next step once tubing is the correct length
10. facturer s specifications Interconnecting piping tubing 2 4 1 Definition Interconnecting piping tubing is all fluid piping tubing between the circulator and the process equipment 2 4 2 Piping tubing should be installed to meet local codes or other applicable standards 2 4 3 The interconnecting piping tubing system should be sized and constructed to minimize pressure losses and should not be less than the corresponding pipe tube size and schedule as contained in the circulator refer to the piping and instrumentation diagram of pipe size schedule and material 2 4 4 The interconnecting piping tubing system both to and from the seal should be construct ed of similar material as the circulator 2 4 5 Piping tubing must not be supported by the circulator 2 4 6 Before installing the piping tubing system should be checked for freedom from contami nation If not completely free of contaminants clean and flush the entire interconnecting piping tubing system before connecting the cir culator Once you are sure the piping tubing system is free of contamination drain the flushing media and air blow dry Do not under any circumstances use the circulator to flush the interconnecting piping tubing Using the cir culator to flush the interconnecting piping tubing will void the warranty The circulator is flushed clean and sealed at the factory 2 4 7 Connections to circulator A teflon paste pipe sealant is recommended and
11. fficient operation It is the customer s responsibility to familiarize them selves with the instrumentation and controls mounted on the circulator The customer s supplied control panel shall at minimum provide the functions listed and as described on the circulator drawings 3 3 This circulator is equipped with a Pressure Relief Valve PRV 1 and a Pressure Control Valve PCV 1 The pressure relief valve on the right end of the mani fold is factory set at and should never be adjusted The pressure contol valve on the left end of the mani fold is factory set and will need adjustment to meet the requirements of the application The pressure control valve can be adjusted using the following procedure and referring to the manufacturers service manual in Appendix 2 of this manual 3 4 Pressure control valve adjustment The pressure control valve located on the left end of the manifold is factory set at 200 psig 1379 kPa and will need adjustment to meet the requirements of the application Follow these steps to adjust the pressure control valve 3 4 1 The fluid temperature in the circulator must be at the normal operating temperature to achieve the correct pressure setting 3 4 2 To prevent accidental over pressurization of the seal connect the seal supply port directly to the seal return port bypassing the seal This will protect the seal from high pressures during valve adjustment 3 4 8 Completely open the pressure control valve
12. lly protected to insure a continuous flow of barrier fluid 2 1 2 Shading the circulator from direct sunlight is recommended 2 1 3 Installation must take place during a time when ambient temperatures are above freezing or with all fluid lines protected from damage 2 1 4 Follow notes listed on the circulator order drawings in Appendix 1 covering utility require ments and control component points 2 2 Lifting uncrating 2 2 1 Remove the crating carefully to avoid damag ing components 2 2 2 The circulator must be lifted only from the bottom or by the lifting lugs when provided Lift carefully to avoid damaging circulator components Foundation placement 2 3 1 The foundation customer steel base or con crete pad for the circulator should be flat and level with anchor bolts set firmly in place A foundation weight of not less than 3 times the weight of the circulator when filled with barrier fluid is recommended as a minimum for concrete foundations Steel baseplates shall have sufficient rigidity to prevent distort ing the circulator after bolt down 2 3 2 The foundation must be free of all debris prior to placement of the circulator 2 3 3 The circulator reservoir is fabricated such that the top is level Gently lower the circulator onto the foundation and check to see if the level is maintained If required shim mounting feet level before bolting the circulator down Mounting bolts should be torqued per manu
13. on Instructions included with the product and train its employees and contractors in the safe use of Flowserve products in connection with the specific application While the information and specifications contained in this literature are believed to be accurate they are supplied for informative purposes only and should not be considered certified or as a guarantee of satisfactory results by reliance thereon Nothing contained herein is to be construed as a warranty or guarantee express or implied regarding any matter with respect to this product Because Flowserve is continually improving and upgrading its product design the specifications dimensions and information contained herein are subject to change without notice Should any question arise concerning these provisions the purchaser user should contact Flowserve Corporation at any one of its worldwide operations or offices Copyright 2010 Flowserve Corporation flowserve com TO REORDER REFER TO B M F O USA and Canada Tulsa Oklahoma USA Telephone 1 918 599 6062 Telefax 1 918 583 1071 Europe Middle East Africa Roosendaal the Netherlands Telephone 31 165 581400 Telefax 31 165 554590 Asia Pacific Singapore Telephone 65 6544 6800 Telefax 65 6214 0541 Latin America Mexico City Telephone 52 55 5567 7170 Telefax 52 55 5567 4224
14. refully close the pressure relief valve on the right end of the manifold until the desired pres sure is maintained in the system 3 5 6 Shut down the circulator The pressure relief valve is now set at and will not need further adjustment Higher adjustment of the pressure relief valve may cause damage to the pump 3 5 7 Once the pressure relief valve is set reset the pressure control valve setting Refer to the previous section of this document 4 Maintenance Caution Do not attempt to work on this system unless you have on safety glasses with side shields and you have completely read and understand this service manual 4 1 Electrical power input Shut down all electrical power to the circulator prior to attempting maintenance 4 2 Service of suction strainers To service the suction strainer the circulator pump must be shut off Make sure the circulator motor cannot be auto started Remove top plate of reservoir Strainers should be checked and cleaned every 12 months 4 3 Customer electrical It is the customer s responsibility to provide a control panel to properly operate the circulator 4 4 Pressure filter 4 4 1 Caution Do not attempt to open any lines loosen fittings or remove filter canister unless all pressure gauges read zero pressure Be sure that instrument isolation valves are open to gauges Always wear safety goggles with side shields when performing mainte nance or making adjustments to
15. rere FLOWSERVE Flowserve Circulator Instruction Operation and Maintenance Manual A Experience In Motion Section Table of Contents Installation Start up and Maintenance 1 Installation Start up Introduction 3 4 Pressure control valve adjustment 3 5 Pressure relief valve reset procedure Maintenance Troubleshooting Piping and Instrumentation Diagram Kit Installation Instruction o1 m Pressure switch Accumulator Level switch Heat exchanger Pressure gauge Customer Drawings Section A Installation Start up and Maintenance 2 3 1 Introduction 1 1 This manual is a valuable tool covering the circulator you have purchased 1 2 Do not proceed with installation or operation until you have read and understand this manual 1 3 Following is a step by step approach covering instal lation start up operation and maintenance of the circulator 1 4 Familiarize yourself with and refer to the circulator drawing Section B Item numbers referred to in this manual can be found on this drawing Order specific drawings can be found in Appendix 1 1 5 The circulator purchased includes only the kit options shown on these drawings Additional kits are available as described in Section C 2 4 2 Installation 2 1 Location 2 1 1 Circulator location and ambient temperature extremes must be taken into account All inter connecting piping tubing must be therma
16. the system 4 4 2 After 8 hours of initial start up or sooner per clogging indicator the filter element should be changed 4 4 8 Change element every time the clogging indi cator on the filter is in the red service filter position 4 5 Questions Do not hesitate to contact your Flowserve representative with any questions you have concerning the installation operation or maintenance of the circulator 5 Troubleshooting Problem Unable to maintain Pressure Low Pressure Unable to maintain Pressure High Pressure Probable Cause Low pressure control valve setting Follow the procedure in this document to adjust the valve as required Low pressure relief vale setting Fluid is bypassing the through the valve and returning to the tank Follow the procedure in this document to adjust the valve as required High pressure control valve setting Follow the procedure in this document to adjust the valve as required Low Temperature High Viscosity Low temperature can cause the barrier fluid to have a too high of viscosity creating high pressure loss on the seal supply and return lines Insulate line to maintain temperature Poor supply and return line piping The supply and return line piping should be sized and constructed to eliminate as much pressure loss as practical Unable to maintain Flow Low pressure relief vale setting Follow the procedure in this document to adjust the valve as required
17. water return option Section C Kit Installation Instructions Available kit options Option 1 Pressure switch Part code UKDPU9802 Option 2 Safety feature accumulator Part code UKDPU9803 Option 3 Level switch Part code UKDPU9805 Option 4 External heat exchanger Part code UKDPU9806 Before installing any kit to the circulator it must be shut down and disconnected from the main power source Safe ty glasses with side shields must be worn when working on the unit Clean the unit of all debris Familiarize yourself with these instructions and the components for each kit before beginning any installation Option 1 The pressure switch kit includes 1 4 NPT ball valve 1 4 x 1 2 NPT adapter Pressure switch 1 2 NPT Kit installation instructions 1 Apply Teflon tape and or Jomar pipe dope or equal to adapter threads Start no closer to the end of the threads than the 2nd thread 2 Thread 1 4 side of adapter into ball valve finger tight Figure 1 eo 10 11 12 Thread 1 2 side of adapter into pressure switch finger tight Place an open end wrench on the ball valve and an open end wrench on the pressure switch connection nut Tighten connection until ball valve handle is facing the pressure switch adjustment cover Do not over tighten Apply Teflon tape and or Jomar pipe dope or equal to the ball valve threads Start no closer to the end of the treads than the 2nd thread

Download Pdf Manuals

image

Related Search

Related Contents

KX-TG313CSK - Panasonic Canada  SONOFLEX F ® - Materiales PEGAR  Manual do operador    Alcatel-Lucent OMNIACCESS 740 User's Manual    

Copyright © All rights reserved.
Failed to retrieve file