Home
Boiler Replacement
Contents
1. BOILERSUPPLY NCE 9 42 a Knott Road ae TN 37921 Page 1 OF 4 PROPOSAL TO Oneida Schools 330 Claude Terry Drive Proposal No TT0115GW01 Oneida TN 37841 SUBJECT Replace Hot Water Boiler With Atlas Model A100 DATE January 21 2015 Boiler Supply Company offers to install a replacement for the existing Bryan Hot Water Boiler with an Atlas Model A100 Condensing Boiler by Ajax Boiler Inc This boiler is both very efficient and environmental friendly Installation and start up are also offered ITEM 1 ATLAS MODEL A100 HOT WATER BOILER EQUIPMENT We offer to supply and install one 1 Atlas Model A100 Hot Water Boiler manufactured by Ace Heating The boiler is rated for an input of 1 000 000 BTU hr The Atlas A100 boiler performs dependably and quietly offering high efficient for space heating domestic and process hot water Modular design robust controls and low emissions makes this boiler an excellent choice for a hot water boiler The offered Atlas Model A100 has the following features Boiler design is a cylindrical finned water tube coil Boiler heating surface is copper construction Copper fin tubes with 1 25 ID Unit can be used for domestic water service Fired by natural gas site pressure required is 5 14 W C Input is 1 000 000 BTU hr Burner has variable speed and provides full modulation 7 5 1 turndown Knit metal fiber burner for high efficiency and low emissions Thermal efficiency is 90 w
2. Condensing Kit to store and process condensate 31 Circulation Pump is not provided 32 Exhaust vent size is 8 ID 33 Lead time until delivery is 6 weeks 34 Lead times are subject to change and must be verified at time of order entry INSTALLATION Installation services shall include the following Besa fe YP pa 10 ie 1 13 14 15 16 Order the replacement Atlas boiler Receive the Atlas boiler and provide temporary storage Deliver the Atlas boiler to the work site Disconnect electrical power from the existing Bryan boiler Disconnect water piping from Bryan boiler Disconnect the natural gas piping from the Bryan boiler Disconnect the exhaust stack from the Bryan boiler Remove the Bryan boiler and dispose Set the Atlas boiler in place Connect the new boiler to the existing stack Connect electrical power to Atlas boiler Connect water piping to the Atlas boiler Connect natural gas piping to the Atlas boiler Commission the Atlas boiler Train the customer employee on the operation of the Atlas boiler Clean up work site PRICE ITEM 1 EXWORKS FACTORY Freight Included 0eseeeeeeeeee 31 421 00 BOI LERSUPPLY NCE 419 42 eo Knott Road Knoxville TN 37921 Page 3 OF 4 ITEM 2 STACK FOR CONDENSING BOILER We offer to supply and install Model CS Boiler Exhaust Stack by Van Packer This stack is designed for a Condensing Hot Water Boiler This stack is a double wall design with
3. 7 15 3 4 0 1 2 9 1 2 3 3 4 3 4 I E 863 CHN1442 1 440 85 1 224 1 064 36 68 4 33 2 153 4 OT 2 0 1 2 3 3 4 83 4 1 T 965 CHN1802 1 800 as 1 530 1 3 36 82 1 4 3H 15 3 4 1 ling 33 4 83 4 wW 12 E 1 100 CHN2072 2 070 85 1760 1 530 36 921 2 331 2 153 4 I u 333 4 83 4 e 1z E 1 219 Notes Change N to L for LP gas models No deration on LP models Water connections for models CH 0402 0752 are 2 NPT on 6 1 2 centers Header increases B dimension 3 1 2 for models CH 0402 07352 and 6 1 4 for madels CH 9992 2072 Water connections for models CH 0992 2072 are 2 1 2 NPT on 11 174 centers Performance data is based on manufacturer test results Venting Options J Aire Lock Direct Vent Sealed Combustion C DirectAire Vertical J DirectAire Vertical w Sidewall Inlet C Outdoor Installation LJ Power DirectAire Horizontal C Powered Side Wall CO Sidewall r e Lochinvar LLC eae 300 Maddox Simpson Parkway e p t Lochinvar Gs dy a P 615 889 8900 F 615 547 1000 S ae cafes a High Efficlency Water Heaters Boilers and Pool Heaters Hi wrew Lochinvor com 12 13 Printed in U S A
4. Btw Hr output Condensing design with up to 94 0 Thermal Efficiency 5 1 Turndown ASME Stamless Steel Heat Exchanger Direct Spark Ignition ASME pressure relief valve PVC Venting SMART SYSTEM Control Password Security NaturaV LP gas Conversion Kit Outdoor Reset Sidewall Vent Terminals 0 10 Vdc input Contacts on any Failure 3 Pump Control Pump Relay w Freeze Protection Low NOx operation Upon completion of job TERMS SIGNED ACCEPTED BY DATE JERRY DRAPER ACCOUNT MANAGER Any additional repairs will be billed on a time and material basis This proposal is valid for 10 days ALL LABOR ON REPAIR WORK WILL BE WARRANTIED FOR A PERIOD OF 90 DAYS UNLESS OTHERWISE STATED ALL PARTS WILL BE WARRANTIED PER MANUFACTURER S WARRANTY IT IS FURTHER UNDERSTOOD THAT IN THE EVENT IT IS NECESSARY FOR THE SELLER TO EMPLOY AN ATT ORNEY TOENFORCE THE SELLER S RIGHTS IN ANY PARTICULAR IN CONNECTION WITH THE TERMS OF THIS AGREEMENT THEN IN SUCH EVENT THE PURCHASER WILL BE RE SPONSIBLE FOR ALL EXPENSES INCLUDING BUT NOT LIMITED TO ATTORNEY S FEES NECESSARY TO ENFORCE THIS AGREEMENT KBN801 Lochinvar KBN801 654 000 BTU Output Knight XL High Efficiency Boiler Page 1 of 3 Home Radiant Heat amp Heating Supplies Overview Reviews Resources BTU Calculator Brochure Product Overview Submittal Sheet Install Instructions User Guide Designer Guide Wiring Guide Service Manual Replacement Parts List Pump Selection Chart Warran
5. EM Digital Operating Control SMART SYSTEM Digital Operating Control Features 2line 16 Character LCD Display Password Security Built In Cascading Sequencer Building Management System Control 0 10 VDC Input Control Outdoor Reset Enter Product or SKU 0 FREE SHIPPING On This item 1 9 2015 KBN801 Lochinvar KBN801 654 000 BTU Output Knight XL High Efficiency Boiler Page 2 of 3 Vent Type Direct Vent Night Setback Width Inches 15 1 2 Three Pump Control System Boiler amp DHW Height Inches 42 5 Pump Relay With Freeze Protection Gas Connection 1 Product Service Indicator aaa o Field Connacloa Versatility Optional PC Or Pocket PC Software Product Specifications Floor Standing Gallon Capacity 5 7 Heating Surface Sq Ft 65 3 Water Connections 2 Drain 3 4 Max Working Pressure 160 psi i Number of Relief Valves 1 Relief Valve Size 3 4 Relief Valve Pressure Rating 50 psi Gas Inlet Connection 1 eo BTU Hr Input 800 000 BTU Hr Output High Fire 752 000 BTU Hr Output Low Fire 150 400 Voltage Heater 120 V Voltage Control 24 V Total Amps 2 7 A Number of Electrical Connections 1 Dimensions H x W x D 42 1 2 x 15 1 2 x 45 1 4 Vent Size 6 Vent Category IV Vent Material PVC Shipping Weight 440 Ib l PLEASE NOTE The product weighs 405 Ibs and may require the
6. Mechanical Contractors Inc QUOTATION 3200 HENSON ROAD P O BOX 50610 KNOXVILLE TENNESSEE 37950 0610 TELEPHONE 865 588 0180 FAX 865 602 4124 TO_ Oneida Special Schools DATE 1 27 2015 Attn David Mayes JOB Hot Water Boiler Change Out LOCATION_Oneida Tennessee Fax ARCHITECT N A NOT RESPONSIBLE FOR DELAYS BY ORDERS FOR SPECIAL MATERIAL OR EXTRA ACCEPTED REASON OF STRIKES ACCIDENTS OR PRICES SUBJECT TO CHANGE WITHIN 30 DAYS WITH THE DISTINCT UNDERSTANDING THAT THEY CAUSES BEYOND OUR CONTROL ARE NOT SUBJECT TO CANCELLATION DESCRIPTION Thanks for the opportunity to submit you the following proposal We purpose to furnish materials and labor for the following scope of work Scope of Work 1 Remove one existing Bryan Boiler 2 Provide and install one new Lochinvar CHN0752 750MBH input boiler 3 Provide Labor and materials to replace the existing exhaust stack with a new 8 stack 4 Rework existing HWS amp HWR piping to fit new boiler 5 Re insulate piping damaged by install 6 Provide our own electrical disconnect and reconnects Price 28 513 00 Qualifications 1 Clear access to work area 2 Based normal work hours M F 3 No painting 4 No test and balance of system 5 No engineering or stamped drawings 6 As of 1 23 15 there was two of these boilers in stock in Nashville Tn TERMS Net 30 Very truly yours Accepted By Signed Kenneth W Wade High Efficiency Water Heaters Boi
7. ith inlet water temperature of 100 F and 100 firing rate 10 Thermal efficiency is 87 with inlet water temperature of 120 F and 100 firing rate 11 NOx emissions are less than 9 ppm 12 CO emissions are less than 50 ppm 13 Boiler designed and manufactured in accordance with ASME Section IV 14 Maximum allowable working pressure is 160 psi 15 Maximum allowed water temperature is 210 F 16 Sealed combustion chamber for increased efficiency and reduces emissions 17 Venture air inlet provides for fuel and air pre mixing before the combustion chamber 18 Fuel air ratio is controlled by a combination of blower speed and gas control valve CRNA S YN pa OILERSUPPLY INCE 1 9 4 2 2711 Knott Road Knoxville TN 37921 Page 2 OF 4 19 Flame safe guard controller with integrated operating modulating and high limits safety controls 20 Keyboard Display Interface with LCD Panel and 4 button display 21 Display provides boiler status including sequence lockouts alerts set points controlled temperature and flame signal 22 Alarm and silencer 23 Dimensions of the boiler cabinet 29 width 34 depth and 54 height 24 Shipping weight of boiler is approximately 1 000 Ibs 25 Stainless steel jacket 26 Safety relief valve 27 Electrical voltage requirements 120 volt 1 phase 60 Hertz 28 Recommend hot water flow rate is 50 GPM 29 Pressure drop in the HW Boiler for 50 GPM is only 13 feet of head 30
8. lers and Pool Heaters COPPER FIN II BOILER Submittal Sheet CHE Sub 10a COPPER FIN II GAS BOILER MODELS 402 2072 JOB NAME LOCATION ENGINEER MECH CONTRACTOR MODEL NO TYPE GAS Btu hr INPUT Btu hr OUTPUT NOTES SMART SYSTEM FEATURES gt SMART SYSTEM Operating Control gt 2 Line 16 Character LCD Display gt Built in Cascading Sequencer for up to 8 boilers gt Front End Loading Capability with Crest or Knight Boilers gt Building Management System Integration with 0 10 VDC Input gt Outdoor Reset Control with Outdoor Air Sensor gt Password Security Domestic Hot Water Prioritization gt Low Water Flow Control amp Indication gt Inlet amp Outlet Temperature Readout STANDARD FEATURES gt 85 Thermal Efficiency AHRI Certified gt Proportional Firing up to 4 1 Tumdown gt Hot Surface Ignition gt Low NOx Operation gt Sealed Combustion gt Low Gas Pressure Operation gt Vertical amp Horizontal Venting Category i Venting gt Double Wall B Vent Material gt Category IV Venting gt AL29 4C Stainless Steel Vent Material gt ASME Copper Finned Tube Heat Exchanger gt Freeze Protection gt ASME Certified H Stamped Service Reminder gt Gasketless design gt Time Clock gt 160 psi working pressure gt 0 10 VDC Rate Output gt On Off Switch gt Condensing Protection gt Combustible Floor Rated CH 0992 2072 gt 0 10 VDC S
9. nmental Quality gt Three Pump Control gt System Pump gt Boiler Pump gt Domestic Hot Water Pump gt High Voltage Terminal Strip gt 120 VAC 60 Hertz 1 Phase Power Supply gt Pump Contacts with Pump Relay gt Low Voltage Terminal Strip 24 VAC Auxiliary Device Relay Output Louvers gt Auxiliary Proving Switch Contacts Louvers gt 3 way Valve Contacts for Low Temperature Protection gt Alarm on Any Failure Contacts 0 10 VDC System Pump Speed Contacts gt Runtime Contacts gt DHW Thermostat Contacts gt DHW Tank Sensor Contacts gt Unit Enable Disable Contacts System Sensor Contacts Supply and Return gt Outdoor Air Sensor Contacts gt Contacts for Air Louvers gt Contacts on Any Failure gt Cascade Contacts 2 0 10 VDC BMS External Control Contact gt 0 10 VDC Rate Contacts Copper Fin l Gas Boiler Dimensions amp Specifications Dimensions amp Specifications Net AHRI Model Input Thermal Output Rating Vent Air Gas Shipping Number MBH Efficiency MBH MBH B c D G H Size Inlet Conn Weight CHNO402 399 85 39 295 V F nI 12 7 r 29 61 2 6 6 1 8 CHNOSO2 500 85 425 30 451 7 22 4 1 1 2 r 29 6 1 2 6 6 11 4 414 CHNO652 650 85 553 48l 56 3 4 NA 12 2 8 1 4 29 61 2 8 8 1 1 4 500 p CHNO7S2 750 85 638 555 64 221 4 124 7 s e 23 61 2 8 J 1 543 CHNO992 990 45 842 732 36 AB 1 4 IAZ AE 81 2 33 3 4 83 4 ww 10 E 773 CHNI262 1 260 85 1 071 931 36 581 2 331
10. ols Fantech FAQs Ball Valves Grundfos Pumps PEX Tubing for Heating Grundfos About Us i Bradford White Water Heaters Honeywell Thermostats PEX Tubing for Plumbing Honeywell Meet The Team i Copper Fittings Honeywell Zone Valves HVAC Air Conditioning Taco Quote of the Day ProPress Fittings Radiant Heal Fantech Ventilation Fans Triangie Tube Testimonials PVC Fittings Taco Pumps LG Mini Split Air Conditioners Uponor SupplyHouse Gear Steibel Eltron Tankless Heaters Triangle Tube Boilers Line Sets Viega i Careers Sump Pumps Weil Mciain Boilers Panasonic Ventilation Fans Watts SupplyHouse Coupons Takagi Tankless Heaters White Rodgers Thermostats Goodman Air Conditioners Weil Mclain tt nt vs Connect With Us Shop With Confidence Subscribe to our Channel N OD SECURED powered Sy Symantec Like Us on Facebook i Or LLA Visit Our Blog Fors soca Radiant Heat Supplies VisionPro Honeywell Thermostats Taco pumps and mini split air conditioners If there are items you are looking for but can t find on our website please contact our Customer Service Representatives amp we wili do our best to find what you need 2015 SuppiyHouse com Terns of Use Privacy Policy Site Map ep At SupplyHouse com our goal is to bring you the highest quality piumbing heating and HVAC supplies at competitive prices Our product catalog includes PEX Plumbing Supplies ASSOCIATE close Shopping For a Boiler ran ua Interstate
11. one inch air gap Features of the offered Model CS Stack are as follows 0 OS Oy Oo Be oe 0 Double wall design with one inch air gap Inner material is 24 gauge VP1738 stainless steel VP1738 is suited for condensing conditions Outer shell material is 24 gauge Aluminized Steel Insulation is 1 air gap Stack has 8 ID Stack height is 21 feet Included is 90 Boot Tee qty 1 Included is Rain Cap qty 1 Approximate lead time until delivery is 3 weeks PRICE ITEM 2 EXWORKS FACTORY Freight Included seee 4 810 00 If you have any questions then please contact me Please see the Boiler Supply Company s Terms and Conditions which are shown below as they are an integral part of this proposal Sincerely Gene Webb Account Manager Boiler Supply Company 865 363 3936 ACCEPTED Company By Title BOILERSUPPLY NC E 9 42 i Knott Road a TN 37921 Page 4 OF 4 Boiler Supply Company Standard Terms and Conditions As an option if work is done during overtime or weekends price will be extra Any additional labor or parts not included in this quote will be charged on a time and material basis Prices quoted herein do not include Federal State and Municipal Sales Use Occupational Privilege or similar taxes based on or measured by gross proceeds sales or material cost If the cost of the aforementioned taxes is incurred by the seller it will be added to the foregoing
12. pector in each state is the Jurisdictional Authority for the administration and enforcement of the requirements in his state If you have any doubts as to compliance please contact the Chief Boiler Inspector for the state in which the device is to be installed EXWORKS The purchaser is responsible for the equipment once it has been loaded for delivery at the factory The purchaser receiving the items listed above is responsible for all Coordination of delivery and unloading Boiler Supply Company will provide the purchasers contact information to the freight company and provide the purchaser with the freight carrier information and tracking if available Boiler Supply Company is not responsible for any charge fees or penalties arising from delays in manufacturing shipment delivery or coordination of delivery Cookeville Heating amp Cooling Services LLC 347 East Stevens Street e Cookeville TN 38501 3541 931 528 5514 e 931 526 2408 Fax PROPOSAL Date January 9 2015 PHONE JOBNAME __ Elementary School JOB ADDRESS David Boiler replacement x Remove Bryan 900MBH boiler and replace with a Lochivar 800MBH 94 efficient boiler Reconnect to the existing gas electrical and water piping Modify flue and water piping as needed to make all connection Includes all material labor start up and check operation Price 27 900 00 Lochinvar KNIGHT KBN801 Heating Boiler natural gas fired with 800 000 Btw Hr input 752 000
13. prices where applicable Terms of payment are net 30 days for proposals totaling less than 20 000 00 Terms of payment for proposals totaling more than 20 000 00 will require progress payment x Progress payments are indicated below for equipment only proposals 20 on Order Placement Due Net 30 days from date of invoice 30 on release for production Due Net 30 days from date of invoice 50 upon readiness to ship Due Net 30 days from date of invoice Progress payments when Installation or Labor is required with the supplied equipment 40 on Order Placement Due Net 30 days from date of invoice 50 on Completion of installation Due Net 30 days from date of invoice 10 on Commissioning startup or within 10 Days of completion of installation Whichever occurs first Due Net 30 days from date of invoice Prices quoted herein are firm for a period of 30 days from the date of this proposal In the event we are honored with your order please acknowledge acceptance of this quotation and terms by signing one copy and return with your purchase order If more than 30 days are required for completion of this project partial billing will be submitted each month based on the value of labor materials and equipment incorporated in the installation and or materials and equipment delivered to the job site prior to the invoice date The installation and operation of the above described device must comply with applicable laws rules and regulations The Chief Boiler Ins
14. ty Info H Specs l Fuel Type Natural Gas Efficiency 94 System Type Hydronic Water Features Direct Vent Condensing El Spark Ignition Depth Inches 45 1 4 Vent Size 6 Water 2 Connection BTU Input 800000 DOE Rating 752000 IBR Rating 654000 Boiler Type High Efficiency http www supplyhouse com Lochinvar KBN801 654000 BTU Output Knight XL High E Product Q amp A Signin Order Status Customer Service pan FREE SHIPPING ON ORDERS OVER 300 i Heating Supplies Boilers High Efficiency Gas Boilers Lochinvar Boilers 654 000 BTU Output Knight XL High Efficiency Boiler SKU KBN801 Brand Lochinvar Be the first to Write a Review PRICE 17 349 95 each In Stock Ships in 24 48 Hours 5 Available s 1 Videos Description for Lochinvar KBN801 Lochinvar s Knight XL Boilers Feature Modulating Bumer With 5 1 Tumdown ASME Stainless Steel Heat Exchanger Direct Vent Sealed Combustion 50 psi Relief Valve Adjustable High Limit With Manual Reset Flow Switch Temperature amp Pressure Gauge Direct Spark Ignition Low NOx Operation Low Gas Pressure Operation Zero Clearances to Combustibles Easy Access Terminal Strip Natural to LP Conversion Kit Inlet amp Outlet Temperature Sensors Low Water Flow Indication Domestic Hot Water Prioritization Adjustable Leveling Legs Sidewall Vent Terminals g i fa On Off Switch Contact On Any Failure SMART SYST
15. use of a lift gate H if you do require a lift gate al your delivery you ll have the option to add this FREE of charge when you checkout You May Also Need Page 1 of 7 1 Gal Heavy Body 112 Gal Heavy Body 1 qt Boiler amp Heating System Cleaner SKU 35206 Brand Hercules 12 25 each 142 20 box 42x 11 85 In Stock 34 Available Ships in 24 48 Hrs SKU 30310 Powdered Stop Leak Hercules 12 75 each 148 20 box 12x 12 35 In Stock 30 Available Ships in 24 48 Hrs Fumace Cement SKU 35526 Brand Hercules i 17 25 each EE 66 60 box 4x 16 65 In Stock 38 Available Ships in 24 48 Hrs Furnace Cement SKU 35521 Brand Hercules i 9 45 each i 54 90 box CJ 6x 9 15 In Stock 2 Available Ships in 24 48 Hrs http www supplyhouse com Lochinvar K BN801 654000 BTU Output Knight XL High E 1 9 2015 KBN801 Lochinvar KBN801 654 000 BTU Output Knight XL High Efficiency Boiler Page 3 of 3 Enter your email address Customer Service Plumbing Supplies Heating Supplies PEX Popular Brands Contact Us Access Doors Baseboard Heaters PEX Fittings AO Smith Shipping Policy i AO Smith Waler Healers Buderus Boilers PEX Manifolds Bell amp Gossett Retums amp Exchanges Aqua Pure Water Filters i Bumham Boilers PEX Plumbing Bradford White Low Price Guarantee Backflow Preventers Extro Tanks PEX To
16. ystem Pump Speed Input gt Adjustable High Limit w Manual Reset gt Data Logging gt Flow Switch gt Hours Running Space Heating gt Low Air Pressure Switch gt Hours Running Domestic Hot Water gt Inlet amp Outlet Temperature Sensors gt Ignition Attempts gt Easy Access Terminal Strips gt Last 10 Lockouts gt Downstream Test Cocks gt Programmable System Efficiency Optimizers gt 50 psi ASME Relief Valve gt Night Setback gt Temperature amp Pressure Gauge gt Anti Cycling gt 1 Year Warranty on Parts See Warranty for Details gt Outdoor Air Reset Curve gt 10 Year Limited Warranty See Warranty for Details gt Boost Temperature amp Time FIRING CODES D w7 Firing Code Califomia Code D M9 Firing Code Hot Surface Ignition OPTIONAL EQUIPMENT Dh Alarm Eh High amp Low Gas Pressure Switches w Manual Reset Cd Cupro Nicke Heat Exchanger with Electronic Supervision O Low Water Cut Off Probe Type w Manual Reset amp Test M13 Firing Code CSD1 Factory Mutual GE Gap Ch Modbus Communications CERTIFICATIONS L BMS Gateway BACnet or LonWorks gt Combustible Floor Kit CH 0402 0752 D gt Stack Frame gt Low Temperature Protection Valve D 30 psl ASME Relief Valve Ch 75 psi ASME Relief Valve Ch 100 psi ASME Relief Valve gt 125 psi ASME Relief Valve Cb 150 psi ASME Relief Valve ANSI Z21 13 CSA 4 9 certified South Coast Air Quality Management District Texas Commission on Enviro
Download Pdf Manuals
Related Search
Related Contents
Samsung NJ032WCXB1 User Manual MANUAL DEL OPERADOR FileMaker Go Development Guide User Manual Rev1.1 CruizCore® XG1350 Digital Gyroscope Impression i10-A LE8G Quick Start Guide Samsung SGH-C120 Manuel de l'utilisateur Rockbox user manual ESPECIFICAÇÕES TÉCNICAS - SEPLAG Betriebsanleitung Handpumpen ZPH und HM Copyright © All rights reserved.
Failed to retrieve file