Home

I-Lock™ Coupler Install Manual

image

Contents

1. NORTH AMERICA wesen im Elek Icom Vi 8 0IN CAB DECALS The following two In Cab Decals must be affixed in a suitable location within the operators working area For replacement decals please call your nearest Wedgelock dealer Fig 8 0 1 Warning Decal amp 8 0 2 l Lock Coupler Oerating Decal Fig 8 0 1 Warning Decal UN LOCK DETACH 5 LOCK Fig 8 0 2 l Lock Coupler Operation Decal 19 SECTION 9 TORQUE CHARTS Y WEDGELO C K NORTH AMERICA 9 0 TORQUE CHART METRIC BOLTS The following chart gives the standard torque setting of the bolts used in this hydraulic kit installation It is important to follow the chart when installing bolts and nuts Failure to do so could result in premature failure damage to components or even serious injury Fig 8 0 1 Torque Setting of Metric Grade 8 8 Bolts amp Nuts Bolt Dia x Pitch mm Lb Ft N LA M8 x 1 25 24 0 M10 x 1 5 M12 x 1 75 0 w A C BRIN Nm M6 x 1 0 99 240 83 O NO 83 0 147 4 202 7 287 4 Fig 8 0 1 Torque Setting of Metric Grade 8 8 Bolts amp Nuts 9 1 TORQUE CHART JIC CONNECTIONS JIC SAE 37 Flare Connections are a very common connection in fluid power applications Both the male and female fittings have a 37 seat The seal takes place between the male flare and the female cone seat The thread holds the connection mechanically Torque Setting of JIC Connectors Nominal Size DashSize
2. l LOGK COUPLER INSTALLATION MANUAL v4 SPECIAL NOTE Your new Wedgelock Coupler fitted with the I LOCK Safety Device requires the installation of a third hydraulic line please follow the instructions carefully COUPLER HOSES amp COMPONENTS DIPPER ARM I HOSES amp COMPONENTS BOOM ARM HOSES amp COMPONENTS BOOM BASE TO VALVE HOSES amp COMPONENTS PUMP amp TANK HOSES amp COMPONENTS CABIN MOUNTED COMPONENTS Toll free 800 CASCADE 227 2233 Telephone 503 669 6257 NORTH AMERICA cascadewedgelock cascorp com UN I LOCK COUPLER INSTALLATION REFERENCE CARD PLEASE READ INSTALL MANUAL THOROUGHLY BEFORE INSTALLATION Remove Bucket if attached to the excavator dipper arm 8 Install Quick Coupler using the carrier machine s original dipper and linkage pins 8 9 Once mounted rotate coupler through its full range of movement and check clearances around coupler and dipper arm 9 Begin routing hoses from coupler to the dipper manifold on the dipper arm to determine hose routing and dipper manifold positioning 10 12 Position dipper arm hoses install hose clamps and connect hoses to dipper manifold as labeled 10 LE Position boom hoses install hose clamps and join unions Ensure all moving joints are fitted with abrasive sleeve 13 After hose routing 1s completed it will be easy to determine the best final mounting location for the coupler control valv
3. COUPLER INSTALLATION NORTH AMERICA 3 4 FITTING THE COUPLER Dipper Pin e Place o rings over ear plates of coupler to hold in position until ready for final placement e Carefully raise the dipper arm of the carrier machine so that the weight of the coupler is off the ground Ensure that the dipper arm is in a vertical position Fig 3 4 1 e Retract the bucket curl cylinder until the coupler front boss aligns with the dipper pin hole The coupler will balance allowing an easy insertion of the main dipper pin e Align pin retention system and fix dipper pin into place Grease both the dipper pin and the linkage pin e Rotate coupler through full rotation to check clearances NOTE ORIGINAL OEM DIPPER PIN MUST BE USED Fig 3 4 1 Raise dipper arm to Fig 3 4 2 Retract bucket curl cylinder take weight off coupler to align dipper pin CAREFULLY ROTATE THE COUPLER THROUGH FULL ROTATION TO CHECK CLEARANCES IF THERE ARE ANY SIGNS OF INTERFERENCE STOP IMMEDIATELY AND CONTACT YOUR WEDGELOCK DEALER SECTION 4 HYDRAULIC KIT INSTALLATION Y WEDGELO C K NORTH AMERICA There are three main sections to the hydraulic kit installation which consists of e Fitting of the Junction Manifold Block to the dipper arm Fitting of the l Lock Control Valve in the engine pump compartment e Routing the 3 Line Hydraulic Circuit to complete the hydraulic part of the coupler installation 4 0 JUNCTION MANIFOLD POSITION Fig 4 0 1 Junctio
4. Nm Lb Ft F F F T 15 17 10 8 12 5 114 CO J LA se 6 27 30 19 6 22 0 11 4 427 8 59 65 455 478 1 Fig 8 1 1 JIC Connections Chart 9 2 PRESSURE SETTING CHART The following chart shows the range of allowable pressure settings for the l Lock Coupler circuit It is highly recommended that the pressures for each function are tested and checked be fore the equipment is put to use l Lock Control Valve Pressure Range bar Pressure Range psi p esum FuMan I Lock Primary Cylinder Retract Primary Wedge 225 240 3260 3580 Extend Primary Wedge 138 145 2000 2100 SAFETY Safety Knuckle Release 225 240 3260 3580 20 Pressure Relief Valve 166 180 2400 2600 iV WEDGELOCK NORTH AMERICA PO Box 20187 Portland OR 97294 0187 USA 800 CASCADE 227 2233 Tel 503 669 6257 www wedgelockusa com Cascade and Wedgelock are registered trademarks of Cascade Corporation 902 0015 Rev 2 Cascade Corporation 2013 All rights reserved Form 6827658 500 GE 06 13
5. hose route and length through this pivot area is recommended Mark the position of additional hose clamps along the top of the boom Prepare the surface of the boom for welding in these locations Weld clamp assemblies ensuring that only the vertical ends of the clamp brackets are welded Touch up paint the boom and clamp to match the carrier machine color Tighten all hose joints between the coupler cylinder and the dipper arm to boom connections Tighten the clamp assemblies pulling through any excess hose working from the dipper end to the bottom of the boom Allow hose slack for pivot movement and ensuring that the hose assemblies are not stressed in any way Use cable ties where required Dipper to Boom Hose Joint Boom to Valve Hose Joint Clamp Assemblies Multiple locations along boom Fig 4 6 2 Boom Hose Routing Hose slack for pivot movement with nylon abrasive sleeve SECTION 4 HYDRAULIC KIT INSTALLATION Y WEDGELOCK NORTH AMERICA 4 7 HOSE ROUTING BOOM TO VALVE Connect the RED color coded hoses for the Boom to Valve to the boom hoses at the base end of the boom Route the hoses through to the pump compartment towards the control valve following the existing hose routing from the boom end Trace the hoses from the quick coupler cylinder right through to the end where they connect to the valve to determine the correct hose for each port position on the valve Connect the hose ends to the con
6. for leaks Oil spills are sometimes unavoidable Contain all fluid spills with appropriate absorbent materials and dispose accordingly Immediately clean affected areas to minimize safety risks When operating plant and machinery keep people and property well out of harms way Evaluate the working environment and identify hazards Ensure that all people involved in the installation understand the hazards associated with this procedure 2 1 WELDING PRECAUTIONS Before commencing any welding procedures on the carrier machine ensure that the engine is turned off and the battery supply is disconnected refer to the carrier machine service manual Ensure all surrounding areas are protected with a flame resistant covering Clear surrounding areas of combustible materials Ensure you have a fire extinguisher at hand Cover highly susceptible surfaces like cylinder rods glass windows electrical components and plastics to prevent spatter or heat damage Connect the ground cable earth lead from the welder to the component to be welded to the carrier machine Ensure parts and surfaces to be welded are clean and prepared properly for welding Use appropriate PPE Personal Protective Equipment when carrying out any welding procedures II WEDGELOCK SECTION 1 SAFETY NORTH AMERICA 3 0 SAFETY DURING COUPLER INSTALLATION e Always use the correct PPE when removing attachments from carrier machines e Stand well clear of machinery that is i
7. COUPLER INSTALLATION 3 2 REMOVE THE EXISTING BUCKET Before you fit the coupler to the carrier machine you have to first remove any existing attachment from the dipper arm Fig 3 2 1 Place the bucket or attachment in a safe position on the ground Undo the pin retention systems holding the dipper pin and link pin in their position Gentle raise the bucket off the ground and rotate the cylinder until the weight is off the dipper pin Remove the dipper pin and place in a clean area Lower the bucket to the ground with the bucket curl cylinder until there is no longer weight on the link pin Remove the link pin and place in a clean place 3 3 FITTING THE COUPLER Link Pin Ensure the coupler is sitting on a flat surface in the correct orientation Align the dipper arm of the carrier machine with the coupler Position the o rings for the linkage boss assembly on the linkage boss if fitted Using the bucket curl cylinder lower the linkage into position on the rear boss of the coupler Fig 3 3 1 Align the coupler if necessary using a bar or lever Insert the linkage pin through the coupler boss and linkage boss Align pin retention system and fix linkage pin into place Locate the o rings into the correct position if fitted NOTE ORIGINAL OEM LINKAGE PIN MUST BE USED WEDGELOCK NORTH AMERICA Ww Fig 3 2 1 Remove Bucket Fig 3 3 1 Lower linkage into coupler II WED G ELO t K SECTION 3
8. SE ROUTING VALVE TO PUMP TANK 5 0 ELECTRICAL INSTALLATION 6 0 LOOSE HOSE KIT ASSEMBLV 6 1 PRE CRIMPED HOSE KIT ASSEMBLV 6 2 ELECTRICAL SCHEMATIC 7 0 FINISH amp TEST 8 0 IN CAB DECALS 9 0 TORQUE CHART METRIC BOLTS 9 1 TORQUE CHART JIC CONNECTORS 9 2 PRESSURE SETTING CHART PAGE 2 9 o 0 O CO OO N N 10 11 11 12 12 13 14 14 15 16 16 17 18 19 20 20 20 II WEDGELOCK SECTION 1 INSTALLATION GUIDELINES NORTH AMERICA Please read this Installation Manual thoroughly before you commence installation of the l Lock Coupler Deviating from these instructions may result in increased install time and or damage to the hydraulic kit carrier machine or attachment 1 0 CHECK LIST Before you start check the following e Check the contents of the installation components supplied Ensure that the components are correct for the carrier machine that the coupler is to be installed e Check that the carrier machine is positioned on level ground e Check that you have absorbent materials available to soak up any fluid spills e Dispose of any used materials in a safe and environment friendly manner e Power off the carrier machine If the machine has been working ensure that it has cooled down adequately prior to commencing any part of the installation procedure e Before carrying out any welding on the carrier machine disconnect the battery Refer to the carrier machine operator maintenance m
9. XT primary wedge extend Fig 4 2 1 l Lock Control Valve e SAFETY safety knuckle release PRV set to 145 Bar PRV set to 240 Bar e For pressure settings refer to the pressure settings chart on page 20 e For service details regarding the control valve refer to the service section in the Operators Manual 4 3 INSTALLING THE CONTROL VALVE e Identify the pump that delivers flow to the BUCKET CURL CYLINDER of the carrier machine This is the most common pump used for hydraulic couplers operating on mains pressure refer to the carrier machine service manual if required e Utilizing the mounting plate supplied determine a suitable location in the pump engine compartment of the carrier machine to mount the control valve The mounting plate can either be welded or bolted into position Fig 4 3 1 Mounting Plate Fig 4 3 1 Mounting Plate e Bolt the Control Valve to the mounting plate with the bolts provided NOTE The best position for mounting of the control valve may be determined after the hose routing from the boom to the pump compartment Check where the hoses exit from the boom end in the pump compartment before mounting the valve as the l Lock hoses will invariable follow this same route 11 SECTION 4 HYDRAULIC KIT INSTALLATION Y WEDGELOCK NORTH AMERICA 4 4 HOSE ROUTING Wedgelock Hose Kits have been designed to improve the speed and ease in which an installer can fit the hydraulic kit The content of the hydrau
10. anual Ensure that the pressure in the hydraulic system is relieved before opening any hydraulic lines SECTION 2 PRECAUTIONS Y WEDGELOCK NORTH AMERICA Please ensure you follow the stated precautions below while carrying out the coupler and hydraulic kit installation procedure 2 0 SAFETY PRECAUTIONS Always use PPE Personal Protective Equipment when servicing operating or maintaining plant machinery and its components Refer to the carrier machine Service Manual for correct procedures when carrying out work on the machine The machine service manual takes precedence over any discrepancies between that and this installation manual Allow for hydraulic oil to cool adequately before opening or accessing any hydraulic lines Hydraulic lines fittings and components can be hot which can be harmful causing severe burns Relieve the hydraulic tank pressure before accessing hydraulic lines Refer to the carrier machine service manual for proper procedures Ensure that the stick of the carrier machine is resting on the ground at all times do not leave attachments suspended in the air during service installation Check and tighten all fittings hose connections and joints within the hydraulic quick coupler circuit prior to activating the machine Visually inspect for oil leaks tighten and adjust accordingly Avoid contact with hydraulic fluids and high pressure oils use cardboard or similar as a backing when checking
11. ck Controller Dual Switch Assembly and Solenoid Loom are designed to enable a plug amp play electrical installation process Determine a suitable position for the l Lock Controller Ensure the position is a dry location and easily accessible Mount into position Caution Do not over tighten fixing screws Find two spare locations in the machine console preferably side by side to insert the dual rocker switches Route the switch wires to the l Lock Controller Connect the corresponding male spade fitting to the female connector on each of the assemblies Locate a switched fused power source from within the console of the carrier machine Connect the RED power lead on the Dual Switch Assembly to the power source Find a suitable earth location negative and connect the BLACK wire from the l Lock Controller Plug the Solenoid Loom into the l Lock Controller Route the Solenoid Loom from the l Lock Controller position through to the engine compartment where the l Lock Solenoid Valve is located Connect the RED labeled DIN Plug to the WEDGE solenoid Connect the BLACK labeled DIN Plug to the SAFETY solenoid Ensure that all electrical looms are routed and fixed securely using cable ties where required NOTE See Electrical Assembly Fig 6 2 2 SECTION 6 ASSEMBLIES iV WEDGELOCK Y NORTH AMERICA 6 0 LOOSE HOSE KIT ASSEMBLY war CD Bes E CO O en 2 Port cio ax DJ COUPLER amp I LOCK E Sarery syste
12. e 11 14 Route hoses from valve ports to hoses on boom and join with unions 14 Locate and connect pressure line from test port on pump to P port on valve 14 Locate and connect hose from hydraulic tank return line to T port on valve 14 Locate mounting position for l LOCK control switch in cab 15 Route electrical harness from din connectors on valve to switch harness and attach positive and negative leads 15 Check circuit pressures 20 and test coupler function to ensure system 1s working properly refer to Operators Manual Refers to Installation Manual page reference CONTENTS REFERENCE CARD SECTION 1 INSTALLATION GUIDELINES SECTION 2 PRECAUTIONS SECTION 3 COUPLER INSTALLATION SECTION 4 HYDRAULIC KIT INSTALLATION SECTION 5 ELECTRICAL INSTALLATION SECTION 6 ASSEMBLIES SECTION 7 FINISH amp TEST SECTION 8 DECALS SECTION 9 TORQUE CHARTS TV WEDGELOCK NORTH AMERICA 1 0 CHECK LIST 2 0 SAFETY PRECAUTIONS 2 1 WELDING PRECAUTIONS 3 0 SAFETY DURING COUPLER INSTALLATION 3 1 COUPLER ORIENTATION 3 2 REMOVING THE EXISTING BUCKET 3 3 FITTING THE COUPLER LINK PIN 3 4 FITTING THE COUPLER DIPPER PIN 4 0 JUNCTION MANIFOLD POSITION 4 1 FITTING THE JUNCTION MANIFOLD BLOCK 4 2 THE I LOCK CONTROL VALVE 4 3 INSTALLING THE CONTROL VALVE 4 4 HOSE ROUTING 4 5 HOSE ROUTING DIPPER ARM 4 6 HOSE ROUTING BOOM 4 7 HOSE ROUTING BOOM TO VALVE 4 8 HO
13. g radius area and working parameter of the machine e From the seat of the excavator start the machine and lower the excavator arm to near the ground In a very slow motion using the excavator levers raise the dipper arm and rotate the coupler through full rotation Then raise the boom of the excavator and motion the dipper arm cylinder to full extension Now motion the dipper arm cylinder to full retraction lowering the boom arm in unison Use this process to check the hose routing throughout the complete circuit Ensure that the hoses are not under any strain or subject to potential jamming or pinching Assistance will be required to do this Modify hose routing if required e Running the machine at idle or a low engine RPM setting to supply a low volume of oil through the circuit Activate the circuit and check for any leaks Shut down the machine immediately if leaks are detected then tighten coupler as required and re check e Activate the coupler circuit several times to ensure that the system is working correctly refer to the l Lock Coupler Operators Manual e Once the test procedure has been completed touch up paint any welded brackets or assemblies and cable tie any loose hoses e Affix In Cab Decals in a suitable location within the operators working area Fig 7 0 1 In Cab Decals Before using the l Lock Coupler carefully read the I Lock Coupler Operators Manual thoroughly 18 WEDGELOCK SECTION 8 IN CAB DECALS
14. ilizing a Pre Crimped or Loose hose kit supplied by Wedgelock we have endeavored to supply the majority of the fittings required to carry out a complete install of an l Lock Coupler however due to the vast array of different carrier machines fitting types and port sizes not all circumstances may be accounted for In instances where the fittings supplied do not match the port size or the type of carrier machine that this install is being carried out on please contact your nearest machinery dealer or hydraulic fittings provider for the additional appropriate component s NOTE 2 See Hydraulic Schematic Fig 6 0 1 II WED G ELO t K SECTION 5 ELECTRICAL INSTALLATION NORTH AMERICA 5 0 ELECTRICAL INSTALLATION The l Lock Coupler must be operated utilizing the l LOCK CONTROLLER DUAL SWITCH ASSEMBLY and SOLENOID LOOM The proprietary electrical components have been designed in conjunction with the functionality and operation of the coupler safety features The built in Timer and Operational Sequences controlling the solenoid valves are features which provide the operator and fellow co workers a safe work environment during attachment change over Failure to utilize the proprietary electrical components with the l Lock Coupler could result in coupler malfunction causing serious harm or even death Fig 5 0 1 amp 5 0 2 amp 5 0 3 Fig 5 0 1 Dual Switch Assembly Fig 5 0 3 Solenoid Loom Fig 5 0 2 I Lock Controller The l Lo
15. lic hose kit has been pre determined to ensure that in most cases the majority of fittings required to complete the install are provided In some circumstances additional fittings may have to be sourced to complete the connection to the pump test port and tank return For information regarding the port type at these locations please refer to the carrier machine service manual The Pre Crimped Wedgelock hose kits are color coded at each end of the pre crimped hoses Following the Installation Reference Card will assist with identifying each of the hoses to be routed in respect to their relative positions on the carrier machine Once the manifold block and solenoid control valve are in position begin routing the hoses from the coupler end of the machine to the engine compartment end If using a Pre Crimped Hose Kit follow the instructions ensuring that each color coded hose is positioned as required If using a Lose Fitting Kit you can use the color coded instructions as a guide to achieve the same results 4 5 HOSE ROUTING DIPPER ARM e Connect the Jumper Hoses from the quick coupler cylinder to the junction manifold block mounted on the dipper arm Use jumper hoses nylon abrasion sleeve and fittings provided which are color coded YELLOW Note which hoses are connected to which ports on the quick coupler cylinder as these will have to match the port options on the valve in the engine compartment e Connect the Dipper Arm hoses
16. m 8 Bar E L 3 LJ cb ch MTHS cp ap fJ do p 0 c 3 ges c DI oa Coupler Hoses S Pump amp Tank Hoses d Boom Hoses VALVE Fig 6 0 1 Loose Hose Kit Assembly 6 1 PRE CRIMPED HOSE KIT ASSEMBLY Coupler Hoses CE 9 PORT HYDRAULIC COUPLER MANIFOLD amp I LOCK SAFETY rE 7 16 UNO SYSTEM EE Dipper Arm Hoses Pump amp Tank Hoses MACHINE SPECIFIC FITTINGS Boom Hoses Fig 6 1 1 Pre crimped Hose Kit Assembly 16 Y WEDGELOCK NORTH AMERICA ES 6 2 ELECTRICAL ASSEMBLY l Lock Controller Male Female Connectors Power Source Connection Fig 6 2 2 Electrical Assembly SECTION 6 ASSEMBLIES Solenoid Loom SECTION 7 FINISH amp TEST Y WEDGELOCK NORTH AMERICA 7 0 FINISH amp TEST Before starting this section position the machine in the Oil Level Check position as suggested by the excavator machine manufacturer Check the oil level sight gauge on the hydraulic tank Add hydraulic oil if necessary refer to the carrier machine service manual for further information e Check the hose clamp assemblies and valve mounting bolts are tightened as per the Torque Setting of Metric Bolts amp Nuts Chart Fig 8 0 1 e Starting at the coupler end thoroughly check that the hose connections are tightened through out the complete circuit as per the JIC SAE 37 FLARE Connection Chart Fig 8 1 1 e Clear all personnel and all obstacles from the swin
17. n Manifold Block The Junction Manifold block is a 9 port block designed to enable multiple IN This side to dipper arm routing options and variable positional options to optimize the jumper Comect onentation hose routing at the base of the dipper arm Note correct orientation Fig 4 0 1 e Positioning of the Junction Manifold Block and the hose routing option is critical to the life cycle of the jumper hoses Fig 4 0 2 e To determine the optimum position of the Junction Manifold Block first rotate the bucket curl cylinder through full rotation to check available clearances for the manifold at both full stroke and zero stroke Fig 4 0 2 Hose routing options he manifold should be placed as close as possible to the main dipper pin to minimize jumper hose length when utilizing universal jumper hose kits any excess jumper hose can be then contained inside the coupler body 4 1 FITTING THE JUNCTION MANIFOLD BLOCK e Once the optimum position has been determined clean and prepare the surface of the dipper arm to be welded e Lightly tack the manifold into position carefully tacking only the ends of the manifold Refer to welding precautions and carrier machine service manual for welding instructions Fit one adaptor to the manifold and route one jumper hose from the manifold to the coupler cylinder e Rotate coupler SLOWLY through full rotation checking that the hose can move freely and is not subject to pinching
18. n motion at all times e NEVER place hands or fingers near pin holes or recesses e Always use correct tools when carrying out removal and installation of attachments on the carrier machine Use correct lifting techniques and lifting equipment when maneuvering heavy objects e Attachments may roll or tip during removal when placed on the ground place with extreme caution e Always use assistance when installing and removing attachments pinned to the carrier machine 3 1 COUPLER ORIENTATION The l Lock Coupler has been designed and manufactured to fit the dipper arm and linkage assembly of the carrier machine The l Lock Coupler fits the carrier machine in one orientation only with the C Section facing the operators view see fig 3 0 1 e Always use the original bucket pins to fit the coupler to the machine These pins are designed for the dipper arm and linkage assemblies e Always replace o rings to original positions and utilize pin retention systems where applicable DO NOT use standard attachment pins to connect the coupler to the machine If unsure consult your Wedgelock Dealer immediately e ifa THUMB is will be fitted to the carrier machine utilizing the main dipper pin position refer to the THUMB Installation Guide for reference Dipper Arm QUEE Operator View Ag B a VW A N Be ech f ie wl K Coupler C Section Coupler C Section Fig 3 1 1 Coupler Orientation SECTION 3
19. or crushing at any point Re position manifold if required ae e Remove jumper hose stitch weld the ends ONLY of the ea manifold block to the dipper arm Fig 4 1 1 Stitch weld N XQ l location Weld here on both ends a i Ru e Touch up paint finish on welded component to match carrier machine color Fig 4 1 1 Stitch weld location 10 II WED GELOC K SECTION 4 HYDRAULIC KIT INSTALLATION NORTH AMERICA ES 4 2 THE I LOCK CONTROL VALVE The l Lock Coupler is designed to operate on the carrier machine s MAINS PRESSURE supply The l Lock Control Valve controls the oil pressure and oil flow to the coupler for both the Primary Wedge function AND the Safety Knuckle function The l Lock Coupler Control Valve MUST BE USED for any installation of an l Lock Coupler e The l Lock Control Valve consists of twin solenoid valves two pressure reducing valves and 5 ports for hose routing The distinguishable markings are there to assist with the electrical connection and hose routing to ensure that the coupler operates in accordance with which it has been designed Fig 4 2 1 e he markings on the control valve are as follows Twin Solenoid Valves Twin Solenoids SAFETY safety knuckle solenoid e WEDGE primary wedge solenoid Two Pressure Reducing Valves e 1 PRV set to 240 Bar e 2 PRV set to 145 Bar 9 Ports for hose routing a Check Valve e P pressure in e T tankreturn e RET primary to hydraulic tank line E
20. to the junction manifold block using the hoses and fittings color coded BLUE Route these hoses along the upper side of the dipper arm e Determine best position for the hose clamps provided Prepare surface of the dipper arm for welding the clamps into position Weld clamp assemblies ensuring that only the vertical ends of the clamp brackets are welded Touch up paint the dipper arm and clamp to match the carrier machine color Fig 4 5 1 e During clamp welding procedure ensure that the dipper hoses are placed in a clean and safe position away from heat and the welding area e Lightly clamp dipper arm hoses into position do not fully tighten at this stage Fig 4 5 2 Hose Clamps Fig 4 5 1 Hose Clamp Position example only 12 Fig 4 5 2 Hose Clamp Assembly Y Y W E D G E L t K SECTION 4 HYDRAULIC KIT INSTALLATION NORTH AMERICA 4 6 HOSE ROUTING BOOM Fit the nylon abrasive sleeve over the loose ends of the Dipper hoses A Using the GREEN color coded hoses for the Boom connect these to the qis G dipper arm hoses Fig 4 6 1 Lay the Boom hoses along the top of the boom arm in preparation of Z PEA pisse jafni Ini iti j i Typical determining the best hose clamp position for this part of the installation Fig 4 6 2 Mark the position of the top hose clamp on the boom allowing for the hose to follow the boom movement relative to the dipper arm movement on the top pivot point Following the existing
21. trol valve ensuring that they are connected to their respective port positions relative to the cylinder Cable tie Boom to Valve hoses to existing hoses where appropriate and coil any excess hose in the pump compartment Ensure that the hoses are not bound up or under any strain Tighten all hose joints and fittings between the lower boom end and the control valve 4 8 HOSE ROUTING VALVE TO PUMP TANK Using the BLACK color coded hoses from the install kit connect the hose ends to the valve marked P Pump and T Tank A supplied Check Valve should be connected directly to the P Pressure port on the l Lock 14 Control Valve with the fittings provided in the kit See Control Valve Assy Fig 4 2 1 Utilizing a TEST PORT on the pump that delivers hydraulic pressure to the bucket curl cylinder circuit see 4 3 above connect the hose from the check valve on the P port to the test port Locate an existing tank line hose on the main return manifold or hydraulic tank Disconnect the existing hose and install a tee fitting Reinstall the existing hose onto one end of the tee and then connect the new tank line hose from the control valve T port to the other end of the tee Cable tie hoses to existing hoses where appropriate and coil any excess hose if required Ensure that the hoses are not bound up or under any strain Tighten all hose joints and fittings between the control valve and the pump and tank NOTE 1 When ut

Download Pdf Manuals

image

Related Search

Related Contents

SERVICE MANUAL McDonald`s SinBaD Series SINGLE  novero Rockdale EN_v1_0  User`s Manual  Senseo Senseo HD7825/31 coffee maker  Bedienungsanleitung  User Manual of Cross Camera  H1, H2 and H3 Operation Manual    User Manual - SharePoint  

Copyright © All rights reserved.
Failed to retrieve file