Home

I. Immersion Suit Repair Kit (Set of Servicing Equipment)

image

Contents

1. Provide air into the suit through the foot pump to 2 Sprinkle along seams and closures a pressure of 0 7 to 1 4Kpa 0 1 to 0 2psi acc of the immersion suit with a soapy MSC Circ 1114 Maintain the pressure to those water solution limits for the air test 3 Check carefully if any bubbles appear from the Immersion Suit4 It is normal that the bubbles appear in the zipper and mark properly the leaking areas of the suit slides and the zipper toother part in the clamp IV Procedures of Repair e Remove the air test device e Clean the suit thoroughly with fresh water and dry it trying to leave the marks visual A Repair of steams and closures as described in the air test procedure instructions 1 Adapt the applicator on the glue tube for use 2 Apply a gentle amount of glue on the marked leaking areas Let it dry for 8 10 minutes Then apply once again a glue layer on the immersion suit damaged area Leave the immersion suit till the next day for the next use B Repair of Rips Tears and Punctures 1 With use of glue tube and applicator apply a 2 Let it dry for 8 10 minutes Then apply once glue layer on both sides of immersion suit again a glue layer on both sides of Immersion suit s damaged area damaged area 3 Then press the 2 sides together for 2 minutes Leave the immersion suit till the next day for the next use
2. SERVICE MANUAL FOR THE AIR PRESSURE TEST AND REPAIR OF IMMERSION SUITS Immersion Suit Repair Kit Set of Servicing Equipment The aluminum kit contains a set of Servicing Equipment A A face fixture two parts B A pressure gauge 0 6kPa C A foot pump with multi valve adaptor D Glue and applicator two pieces Il Adjust the Air Test Device on the Immersion Suit Part 1 Face fixture xi ad 2 Place part 1 face fixture inside immersion suit hood area and zip up Attention Stretch the hood fabric by pulling it to the direction of arrows The hood should not have any folds 1 Lay the immersion suit on a work table and check for damages Em Part 2 Face fixture a 7 3 Place part 2 face fixture on part 2 by 4 Image of assembled face fixtures with adjusting its holes carefully through the hood Attention The zipper head bolts and joints should pass through the hole 5 Install the o ring gasket and tighten up the butterfly nut so as to eliminate leakage around the face seal 6 Check the pressure gauge for any breaks 7 Insert the Pressure Gauge at the face on the dial surface or to the pointer fixture by pressing down at the same time the joint at face fixture 9 Install the Connector for the foot pump 10 Adjust the multi valve adaptor on the by pressing down the proper joint so as to connector of face fixture insert the connector lil Air Test Procedure 1

Download Pdf Manuals

image

Related Search

Related Contents

PGー ・PBー プラスチゲージ取扱説明書  threeDwall EKB-02-103 Instructions / Assembly    

Copyright © All rights reserved.
Failed to retrieve file