Home
Manuel d`installation
Contents
1. INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE Y INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE tape Step ENGAGER LES PANNEAUX DE PORTE DANS LES RAIL SUP RIEUR amp INF RIEUR INSERT DOOR PANELS INTO TOP amp BOTTOM TRACK PAGE 8 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS tape Step 13 UTILISER UNE TOURNE CROU OU UNE PINCE POUR UN AJUSTEMENT VERTICAL USE HEX NUT DRIVER OR PLIERS FOR VERTICAL DOOR ADJUSTMENT SERREZ TIGHTEN DESSERREZ LOOSEN N AJUSTEMENT VERTICAL Sa VERTICAL ADJUSTMENT INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE tape Step INSTALLER LES JOINTS LAT RAUX SUR LE PANNEAU DE PORTE 1 INSTALL SIDE PANEL GASKET ONTO DOOR PANEL 1 1 PAGE 9 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS tape Step 5 INS REZ LES COUVERCLES EXTENSEUR INSERT EXPANDER CAPS INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE mal tape Step VIS 3 8 LG 8 CAPUCHON COUVRE VIS 8 00 SCREW 3 8 LG 8 SCREW CAP 8 INTERIOR SHOWER SIDE SUR LES DEUX C T S ON BOTH SIDE PAGE 10 TAPES D INSTALLATION DE LA PORTE DOO
2. LG 6 INSERT THE WALL PLUGS 6 AND PUT IN EACH A DROP OF SILICONE SECURE THE WALL JAMB USING 1 3 8 SCREWS 6 PAGE 5 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS tape Step INS REZ UN C T DU CADRE DANS LE JAMBAGE INSERT ONE SIDE OF FRAME INTO WALL JAMB Descendezie ca dhe Lover hame INT RIEUR DE LA DOUCHE INTERIOR O 4H Glissez W Slide Poussez y Push tape Step ENGAGER L AUTRE C T DU CADRE DANS LE JAMBAGE ENGAGE THE OTHER SIDE OF FRAME INTO WALL JAMB PAGE 6 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS RAIL SUP RIEUR TOP TRACK INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE tape Step PANNEAU FIXE 2 SUR LES DEUX C T S FIXED PANEL 2 ON BOTH SIDE SUPPORT VITRE GLASS SUPPORT RAIL INF RIEUR BOTTOM TRACK INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE tape Step SUPPORT VITRE 8 VIS LG 8 GLASS SUPPORT 8 SCREW LG 8 PAGE 7 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS tape Step INSTALLATION DES PANNEAUX DE PORTE INSTALL DOOR PANELS ENFONCER PUSH DOWN ENFONCER PUSH DOWN
3. 2 PAGE 1 LISTE DES OUTILS REQUIS REQUIRED TOOLS LIST 14 I a TOURNEVIS SCREWDRIVERS MECHE POUR TUILE EN CERAMIQUE MECHE CERAMIC TILE DRILL BIT DRILL BIT SCELLANT PER EUSE NIVEAU TOURNE CROU CRAYON RUBAN MESURER MAILLET SILICON DRILL LEVEL HEX NUT DRIVER PENCIL MEASURE TAPE MALLET LISTE DES PI CES ET DE LA QUINCAILLERIE PACKAGING CHECK LIST amp HARDWARE 7 2 rg SUPPORT VITRE G 4 SUPPORT VITRE D 4 JOINT LAT RAL 4 ENS DE POIGN E 2 GLASS SUPPORT L 4 GLASS SUPPORT R 4 SIDE GASKET 4 SET OF HANDLES 2 POUR VERRE POINT PARIS 3 SEULEMENT FOR PARIS POINT M4 X 8 GLASS ONLY CAPUCHON JOINT MAGN TIQUE 2 JOINT LAT RAL C T JAMBAGE 2 MAGNETIC DOOR COUVRE VIS 8 VIS 3 8 LG 8 SIDE GASKET WALL JAMB SIDE 2 GASKET 2 SCREW CAP 8 SCREW 3 8 LG 8 M4 X 35 VIS LG 4 CHEVILLE 8 VIS 1 3 8 LG 14 SCREW 4 LG 4 WALL PLUG 8 SCREW 1 3 8 LG 14 PAGE 2 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS tape Step POSEZ ET CENTREZ LE CADRE AVEC LES JAMBAGES SUR LE SEUIL DE LA BASE DE DOUCHE O POSITION AND CENTER THE FRAME TOGETHER WITH WALLJAMBS ONTO THRESHOLD OF SHOWER BASE THE INSTALLATION SHOWN IS BASED ON PLUMB FINISHED WALLS AND A LEVELLED BASE IF THESE CONDITIONS ARE NOT MET PLEASE ADJUST ACCORDINGLY L INSTALLATION ILLU
4. porte et les panneaux lat raux avec une solution d eau et d tergent doux Cela suffira pour conserver l aspect neuf des panneaux de verre et du cadre d aluminium N utilisez jamais de poudre ou tampons de r curage ni d instruments tranchants sur les surfaces en m tal et en verre de la porte HOW TO CARE FOR YOUR DOOR Never use scouring powder pads or sharp instruments on metal work or glass panels An occasional wiping down with a mild detergent diluted in water is all that is needed to keep the panels and aluminum parts looking new Des changements peuvent tre apport s au produit sans pr avis Product specifications are subject to change without notice LISTE DES PI CES ET DE LA QUINCAILLERIE PACKAGING CHECK LIST amp HARDWARE RAIL HAUT AVEC CANAL ARRONDI TOP TRACK WITH ROUNDED CHANNEL Oo O RAIL DU BAS AVEC CANAL PLAT BOTTOM TRACK WITH FLAT CHANNEL JAMBAGE 2 WALL JAMB 2 1 EXPANDER 2 PANNEAU FIXE 2 FIXED PANEL 2 SUPPORT VITRE G 4 GLASS SUPPORT LL 4 SUPPORT VITRE D 4 GLASS SUPPORT 4 RAIL DU BAS 1 BOTTOM TRACK 1 PANNEAU DE PORTE 2 DOOR PANEL 2 JOINT LAT RAL 4 SIDE GASKET 4 ENS DE POIGN E 2 SET OF HANDLES 2 JOINT LAT RAL C T JAMBAGE 2 SIDE GASKET WALL JAMB SIDE 2 RAIL DU HAUT 1 TOP TRACK 1 JOINT MAGN TIQUE 2 MAGNET GASKET
5. Guide d installation Instruction manual 3005 PORTE COULISSANTE COURB E CURVED GLASS SLIDING SHOWER DOOR 10 13 PORTE COULISSANTE COURB E CURVED GLASS SLIDING SHOWER DOOR INSTRUCTIONS D INSTALLATION POUR PORTE COULISSANTE COURB E Please keep this manual and product code number for future reference and replacement parts ordering if necessary Veuillez conserver ce manuel et le code de produit pour votre r f rence future et au besoin la commandent les pi ces de rechange PORTE COULISSANTE COURB E CURVED GLASS SLIDING SHOWER DOOR LIRE ATTENTIVEMENT AVANT DE COMMENCER READ CAREFULLY AND COMPLETELY BEFORE PROCEEDING IL EST RECOMMAND DE PORTER DES LUNETTES DE S CURIT EN TOUT TEMPS LORS DE L INSTALLATION IT ISRECOMMENDED THAT YOU WEAR SAFETY GLASSES AT ALL TIMES DURING INSTALLATION INSTALLATION SUR LES TUILES EN C RAMIQUE Si votre porte de douche est install e sur des tuiles en c ramique les tuiles doivent tre prolong es compl tement sous les jambages muraux Utilisez du compos aux silicones pour sceller le joint entre les tuiles en c ramique et la base de la douche INSTALLATION OVER CERAMIC TILE If your shower door is to be installed over ceramic tile tile should extend completely under both wall jambs Silicone should be used to seal the line where ceramic tile meets the base ENTRETIEN DE LA PORTE DE DOUCHE De temps autre nettoyez la
6. R INSTALLATION STEPS POUR VERRE MENT PARIS POUR VERRE 6mm OR OU ___ SEULEMENT 08 PARIS GLASS ONLY FOR 6mm GLASS ONLY INS RER JOINT LATERAL Etape Step C T JAMBAGE 2 les deux c t s 2 INT RIEUR INSERT SIDE GASKET DE LA DOUCHE WALL JAMB SIDE 2 INTERIOR both sides SHOWER SIDE INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE 2 Heures Hours tape Step CALFEUTRAGE EXT RIEUR RAIL INF RIEUR LE LONG DU JAMBAGE SILICONE EXTERIOR OF BOTTOM TRACK ALONG WALL JAMB PAGE 11
7. STR E EST BAS E SUR DES MURS FINIS D APLOMB ET UNE BASE DE DOUCHE NIVEL E SI CES CONDITIONS NE SONT PAS PR SENT ES VEUILLEZ AJUSTER EN CONS QUENCE AJUSTEZ ET NIVELEZ LE CADRE tape Step TRACEZ LES LIGNES DE REP RE LE LONG DU C T EXT RIEUR DU JAMBAGE ENLEVEZ LE CADRE DE LA BASE ADJUST AND LEVEL THE FRAME ASSEMBLY TRACE OUTER EDGE OF WALL JAMBS REMOVE FRAME ASSEMBLY FROM BASE SUR LES DEUX C T S ON BOTH SIDE PAGE 4 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS tape Step EXTENSEUR 2 RAIL 2 VIS 1 3 8 LG 8 EXPENDER 2 TRACK 2 SCREW 1 3 8 LG 8 tape Step INS REZ LES JAMBAGES TEMPORELLEMENT INSERT WALL JAMBS TEMPORALLY PAGE 3 TAPES D INSTALLATION DE LA PORTE DOOR INSTALLATION STEPS R ALIGNEZ LE JAMBAGE LA LIGNE DE REP RE 2 MARQUEZ LES POINTS DE REP RE DE PER AGE SUIVANT LES AVANT TROUS tape Step PERCEZ LES TROUS EN UTILISANT UNE M CHE APPROPRI E 1 4 REALIGN WALL JAMB WITH REFERENCE LINE 2 MARK DRILLING LOCATION FOLLOWING PILOT HOLES DRILL HOLES BY USING SUITABLE 1 4 DRILL BIT SUR LES DEUX C T S ON BOTH SIDE tape Step INSEREZ LES CHEVILLES 6 ET METTEZ Y UNE GOUTTE DE SILICONE FIXEZ LES JAMBAGES AVEC LES VIS 1 3 8
Download Pdf Manuals
Related Search
Related Contents
Manual Manual de instrucciones l`utilisation et LB 1 - Wacker Neuson 7537型工具 TWM862-R KUDA 085255 holder 入札説明書等に関する質問回答書 Copyright © All rights reserved.
Failed to retrieve file