Home
Manuel d`installation
Contents
1. Produits Neptune SYST ME JETS D AIR WISH WISH AIR JETS SYSTEM Syst me de massage jets d air pour bains en polym re Air jet massage system for polymer bathtubs Manuel d installation Installation manual 6835 RUE PICARD SAINT HYACINTHE QUEBEC J2S 1H3 CANADA TELEPHONE TELEPHONE 450 773 7058 TELECOPIEUR FAX 450 773 5063 SANS FRAIS TOLL FREE 1 888 366 7058 produitsneptune com INSTALLATION SYST ME DE JETS D AIR POUR BAINS EN POLYMERE Produits Neptune INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS AVANT DE COMMENCER L INSTALLATION ASSUREZ VOUS D AVOIR UN ACC S POUR RACCORDER L LECTRICIT EN DESSOUS DU MODULE AINSI QUE L EAU SI VOUS INSTALLEZ DE LA ROBINETTERIE BEFORE STARTING THE INSTALLATION MAKE SURE THAT YOU CAN SUPPLY ELECTRICAL POWER BENEATH THE UNIT AND HAVE WATER ACCESS IF YOU INSTALL THE OPTIONAL FAUCETS 1 DEBALLAGE Ouvrir la boite Ne pas utiliser d objets tranchants 1 1 Retirer d licatement le module de la boite Attention le module est lourd Fig 1 1 UNPACKING 1 1 Open the box Do not use any sharp objects Carefully remove the unit from the box Caution Heavy item Fig 1 Figure 1 2 POSITIONNEMENT DU MODULE 2 1 Placer le module sur le plancher et aligner le trou pr alablement perc sur la baignoire avec le trou du module afin de d terminer la position finale Assurez vous que le module est le plus pr s possible de la bai
2. 8 2 Utiliser la t l commande pour d marrer le souffleur R f rez vous aux instructions du souffleur 8 TESTING OF THE UNIT AND THE AIR SYSTEM 8 1 Turn on the power 8 2 Use the remote control to activate the blower Refer to blower instructions 9 INSTALLATION FINALE 9 1 Inspecter le module et s assurer qu il n y a pas de fuite d air et que toutes les composantes telles que la base le souffleur le manifold les tuyaux et les c bles sont correctement install s et raccord s sans interf rence 9 2 Ins rer le couvercle sur la base Fig 14 9 3 Visser en place les 2 vis blanches fournies en bas de chaque c t du couvercle Fig 15 OPTION DE LA ROBINETTERIE Utiliser des blocs de bois 2 x 4 ou 4 x 4 de chaque c t pour soulever le couvercle et raccorder les tuyaux flexibles de la robinetterie aux valves eau Assurez vous que le couvercle est maintenu en toute s curit afin d viter qu il glisse et qu il brise Fig 16 Inspecter soigneusement afin de s assurer qu il n y a pas de fuites d eau avant d enlever les blocs de bois et remettre le couvercle sa place sur la base 9 COMPLETING THE INSTALLATION 9 1 Inspect the unit for air leaks and make sure that all components such as the plastic base blower manifold piping hoses and cables are properly installed and connected without any interference 9 2 Insert the cover over the unit base Fig 14
3. tre perc s perpendiculairement en utilisant une scie emporte pi ce sur le dessus du couvercle de l ext rieur vers l int rieur L utilisation de ruban masquer sur la zone de per age va 4 4 pr venir d cailler ou de rayer la surface NW 3 REMOVING THE UNIT COVER aie Figure 4 3 1 Remove the two white screws holding the cover and the unit base together Fig 3 3 2 Remove cover from above the unit s base Fig 4 FAUCET INSTALLATION e Refer to the manufacturer s faucet instructions for hole size position and appropriate plumbing Take into consideration the positioning of the faucets and the location of the manifold before drilling the cover Fig 5 e Faucet holes must be drilled perpendicularly using a hole saw on the top of the cover from the finished surface not from the inside Figure 5 The use of masking tape on the drilling area will prevent unwanted surface chipping and scratching Produits Neptune INSTALLATION SYSTEME DE JETS D AIR POUR BAINS EN POLYMERE INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS 4 1 Ins rer les 4 tuyaux a air dans le tuyau de m tal blanc Fig 6 4 2 Ins rer le tuyau de m tal blanc dans l oeillet la base du module Si le tuyau de m tal blanc est trop long et fait plier les tuyaux air vous devez le couper une longueur appro pri e Fig 7 IMPORTANT Pour viter de faire plier les
4. Fig 9 IMPORTANT Pour viter de faire plier les tuyaux air assurez vous de faire un grand rayon avec les tuyaux L installation des tuyaux doit tre faite tel qu illustr afin d viter la r tention d eau Fig 10 Pour faciliter l installation vous pouvez utiliser un peu d eau savonneuse pour lubrifier l extr mit des tuyaux et des sorties du manifold avant de les raccorder Fig 11 CONNECTING AIR HOSES TO THE MANIFOLD Connect the 4 bathtub airlines to the air manifold outlets If the air hoses are too long and kink you may cut them to the appropriate length Fig 9 IMPORTANT To avoid kinking of the air hoses make sure that a nice smooth bending radius is achieved The hose installation must be as shown to avoid water retension Fig 10 To facilitate the installation you can use some soapy water to lubricate the end of the hose and the barbed fitting before connecting it Fig 11 Figure 9 Figure 10 Figure 11 Produits Neptune INSTALLATION SYSTEME DE JETS D AIR POUR BAINS EN POLYMERE INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS 7 INSTALLATION LECTRIQUE 120V Installer un circuit de 120V 60Hz 15A prot g d un interrupteur diff rentiel de d faut de mise la terre G F C I de classe A de la bo te d alimentation principale la bo te de jonction Utiliser un c ble de calibre 14 AWG 14 de 3 conducteur 2 con
5. 9 3 Screw in place the 2 white screws provided on each side of the bottom cover Fig 15 FAUCET INSTALLATION Use wood blocks 2 x 4 or 4 x 4 on each side to lift the cover and connect the faucet flexible water connectors to the supply valves Make sure to maintain the cover safely leveled to prevent rollover and damage Fig 16 Carefully inspect for any water leaks before removing the wood blocks and sliding the cover over the unit s base 7 2 S AN Figure 14 jo Figure 15 ele I Figure 16 Tuyaux en acier tress Steel braided hoses
6. AIN FUSE BOX 7 ELECTRICAL INSTALLATION The electrical installation is subject to inspection and approval by local authorities All electrical connections must be made by a licensed electrician 120V Run a separate 120V 60Hz 15A G F I Class A protected electric circuit from the main fuse box to the junction box Use a 14 gauge AWG 14 wire three conductor wire 2 wires plus ground Refer to the unit rating and local electrical code 7 1 Before beginning installation make sure that electrical power is disconnected at the fuse box 7 2 Drill one hole through the floor beside the unit s base to run the electrical feed wire Do not drill through the plastic base Fig 12 FAUCET INSTALLATION Drill 2 additional holes through the floor for hot cold water supplies Figure 13 7 3 Pass the appropriate wire through the drilled hole on the floor Connect the wire inside the junction box already installed over the blower assembly Using UL CSA approved wire connectors in the junction box Black to black Green to ground White to white Make sure all connections are fastened firmly after wiring is completed Fig 13 7 5 Screw the junction box cover lid back in place 7 4 7 4 INSTALLATION SYST ME DE JETS D AIR POUR BAINS EN POLYMERE Produits Neptune INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS 8 TESTDU MODULE ET DU SYSTEME DE MASSAGE A AIR 8 1 Alimenter le module
7. ancher e Pour les autres surfaces utiliser le bon type de vis et assurez vous que la longueur est appropri e 5 FIXING THE BASE UNIT 5 1 Drill through the 4 pre drilled holes on the aluminum angles of the unit base to drill the floor if needed Fig 8 IMPORTANT Be careful not to damage any water pipes electrical wires and electrical components during drilling through the floor Use appropriate fastening hardware to secure the unit in place For wood based or linoleum floors Use the 4 screws provided e For ceramic or other hard surfaces Use the 4 screws provided but make sure to pre drill holes through the hard surface prior to tightening the screws to the wooden frame of the floor e For any other surfaces use appropriate screws and make sure that the length is appropriate IMPORTANT Soyez prudents lors du positionnement de la base puisque les dimensions du couvercle d passent celles de la base Figure 8 IMPORTANT Be careful when installing the unit s base since the cover dimensions exceed the unit s base INSTALLATION SYSTEME DE JETS D AIR POUR BAINS EN POLYMERE Produits Neptune INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS 6 RACCORDEMENT DES TUYAUX A AIR AU MANIFOLD 6 1 Raccorder les lignes a air de la baignoire aux sorties du manifold Si les tuyaux air sont trop longs et plient vous devez les couper une longueur appropri e
8. ducteurs plus la mise la terre Si la distance entre le baignoire et le panneau lectrique est sup rieur 100 pieds 30 4 m tres L installation peut tre soumise une inspection et a l approbation par les autorit s locales Tous les raccordements lectriques doivent tre faits par un lectricien agr r f rez vous votre code lectrique local 7 1 Avant de commencer l installation assurez vous de couper le courant l alimentation lectrique principale Figure 12 7 2 Percer un trou dans le plancher c t de la base du nf v EDEDESSUS module pour passer le fil d alimentation lectrique ee Ne pas percer dans la base en plastique Fig 12 t OPTION DE LA ROBINETTERIE Percer 2 trous suppl mentaires dans le plancher pour les tuyaux d eau chaude et d eau froide 7 3 Passer le fil lectrique appropri dans le trou du plancher 7 4 Raccorder les fils l int rieur de la bo te de jonction d j install e au dessus du souffleur NOIR BLACK NOIR BLACK 7 4 Utiliser des connecteurs approuv s UL CSA l int rieur de DIANE AEM a la bo te de jonction Noir Noir Vert Mise la terre GROUND Blanc Blanc Assurez vous que les fils sont bien raccord s DELA BO TE une fois le branchement termin Fig 13 D ALIMENTATION DU SOUFFLEUR 7 5 Visser le couvercle de la bo te de jonction en place PRINCIPALE JEEE FROM M
9. gnoire sans toutefois lui toucher Fig 2 K 2 2 Marquer la position sur le plancher OPTION DE LA ROBINETTERIE Avec l option de la robinetterie assurez vous que le module est suffisamment pr s de la baignoire afin que l eau coule dans la baignoire Figure 2 2 POSITIONING OF THE UNIT 2 1 Place the unit on the floor and align the hole of the bathtub with the hole of the unit to determine the final position Make sure that the unit will be located as close as possible to the bathtub without any contact Fig 2 2 2 Mark the position on the floor FAUCET INSTALLATION With the faucet option make sure that the unit is close enough to the bathtub so that the faucet will pour water inside the tub INSTALLATION SYSTEME DE JETS D AIR POUR BAINS EN POLYMERE Produits Neptune INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS 3 ENLEVER LE COUVERCLE DU MODULE 3 1 Retirer les deux vis dans le bas du module qui maintiennent le couvercle et la base ensemble Fig 3 3 2 Retirer le couvercle de la base du module Fig 4 OPTION DE LA ROBINETTERIE e Consulter les instructions du fabricant de robinetterie pour d terminer la grosseur des trous percer la position et la plomberie appropri e Prendre en consid ration le jo positionnement de la robinetterie et du manifold avant de percer le couvercle Fig 5 Figure 3 N e Les trous pour la robinetterie doivent
10. tuyaux air assurez vous de faire un grand rayon avec les tuyaux lorsque vous les raccordez au manifold Fig 10 p 6 4 PASSING THE AIR HOSES INSIDE THE UNIT 4 1 Pass the 4 air hoses through the white metal pipe Fig 6 4 2 Insert the white metal pipe in the unit s base grommet f the white metal pipe is too long and makes the hoses kink you may cut it to the appropriate length Fig 7 IMPORTANT To avoid kinking of the air hoses make sure that a nice smooth bending radius is achieved when connecting them to the manifold Fig 10 p 6 4 INSERTION DES TUYAUX A AIR L INTERIEUR DU MODULE Figure 6 Figure 7 Produits Neptune INSTALLATION SYSTEME DE JETS D AIR POUR BAINS EN POLYMERE INSTALLATION AIR JET SYSTEM FOR POLYMER BATHTUBS 5 FIXATION DE LA BASE 5 1 Si n cessaire percer le plancher en utilisant les 4 trous pr alablement perc s dans les pi ces d aluminium Fig 8 IMPORTANT En percant le plancher faites attention de ne pas endommager les tuyaux a eau et les fils lectriques Utiliser le bon type de vis pour fixer la base au plancher e Pour un plancher en bois ou en linol um utiliser les 4 vis fournies e Pour un plancher en c ramique ou autres surfaces dures Utiliser les 4 vis fournies mais assurez vous de percer pr alablement des trous dans la surface dure avant de visser les vis dans la structure de bois du pl
Download Pdf Manuals
Related Search
Related Contents
Trekstor vibez wired remote control • ESOTERISME Les secrets de la boule de cristal TAFCO WINDOWS NU2-123S-I Installation Guide Comprehensive HDDM-VGAF CodeWarrior Plug-in for Freescale HCS12(X) Device Initialization Acctiva Easy Multicharger 04 / 06 [42,0410,1369] Direction générale Environnement Copyright © All rights reserved.
Failed to retrieve file