Home
MANUEL D`INSTALLATION "HFB-101"
Contents
1. Instruction d installation eakat Instrctions Mod le Model HFB 101 Fabriqu par Manufactured by UTC Canada Corporation Division ICP BASE POUR D BIT HORIZONTAL HORIZONTAL FLOW BASE 2400 tvo industriel Sherbrooke QG Canada NOTE La base pour d bit horizontal mod le HBF 101 doit tre utilis avec la Four naise Centrale Multi Position au Mazout lorsque install en position de d bit horizontal sur un plancher combustible PR CAUTION Le plancher doit tre gal et de niveau Respectez tous mat riaux combustibles tel que sp cifi dans le manuel de la fournaise l huile un d gagement minimum de 1 L ensemble de la base d bit horizontal La base d bit horizontal doit tre fix e sur le panneau de c t qui fera face au plancher Il peut tre fix sur le panneau du c t droit ou gauche de la fournaise au mazout L ensemble de la base d bit horizontal comprend 4 supports en U et 8 vis auto per antes 8 x 22 2 Installation de la base d bit horizontal Positionner les 4 supports en U selon la figure 1 ou 2 en fonction du mod le de fournaise utilis Les vis identifi es avec la lettre Sont d j pr sentes sur le panneau de c t D visser ces vis et installer les supports en U avec ces m me vis install es leur position originale comme indiqu la figure 1 ou 2 Compl ter le montage des supports en U avec une deuxi me vis auto per ante fourn
2. ie avec la base d bit horizontal et identifi e sur la figure 1 ou 2 par Imprim au Canada Printed in Canada NOTE The horizontal flow base model HFB 101 must be used with Multi Position Oil Fired Central Furnaces when installed in the horizontal flow position on a combustible floor CAUTION The floor must be even and level Minimum clearances to combustible mate rials specified in the oil furnace instructions must be respected 1 Horizontal flow base kit The horizontal flow base must be attached to the panel of the oil furnace that will face the floor be it the right or left side panel The horizontal flow base kit includes 4 U shaped supports and 8 self drilling 8 x 2 screws 2 Horizontal flow base installation The location of the 4 U shaped supports must be as per Figure 1 or 2 according to the furnace model installed The screws identified as Jare existing screws on the side panel Remove these screws and screw the U shaped supports as indicated in Figure 1 or 2 with the same screws at their original locations Secure the U shaped supports with a second _self drilling screw identified in Figure 1 or 2 as B supplied with the horizontal flow base 07 06 29 X40006 Rev E Pour les supports de la figure 2 qui non aucune For the supports on Figure 2 that do not have the vis A r f rez vous la figure 2 pour la position screws identified as A positionning of the U exacte des sup
3. ports en U Utiliser les vis shaped supports must be as per Figure 2 Use pour fixer ces supports Assurez vous que les 4 the screws identified as to fix the supports supports en U sont orient s comme illustr la The orientation of the four U shaped supports figure 1 ou 2 must be as per Figure 1 or 2 DNS 1057 Rev A DNS 0188 Rev B
Download Pdf Manuals
Related Search
Related Contents
F4U-1A Corsair - Horizon Hobby Excalibur electronic WR39-RS-CC User's Manual 大阪府化学物質管理制度 届出マニュアル Shindaiwa 62891-94311 Owner's Manual Power-Flo LX™ / Power-Flo II™ Pump Series - Owner`s F 650 GS - BMW Motorrad España König CMP-SPLITVGA30 video splitter f50000 Acidrina Copyright © All rights reserved.
Failed to retrieve file