Home

Maintenance Manual Manuel d`Entretien Manual de

image

Contents

1. Arandela 3 sealing is pressed Washer Tornillo e 7 n DIN 9021 Screw EXTERIOR TORRE Arandela de Acero OUTSIDE Steel Washer INTERIOR TORRE Pared bandeja INSIDE Wall or soil of basin 2 Junta de goma Sealing Fig 4 Anexo I XT zz e S a M A D O D le Fig 5 Anexo I Pag 10 English Ingles Anglais In EWK I 1260 09 and EWK I 1800 09 cases to assembly the cooling tower we will make the same but in this case we will have two plate heat exchanger and pump collecting instead of one 2 2 2 General observation related to cooling tower site Mark 3 2 2 complement Page 10 The location of the cooling tower will be made preferably on a firm base with two possible alternatives a Layout on concrete b Layout on steel support Figure 6 Annex I and figure 7 Annex I show the different possible layouts according to EWK I model As for as concrete layout chose the maximum dimensions equivalent to steel support layout Figure 6 Annex I and figure 7 Annex I show the different dimensions EWK Fran ais French Frances Les figures indiqu es concernent du mod le EWK I 144 09 EWK I 900 09 Le montage des mod les EWK I 1260 09 et EWK I 1800 09 sera r alis de la m me fa on que d crite ant rieurement mais au lieu d un ensemble changeur pompe deux ensembles sont mont s par tour 2 2 2 Sp cificati
2. l changeur de chaleur est constitu de plaques dont les formes cr ent des conduits aux travers desquels s effectuent les transferts de chaleur R sistant la corrosion en inox 316 Tuyauteries de raccordement Les tubes relient les diff rents composants du circuit Ils sont construits dans des mat riaux r sistant la corrosion 2 Manutention montage et raccordements 2 1 Manutention et d chargement Les tours de refroidissement en circuit ferm EWK I peuvent tre fournies selon deux mani res 1 En trois parties modeles EWK I 144 09 EWK I 225 09 EWK I 324 09 EWK I 441 09 EWK I 680 09 EWK I 900 09 Compl ment annexe 2 du point 3 1 page 6 La premi re partie comprend le bassin et l enveloppe la seconde comprend la partie sup rieure et son moto ventilateur la troisi me comprend l changeur et la pompe Pour la manutention et le d chargement de l ensemble changeur pompe fixer une lingue sur l changeur comme indiqu sur la figure 2 Annexe 1 2 En six parties EWK I 1260 09 EWK I 1800 09 models Compl ment annexe 3 du point 3 1 page7 Espa ol Spanish Espagnol Filtro en Y El filtro impide la posible entrada de impurezas dentro del intercambiador Intercambiador de calor El intercambiador de calor esta formado por placas que a su vez forman conductos a trav s de los cuales se realiza la transferencia de calor Resistente a la corrosi n
3. 0J3UO sojnos op s1nojegedos sop juourooe duiesq sopnos op 1nojeredos np 989 AON UOTJESLIISA nd op SISNQ sop juourooe duros UONESII9AJNA op SISNQ SIP ISP ONIN Jnosueyo9 op ofelpu9s uorjoedsug A UE 2818 np Jew e op juSurosueu ourdo1o ep op ISP ONIN Uursseq np ISP ONIN INSSUEU99 9p ISLANAN NO EJ op o e1ouas uorjedsu PANA suone1dO 9LI9S IP N uomo Pag 23 TT II AJH AH or AA AA AA AJH AIA AA AA SIUONLAIIS O IOPEIQUIEIIOJUI 9P UODNIYSNS A10SUoS op ezorduirTq SEUEISJIOd se op ezard ur 83 18359P 9p EPNEJ OJUSIUIEUODUNJ uomeqo duro OLIEPUNOSS 0jmoJr SELIN UODNIYSNS orrepunoes 0319 19 pepronbuejso UQISIAS equioq EJ 9p uorinynsng equioq EI sp 1070W ap peprsusjut 9 ofejpo4 orjuo Jope nuoA op sered op O NSUE uo ne ns y Jope nuoA op sered op ojynsue UODEQOIdWO A10pe tju2A op uorooIns uoreqoaduro Jope nuoA PP SEJEd se op ezorduirg VAJI OJ IS 10J9NP91 PP 3911998 3P PATU 0 juo Jope nguoA PP 1070W op uoroofns uoro eqoaduiro Jope nguoA IOJOUI op peprsuojur 9 o EJJOA pop 0 13uo AOpEJOJ 3P E NAJEA ej op ezordurq UOISIAS opeuoj 3p EJNAJEA ej op ojuarureuor ung 9p UQISIAS Stj08 op 10pe redos op uorongnsng S jo8 op 1ope redos op ezordumrq SE19q0 9p UODNIYSNS S 19q0 9P ezarduimrT Joperquie2 9jur 9p 819093 UODJSdSUJ A ONIY PP EIIEU ep op uornynsng eTopueq EI 3p 0 018 op ezorduirg efopueq ej op eqonp ezardur operquie
4. montage les plaques extr mes fixes et mobiles doivent rester parall les il y aura lieu de mesurer la longueur de serrage en partie haute centrale et basse de chaque c t 3 2 2 Filtre en Y a Desserrer les vis jusqu ce que l obturateur inf rieur soit lib r Voir figure 10 Annexe 1 b Puis extraire et remplacer l l ment filtrant maille c La maille tant remplac e remonter l obturateur sans oublier le joint si le joint est de type m tallique le remplacer car il ne serait plus tanche si il s agit d un joint en caoutchouc il pourra tre r utilis jusqu ce qu il soit d t rior V rifier l tanch it de l ensemble 3 2 3 Pompe de refoulement Compl ment point 5 2 6 Pages 24 et 25 ATTENTION si une op ration d entretien doit tre effectu e sur les pompes elles doivent tre mises l arr t lectriquement a V rifier la consommation du moteur de la pompe Cette op ration sera r alis e de la m me fa on qu indiqu pour le moteur du ventilateur b D montage de la pompe pour d monter d saccoupler les brides des tubulures du circuit secondaire figure 11 1 Annexe 1 et des tubulures d aspiration figure 11 2 annexel et les fixations du support figure 11 3 Annexel1 Espa ol Spanish Espagnol Despu s del montaje de placas o juntas nuevas Durante el montaje el chap n fijo y el m vil deben de permanecer paralelos siendo necesa
5. 2 Manipulaci n montaje y conexi n 2 1 Manipulaci n y descarga 2 2 Montaje y emplazamiento 2 2 1 Montaje de las torres 2 2 2 Observaciones generales para el emplazamiento de las torres 2 3 Conexionado de la torre 3 Mantenimiento 3 1 Mantenimiento general 3 2 Tareas de mantenimiento 3 2 1 Intercambiador 3 2 2 Filtro en Y 3 2 3 Bomba de impulsi n 4 Investigaci n de aver as EWK Pag 3 English Ingles Anglais Annex I Cooling Tower EWK I Every time EWK I cooling tower model will be consider as open circuit cooling tower plus plate heat exchanger 1 Description and design features 1 1 Tower components Figure 1 Annex I shows the main components that are included in type EWK I towers 20 Aspiration pipe 21 Centrifugal pump 22 Impulse pipe 23 Y filter 24 Plate heat exchanger 25 Header The rest of the components could be found in EWK maintenance manual Page 2 1 2 Operating principle Mark 2 2 complement Page 3 In type EWK I towers the heat rejection from the process is exchanged on the plate heat exchanger having heat transfer and not mass transfer 1 3 Type of design Mark 2 3 complement Page 3 The design features of the different elements composing EWK I cooling towers are Secondary circuit pump This is a centrifugal pump with a hydraulic spiral shells The pump is driven by an alternating current electric motor The p
6. 39jur op ezorduirTq 9 1103 EJ 3p U19U98 uoro adsug NY YH MN PEARCE Aci 9LI9S IP N JUMI I AMA UODEJLSLIJSY IP SILO OJUSIUIUSJUEU 9 0 1 UO Pag 24 EWK EWK Equipos de Refrigeraci n S A CIF A83 090431 Ps de la Castellana 163 10 D 28046 MADRID Tlf 34 91 567 57 00 Fax 34 567 57 86 e mail ewk ewk eu www ewk eu Cooling towers amp Reg N 13921 Tours de refroidissement Reg N2 SQS 13921 Torres de refrigeraci n
7. J OA AU JO o3u0 SATBA WOP SU JO Surueo pue Surq29u SATEA Sui U 24 JO uoge1edo y JO SUNJOY 1OJEUIUAI O yup ou SUNNINSQNS Jojeuruimo Jp ou JO SUIUEO J So zzou au SUNNIIIS NS 9 zzou 24 JO SUIUROJ JISULBYIXO jeu oje d OU Jo SUTUBITO 19319 WOJ JOURS juauroov dosq IY M JO SUIUROJ SUIUSNJ pue surueo o urseq ou Jo Sunoojo Jogueuoxo JEY oje d ay JO Suruea o ODUELIOJJOd DY JO ADMI EJ9A CE O SZ O A NEO A A A A A A A AM pouroj rad suoreod 19quinw ELISS IQUIOJSN 4940 SUI 009 J Y MH JO 01JU09 SOUBUSJUICIN Pag 22 Es M EPA lt Jo AAA OOOO I SSS AA 4AA AA A9 A9 A9 AJA AA AA A9 AA ADA EMMA 3U3UIGSSIDIO IJ21I IP SANO SIP uaroa nugg op 2101007 SUOntAJ9sqO INISULYI9 9p juw w dwy oL 9p Aded np ISP ONIN souuorsIod SIP ISP ONIN odwod v IP 11q9p np 19 Juswouuonouoj np uoneagroA 9Jrepuooes Pnn np SAJN NqN sop uow dwy 9Jrepuooes JTNOJIO np IITSYIULIS 9p UONBIYIOA eduiod ej ap juswosejdwoy oduod e op majou np oyrsuojur op 3o uorsuoj LJ op 2 QJ UOJ MALU np so ed sop IJSUL 9p ISPLSIA INUA np so ed sop o Suev op o QJ UOJ Jnoje nuoA np uonexy vj op uOne2gro A Jnoje nuoaA np SILA SIP S8EAOJJSN JUOS9I rs IMIJINPII np s Iny p NESAIU np UOHEOHIIS Jnoje nuoA OJOU np UONPXY EJ 9p VONPIYITS A JNIJE NUIA 0J0W np 9JISUIJUT op 19 UOISUA EJ op IJONUOD MOP np JUSWIQUUOTJOUO np AQU n 2 p jurodde p ouueA vj op jusureuuorjouo np o
8. Maintenance Manual Manuel d Entretien Manual de Mantenimiento EWK I Closed Circuit Towers Tours Ferm es Torres Cerradas http www ewk eu EWK Pag 1 English Ingles Anglais 1 Description and design features 1 1 Tower components 1 2 Operation principle 1 3 Type of design 2 Handling assembling and connecting the elements 2 1 Handling and unloading 2 2 Assembling and erection on site 2 2 1 Assembly of tower 2 2 2 General observations related to tower sites 2 3 Tower connections 3 Maintenance 3 1 General 3 2 Maintenance tasks 3 2 1 Plate heat exchanger 3 2 2 Y filter 3 2 3 Centrifugal pump 4 Troubleshooting Pag 2 Fran ais French Frances 1 Description et caract ristiques de construction 1 1 Composants de la tour 1 2 Principe de fonctionnement 1 3 Construction 2 Manutention montage et raccorde ments 2 1 Manutention et d chargement 2 2 Montage et positionnement 2 2 1 Montage des tours 2 2 2 Observations g n rales concernant le positionnement des tours 2 3 Raccordements de la tour 3 Entretien 3 1 Entretien g n ral 3 2 Taches d entretien 3 2 1 Echangeur 3 2 2 Filtre en Y 3 2 3 Pompe centrifuge 4 Recherche de pannes Espa ol Spanish Espagnol 1 Descripci n y caracter sticas de construcci n 1 1 Componentes de la torre 1 2 Principio de funcionamiento 1 3 Forma de construcci n
9. ada como torre de refrigeraci n abierta mas intercambiador de calor 1 Descripci n y caracter sticas de construcci n 1 1 Componentes de la torre En la figura 1 Anexo I pueden apreciarse los elementos que completan la torre tipo EWK I 20 Tubo de aspiraci n 21 Bomba centrifuga 22 Tubo de impulsi n 23 Filtro Y 24 Intercambiador de calor 25 Colector de entrada El resto de posiciones podr n encontrase en el manual de torres abiertas EWK P g 2 1 2 Principio de funcionamiento Complemento al punto 2 2 P g 3 En la torre EWK I el intercambio de calor procedente del proceso se realiza dentro del intercambiador de placas produciendo una transferencia de energ a y no de masa 1 3 Forma de construcci n Complemento al punto 2 3 P g 3 Las caracter sticas constructivas de los diferentes elementos que componen las torres de refrigeraci n EWK I son Bomba del circuito secundario La bomba del circuito secundario es centrifuga de cuerpo espiral accionada por un motor el ctrico de corriente alterna La bomba dispone de conexiones para el llenado y medici n de la presi n EWK Fig I Anexo I Pag 5 English Ingles Anglais Y filter Y strainer installed in
10. allo en la bomba de impulsi n e Ventilador desequilibrado por ensuciamiento o desperfectos e Aver a en los cojinetes Fallo en la bomba de impulsi n Bomba averiada V lvulas de cierre cerradas Rejilla de aspiraci n obstruida Filtro en Y obstruido Defecto en el sistema de pulverizaci n Nivel de agua demasiado baja la bomba aspire aire e Obstrucci n o desorientaci n de las toberas Fallo en el circuito secundario The cooling tower decreases La puissance de refroidissement descend La capacidad de enfriamiento es baja The fan is not impelling air Le ventilateur n impulse pas d air El ventilador no impulsa aire Abnormal noises are heard Pr sence de bruits anormaux Aparici n de ruidos anormales Vibrations Vibrations Vibraciones Secondary circuit defective Panne dans le circuit secondaire Defecto en circuito secundario The water is not falling in an uniform way in the collecting basin L eau ne tombe pas uniform ment sur le bassin No cae agua uniformemente en la bandeja Pag 21 Lg b L L dj d RRA edid JmoaJ9 amp repuooss ayy Surnjsqns HJOQUUO9 JoJo repuooeos UI SSIUJYST IOJEM JIMI dund ou Sugnysqns ojow dund ayy jo JUIN pue 98EJJOA SU JO OIJUOJ S9P q UR Jo o SUE UONE NSOY Sope q uey JO o gue JIM UEJ SU JO SUIUSJSEJ FIYI Sope q JO SULUBIJO pony Jr 1eonpor ur 943 IO JO O 33U0 3UurUuojsvj IOJOU UEJ oui JO SUI DSY 19919 UB 943 JO JUSLINO pue 98E
11. ause Cause Possible Fran ais French Frances 4 Recherche de pannes Clogging of the plate heat exchanger Air temperature higher than design Clogging or deposits in water circuits Strange bodies in air circulation area due to fouling or ice formation No free air circulation Failure in fan regulation Failure in impulse pump Leaks in the circuit Clogging of the Y filter Electric motor not running Wrong direction of rotation Failure in the regulation Failure in the motor set Failure in the reducer During the switching at low revolutions the time relay is not correctly regulated for the fan motor Failure in the impulse pump Unbalanced fan due to fouling or failure Failure in bearings Failure in the impulse pump Defective pump Shut off valves closed Solution grill clogged Clogged Y filter Defective spraying system Water level to low the pump sucks air Clogging or incorrect orientation of nozzles Failure in the secondary circuit Pag 20 Encrassement de l changeur plaques Temp ratures d air sup rieures celles s lectionn es Encrassements en d p ts dans le circuit hydraulique Corps trangers dans la zone de circulation d air encrassement ou formation de glace La circulation d air est emp ch e Panne de r gulation du ventilateur Panne de la pompe de refoulement Fuite sur le circuit secondaire Encrassement du filtre en Y Le moteur est arr t Le sens de
12. bain dans un produit appropri NOTA ne jamais utiliser de brosse m talliques grattoirs ou quivalent On pourra employer un nettoyeur haute pression mais avec pr cautions et jamais avec adjonction d abrasif c Avant de remonter les plaques il est conseill d appliquer une graisse de silicone dans le logement du joint afin d viter qu il ne se colle la plaque contigu facilitant ainsi un futur d montage En vue du remontage il y a lieu de v rifier chaque plaque et joint avec soin Les plaques doivent tre propres et les joints ne doivent contenir aucune substance ou particule pouvant affecter l tanch it de l quipement Un grain de sable sur un joint peut provoquer une fuite pendant le fonctionnement de P quipement Espa ol Spanish Espagnol Nota La periodicidad de estas tareas de mantenimiento podr variar dependiendo de la calidad del agua y del aire 3 2 Tareas de mantenimiento 3 2 1 Intercambiador a Para abrir el intercambiador debemos aflojar los pernos de manera uniforme manteniendo dos de ellos diagonalmente opuestos apretados Despu s de soltar todos los pernos empujar el chap n m vil hasta la columna soporte Las placas deben separarse con cuidado de forma que las juntas no se despeguen y procurando mantener el orden de las mismas lo cual facilitar el posterior montaje Fig 9 Anexo I b Las placas deben de limpiarse con un cepillo blando y un producto adec
13. calidad INOX 316 1 Tuber as de conexi n Los tubos conectan las distintas partes del circuito Est n fabricados en materiales resistentes a la corrosi n 2 Manipulaci n montaje y conexi n 2 1 Manipulaci n y descarga Las torres de refrigeraci n de circuito cerrado EWK I pueden ser suministradas de dos maneras diferentes 1 En tres partes modelo EWK I 144 09 EWK I 225 09 EWK I 324 09 EWK I 441 09 EWK I 680 09 EWK I 900 09 Complemento al apartado 2 del punto 3 1 P g 6 La primera parte consta de bandejaenvolvente la segunda consta de caperuzagrupo motor y la tercera consta del conjunto intercambiador bomba Para la manipulaci n y descarga del conjunto intercambiador bomba enganchar una eslinga al intercambiador de calor de la manera indicada en la figura 2 Anexo I 2 En seis partes modelo EWK I 1260 09 EWK I 1800 09 Complemento al apartado 3 del punto 3 1 P g 7 La quinta y sexta parte constan ambas de un grupo intercambiador bomba Fig 2 Anexo I EWK Pag 7 English Ingles Anglais For the handling and unloading of the collecting PHE pump hook a sling on the plate heat exchanger as show the picture number 2 Annex I 2 2 Assembly and erections on site 2 2 1 Assembly of towers Mark 3 2 1 complement Page 7 When the mark 3 2 have finished we assembly the plate heat exchanger and the pump collecting together with the cooling tower The assemb
14. d eau 2 La tubulure d aspiration sera mont e tel qu indiqu sur la figure 3 annexe 1 en reliant la sortie de la tour l aspiration de la pompe Le raccordement de la bride du tube d aspiration devra tre r alis selon la figure 4 Annexe 1 3 Le tube de refoulement qui relie la sortie de la pompe l entr e de l changeur sera normalement install en nos usines dans le cas contraire il faudra le monter selon la figure 3 Annexel 4 Enfin il faudra installer le collecteur sur la partie sup rieure de la tour selon les indications de la figure 5 Annexe 1 pour relier la sortie de P changeur de chaleur l entr e de la tour Espa ol Spanish Espagnol Para la manipulaci n y descarga del conjunto intercambiador bomba enganchar una eslinga al intercambiador de calor de la manera indicada en la figura 2 Anexo I 2 2 Montaje y emplazamiento 2 2 1 Montaje de las torres Complemento del punto 3 2 1 P g 7 Una vez realizado en su totalidad el punto 3 2 procederemos al ensamblaje del grupo intercambiador bomba con la propia torre El montaje se realizar de la manera siguiente 1 Deber situarse en conjunto intercambiador bomba en el lateral de la torre en el cual se encuentren los tubos de distribuci n 2 El tubo de aspiraci n se instalar tal y como se muestra en la figura 3 Anexo I conectando la salida de la torre con la entrada de la bomba La conexi n de la b
15. e necessary to measure the assembling on the top and the bottom on both sides 3 2 2 Y filter a By opening the filter cap the bolts have to be loosened Figure 10 Annex I b After that the strainer has to take out and replace for a new one c Once time the strainer is removed and replaced install again the Y filter tap in case that this joint was made of steel otherwise if the joint is made of rubber we could keep the joint until we could observe some kind of degradation screwing until hold back the Y filter 3 2 3 Impulse pump Mark 5 2 6 complement Page 24 and 25 WARNING The main switch must be disconnected before attempting any work to the impulse pump a Checking the electric motor consumption of the pump This operation may be performed in a similar fashion to that explained in fan motor b Dismounting the impulse pump To dismount the impulse pump disconnects the flanges of the secondary circuit pipe figure 11 1 Annex D of the suction pipe figure 11 2 Annex I and the bedplate fastening figure 11 3 Annex D Pag 18 Fran ais French Frances Les plaques devront tre remont es exactement comme elles l taient avant leur ouverture La face comportant le joint doit tre orient e vers la plaque extr me fixe Il est recommand de proc der un nouveau serrage apr s un temps de fonctionnement de P changeur ou apr s un changement de plaques ou de joints Pendant le
16. et pipe mark 1 Figure 8 Annex I b Connection of the outlet pipe mark 2 Figure 8 Annex I 3 Maintenance 3 1 General Mark 5 1 complement Page 19 In case the cooling tower is going to be out of service for a long time take the following precaution 1 Inspect the condition of fill drift eliminator and plate heat exchanger 2 Remove renew the strainer from the Y filter Each time we remove the strainer we will renew the joint from the Y filter in case that this joint was made of steel otherwise if the joint is made of rubber we could keep the joint until we could observe some kind of degradation The maintenance and periodicity of revisions to be made in the tower are limited to the following operations Inspect the plate heat exchanger Clean the plate heat exchanger Clean Y filter Clean the secondary connection pipes Check centrifugal pump parameters Pag 14 Fran ais French Frances 2 3 Raccordements de la tour Compl ment point 3 3 Page 13 Le raccordement de la tour se r alisera dans l ordre suivant a Raccordement de la tubulure d entr e point 1 figure 8 Annexel b Raccordement de la tubulure de sortie point 2 figure 8 Annexel 3 Entretien 3 1 Entretien g n ral Compl ment point 5 1 Page 19 ci dessus S1 la tour n est pas utilis pendant une longue p riode les mesures suivantes seront prises 1 V rifier l tat du packing d
17. giration du ventilateur est incorrect Panne de r gulation Avarie du moteur Avarie du r ducteur Temporisation du relais de passage GV PV mal r gl e Panne de la pompe de refoulement Ventilateur d s quilibr par encrassement ou d t rioration Paliers ou roulements endommag s Panne de la pompe de refoulement Pompe endommag e Vannes d isolement ferm es Grille d aspiration encrass e Filtre en Y obstru D faut dans le syst me de pulv risation Niveau d eau trop bas la pompe aspire de l air Obstruction ou mauvaise orientation des buses de pulv risation Panne du circuit secondaire Espa ol Spanish Espagnol 4 Investigaci n de aver as Posibles Causas EWK Failure Panne Fallo e Incrustaciones calc reas en la parte interior del intercambiador de calor Temperatura del aire superior al valor de proyecto Ensuciamiento y dep sitos en los circuitos de agua Cuerpos extra os en la zona de circulaci n del aire por ensuciamiento o formaci n de hielo e No existe circulaci n libre de aire e Fallo en la regulaci n del ventilador Fallo en la bomba de impulsi n Fugasen el circuito secundario Ensuciamiento del filtro en Y No funciona el motor e Sentido de giro incorrecto Fallo en la regulaci n e Aver a en el conjunto del motor e Aver a en el reductor Al conmutar a revoluciones mas bajas rel de tiempo mal regulado para el motor ventilador F
18. ly will make as follow 1 The previous joint will be placed near the cooling tower in the side that found the inlet distribution pipes 2 The aspiration pipe will be installed as picture 3 Annex I connecting the cooling tower outlet and the pump To install the flange follow the assembly instructions steps as show the picture 4 Annex I 3 The driving pipe leave our factory installed if not you have to install the driving pipe to connect the outlet pump with the plate heat exchanger as show the picture 3 Annex I 4 Finally you have to install the main header as show the picture 5 Annex I to install the plate heat exchanger outlet with the cooling tower inlet The pictures are faithful to EWK I model from EWK I 144 09 to EWK I 900 09 Pag 8 Fran ais French Frances Les cinqui mes et sixi mes parties comprennent toutes les deux un ensemble changeur pompe Pour la manutention et le d chargement de l ensemble changeur pompe accrocher une lingue sur l changeur de chaleur de la mani re indiqu e sur la figure 2 Annexe 1 2 2 Montage et mise en place 2 2 1 Montage des tours Compl ment du point 3 2 1 Page 7 Le point 3 2 tant r alis on proc dera l assemblage de l ensemble changeur pompe avec la tour Le montage s effectuera de la mani re suivante 1 L ensemble changeur pompe sera positionn du c t de la tour o sont situ s les tubes E S
19. ons g n rales concernant la mise en place des tours Compl ment du point 3 2 2 Page 10 La mise en place de la tour sera r alis e sur un support solide selon les alternatives suivantes a Mise en place sur un sol en b ton b Mise en place sur un support m tallique Les mises en place possibles selon les mod les de tours sont indiqu es sur les figures suivantes Figure 6 Annexe 1 et figure 7 Annexel En ce qui concerne le support en b ton ils devra avoir pour dimensions les cotes hors tout du support m tallique quivalent son mod le de tour Les dimensions sont indiqu es sur les figures 6 Annexe 1 et figure 7 Annexe 1 Pag 11 Espa ol Spanish Espagnol El montaje en los modelos EWK I 1260 09 y EWK I 1800 09 se realizara del mismo modo descrito anteriormente pero en lugar de tener un solo grupo intercambiador bomba disponen de dos grupos intercambiador bomba 2 2 2 Observaciones generales para el emplazamiento de las torres Complemento del punto 3 2 2 P g 10 El emplazamiento de la torre se realizara preferentemente sobre piso firme con dos posibilidades alternativas a Disposici n sobre cemento b Disposici n sobre soporte met lico Las posibles disposiciones seg n el modelo de torre se muestran en las figuras siguientes Figura 6 Anexo I y figura 7 Anexo I En cuanto al apoyo sobre soporte de cemento este deber tomar las dimensiones m ximas del so
20. porte met lico equivalente a su modelo de torre Las dimensiones se podr n obtener de las figuras 6 Anexo I y figura 7 Anexo I Pag 12 EWK Fig 7 Anexo I PERFILES MODELO A B c D 1 2 3 4 5 EWK I 144 330 1725 565 1080 IPE 160 IPE 160 IPE 160 IPE 160 EWK 225 350 2060 620 1480 IPE 160 IPE 160 IPE 160 IPE 160 IPE 160 EWK I 324 410 2440 640 1800 HEB 160 IPE 160 IPE 160 IPE 160 HEB 160 EWK I 441 482 5 2650 630 2020 IPE 180 IPE 180 IPE 180 IPE 180 IPE 180 Fig 6 Anexo I 330 340 330 g 8 8 8 3 m 5 Y Y E Y R Le gt PE 240 E 3 weno aj R R22 O E LE _R _ 3 sa 8 we 240 Em g Il 3 EWK 1 680 1080 HEB 240 8 iie EWK I 680 EWK 1900 EWK 1 144 EWK 900 EWK I 800 EWK 11260 re ala aba d i a Il Pag 13 English Ingles Anglais 2 3 Cooling tower connections Mark 3 3 complement Page 13 The cooling tower connections will be made in the following order a Connection of the inl
21. que se cambie la malla la junta de estanqueidad del filtro deber ser sustituida por una nueva en caso de que sea met lica por el contrario si se trata de una junta de goma podremos mantenerla hasta que sea apreciable su degradaci n El mantenimiento y la periodicidad de las revisiones a realizar se limitan a las siguientes Operaciones Inspecci n general del intercambiador X X Limpieza del intercambiador X X AJ Limpieza del filtro en Y X X 92 Limpieza de conexiones circuito secundario X X Par metros funcionamiento bomba secundaria X X SALE English Ingles Anglais Note The period for these maintenance tasks may change depending on the quality of water and air 3 2 Maintenance tasks 3 2 1 Plate heat exchanger a By opening the plate heat exchanger the bolts have to be loosened equally that the follower shall have a straight moving by opening The last distance of the opening can be made by 2 bolts After that the follower is pulled back towards the column b The plate heat exchanger is separated and the plates are pulled from each other Use a soft brush and a qualified cleaning material for cleaning the plates If the cover is thick from scale or organic material the plates are put in a vat with a qualified cleaning material NOTE Wire brush sandpaper metal scraper must not be used Neither the plates nor the gasket can bear heavy handed robust treatments A high pressure cleaner can be used bu
22. rida del tubo de aspiraci n deber instalarse seg n la figura 4 Anexo I 3 El tubo de impulsi n que conecta la salida de la bomba con la entrada del intercambiador saldr instalado de nuestra f brica en caso contrario se deber instalar seg n muestra la figura 3 Anexo I 4 Por ultimo se deber instalar el colector en la parte superior de la torre tal y como se muestra en la figura 5 Anexo I con el fin de conectar la salida del intercambiador de calor y la entrada a la torre cerrando as el circuito Las figuras mostradas son fieles a los modelos EWK I 144 09 EWK I 900 09 EWK Pag 9 i e e CJ a d V CJ A CJ W o TAR ASS GE INU m TUBO DE ASPIRACION ASPIRATION PIPE Fig 3 Anexo I Instrucciones de montaje Brida EM Flange 6 Para el montaje final las superficies A deben ser recubiertas Arandela BULTE con componente sellador PUR Sikaflex 11 FC BULTE Washer DETALLE ESCALA 1 2 n DIN 125 Los tornillos deben apretarse lo suficiente incluso con llave dinamometrica hasta que la junta quede presionada Assembly instructions At final assembly surfaces A must be coated with PUR Y sealing compound Sikaflex 11 FC 4 5 Tera Screws must be tightened evenly with dynamometric key until Nut
23. rio medir la longitud de apriete en la parte superior en el centro y en la parte inferior de ambos lados 3 2 2 Filtro en Y a Deber n aflojarse los tornillos hasta que la tapa inferior quede libre V ase en la figura 10 Anexo D b Posteriormente procederemos a extraer y sustituir la malla que se aloja en su interior por otro igual c Una vez repuesta la malla nueva deberemos instalar de nuevo la tapa sin olvidar la junta en caso de que la junta sea met lica esta deber ser sustituida por una nueva debido a que no ser estanca si se trata de una junta de goma esta se podr reutilizar hasta que se encuentre desgastada apretando los tornillos hasta que el conjunto sea estanco 3 2 3 Bomba de impulsi n Complemento del punto 5 2 6 P g 24 y 25 ATENCI N Si se van a realizar trabajos en la bomba de impulsi n se debe desconectar el interruptor principal a Comprobar el consumo del motor de la bomba de impulsi n Esta operaci n se realizar de manera an loga a lo indicado para el motor del ventilador b Desmontaje de la bomba de impulsi n para desmontar la bomba de impulsi n desacoplar las bridas de la tuber a del circuito secundario figura 11 1 Anexo I y del tubo de aspiraci n figura 11 2 Anexo I y las sujeciones de la bancada figura 11 3 Anexo I EWK Fig 10 Anexo I Fig 11 Anexo I Pag 19 English Ingles Anglais 4 Troubleshooting Possible C
24. secondary circuit piping to reduce possible contamination of the plate heat exchanger Plate heat exchanger The plate heat exchanger is made with plates those plates create channels inside the PHE where the heat reject 1s transferred The plates are made of stainless steel AISI 316 Secondary circuit piping The pipes connect the different parts of the secondary circuit Those are made of corrosion proof materials 2 Handling assembling and connecting the elements 2 1 Handling and unloading In type EWK I towers can be supplied in two different ways 1 In three parts EWK I 144 09 EWK I 225 09 EWK I 324 09 EWK I 441 09 EWK I 680 09 EWK I 900 09 models Mark 3 1 section 2 complement Page 6 The first part have basin middle casing and the second one have top casing together with motor and fan and the third one have the pump and the plate heat exchanger For the handling and unloading of the collecting PHE pump hook a sling on the plate heat exchanger as show the picture number 2 Annex T 2 In six parts EWK I 1260 09 EWK I 1800 09 models Mark 3 1 section 3 complement Page 7 The fifth and sixth parts both have plate heat exchanger and pump collecting Pag 6 Fran ais French Frances La pompe dispose de raccordements permettant le remplissage et la mesure de pression Le filtre en Y emp che l entr e d impuret s dans l changeur Echangeur de chaleur
25. t with absolute care and never add abrasives c The plates and the gaskets are checked carefully before mounting the plates have to clean the gaskets to be without fatty substance and other uncleanness A grain or sand on the gasket can cause leakiness during running and damage of gaskets The gaskets always have to be turned towards the head of the plate heat exchanger If the gaskets have been changed or the plate heat exchanger has just been delivered the plate heat exchanger is assembled according to the minimum measure stated on the name plate The plates must be installed in the same order that we removed Pag 16 Fran ais French Frances Nota La p riodicit des taches d entretien pourra varier selon la qualit de l eau et de l air 3 2 Taches d entretien 3 2 1 Echangeur a Pour ouvrir l changeur desserrer les boulons uniform ment en conservant deux d entre eux diagonalement oppos s serr s Apr s avoir d mont tous les boulons pousser la plaque extr me mobile vers la colonne support Les plaques doivent tre s par es pr cautionneusement afin de ne pas d coller les joints et en prenant soin de conserver l ordre de montage initial ce qui permettra le remontage ult rieur Fig 9 Annexe 1 b Les plaques devront tre nettoy es avec une brosse tendre et un produit appropri Dans le cas d incrustations importantes de mati res organiques le nettoyage s effectuera par un
26. u s parateur de gouttes et de l changeur de chaleur 2 D monter et remplacer la maille du filtre en Y chaque changement de maille changer galement le joint d tanch it s il s agit d un joint m tallique Si il s agit d un joint en caoutchouc il ne sera chang que si n cessaire L entretien et la p riodicit des op rations r aliser se limitent aux op rations suivantes Op rations d entretien V rification g n rale de l echanger Nettoyage de l echangeur Nettoyage du filter en Y Nettoyage des raccordements du circuit second V rifications des parameters de la pompe EWK Espa ol Spanish Espagnol 2 3 Conexionado de la torre Complemento del punto 3 3 P g 13 El conexionado de la torre se llevara a cabo en el orden siguiente a Conexi n de la tuber a de entrada punto mi 1 Figura 8 Anexo I b Conexi n de la tuberfa de salida punto 2 Figura 8 Anexo I 3 Mantenimiento 3 1 Mantenimiento general Complemento del punto 5 1 Pag 19 en adelante Cuando la torre se deje fuera de servicio durante largo tiempo tomar las siguientes precauciones 1 Inspeccionar el estado del relleno del separador de gotas y del intercambiador de calor 2 Desmontar y renovar la maya del filtro en BART Y Cada vez
27. uado En el caso de grandes incrustaciones con materia org nica podemos proceder a la limpieza sumergiendo las placas en un ba o con un producto adecuado NOTA No utilizar cepillos met licos rascadores o similar Podemos usar un limpiador a alta presi n pero con precauci n y nunca con adici n de abrasivos c Antes del montaje de las placas es aconsejable aplicar grasa de silicona en el reverso del alojamiento de la junta para evitar que la misma se pegue a la placa contigua facilitando una posterior apertura Para el posterior montaje debemos comprobar con cuidado todas las placas y sus juntas Las placas deben de estar limpias y las juntas no deben contener sustancias o part culas que puedan influir en la estanqueidad del equipo Un peque o grano de arena en las juntas puede producir una fuga durante el funcionamiento del equipo Las placas deben de montarse exactamente igual a como estaban antes de su apertura La cara con junta de las placas debe ir orientada siempre hacia el chap n fijo Se recomienda hacer un apriete final a la medida m nima despu s de un tiempo de funcionamiento del intercambiador o bien EWK At start up A la mise en marche A la puesta en marcha Semi annual Semestrel Semestral Yearly Anuel Anual Paragraph Point Apartado Monthly Mensuel Mensual Pag 17 English Ingles Anglais During the assembling the head and the follower have to be parallel It is therefor
28. ump has connections for filling and for pressure measurement Pag 4 Fran ais French Frances Annexe 1 Tours de refroidissement EWK I A toutes fins la tour de refroidissement mod le EWK I sera trait e comme une tour de refroidissement ouverte plus changeur de chaleur 1 Description et caract ristiques de construction 1 1 Composants de la tour Sur la figure 1 Annexe 1 on peut voir les l ments qui compl tent la tour de type EWK I 20 Tubulure d impulsion 21 Pompe centrifuge 22 Tubulure d impulsion 23 Filtre en Y 24 Echangeur de chaleur 25 Collecteur d entr e Le reste des composants pourront tre trouv s dans le manuel de maintenance des tours EWK page 2 1 2 Principe de fonctionnement Compl ment point 2 2 page 3 Dans la tour EWK I l change de chaleur composante du process s effectue gr ce l changeur plaques qui r alise un transfert d nergie et non un transfert de masse 1 3 Construction Compl ment point 2 3 page 3 Les caract ristiques constructives des diff rents l ments qui composent les tours de refroidissement EWK I sont Pompe du circuit secondaire la pompe du circuit secondaire est de type centrifuge corps spiral command e par un moteur lectrique courant alternatif Espa ol Spanish Espagnol Anexo I Torres de Refrigeraci n EWK I A todos los efectos la torre de refrigeraci n modelo EWK I ser trat

Download Pdf Manuals

image

Related Search

Related Contents

Proctor-Silex Coffeemaker 48575 User's Manual  landscape lighting kit ensemble pour éclairage de jardin  Manuel d`utilisation de LOTAS RCP 2014 version 3.0.0.0  PAA PAA50F-3 と PBA50F  italiano - Tecno-Gaz  FATS User Manual - Innovation Data Processing  Volkswagen    Tristar KR-2156 portable vacuum cleaner  取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file