Home

Installation Instructions

image

Contents

1. N ii LIMIT S LE Jumper RED YELLOW BLUE HUMIDIFIER BLACK WHITE RIELLO SWITCHING PRIMARY D x LIMIT SENSOR CONTROL a SUB BASE 2 4 d d EN BLACK d a m PRIA CIRCULATING SER rar j os ere ON7 2 BLOWER CONSTANT LOW A AN WHITE 3 Ki k2 SPEED SWITCH Pu NE THERMOSTAT ELECTRONIC FAN TIMER A STANDARD HEAT COOL WIRING DIAGRAM WITH ELECTRONIC FAN TIMER WHEN HEATING amp COOLING SPEED ARE THE SAME
2. PRIMARY CONTRO DC NA la LIMIT SENSOR AN NO Y WAN IL W PRIM CIRCULATION CIRCULATING ASA CONTROL FAN RMOSTAT a K3 1277 3 d on N SALVE SON ENE THERMOSTAT PRIMARY par ELECTRONIC FAN TIMER DARD HEAT COOL WIRING DIAGR WITH ELECTRONIC F WHEN HEATING amp COOLING SPEED ARE THE REMOVE J d AN CT RED WIRE TO THE HEAT HEN DIFFERENT HEATING amp COOLING EED ARE REQUIRE NSTRUCTION MANUAL ALS ONLY OIL PRIMARY CONTROL EQUIPPED WITH VALVE ON DELAY PRE PURGE R P OR U USE CONST IGNITION ONLY NEVER USE THE INTERRUPTED IGNITION AND OR THE BLUE WIRE ON R7184 CONTROL USE ONLY R WIRE HUMIDIFIER REMOVE THE DUMMY TERMINAL MARKED HU ELECTRONIC AIR CLEANER REMOVE THE DUMMY TERMINAL MARKEO SL ain614 J uinq 994939 INGD weibeip BULIAA L EN FRAN DISCONNECT ON HO
3. TAT ei PRIMARY CONTROL K3 THERMOS REMOVE JUMPER REFER TO INSTR USE ONLY COP AND CO UCTION NECT RED WIRE TO THE HEAT TERMINAL WHEN DIFFERENT HEATING A NUAL ALSO An LU ELECTRONIC FAN TIMER WHEN HEATING amp COOLING SPEED ARE TH OLING TROL ELECTRICAL CONNECTION MANDATORY DIRECT VENT APPLICATION BLOWER SPEED ARE REQUIRED ONLY RMINAL MARKED HE DUMMY TE A 90 Sec BLOWER ON DELAY DEPEND OTHER CON el ain614 douinq ofiary Wa Weibeip BUHIM Figure 14 Parts list CBMAAA036105 N 850067 Rev B 20 Table 9 Parts list CBMAAA036105 Se CO TEN Rear Panel Insulation D Rear Baffle I ra tr tate n Side Panel Insulation eS ee es BO1679 01 RightLateralBaffle ii OOOO Latch Assembly Female JO A Front Divider Panel Assembly Front Panel Insulation A A re RO2ROO3 High Limit 195 307 n B01214 Flue Cover Gasket ET x 501697 SmokeBox ES oo HexagonalFlange Nut 3 8 16NC Brass Hexagonal Nut 3 8 16 NC Zinc PO B r OOOO 7 m PRES ES alado ro ole vinj O s oo Recessed Handle Black
4. ESAS CN6 8 Y RI VA n Z CIRCULATION i GCI O WA CAD C I CIRCULA ss EAC ato THERMOSTAT PSR d kep Ne N Dji K A ELECTRONIC FAN TIMER WITH ELECTRONIC FAN TIMER WHEN HEATING amp COOLING SPEED ARE THE SAME in BLOWER OFF AL WHEN DIFFERENT HEATING amp COOLING BLOWER O DEAY DELAY DELAY 34 MANUAL A RIMA j D WITH VALVE OI SE CON STANT IGNITION ONLY NEVER USE THE INTERRUI ANI E BLUE WIRE ON R7184 CONTROL a dS WIRE BLOWER OFF DELAY 5 ARE BLOWER ON DELAY ZL ain614 yayoeg in lniq anbiosje uuuieiBeiq LZ V F 2 AIS 1 H VAS AN VINSTA A NE H VERSION EN FR J ID If gt DA d L INSTALLA TUN BLOCKED 4 EN LH _ 15 VAC iph 6CHZ POWER SHUT OFI FUSED DISCONNECT ON HOT LEG R d D ADA ta T LE GR V lt ELECT AIR CLEANES G ASH 1660 SNA TRANSFO HEA K2 S SED MOT LEAD gt
5. 12 Tableau 5 Sp cifications techniqUues 16 Tableau 6 D bit d air PCM avec filtre air 17 Tableau 7 D gagement minimum mat riaux combustibles 18 Tableau 8 D gagement minimum mat riaux combustibles 19 Tableau 9 Liste de pi ces CBMAAA036105 23 Tableau 10 Liste de pi ces CBMAAA060120 25 Tableau 11 Liste de pi ces CBMAAR0O36105 27 Tableau 12 Liste de pi ces CBMAAR060120 29 1 0 S CURIT POUR VOTRE S CURIT NE PAS ENTREPOSER O UTILISER D ESSENCE DE LIQUIDES OU DE VAPEURS INFLAMMABLES A PROXIMITE DE CET APPAREIL OU DE TOUT AUTRE APPAREIL NE PAS TENTER DE D MARRER LE BRULEUR SI UN EXC DENT DE MAZOUT S EST ACCUMULE SI L APPAREIL DE CHAUFFAGE CENTRAL EST REMPLI DE VAPEUR OU SI LA CHAMBRE DE COMBUSTION EST TRES CHAUDE 1 1 DANGER MISE EN GARDE ET AVERTISSEMENT Comprenez bien la port e des mots suivant DANGER MISE EN GARDE ou AVERTISSEMENT Ces mots sont associ s aux symboles de s curit Vous les retrouverez dans le manuel de la fa on suivante Le mot DANGER indique les plus graves dangers ceux qui provoqueront la mort ou des dommages corporels et ou mat riels s rieux A MISE EN GARDE L expression MISE EN GARDE signifie un danger qui peut entrainer la mort ou des dommages corporels et ou mat riels AX
6. 7 Figure 10 Model CBM Size 105 16 2 4 5 Blocked vent shut off BVSO 7 Figure 11 Model CBM Size 120 17 2 4 6 Oil burner 9 Figure 12 Wiring diagram CBM Beckett burner 18 2 4 7 Electrical system 10 Figure 13 Wiring diagram CBM Riello burner 19 2 4 8 Air filter 10 Figure 14 Parts list CBMAAA036105 20 2 4 9 Air Conditioner or Heat Pump 10 Figure 15 Parts list CBMAAA060120 22 2 4 10 Horizontal or downflow installation 10 Figure 16 Parts List CBMAAR036105 24 Figure 17 Parts list CBMAAR060120 26 3 0 OPERATION 11 3 1 SUPPLY AIR ADJUSTMENTS 11 3 2 OPERATIONAL CHECKLIST 11 TABLES 3 3 PURGING THE OIL LINE 11 34 COMBUSTION CHECK 12 Table 1 Minimum dimensions required in ventilation 3 5 LIMIT CONTROL CHECK 12 EE 9 36 YEAR ROUND AIR CONDITIONING 12 Table 2 Filter rack flance dimensions for return air duct 10 37 HEATING Lo SEE chu de A SAYO Me 12 Table 3 Blower speed adjustments 4 speed motor heating mode
7. 3 0 TONS HIGH 35TONS MED LOW 40TONS MED HIGH SOTONS HIGH Les d lais de d part et d arr t du ventilateur peuvent tre ajust s en positionnant les interrupteurs DIP de la carte lectronique tel que montr sur la figure 9 CBM Capacit 120 Figure 9 D lais de d part et d arr t du ventilateur Carte 1158 3 4 T I I I I I I I I I I I L 90 Sec 4 Min DELAY ON DELAY OFF 6 Min DELAY OFF DELA Y ON 2134 012134 Mi OFF 2 Min 30 SE DELAY OFF DELAY 60 Sec DELAY ON 3 2 V RIFICATION DU FONCTIONNEMENT Avant de d marrer l unit de chauffage s assurer que les requis suivants sont rencontr s 1 De la conformit de l installation lectrique du syst me de distribution d huile du syst me d vacuation des gaz d admission d air et du syst me de ventilation 2 La porte d acc s au ventilateur et les vis de blocage sont bien en place 3 Si utilis le syst me d arr t anti refoulement BVSO est install conform ment aux instructions vacuation par chemin e La valve pour l alimentation en huile est ouverte La porte d observation de la flamme et les deux portes d acc s pour le nettoyage situ es l avant de l unit sont bien ferm es 6 Le bouton Reset du br leur
8. a Placer un bout de tube de plastique transparent de 6 4mm 1 4 de diam tre sur le raccord de purge de la pompe au mazout b D marrer le br leur au mazout puis ouvrir le raccord de purge Faire fonctionner le br leur jusqu ce que le tube de purge soit compl tement exempt de bulles d air c Quand il n y a plus de bulles d air serrer le raccord de purge ce qui va permettre au mazout de circuler jusqu au gicleur et d allumer le br leur Si la purge prend plus de 15 secondes et qu aucune flamme n a t allum e le br leur va s arr ter Pousser le bouton de remise z ro sur le dessus du contr le primaire pour red marrer le br leur Pour plus d informations sur le fonctionnement du contr le primaire se r f rer aux instructions incluses avec l appareil de chauffage central ou de br leur 3 4 V RIFICATION DE LA COMBUSTION IMPORTANT Les surfaces m talliques de l changeur peuvent contenir de l huile et l isolation des d flecteurs contient des liants Ces produits br lent ou s vaporent lorsque l unit fonctionne pour la premi re fois Pour cette raison la lecture de fum e peut tre fauss e durant les premi res minutes de fonctionnement ll est donc important que l unit fonctionne durant au moins 60 minutes avant de prendre des lectures permettant l ajustement de la qualit de combustion IMPORTANT La v rification de la combustion DOIT tre effectu e apr s un remplacement du g
9. i Le service d entretien et l inspection doivent tre fait r guli rement pour un rendement optimum et s curitaire j Avant le service d entretien permettre l appareil de refroidir Toujours couper l alimentation en mazout et l lectricit avant le service Ceci pr viendra les d charges lectriques et les br lures k Sceller les conduits d alimentation et de retour d air Le syst me d vacuation DOIT tre v rifi pour s assurer qu il est de la dimension et du type requis m Installer le format ad quat et le bon type de filtre n L appareil DOIT tre install de telle sorte que les composantes lectriques soient prot g es de tout contact direct avec l eau 2 3 R GLES DE S CURIT L INSTALLATION Votre appareil de chauffage est b ti pour vous procurer de nombreuses ann es de service en toute s curit la condition qu il soit install et entretenu ad quatement Cependant un usage abusif ou inad quat peut raccourcir sa long vit et provoquer des risques de danger pour le propri taire 2 3 1 D tecteurs a La US Consumer Product Safety Commision Commission am ricaine pour la s curit des biens de consommation recommande que les usagers d appareils de chauffage au gaz ou au mazout se munissent de d tecteurs de monoxyde de carbone Le monoxyde de carbone peut entra ner la mort ou des dommages corporels Ainsi afin d tre averti temps d un niveau de monoxyde de carbone
10. c t deviendra le dessus quand l unit sera install e Enlever la forme pr d coup e du tuyau fum e situ e sur le haut du devant du panneau choisi Installez le coude fum e de fa on a ce qu il sorte du cabinet de l appareil de chauffage central par cette ouverture 2 Pour installation contre courant le tuyau fum e doit sortir du cabinet par l ouverture d un des panneaux de c t tel que d crit ci haut puis le prolonger le long du c t de l appareil de chauffage central S assurer que le d gagement des mat riaux combustibles est suffisant L installation d une feuille de m tal comme cran sur tout mur pourrait tre requis pour r duire les risques d incendie 3 Retirer le br leur Pour les mod les avec br leur Beckett desserrer les crous de montage puis tourner l g rement le br leur au mazout en sens contraire des aiguilles d une montre afin de d bloquer la bride du br leur Pour les mod les avec br leur Riello d visser compl tement les crous de montage Eviter tout stress inutile au filage du br leur ll peut tre n cessaire de d connecter les fils lectriques du br leur dans certains cas 4 Pour r installer le br leur Beckett ins rer le br leur dans les boulons de bride du br leur tourner le br leur dans le sens des aiguilles d une montre pour le verrouiller et serrer les crous 3 0 OP RATION 3 1 VERIFICATION DE L AJUSTEMENT DU VENTILATEUR Cet ap
11. 6 3 D B 7 Li U u 8 IS SIN 8 POIGNE ENCASTRE NOIR LOQUET MALE PORTE AVANT PORTE SEULEMENT ASS PORTE DU VENTILATEUR COUVERCLE DE LA BOITE ELECTRIQUE rs 01 ASS VENTILATEUR DE REMPLACEMENT g A PLAQUE DE PROTECTIONPOURFAUTEUMT 1 ko oo Ayi ERE SRE HAUTE LIMITE 140F 7 RO 1 GLISSIERE DU VENTILATEUR SEPARATEUR DU VENTILATEUR DEFLECTEUR LATERAL GAUCHE A Se ee ee ee ASS PANNEAU COTE GA ISOLATION PANNEAU DE COTE EMBOUT SUPPORT DE FILTRE pT pO CONTOUR SUPPORT DE FILTRE V ii Keel P2REQUIS n 8 oO 5 8 81818 Bala lalate ololo DID IS 6 291 01 B01681 BANDE SCELLANTE 1 1 2 X 13 1 8 LISSIERE VENTILATEUR 2 REQUIS UPPORT DE BOITE ELECTRIQUE ees L01F009 TRANSFORMATEUR 120 24Volts 40VA B01683 BOITE ELECTRIQUE mas SUBSTITUTIONAST9108A eS eee SISI ILIS gt R99G00 CARTE ELECTRONIQUE HON ST9103A G00 CARTE ELECTRONQIUE UTEC 1158 110 N SUBSTITUTION A ST9103A I ala BELLE ziel3151315 Rss q ol g Q A 2 2 20 KIT ELECTRIQUE ee ee n COMMUT BASC SPST EEE Y CONDENSATEUR 5 VF ri ASS SUPPORT DE MOTEUR RE a W B01890 01 ASS MOTEUR SUPPORT 18 HP COMPLET COMPREND MOTEUR ET LES PATTES B00202 KIT ELECTRIQUE VENTILATEUR B03720 04 VENTILATEUR 100 10T DD COMPREND ROUE ET BATI B01024 SUPPORT DE CONDENSATEUR A U a N04Z026 GARNITURE BRIDE Z 51 2Z04F007 FILTRE PAPIER 16X24X1 EZ g 8 W ee aje aj ejeje w B50067 Rev B
12. Si l application n cessite un fonctionnement extr mement silencieux l int rieur des 3 0 premier m tres 10 premiers pieds des conduites si possible d alimentation et de retour d air doit tre isol d un mat riel acoustique c Si la grille de retour d air est install e proximit de l entr e du ventilateur l air devrait parcourir un angle minimum de 90 entre l entr e du ventilateur et la grille Pour r duire davantage le niveau de bruit il est possible d installer des pales acoustiques rotatives ou d isoler les conduits tel que d crit au point b d Si une seule grille d air est utilis e les conduites entre la grille et l appareil de chauffage central doivent tre de la m me dimension que l ouverture de retour d air de l appareil Lorsque l appareil de chauffage central est install avec de l quipement de climatisation pour fonctionner l ann e suivre les recommandations suivantes A MISE EN GARDE RISQUE D INTOXICATION AU MONOXYDE DE CARBONE Installer un serpentin de climatisation vaporateur du c t des conduits d alimentation en air chaud Un serpentin install du c t du retour d air peut causer de la condensation et un bris pr matur de changeur de chaleur Ceci peut entra ner la mort des blessures et ou des dommages mat riels a Dans les applications o l air circule en s rie le serpentin est mont apr s l appareil de chauffage central dans un espace ferm
13. f rer aux instructions fournies avec le dispositif ainsi que la section 4 de ce manuel pour plus de d tails AVERTISSEMENT RISQUE DE CHOC LECTRIQUE Ne pas respecter cet avertissement pourrait entra ner des blessures corporelles ou la mort D branchez l alimentation lectrique de la fournaise avant d effectuer le c blage du dispositif d arr t anti refoulement AVERTISSEMENT RISQUE DE BLESSURE Ne pas respecter cet avertissement pourrait entra ner des blessures corporelles Les pi ces de m tal peuvent avoir des bords tranchants ou des bavures Portez des v tements protecteurs des verres de s curit et des gants lorsque vous manipulez des pi ces de m tal et entretenez la fournaise Figure 2 Diagrammes lectriques BVSO i OPERATING LIMIT SWITCH L 5 i SAFETY LIMIT SWITCH d gt H 1 SED RED COMMON W OT LINE LIMIT H BLACK ON lt S ou NEUTRAL L WHITE DL vol PRIMARY DO CONTROL IGNITION GNITION P DNS 01340 Rev FACTORY WRED Br leur Beckett Br leur Riello Figure 3 Branchement du syst me anti refoulement installation en d bit d
14. requiert un circuit lectrique 115VAC connect la bo te de contr le un raccordement pour le thermostat tel qu indiqu sur le sch ma lectrique un ou plusieurs raccordements la ligne de mazout des conduits ad quats et un raccordement un vent de dimensions ad quates La capacit d air de cet appareil de chauffage central est con ue pour permettre le refroidissement du d bit d air Se r f rer au tableau 6 pour conna tre les d bits d air pr vus selon la pression statique externe des conduites 2 2 RECOMMANDATIONS POUR UNE INSTALLATION S CURITAIRE MISE EN GARDE L installation ou les r parations par du personnel non qualifi peuvent entra ner des risques pour vous et les autres L installation DOIT tre conforme aux codes locaux ou dans le cas d absence de codes locaux elle doit tre conforme aux codes nationaux qui s appliquent Les renseignements contenus dans ce manuel s adressent un technicien qualifi exp riment dans ce type de travail au courant des pr cautions prendre des r gles de s curit respecter et muni des outils appropri s ainsi que des instruments de v rification ad quats Ne pas suivre soigneusement les instructions de ce manuel peut causer un mauvais fonctionnement de la fournaise entra ner la mort ou des dommages corporels et ou mat riels MISE EN GARDE RISQUE D INCENDIE L appareil doit tre install au niveau Ne jamais installer ave
15. situ dans le courant d air d alimentation Le ventilateur de l appareil de chauffage central est utilis la fois pour la circulation de l air de chauffage et de refroidissement b Dans les installations o l air circule en parall le des clapets doivent tre install s pour diriger l air au dessus de l changeur d air de l appareil de chauffage central quand le chauffage est demand et au dessus du serpentin de refroidissement si la climatisation est d sir e 2 4 3 Instructions d vacuation chemin e L vacuation de l appareil de chauffage central devrait se faire l ext rieur en respectant les codes locaux ou les exigences des services locaux AVERTISSEMENT Pour assurer un fonctionnement s curitaire et satisfaisant les appareils fonctionnant au mazout devraient toujours tre raccord s des tuyaux dont le tirage est suffisant en tout temps Pour des informations suppl mentaires sur l vacuation se r f rer ANSI NFPA 211 Chemin es foyers vents et appareils de chauffage au combustible solide et ou CSA B139 Code d installation Cet appareil de chauffage central est homologu pour tre utilis avec un vent de type L temp rature maximale des gaz de combustion de 302T 575F Enlever pr alablement la forme pr d coup e du tuyau fum e situ sur le panneau sup rieur avant ou de c t Installez le coude du conduit de mani re ce qu il sorte du cabinet de l appareil
16. une bande d air trop ouverte par un manque de tirage de fum e effet chemin e par un blocage quelconque comme de la suie dans la section secondaire de l changeur de chaleur par l utilisation d un gicleur d entr e trop grand ou par une pression de pompe au mazout trop lev e 6 Une fois que toutes les proc dures d installation mentionn es ci dessus ont t compl t es faire fonctionner le br leur et laide d un miroir d inspection observer le motif de la flamme a l extr mit du gicleur Toute irr gularit comme une flamme qui br le d un c t ou des patrons de pulsations dans la flamme devrait tre corrig e en changeant le gicleur 3 5 VERIFICATION DES LIMITEURS DE TEMPERATURE Apres que l appareil de chauffage central ait fonctionn durant au moins 15 minutes restreindre l entr e d air en bloquant les filtres ou en fermant les registres de retour d air et laisser l appareil de chauffage central s teindre en limite lev e Le br leur va s teindre OFF et le ventilateur principal devrait continuer fonctionner Enlever la restriction et le br leur devrait se rallumer en quelques minutes 3 6 AIR CONDITIONN L ANN E Cet appareil de chauffage central est con u pour tre utilis avec de l quipement de climatisation et pouvoir fournir de Pair conditionn Pann e Le ventilateur est donc dimensionn pour le chauffage et pour le refroidissement toutefois il est possibl
17. AVERTISSEMENT Quant au mot AVERTISSEMENT il est utilis pour indiquer les pratiques dangereuses qui peuvent provoquer des dommages corporels et ou mat riels mineurs 1 2 R GLES DE S CURIT G N RALES MISE EN GARDE N utiliser qu avec du mazout 2 maximum Ne pas utiliser d essence d huile moteur ou toute autre huile contenant de l essence MISE EN GARDE Ne jamais faire br ler de d chets ou de papier dans le systeme de chauffage Ne jamais laisser de chiffons ou de papier proximit de l unit AVERTISSEMENT Ces instructions devraient tre utilis es par des techniciens qualifi s et form s pour installer ce type d appareils de chauffage central L installation de cet appareil par une personne non qualifi e peut endommager l quipement et ou conduire des conditions hasardeuses susceptibles d entra ner des dommages corporels IMPORTANT Toutes les exigences requises par les codes locaux et nationaux concernant l installation d quipement de chauffage au mazout les installations lectriques et les raccordements de conduits doivent tre respect es Certains codes mis par l Institut des standards canadiens qui pourraient s appliquer sont CSA B139 Code d installation d quipements de chauffage au mazout Installation d quipements de chauffage au mazout ANSI NFPA 90B Syst mes de chauffage air chaude et syst me d air climatis Chemin es foyers vents et
18. B01683 Electrical Box R99G00 R99G0 0 Electronic Board UTEC 1158 110 Replace ST9103A B02329 Electrical kit RIELLO md w Wu v BO1684 RO2R002 B02111 B01680 2 ojo w Q N gt B N LO7FOO3 Rocker Switch SPST 011001 B01888 01890 01 Includes Motor and Legs B00202 Electric blower kit B03720 0 Includes Wheel and Housing 01024 LO1H009 Riello onl Z04F 007 NO4ZO64 w RIS SIP E aloa p p gt elal oleja gt alol ol oli W w 52 B50065 Rev B 25 Figure 17 Parts list CBMAAR060120 B50071 Rev B 26 Table 12 Parts list CBMAAR060120 1 EAT EXCHANGER ASSEMBLY EAR PANEL ASSEMBLY EAR PANEL INSULATION IGHT SIDE PANEL ASSEMBLY 01800 NCLUDES PANEL AND LATCH ATCHE ASSEMBLY FEMALE NCLUDES PANEL INSULATION AND BABELS IGH LIMIT 175 20F 1 3 4 NCLUDES BAFFLE AND INSULATION Z99F050 RECESSED HANDLE BLACK OOR ONLY NCLUDES DOOR AND LABEL B01406 01 NCLUDES BLOWER MOTOR AND CAPACITOR IMIT CONTROL 140F 7 EQUIRED NEL ONLY B01805 01875 NCLUDES PANEL INSULATION AND BAFFLE B01291 01 SEAL STRIP 1 1 2 X 13 1 8 REQUIRED RANSFORMER 120 24Volts 40VA RIELLO ONLY 3A 43B R99G004 JELECTRONIC BOARD 1158 110 REPLACE ST9103A LO7F003 ROCKER SWITCH SPST B02329 LECTRICAL KIT RIELLO LO11005 APACITOR 15 MF NGLUDES LEGS BAND AND FASTENERS B01891 01 B03720 05 BLOWER 120 10T DD NO4ZOG4 GASKET
19. Cette ouverture se doit d tre positionn e de sorte qu elle ne puisse tre obstru e 2 4 2 Recommandations pour les conduites AVERTISSEMENT Lorsque les conduites d alimentation d air transportent l air dans un autre espace que celui o l appareil est install les conduits de retour doivent tre tanches et aussi dirig s dans un autre espace que celui de l appareil Un conduit scell ou termin incorrectement cr e des conditions hasardeuses pouvant conduire des blessures corporelles MISE EN GARDE Les grilles de retour d air et les registres d air chaud ne doivent pas tre obstru s IMPORTANT Les clapets doivent pouvoir emp cher l air refroidi de s introduire dans l appareil de chauffage central En cas d op ration manuelle ils doivent tre capables d emp cher le fonctionnement de l unit de refroidissement ou de l appareil de chauffage central si le clapet n est pas enti rement dans une position de climatisation ou de chauffage NOTE Ne pas ouvrir l arri re de l appareil pour le retour d air Pour assurer un fonctionnement satisfaisant de l appareil de chauffage central il est n cessaire que la dimension des conduites soit ad quate Les conduites doivent se conformer la derni re dition de NFPA 90A Installation of Air Conditioning and Ventilating Systems et de NFPA 90B lt Warm Air Heating and Air Conditioning Systems gt ou leur quivalent canadien La con
20. LATERAL DROIT SS PANNEAU DESSUS AVANT SS LOQUET FEMELLE SS PANNEAU SEP AVANT OLATION SEPARATEUR AVANT UTELIMTE 175 20F 1 3 4 RHEGEASON GARNITURE BRIDE DEVACUATION RIDE D ECHANGEUR 6 DIA CROU HEXAGONAL A BRIDE 3 8 16NC LAITON CROU HEXAGONAL 3 8 16NC ZINC RULEUR RIELLO 40 F5 OQUET MALE POIGNE ENCASTRE NOIR PORTE AVANT ASS PORTE DU VENTILATEUR COUVERCLE DE LA BOITE ELECTRIQUE SS VENTILATEUR DE REMPLACEMENT 8 N Sl lg 21818 2 10910 JBE Die 8 g 218 SIR amp 8 8 g s g g g e g 1 En IS O PORTE SEULEMENT 2 8 B El 2 8 CO FC 0 m mn ii 82 i SE TE i Ea EE ENE lee i 2 8 21 8 ae g H H H on NE al 2 ET E ai P EE 3 aj al f fey FEL NER d e 2 lu 9 9 B ETE 7 i al e mi 8 U LAQUE DE PROTECTION POUR HAUTE UMTE HAUTE UMTE 140F 7 SS FORTE DOBSERVATION LISSIERE DU VENTILATEUR EPARAT EUR DU VENTILATEUR FLECTEUR LATERAL GAUCHE SS PANNEAU COTE GAUCHE OLATION PANNEAU DE COTE MBOUT SUPPORT DE FILTRE CONTOUR SUPPORT DE FILTRE ILTRE PARER 20 X 30 X 1 ANDE SCELLANTE 1 1 2 X 13 1 8 68 LISSIERE VENTILATEUR 682 SUPPORT DE BOITE ELECTRIQUE FO RANSFORMATEUR 120 24Vdts 40VA OITE ELECTRIQUE RELASSPDT 24 VAC CARTE ELECTRONIQUE HON ST9103A CARTE ELECTRONIQUE 1158 110 COMMUT BASC SPST IT ELECTRIQUE RIELLO SUPPORT DE CONDENSATEUR CONDENSATEUR 15 MF ASS SUPPORT DE MOTEUR ASS MOTEUR 3 4 DD IT ELECTRIQUE VENTILA
21. Latch Male 2 B01883 05 Blower Door Assembl Includes Door and Labels 2 2 N w B01684 Electrical Box Cover Fa ARA B01405 01 Replacement Blower Assembl Includes Blower and Motor F N al 2 2 2 AAA A UO A00284 High Limit Protective Shield l RO2R002 High Limit 140F 7 Bo2111 Observation Door Assem bl DIN lc B01680 _ Blower Slide Support B01846 Blower Divider L w o REECH Lett Lateral Bare Left Side Panel Assembl 80164502 Side Panelinsulaion _ D B i FlerRackAccess ff o Filter Rack Frame NAAA LAS required 3 3 w w ou Me B01291 01 Seal Strip 1 1 2 x 13 1 8 B01681 Blower Slide Support 2 required B01682 Electrical Box Support i c L01F009 Transformer 120 24Volts 40VA B01683 Electrical Box VV Replace ST91034 id 3 4 _ A 41B Replace ST9103A B00203 Electrical kit __ f LO7F003 Rocker Switch SPST f CD n Capacitor 2HE ff _B01888 Motor Mount Assembly f B00202 Electric blower kit U O a NO4Z026 Burner flange Z04F007 Air Filter 16 x 24 x 1 Paper In C p N 4 4 4 4 4 4 4 14 15 16 17 19 0 1 2 4 6 7 1 2 6 7 8 9 0 3 4 5 6 7 8 9 50 51 B50067 Rev B 21 Figure 15 Parts list CBMAAA060120 B50072 Rev B 22 Table 10 Parts list CBMAAA060120 B01787 _ HEAT EXCHANGERASSEMBLY BAFFLEANDGASKETS
22. NOT INCLUDED B01877 IREARPANELASSEMELY INCLUDES PANEL INSULATION ANS BAFFLE 801987 REAR PANEL INSULATION A O O O Ca O O ASSEM ZC FIX AL LIE DIG A 3 SS lt B01988 B01875 01 RIGHT SIDE PANEL ASSEMBLY INCLUDES PANEL INSULATION ANS BAFFLE w gt Z 1 dl m B01800 01 SIDE PANELINSULATION De O BO1805 01 RIGHT SIDE BAFFL OOOO BO1874 Z99F003 LATCHE ASSEMBLY FEMALE Te B01878 F 7 PA TIO Bo1853_ FRONT SEPARATOR INSULATION AE ESA 2R005_ HIGH LIMIT 175 20F 1 3 4 WEEN SOUND TRAP BLY B01751 INCLUDES BAFFLE AND INSULATION GASKET FLUE OUTLET FLANGE 3 a ie ot BO1747 FLUE OUTLET FLANGE 6 DIA RR O 0001 HEX FLANGE NUT 3 8 16NC LAITON F07F011 HEX NUT 3 8 16NC ZINC e O Kl C OSOS l a n CH Y B01537 01 Z99F038 Z99F050 B01852 23 B0684 ELECTRICAL BOX COVER 25 804804 FLOOR TV 26 A00284 HGHLIMIT PROTECTIVE HIED 27 RO2R002 LIMT CONTROL 140 7 ff O 28 BO2111 OBSERVATION DOORASSENBLY _ _ 30 B01795 BLOWERDMDER PANEONY 31 BO1805 02 LEFT SIDE BAFFLE B01800 02 B01808 B01809 Z04F013 B01291 01 B01681 BLOWERSLIDE RAIL ____ 2REQURED B01682 L01F009 B01683 N04Z026 R99G00 REPLACE ST9103A R99G00 LO7FOO B00203 B01024 LO11005 B01889 B01891 04 B00202 B037 20 05 INCLUDES WHEEL AND HOUSING 8 N NCLUDESLEGS BAND AND FASTENERS 3121213 BR Elg ASE ala Ala miz e vw o k ss 2 Y elle Elle ee ea e e 5
23. No4z026 GARNTURE BRIDEFXE lt 43A R2G002 CARTEBLECTRONQUEHONSTOIOA U j 44 LO7F008 COMMUT BASC SPST L O 45 200203 KITELECTRIQUE LUI 46 B01024 SUPPORT DE CONDENSATEUR 47 Lupp JCONDENSATEURISME OOOO 48 B01889 ASSSUPPORTDEMOTER COMPRENDPATTES BANDESETATTACHES 49 Bot891 04 JASS MOTEUR 34DD Cal 80202 KITELECTRQUE VENTILATEUR gt gt B03720 05 VENTILATEUR 120 107 DD COVERED ROUJE ET BATI B50072 Rev B 25 Figure 16 Liste de pi ces CBMAAR036105 Se s VSL VSL B50065 Rev B 26 Tableau 11 Liste de pi ces CBMAAR036105 CHANGEUR SEULEMENT PREND PANNEAU ISOLATION ET DEFLECTEUR ASS ECHANG CHALEUR ASS PANNEAU ARRIERE ISOLATION PANNEAU ARR ERE DEFLECT BURARRIERE ASS PANNEAU COTE DR ISOLATION PANNEAU DE COTE DEFLECT BURLATERAL DROIT ASS PAN DESSUS AVANT ASS LOQUET FEMELLE ASS PANNSEP AVANT ISOLATION PANNEAU AVANT HAUT LIMIT 195 30F 1 75 ASS PIEGEASON GARNTURE COUVERCLE DE TUYAU A FUVEE SORTIE A FUMEE ECROU HEXAGONAL A BRIDE 38 16NC LATON ECROU HEXAGONAL 3 8 16NC ZINC BRULEURRIELLO 40 F3 POIGNE ENCASTRE NOIR LOQUET MALE PORTE AVANT ASS PORTE DU VENTILATEUR OOUVERCLE DE LA BOITE ELECTRIQUE ASS VENTILATEUR DE REVPLACEMENT PLANCHER PLAQUE DE PROTECTION FOUR HAUTE LIMT HAUTE LIMITE 140F 7 ASS PORTE D OBSERVATION GLISSIERE DU VENTILATEUR SEPARATEUR DU VENTILATEUR DEFLECT E
24. TUYAU FUM E 10 16 cm 4 10 16 om 4 10 16 cm 4 VERTICALE AU DESSUS DU TUYAU FUM E 22 86 cm 9 22 86 cm 9 22 86 cm 9 DEVANT FOURNAISE 20 32 cm 8 20 32 cm 8 60 96 cm 24 t Lorsque la base KLASB0601DET ou KLASBO701DET est utilis e 19 D ALLATION BLOCKED DL 115 vac tph 60HZ POWER SUPPLY L2 N SHUT O MANDATORY FOR CANADA ONLY 9 ASH 6860 SNA TN MOLE K2 EC OFF MA NDATO RY FOR YELLOW E CANADA ONLY l MOTOR A HUMIDIFIER BLACK desen Maite Li WHITE e CRANGE BURNER MOTOR 115vAC VALVE TRANSFO 24VAC OIL RIMARY CONTROL AN D NL LIMIT SENSOR IN
25. air ascendant et vacuation verticale La position du trou dans le gt IL tuyau d vacuation est d termin e en fonction de la longueur du kit lectrique lt o Dispositif d arr t anti refoulement BVSO Kit lectrique fourni lon Utiliser les 3 attaches fournies Les fils ne doivent pas entrer en contact avec les tuyaux Brancher les fils sur Menys a d vacuation ou de les bornes libres nf nettoyage des hautes limites gt Brancher le fil de mise terre sur une vis de la cabineterie DNS 1043 Rev A Figure 4 Branchement dispositif anti refoulement installation d bit ascendant et vacuation verticale Connexion la limite haute Voir Fiaure 2 Figure 5 Branchement dispositif anti refoulement installation d bit ascendant et vacuation horizontale Connection la limite haute Voir Fiaure 2 DNS 1043 Rev A Figure 6 Branchement dispositif anti refoulement installation horizontale avec vacuation horizontale Connection a la limite haute c Voir Fiaure 2 DNS 1043 Rev 10 Figure 7 Branchement dispositif anti refoulement installation horizontale avec vacuation verticale DNS 1043 Rev A Connexion la limite haute Figure 8 Branchement dispositif anti refoulement installation descendant C
26. blessures corporelles si jamais un probl me lectrique se produisait Une vis verte de mise la terre est incluse dans la bo te de contr le pour effectuer cette connexion L appareil doit tre install en respectant la derni re dition ANSI NFPA 70 du Code lectrique national la Section 1 du Code lectrique canadien CSA C22 1 et ou les codes locaux Le syst me de contr le repose sur la bonne polarit de l alimentation lectrique Connecter le fil HOT H et le fil NEUTRE N tels qu indiqu aux figures 12 et 13 Un circuit lectrique distinct muni d un interrupteur fusible ou d un coupe circuit devrait tre utilis entre le panneau lectrique principal et l unit Utiliser uniquement du fil de cuivre pour du courant de 115V avec cette unit Les conduits m talliques si requis utilis peuvent se terminer directement sur le panneau de c t de l unit Il n est pas n cessaire de les prolonger l int rieur de l unit entre le panneau de c t et la bo te de contr le Si vous remplacez des fils d origine de l appareil de chauffage central utilisez seulement du fil de cuivre 16 AWG 105 Les instructions pour l installation lectrique du thermostat sont emball es dans la bo te du thermostat fourni sur place Effectuer les connexions du thermostat telles qu indiqu sur les figures 12 et 13 et aux bornes du panneau 24 volts du relais primaire Si vous installez des access
27. chauffage central environ 15 24 cm 6 du plafond et du plancher de l espace ferm Le tableau 1 indique les dimensions minimales requises pour chacune des deux ouvertures de ventilation Tableau 1 Dimensions minimales requises pour les ouvertures de ventilation FET e Dee BTU h 50 80 cm 20 AVERTISSEMENT Ne pas obstruer les ouvertures d air de combustion de l appareil de chauffage central Toute obstruction r sultera en une combustion inad quate et accro t les risques d Incendie et ou de dommages corporels Installation avec chemin e seulement Le r gulateur de tirage barom trique inclus avec l appareil de chauffage central devrait tre install dans la m me pi ce ou espace que l appareil de fa on viter toute diff rence de pression entre le r gulateur et l alimentation en air de combustion L air requis pour faire fonctionner le ventilateur d vacuation les syst mes de ventilation des cuisines les s cheuses et les foyers doit tre consid r pour d terminer un endroit capable d approvisionner la quantit d air requise pour la combustion Si l espace confin est situ dans un b timent de charpente conventionnelle dont la construction en briques ou en pierres les infiltrations pourraient tre suffisantes pour fournir l air requis pour la combustion la ventilation et la dilution des gaz de combustion Cette d cision doit tre prise sur une base individuelle des installations
28. de chauffage central par cette ouverture Dans le cas des installations l horizontale ou contre courant les formes pr d coup es d un des panneaux de c t seront utilis es Inspection pr alable l installation du syst me de d vacuation Avant d installer cet appareil de chauffage central il est fortement recommand de faire une inspection compl te de tous les syst mes d vacuation d j existants Pour toutes les chemin es ou vents cette inspection comprend a L inspection de toute d t rioration de la chemin e ou de l vent En cas de d t rioration la chemin e doit tre r par e ou l vent remplac b La v rification du syst me d vacuation pour s assurer qu il est exempt de toute obstruction Toute obstruction doit tre d gag e avant d installer l appareil de chauffage central c Le d bouchage de la chemin e ou de l vent s ils taient pr alablement utilis s pour l vacuation d un foyer ou d un appareil de chauffage au combustible solide d La v rification que tous les raccordements inutilis s de la chemin e ou de l vent sont convenablement scell s e La v rification du rev tement et des dimensions de la chemin e en fonction des codes applicables Se r f rer la liste de codes de la section 1 2 Chemin e de ma onnerie Cet appareil de chauffage central peut tre vacu dans une chemin e de ma onnerie existante Toutefois l appareil de chauf
29. en consid rant le volume total d espace non confin le nombre de fen tres et d ouvertures de ventilation le nombre de portes menant l ext rieur les portes int rieures qui peuvent refermer l espace non confin et l tanch it totale du b timent Plusieurs nouvelles constructions et certaines plus vieilles qui ont t isol es doivent tre consid r es comme des constructions tanches Par cons quent les infiltrations d air y sont insuffisantes pour approvisionner l air requis pour la combustion et la ventilation Une construction devrait tre consid r e comme tanche si a Les murs et plafonds expos s a l air ext rieur sont munis d un retardateur continu de vapeur d eau dont le taux est d une perm ou moins et dont les ouvertures sont ferm es herm tiquement ou scell es et ou b Des bandes isolantes ont t ajout es aux portes et fen tres utilis es et ou c Du calfeutrant ou du scellant ont t appliqu s o il y avait infiltration d air comme autour des portes et fen tres entre les seuils de porte et les planchers entre les panneaux de mur aux ouvertures lectriques de plomberie de mazout ou autres Lorsqu un apport en air frais est requis pour la combustion pour un espace non confin une ouverture de 6 45 cm 1 po par 1000 BTU par heure pour le total des inputs de tous les appareils pr sents dans cet espace mais d au moins 645 16 cm 100 po doit tre disponible
30. est bien enfoncer ou r armer 7 L ajustement d air pr liminaire du br leur est conforme aux tableaux des sp cifications de ce manuel 8 L ajustement des vitesses de ventilation en chauffage et climatisation sont ad quats et selon les sp cifications de ce manuel 9 Les d lais de d part et d arr t du ventilateur sont r gl s de fa on satisfaisante 10 Le thermostat de la pi ce est en mode chauffage et est r gl une temp rature sup rieure la temp rature ambiante Pour d marrer principal a ON l unit mettre Flinterrupteur lectrique AVERTISSEMENT Ne pas alt rer l unit ou ses contr les Appelez un technicien qualifi 3 3 PURGE DE LA LIGNE DE MAZOUT 1 Un filtre au mazout 10 microns ou moins devrait tre install aussi pr s que possible du br leur dans le cas de tous les br leurs au mazout et est essentiel avec les br leurs faible taux d allumage Nous recommandons l utilisation d un filtre l huile faible chute de pression avec une capacit sup rieure celle de la pompe combustible 2 Dans une installation neuve l air se trouvant dans la conduite de mazout qui va du r servoir au gicleur doit tre totalement purg pour pr venir un gouttement excessif La pompe de mazout est munie d un raccord sp cial permettant de purger tout air se trouvant entre le r servoir et la pompe de mazout La proc dure suivre pour cette op ration est la suivante
31. l La u area se 11 3 8 COOLING 12 Table 4 Blower speed adjustments 4 speed motor 3 9 CONSTANT BLOWER SWITCH 12 cooling MOO kew io teenies E eee teni 11 4 0 MAINTENANCE 12 Table 5 Technical Specifications 14 Table 7 Minimum clearances to combustible materials 16 41 HEAT EXCHANGER CLEANING 13 Table 8 Minimum clearances to combustible materials 17 42 BLOWER REMOVAL 13 Table 9 Parts list CBMAAA036105 21 4 3 BLOCKED VENT SHUT OFF BVSO i CLEANIN Gita ts tae ne 13 Table 10 Parts list CRBMAAAOGDI2D 2 23 Table 11 Parts list CBMAAR036105 25 SC ESR EMNE ee 14 Table 12 Parts list CBMAAR060120 2 27 1 0 SAFETY REGULATIONS FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPOURS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE DO NOT ATTEMPT TO START THE BURNER WHEN EXCESS OlL HAS ACCUMULATED WHEN THE FURNACE IS FULL OF VAPOUR OR WHEN THE COMBUSTION CHAMBER IS VERY HOT 1 1 DANGER WARNING AND CAUTION The words DANGER WARNING and CAUTION are used to identify the levels of seriousness of certain hazards It is important that you understand their meaning You will notice these words in the man
32. potentiellement dangereux vous devriez faire installer dans votre difice ou r sidence des d tecteurs de monoxyde de carbone autoris s par une agence reconnue sur le plan national ex Underwriters Laboratories ou International Approval Services et les maintenir en bon tat voir la note plus bas b ll existe plusieurs sources possibles de flammes ou de fum e dans un difice ou une r sidence Les flammes ou la fum e peuvent entra ner la mort ou des dommages corporels et ou mat riels Ainsi afin d tre averti temps d un d but de feu potentiellement dangereux vous devriez vous procurer des extincteurs et faire installer dans votre difice ou r sidence des d tecteurs de fum e autoris s par une agence reconnue sur le plan national comme Underwriters Laboratories et les maintenir en bon tat voir la note plus bas AVERTISSEMENT S assurer que l espace autour de l entr e d air de combustion est libre de d bris neige ou glace 2 3 2 Temp rature froide et votre b timent A MISE EN GARDE RISQUE DE GEL Couper l alimentation en eau Si votre appareil demeure ferm durant la saison froide les conduites d eau peuvent geler clater et provoquer des d g ts d eau importants Si le syst me de chauffage est laiss sans surveillance durant la saison froide prendre les pr cautions suivantes a Fermer l entr e d eau principale de la maison ou difice et vider les conduites d eau si cel
33. supply and ventilation 2 The blower access door is in place and the blower rail locking screws are well tightened 3 The Blocked Vent Shut Off BVSO is according to instructions for chimney venting 4 The oil supply valve is open 5 The flame observation door and the two clean out access doors located at the front of the unit or well closed 6 The burner Reset button is well pushed in or re armed 7 The preliminary air adjustments on the burner comply with the technical specifications in this manual 8 The blower speed adjustments for heating and air conditioning are appropriate and according to the specifications in this manual 9 The blower start stop delays are satisfactory 10 The thermostat of the room is in the heating mode and is set higher than the ambient temperature installed To start the unit turn the main electrical switch on CAUTION Do not tamper with the unit or its controls Call a qualified service technician 3 3 PURGING THE OIL LINE 1 A 10 micron or less oil filter should be installed as closely to the burner as possible with all oil burners but it is essential for burners with a low firing rate We recommend the use of a low pressure drop oil filter with a capacity greater than that of the fuel pump 2 On a new installation the air trapped in the oil line leading from the tank to the nozzle must be thoroughly purged in order to prevent excessive after drip Th
34. the trace of smoke f This method of adjusting the burner will result in clean combustion Bacharach smoke scale between O and a trace and ensure the proper functioning of the system 4 A barometric draft regulator supplied with the furnace must be installed in order to ensure proper draft through the furnace The barometric damper must be mounted with the hinge pins in a horizontal position and the face of the damper vertical for proper functioning see instructions included with damper After the furnace has been firing for at least five minutes the draft regulator should be set to between 0 025 W C and 0 035 WC 5 The over fire pressure that is taken through the observation door located in the centre of the front panel above the burner is a measurement that is necessary to determine if there is a blockage in the heat exchanger or the flue pipe Please refer to the Technical Specifications in this manual for over fire pressure values A high pressure condition may be caused by excessive combustion air due to the air band being too wide open or a lack of flue draft chimney effect or some other blockage such as soot in the secondary section of the heat exchanger or the use of an oversize nozzle input or high pressure pump 6 After all the set up procedures mentioned above have been completed the burner should be fired and an inspection mirror should be used to observe the flame pattern at the tip of the nozz
35. with not heavier than grade 2 Fuel Oil If the burner model is a Beckett AFG the mounting flange is fixed to the burner air tube and no adjustment is required for length If a Riello burner is used refer to the Technical Specifications Table 5 for the insertion length CAUTION NEVER use the interrupted ignition function if a Beckett AFG burner is installed on the furnace Oil Connections Complete instructions for installation of the fuel oil piping will be found in the oil burner installation instructions included with the furnace Oil line entry holes are located in the side panels Two holes are provided on each side so that a two pipe system can be used if desired A 10 micron or finer oil filter should be used with all oil burners installed as closely as possible to the burner 2 4 7 Electrical system WARNING The unit cabinet must have an uninterrupted or unbroken electrical ground to minimize personal injury if an electrical fault should occur A green ground screw is provided in the control box for this connection The appliance must be installed in accordance with the current ANSI NFPA 70 National Electrical Code CSA C22 1 Canadian Electrical Code Part 1 and or local codes The control system depends on the correct polarity of the power supply Connect HOT wire H and NEUTRAL wire N as shown in Figures 12 and 13 A separate line voltage supply should be used with fused d
36. 1 B50072 Rev B 23 Figure 16 Parts List CBMAAR036105 M m NN N SAN B50065 Rev B 24 Table 11 Parts list CBMAAR036105 B016 Heat Exchanger Exchanger onl B0172 Rear Panel Assembly Includes Panel Insulation and Baffle B0198 Rear Panel Insulation B0189 Rear Baffle B01885 ight Side Panel Assembly Includes Panel Insulation and Baffle R B01645 Side Panel Insulation R F v gt Gol N O N pre Owlololuololwlolo jw jwi NRIN INR RI RI rp IN IN IN jaja jaja jaja jaja tt crf oo po 1 No Ol 051N 3 4 GlO N Oo GA S TAN IS ol SID aja BIS IO B01679 0 ight Lateral Baffle B01861 ront Top Panel Assembl Inlcudes Panel and Latch Z99F 003 B01727 Front Divider Panel Assembly Includes Panel Insulation and Labels B01646 RO2R003 B01676 Includes Baffles and Insulation B0121 B0169 F07 Hexagonal Flange Nut 3 8 16NC Brass FO7FO Hexagonal Nut 3 8 16NC Zinc NO1F01 Riello Bumer R40 F3 Z99F 05 Z99F 038 B01887 Door only 01883 0 Blower Door Assembl Includes Door and Labels B01684 01405 0 Replacement Blower Assembl Includes Blower and Motor B0168 A0028 High Limit Protective Shield RO2R002 B02111 B01680 Blower Slide Support required B0184 anel onl 01679 01885 Left Side Panel Assembl Includes Panel Insulation and Baffle 01645 B0169 B0169 Filter Rack Frame 01291 Seal Strip 1 1 2 x 13 1 8 B01681 2 required B01682
37. 103 et des lois am ricaines EUR RIELLO DURS TT dofavectete FS 3 9 16 0 40 70A MED LOW MED HIGH HIGH MED LOW MED HIGH HIGH 1 3 HP 4 vitesses 3 4 HP 4 vitesses 10 x 10 12 x 10 20 x 35 x 48 20 x 39 x 53 Capaci maximum en chretsaton AJUSTEMENT DE LA CONSOMMATION ET DE LA PUISSANCE voir les informations ci dessous La pression de pompe peut tre augment e jusqu 180 PSIG 200 PSIG avec Beckett 1 10 USGPH Ora Ajuster la temp rature des gaz de combustion entre 400F et 575F Ajuster la hausse de temp rature de l air entre 55 F et 85F ENERGY STAR Tableau 6 D bit d air PCM avec filtre air CBM 075 090 et 105 PRESSION STATIQUE EXTERNE AVEC FILTRE AIR 0 2 CE 03 C E 0 5 CE 12425 1305 1250 1130 1000 950 840 740 CBM 120 140 et 155 PRESSION STATIQUE EXTERNE AVEC FILTRE AIR 072 CE os CE 05 CE 17 Figure 10 Mod le CBM Capacit 105 adi 8 504 mm KNOCKOUT BOTH SIDES FOR 5 127 mm DIA AT ENTRE DEFONCABLE CHAQUE COTES POUR TUYAU DE DIA 5 127 mm 1061 mm OIL INLET BOTH S ENTRE DEFONCA JR LIGNE A L HUILE CHAQUE COTES ELECTRICAL CONNECTIONS BOTH SIDES ENTRE DEFONCABLE POUR ALIMENTATION ELECTRIQUE CHAQUE COTES 559 mm SIDE COTE Tableau 7 D gagement minimum mat riaux c
38. 120 S 6 Min 90 REMOVE JUMPER CONNECT RED WIRE TO THE HEAT TERMINAL WHEN DIFFERENT HEATING amp COOLING BLOWER SPEED ARE REQUIRED Ze on Scars It REFER TO INSTRUCTION A TPC v i PRESSURE CONTROL ELECTRICAL CONNECTION MANDATORY DIRECT VENT APPLICATION ONLY USE ONLY COPPER 1 Mir BLOWER OFF FOR HUMIDIFIER REMOVE THE DU RMINAL MARKED HU i EE FOR ELECTRONIC AIR CLEANER REMOV DUMMY TERMINAL MARKED EAC AYS ARE OTHER COMBINAISONS ARE POSSIB LE el aanBi4 olary 41na niq nbi359 l awuweiBeig Figure 14 Liste de pi ces CBMAAA036105 B50067 Rev B 22 Tableau 9 Liste de pi ces CBMAAA036105 COR 667 SS ECHANG CHALEU ECHANGEUR SEULEMENT C 1728 ASS PANNEAU ARRIERE OLATION PANNEAU ARRIERE A A A A AN FLECTEUR ARRIERE 222 7 A IN ASS PANNEAU COTE DR 1645 0 OLATION PANNEAU DE COTE aa eee z 1679 0 FLECTEUR LATERAL DROIT A eee 1861 ASS PAN DESSUS AVANT F003 SS LOQUET FEMELLE wawa se ee 17 ASS PANN SEP AVANT OLATION PANNEAU AVANT AAA A UO ROOS UT LIMIT 195 30F 1 75 MA a ASS PI GE ASON GARNITURE COUVERCLE DE TUYAU A FUMEE SORTIE FUVEE ECROU HEXAGONAL A BRIDE 3 8 16NC LAITON ECROU HEXAGONAL 3 8 16NC ZINC Ke EN EES ER Bo3091 01 BRULEUR BECKETT WEE AAA ooo PORTE SEULEMENT els gt
39. 23 Figure 15 Liste de pi ces CBMAAA060120 N kw A o NA SET B50072 Rev B 24 Tableau 10 Liste de pi ces CBMAAA060120 ME ER EE 2 BO1877 Jee PANNEAUARRERE COMPRENDPANNEA ISOLATIONET DEFLECTEUR 4 B01988 DEFLECTEURARRIERE 6 B01800 01 ISOLATION PANNEAU DECOTE ss 7 BO1805 01 DEFLECTEURLATERALDROT o S U O 8 B01874 ASSPANNEAUDESSUSAVANT COMPREND PANNEAU ET LOQUET 9 Z29003 ASS LOQUET FEMELE LUI ISOLATION SEPARATEUR AVANT 12 RO2R005 HAUTE UMIE 175 20F 1 34 14 EOS GARNTURE BRIDEDEVACUATION o O 15 201747 BRIDEDECHANGELRS DA L OO 16 Fo70001 ECROU HEXAGONAL A BRIDE 38 16NC LATON j O O AER DIS E TT 20 799 050 POIGNE ENCASTRE NOR 22 B01873 05 ASS PORTE DU VENTILATEUR n COMPREND PORIE ET LIBELLE n 23 B01684 COUVERCLEDELABOTEELECTRQUE REO NAAA EAN 26 400284 PLAQUE DE PROTECTION POUR HAUTE LIMTE 27 RO HAUTEUMTE OOOO E 29 801794 GUSSEREDUVENTLATEUR RE 1 ee o pee NNER CORO SF RESO PANE SLOT ESTE A EE 34 Deg EMBQUTSUPPCRTDEFILTRE __ L A 35 B01809 CONTOURSUPPORTDEFILTRE j 36 Z04F013 _ FILTREPAPIR20X OX 37 Bo1291 01 JBANDE SCELLANTE 1 1 2 X 13 V8 L O 38 801681 JGLISSERE VENTILATEUR RWS 39 801682 SUPORTDEBOTEELECTROUE __ 40 _L01F00 _ TRANSFORVATEUR 120 24Vats 40VA 41 60683 BATEBECTRQUE oo n 42
40. COTE DNS 0141 Rev PURGE ate FURNACE COMBUSTIBLE FLOOR WITH THE SUB BASE T a a Ge VERTICALLY ABOVE FLUE PIPE 22 86 cm 9 22 86 cm 9 22 86 cm 9 FURNACE 20 32 cm 8 20 32 em 8 60 96 cm 24 When used with floor base model KLASBO601DET or KLASBO701DET 17 81 VERSION EN FRANCAIS IN i ALLATION BLOCKED Y LH us VAC iph 60HZ POWER SHUT OF MANDATORY I CR FOR CANADA LC CR ONLY 9 164 6860 SNG EAC ELECTRO AIR CLEA K2 COOL UMPER JUMPER teg Ga K2 ZA NL UNUSED 5 E TI 1 CON o M S Eass lt N 9 LIMIT S ES gt E QTY 1 OR 2 S x amp pr Fi i e Be fa Ga an Li p 5 ie N OL PRIM o N of la lo H loro d CONTROL OFF MANDATORY FOR MOTOR amp CN6 8 TRANSFO CNE SS HUMIDIFIER SIGNITOR Li L2 BURNER MOTOR VALVE ji
41. FLANGE EAT EXCHANGER ONLY NCLUDES PANEL INSULATION ANS BAFFLE EN EN NCLUDES PANEL INSULATION ANS BAFFLE w w ojo ala Wa N al DIT r O TIT T Tm oo o T MI TC mio Ol Tr m CH OCH NININ malman MO oi a aji N EN EE ER Ess SS s E olom DN mim luu CARS EES REC gt m NCLUDES WHEEL AND HOUSING cn on ca AA AP A AP AT NI gt O CO HO 01 al B50071 Rev B 27 Fournaise au mazout Multi position Puissance de l entr e 70 000 154 000 Instructions d installation CE MANUEL CONTIENT DES INFORMATIONS IMPORTANTES INSTALLATEUR Utiliser l information contenue dans ce manuel afin de proc der Finstallation de l unit Garder ce manuel pr s Eee MN E gon SE Se de l unit pour r f rences ult rieures v 2 oss s ass os UTILISATEUR Conserver ce manuel d information pour r f rences ult rieures 009 g TECHNICIEN DE SERVICE Utiliser J l information contenue dans ce manuel afin d effectuer l entretien de l appareil Garder ce YN manual pr s de l unit pour r f rences 0 SR V ult rieures H Se A 9 A11540 AUD man nn af CERTIFIED 0 www ahridirectory org Use of the AHRI Certified TM Mark in
42. Glisser le ventilateur sur les rails vers le devant de Punit 6 Refaire toutes ces op rations en ordre inverse pour r installer le ventilateur Se r f rer au sch ma lectrique aux figures 12 et 13 de ce manuel ou au sch ma situ l int rieur de la porte du ventilateur pour effectuer la r installation lectrique de l unit AVERTISSEMENT Assurez vous que le ventilateur est ad quatement soutenu quand vous le sortez des rails surtout en position horizontale ou en d bit descendant afin d viter d chapper le ventilateur et de vous blesser ou d endommager le ventilateur 4 3 NETTOYAGE DU DISPOSITIF D ARRET ANTI REFOULEMENT BVSO Pour un fonctionnement continu et s r le dispositif d arr t doit tre inspect et entretenu chaque ann e par un technicien qualifi AVERTISSEMENT RISQUE DE CHOC LECTRIQUE Ne pas respecter cet avertissement pourrait entra ner des blessures corporelles ou la mort D branchez l alimentation lectrique de la fournaise avant d effectuer l entretien du dispositif d arr t anti refoulement 15 1 D visser les deux vis qui fixent le couvercle du dispositif d arr t 2 Enlever le couvercle 3 Enlever les deux vis qui maintiennent le bo tier de commande l ensemble du tube de transfert de chaleur En glissant le bo tier de commande dans la bonne direction le tube de transfert de chaleur se d tachera 4 Enlevez soigneusement n importe quelle
43. MULTIPOISE OIL FURNACE INPUT CAPACITIES 70 000 154 000 Installation Instructions THIS BOOKLET CONTAINS IMPORTANT INFORMATION INSTALLER Use the information in this SES gt booklet to install the appliance and affix this booklet adjacent to the appliance after E SES Installation W gt A ees x gt USER Keep this booklet of information for future reference 009 2 SERVICER Use the information in this booklet to service the appliance and affix the booklet i adjacent to the appliance after servicing J 0 EE 9 H Y 0 A11540 ALD An 224 CERTIFIED 0 www ahridirectory org Use of the AHRI Certified TM Mark indicates a C J S manufacturer s participation in the program For verification of certification for individual products go to www ahridirectory org Catalog No IM CBM 02 X40190 Rev B Replaces IM CBM 01 X40190 Rev A Copyright 2011 CAC BDP e 7310 W Morris St e Indianapolis IN 46231 Printed in U S A Edition Date 11 11 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations TABLE OF CONTENTS FIGURES 1 0 SAFETY REGULATIONS 3 Figure 1 Counterflow position flue pipe protection 5 Figur
44. O y 27 mm DIA OTES 127 mm me n Tun Here 413 1061 mm Seet OIL INLET BOTH SIDES 7 ENTRE DEFONCABLE POUR L LIGNE A L HUILE CHAQUE COTES a N ELECTRICAL CONNECTIONS BOTH SIDES 422 mm ENTRE DEFONCABLE POUR ALIMENTATION ELECTRIQUE CHAQUE COTES DNS 0139 Rev E Table 7 Minimum clearances to combustible materials P PPLICATION UPFLOW Do FURNACE 2 508cm 2 _508cm 2 2 54 om 1 R I ti AGE OR PLENUM 5 08 om 27 5 08 cm 2 ORIZONTAL WARM AIR DUCT WITHIN 6 ft OF FURNACE 5 08 om 27 7 62 em 3 FU FU H RG H FU R DRE E E A When used with floor base model KLASBO601DET or KLASBO701DET 16 Figure 11 Model CBM Size 120 608 mm KNOCKOUT BOTH SIDES FOR gt ENTRE DEFONCABLE CHAC POUR TUYAU DE DIA 6 152 m 464 MOU 1190 mm 844 mm CIL INLET BOTH SIDES ENTRE DEFONCABLE POUR LIGNE A L HUILE CHAQUE COTES 1346 mm 16 as 406 mm ELECTRICAL CONNECTIONS BOTH SIDES 711 mm ER L ENTRE DEFONCABLE POUR ALIMENTATION ELECTRIQUE CHAQUE COTES SIDE
45. T LEG L2 N POWER SUPPLY G ASH 1660 SNA AIR CLEA a Q ANSFO R TF LO Reut am L BLOWER WHITE UNUSED BLACK WHITE LIMIT S iy fT QTY 1 OR 2 LIMIT S QTY 1 OR 2 AND BLOKED VENT SHUT 6 WHITE N A LG KS THERMOSTAT _ RIELLO PRIMARY BROW burner j ma gt E 46V els sal PURPLE L UN QO CAPACITOR MANDATORY FOR CANADA ONLY HUMIDIFIER LIMIT SENSOR
46. TEUR QUIS PANNEAU SEULEMENT SEE 218 2518 REND PANNEAU ISOLATION ET DEFLECTEUR i oo jo a NIN IN al Selle 81 3121231212 8 RIELLO SEULEVIENT 8121518 i STITUTION AST9103A SE E 8 JE E A ou le m y 20 3 3 8 D REND PATTES BANDES ET ATTACHES 81713 3181312 BIC had sed 3518 ai REND ROUE ET EATI ER ES 3 4 ES 6 ES es CG EU 11 EPI EEN 14 EA KA Kid Ce 19 20 FR 22 E EN El 2 27 Es El El 34 El 33 El 35 ES ESA El P 40 EA Ce 43A Les Ka ES E 47 48 Ka 50 rst 52 NALOG ke IN 850071 Rev B 29
47. UR LATERAL GAUCHE ASS PANNEAU COTE GA ISOLATION PANNEAU DE COTE EVBOUT SUPPORT DE FILTRE OONTOUR SUPPORT DE FILTRE BANDE SCELLANTE 1 12 X 13 1 8 GLISSIERE VENTILATEUR SUPPORT DE BOITE ELECTRIQUE TRANSFORMATEUR 120 24Valts 40VA BOITE ELECTRIQUE CARTE ELECTRONIQUE HON ST9108A CARTE ELECTRONQUE UTEC 1158 110 KIT ELECTRIQUE RIELLO COMMUT BASC SPST OONDENSATEUR 5 IVE ASS SUPPORT DE VOTEUR S MOTEUR SUPPORT 1 3 HP COMPLET T ELECTRIQUE VENTILATEUR NTILATEUR 100 10T DD PPORT DE CONDENSATEUR RELAIS SPDT 24 VAC FILTRE PAPIER 16X24X1 NO47064_ _ GARNTURE BRIDE REND PANNEAU ISOLATION ET DEFLECTEUR PREND PANNEAU ET LOQUET 8 0 PREND PANNEAU ISOLATION ET LIBELLES S alain PREND DEFLECT EURS ET ISOLATION d is ele SSES 01F01 BIBS Blais ook Lan PORTE SEULEMENT COMPREND PORTE ET LIBELLE g CO COMPREND VENTILATEUR MOTEUR CONDESATEUR REQUS PANNEAU SEULEMENT QI COMPREND PANNEAU ISOLATION ET DEFLECTEUR T E geliga ele elc 5 EE SUBSTITUTION ST9103A B 00 PREND MOTEURET LES PATTES glg z i MILL PREND ROUEET BATI RIELLO SEULEMENT ev 27 Figure 17 Liste de pi ces CBMAAR060120 B50071 Rev B 28 Tableau 12 Liste de pi ces CBMAAR060120 E D N SS ECHANGUR CHALEUR SS PANNEAU ARRIERE CLATION PANNEAU ARRIERE FLECTEUR ARRIERE SS PANNEAU COTE DROIT OLATION PANNEAU DE COTE FLECTEUR
48. a est possible Ouvrir les robinets aux endroits requis b Demander une personne de v rifier fr quemment durant la saison froide s il y a suffisamment de chaleur dans la maison ou difice pour viter que les tuyaux g lent Sugg rer cette personne d appeler une agence de service qualifi e si cela est requis 2 4 EMPLACEMENT AVERTISSEMENT Cet appareil de chauffage central n est pas tanche et n est donc pas con u pour l ext rieur L appareil doit tre install de fa on prot ger les composants lectriques de l eau Une installation l ext rieur peut entra ner des conditions lectriques hasardeuses et conduire une d faillance pr matur e de l appareil de chauffage central MISE EN GARDE Pour une installation dans un grenier il est important de conserver au moins 0 3 m 12 entre l isolant et toutes les ouvertures de l appareil de chauffage central Certains mat riaux isolants peuvent tre combustibles L unit doit tre install e dans un endroit ou la temp rature de l air ambiant et de l air de retour est sup rieure 15T 60F Cet appareil de chauffage central est approuv pour un d gagement r duit entre l appareil et des constructions combustibles il peut donc tre install dans un placard ou un espace ferm similaire Comme cette unit peut tre install e en d bit ascendant en d bit descendant a contre courant ou a l horizontale l appareil de chauffage ce
49. accumulation de la surface de commutateur thermique A AVERTISSEMENT Ne pas rafler ou gratigner la surface de l interrupteur thermique Un interrupteur thermique endommag doit tre remplac 5 Nettoyer et enlever toute accumulation de salet ou obstruction de l int rieur du tube de transfert de chaleur 6 Remonter verrouiller et refixer le bo tier de commande l aide de 2 vis qui avaient t enlev es l tape 3 7 Remettre en place le couvercle de l ensemble avec les vis enlev es l tape 1 8 Remettre l alimentation lectrique 5 0 FICHE TECHNIQUE DE L APPAREIL Mod le Date d installation de la fournaise Nos t l service Jour Nom et adresse du technicien de service R SULTAT DU TEST DE MISE EN MARCHE Gicleur Ajustements du br leur Bande principale Bande fine Position de la t te CO Temp rature des gaz la sortie de l unit Temp rature ambiante Tirage dans la chemin e Tirage au dessus du feu Examin par Indice de fum e Num ro de s rie 16 Soir Pression lb po Bacharach F F C E QE Tableau 5 Sp cifications techniques Mod le CBM T ERF Consommation BUS Puissance de chauffage BTU h 84000 98 000 Pression tuyau fum e C E vacuation chemin e OUI 2 3 4 3385 0 65 70B AFUE partir du standard CSA B212 et des lois canadiennes FUE A partir du standard ASHRAE
50. appareils de chauffage au combustible solide Code national d lectricit NFPA 31 ANSI NFPA 211 ANSI NFPA 70 CSA C22 1 Code canadien d lectricit Seule l dition la plus r cente des codes doit tre utilis e Les codes sont disponibles aux adresses suivantes selon le The National Fire Protection Agency Batterymarch Park Quincy MA 02269 L association des standards canadiens 178 boulevard Rexdale Rexdale Ontario M9W 1R3 AVERTISSEMENT RISQUE ENVIRONNEMENTAL Ne pas suivre cet avertissement peut polluer l environnement Retirer et recycler toutes les composantes et les mat riaux i e huile composantes lectriques et lectroniques isolation etc avant la disposition de l unit 2 0 INSTALLATION 2 1 G N RALIT S Cet appareil de chauffage central est une v ritable unit multi positions puisqu il peut fonctionner dans quatre configurations diff rentes c est dire en d bit ascendant contre courant d bit descendant l horizontale avec le d bit d air de gauche droite et l horizontale avec le d bit d air de droite gauche Seules quelques modifications effectu es lors de Finstallation sont requises pour passer d une position a l autre L appareil de chauffage central est exp di en configuration de d bit ascendant et les instructions pour changer aux autres positions sont incluses dans ce manuel L unit est exp di e avec le br leur et les contr les Elle
51. ature Ambient temperature Chimney draft Overfire draft Test performed by 14 Serial number Night Pressure lb po Bacharach W C W C Table 5 Technical Specifications yw T o ooOSS Yy T D 6 1 10 154 000 126 000 13 29C 55 BF 0 06 10 0025 0 06 to 0 026 max 10 025 max 10 025 AFG Burner tube insertion length 27 8 27 8 2 7 8 YES YES 5 3 8 31646 2 374 3383 0 50 70W 0 75 708 AFUE From CSA B212 standard and Canadian regulation GE AFUE 96 From CSA B212 standard and Canadian regulation AFUE max From ASHRAE 103 stadard and US regulation DATA j 7 Blow er speed at 0 50 W C static pressure MED LOW MED HIGH HIGH MED LOW MED HIGH HIGH Motor HP number of speeds 1 3 HP 4 speeds 3 4 HP 4 speeds Blow er w heel size in 12 x 10 ENERA L INFORMATIO 20 391 x 53 18 750 x 23 875 17 x 29 20 x 30 122 kg 270 bs 3 tons INPUT amp OUTPUT ADJUSTMENT see information below Pump pressure can be increased up to 180 PSIG 200 PSIG with Beckett burner at 1 10 USGPH Adjust flue gas temperature betw een 400 and 575 F Adjust fan speed for air temperature rise of 55 to 85 F Table 6 Air delivery in CFM with air filter i 090 and 105 EXTE 7 RE 0 3 WC 15 Figure 10 Model CBM Size 105 193 504 mm N T TE 306 mm 7 N N x KNOCKOUT BOTH SIDES F
52. c une inclinaison vers l avant Si l appareil est install dans cette position le mazout peut couler dans le vestibule et cr er un risque d incendie NOTE est de la responsabilit et de l obligation du consommateur de contacter un technicien qualifi pour s assurer que l installation est conforme aux r glements locaux et nationaux a Cette fournaise N EST PAS con ue pour tre install e dans des maisons mobiles des caravanes ou des v hicules r cr atifs b NE PAS utiliser cette fournaise comme chaufferette de construction ou pour chauffer un b timent en construction c Utiliser uniquement le type de mazout autoris pour cette fournaise voir la section 1 2 de ce manuel Une surchauffe provoquera une d fectuosit de l changeur de chaleur et un fonctionnement dangereux d V rifier les lignes au mazout pour tout signe d humidit indiquant une fuite e S assurer que la fournaise dispose d une alimentation ad quate d air de combustion et de ventilation f L vacuation des gaz de combustion doit s effectuer par la chemin e g Les points num r s la section 3 Op ration sont essentiels au fonctionnement normal et s curitaire du syst me de chauffage S assurer qu ils ont tous t s bien suivis h Suivre les r glements des codes d installation ANSI NFPA No 31 Etats Unis et CSA B139 au Canada ou des codes locaux pour l installation du r servoir de mazout
53. climatisation ou thermopompe 11 2 4 10 Installation l horizontale ou d bit Aer 3 0 OPERATION cassi Ane 12 3 1 V RIFICATION DE L AJUSTEMENT DU VENTILATEUR 222 dns mat Dette tn mets k s 12 3 2 V RIFICATION DU FONCTIONNEMENT 12 3 3 PURGE DE LA LIGNE DE MAZOUT 13 3 4 VERIFICATION DE LA COMBUSTION 13 3 5 VER FICATION DES LIMITEURS DE TEMP RATURE na on alo tans tert sit 14 3 6 AIR CONDITIONN A L ANN E 14 3 7 CHAUFFAGE umu u uu aaa deele ee 14 3 8 CLIMATISATION 2225022357240200 32 0260525660042012 ea 14 3 9 INTERRUPTEUR DE VENTILATION CONTINUE 14 4 0 ENTRETEN coa 14 4 1 NETTOYAGE DE L CHANGEUR DE CHALEUR latines ge unai AREAS 14 4 2 D MONTAGE DU VENTILATEUR 14 43 NETTOYAGE DU DISPOSITIF D ARR T ANTI REFOULEMENT BVSO 15 5 0 FICHE TECHNIQUE DE L APPARELL 16 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 Figure 16 Figure 17 FIGURES D bit descendant protecteur de tuyau fum e 5 Diagrammes lectriqUes 9 Branchement du syst me anti refoulement installation en d bit d air ascendant et vacuation A e azi u PA Ad 9 Branchement dispositif anti refoulement installation d bit ascendant et vacua
54. d the return air must be sealed and also be directed to the space other than where the furnace is located Incorrect ductwork termination and sealing will create a hazardous condition that can lead to bodily harm AA CAUTION Return air grilles and warm air registers must not be obstructed IMPORTANT The dampers should be adequate to prevent cooled air from entering the furnace and if manually operated must be equipped with the means to prevent operation of either the cooling unit or the furnace unless the damper is in the full cool or heat position NOTE The back should not be cut out for return air ducting The proper sizing of warm air ducts is necessary to ensure satisfactory furnace operation Ductwork should be in accordance with the latest editions of NFPA 90A Installation of Air Conditioning and Ventilating Systems and NFPA 90B Warm Air Heating and Air Conditioning Systems or Canadian equivalent The supply ductwork should be attached to the flanged opening provided at the discharge end of the furnace See Figures 10 and 11 for the dimensions of this opening Knockouts are provided on both sides of the furnace to cut the required size of opening for the installation of the return air ductwork This can be done on either the right or the left side of the furnace See Table 2 for location and dimensions Also there is provision on this furnace for a bottom return air duct Knockouts are provided in the fl
55. de suspension sont acceptables Quand l appareil de chauffage central est install avec un d bit horizontal il ne doit pas tre install sur un plancher combustible moins que la sous base approuv e KLASBO701DET soit utilis e Le d gagement minimum requis pour chacune des positions de l appareil de chauffage central est sp cifi dans les tableaux 7 et 8 L appareil de chauffage central devrait tre situ aussi pr s que possible de la chemin e ou de l vent de fa on a maintenir les raccordements courts et directs L appareil de chauffage central devrait galement tre situ le plus pr s possible du centre de distribution d air du syst me 2 4 1 Air pour la combustion et la ventilation Les facilit s de ventilation l emplacement de l appareil de chauffage central devraient permettre une combustion satisfaisante du mazout une ventilation ad quate et le maintien d une temp rature ambiante s curitaire sous des conditions normales d utilisation L emplacement ne devrait pas interf rer avec la circulation de l air dans l espace confin Consulter le code d installation CAN CSA B139 pour obtenir les r glements concernant l approvisionnement en air de combustion et de ventilation Si l appareil de chauffage central est install dans un placard ou autre espace ferm 2 ouvertures de ventilation sont requises pour l air de combustion Les ouvertures devraient tre situ es l avant de l appareil de
56. dicates a G J S manufacturer s participation in the program For verification of certification for individual products go to www ahridirectory org Catalog No IM CBM O2FR X40190 Rev B Remplace IM CBM O1FR X40190 Rev A Copyright 2011 CAC BDP e 7310 W Morris St e Indianapolis IN 46231 Printed in Canada Edition Date 11 11 Le manufacturier se r serve le droit de modifier a tout moment les sp cifications et design sans pr avis ni obligation TABLE DES MATI RES 1 0 S CURIT si bi teka ana ne tan 3322 S 3 1 1 DANGER MISE EN GARDE ET AVERTISSEMENT cest ene bible ese ek pape penk 1 2 R GLES DE S CURIT G N RALES 2 0 INSTALLATION iio 3 2 11 G N RALIT S uu umu uapa a aaa 3 2 2 RECOMMANDATIONS POUR UNE INSTALLATION S CURITAIRE 90203 202620 sees ht sieves edit 4 2 3 R GLES DE S CURIT L INSTALLATION 4 2 3 1 NN p e a a a a 4 2 3 2 Temp rature froide et votre b timent 5 2 4 EMPLACEMENT ir susunan Sa Diada ierit 5 2 4 1 Air pour la combustion et la ventilation 5 2 4 2 Recommandations pour les conduites 6 2 4 3 Instructions d vacuation chemin e 7 2 4 4 R gulateur de tirage cccccccccicne 8 2 4 5 Dispositif d arr t anti refoulement BVSO 8 2 4 6 BrQleur Qu MAZOUL sis sid its 10 2 4 7 Syst me lectrique a 11 2 4 8 el 11 2 4 9 Unit de
57. drain the water lines if possible Open faucets in appropriate areas b Have someone check the structure frequently during cold weather to make sure it is warm enough to prevent pipes from freezing Contact a qualified service agency if required 2 4 LOCATION CAUTION This furnace is not watertight and is not designed for outdoor installation This furnace shall be installed in such a manner as to protect the electrical components from water Outdoor installation will lead to hazardous electrical conditions and to premature furnace failure CAUTION If this furnace is installed in an attic it is important to keep insulation at least 0 3 m 12 away from any furnace openings Some types of insulating material may be combustible The unit must be installed in a location where the ambient and return air temperature is over 15 C 60F This furnace is approved for reduced clearances to combustible construction Therefore it may be installed in a closet or similar enclosure As this unit may be installed as an upflow counter flow or horizontal furnace it may be located in a basement on the same level as the area to be heated suspended or in a crawispace In any case the unit should always be installed level In a basement or when installed on the floor as in a crawlspace it is recommended that the unit be installed on a concrete pad that is 2 5 cm to 5 0 cm 1 to 2 thick When installed in the count
58. duite d alimentation devrait tre attach e a la bride d ouverture qui se trouve la sortie d air chaud de l appareil de chauffage central Se r f rer aux figures 10 et 11 pour les dimensions de cette ouverture Des formes pr d coup es sur les deux c t s de l appareil permettent de d couper l ouverture requise pour l installation des conduites de retour d air L installation de la conduite de retour peut donc se faire soit du c t gauche ou du c t droit de l appareil de chauffage central Se r f rer au tableau 2 pour l emplacement et les dimensions La conduite de retour d air peut galement tre install e sur le dessous de l appareil de chauffage central Des formes pr d coup es se trouvent sur le dessous pour faciliter le d coupage de l ouverture requise pour le tiroir filtres d air et la conduite de retour d air Nous recommandons d utiliser cette ouverture pour les installations en position horizontale et en d bit descendant Les recommandations suivantes devraient tre suivies lors de l installation des conduites a Pour quilibrer le syst me installer des clapets verrouillant dans chacun des branchements des conduits individuels Ajustez les clapets de fa on assurer la pression statique d sir e la sortie de l appareil de chauffage central b Un raccord fait de conduit flexible non combustible devrait tre install sur l appareil pour les syst mes d alimentation et de retour d air
59. e 2 Wiring diagram BVSO 8 1 1 DANGER WARNING AND CAUTION 3 Figure 3 Blocked vent shut off device wiring upflow 1 2 SAFETY INSTALLATION REQUIREMENTS 3 t nstallation with vertical exhaut 8 2 0 INSTALLATION 3 Figure 4 Blocked vent shut off device wiring upflow installation with vertical exhaust oooooocoonninni 9 2 4 GENERAL 3 Figure 5 Blocked vent shut off device wiring upflow 2 2 SAFE INSTALLATION REQUIREMENTS 4 i i d nstallation with horizontal exhaust 9 FRE AE a D Figure 6 Blocked vent shut off device wiring horizontal e E T arts S installation with horizontal exhaust 9 Se Freezng temperatures and your Building S Figure 7 Blocked vent shut off device wiring downflow 2 4 LOCATION 5 installation nr het 9 2 4 1 Air for combustion and ventilation 5 Figure 8 Blocked vent shut off device wiring downflow 2 42 Duct recommendations 6 installation Hecht kh eid meine hh At 9 2 4 3 Venting instructions chimney installation 6 Figure 9 Blower Start Stop delays Board 1158 11 2 44 Draft Regulator
60. e can cause condensation and shorten the life of the heat exchanger 2 4 10 Horizontal or downflow installation 1 On horizontal installations determine which side will become the top when the unit is laid down Remove the flue pipe clearance knockout from the top front of that side panel Install the flue elbow so that it exits the cabinet of the furnace through that opening 2 On counterflow Installations the flue pipe must exit the cabinet through one of the side panel openings as above then extended up the side of the furnace Ensure that adequate clearances to combustibles are observed It may be necessary to install a sheet metal shield on an adjacent wall to prevent any possibility of a fire hazard 3 Remove the burner If its a Beckett burner models loose the mounting nuts and turn the oil burner slightly counter clockwise to unlock the burner flange For the Riello burner models unscrew the mounting nuts Avoid putting undue strain on burner wiring It may be necessary to disconnect the burner wiring in some cases 4 To reinstall the Beckett burner insert the burner in the burner flange bolts and turn the burner clockwise to lock it then tighten the nuts 3 0 OPERATION 3 1 SUPPLY AIR ADJUSTMENTS This unit is equipped with 4 speed blower motors The supply air must be adjusted based on heating air conditioning output and the static pressure of the duct system For the desired air flow please refe
61. e combustion parameters are necessarily modified Refer also to the burner instruction manual In order to obtain optimum performance from the oil burner the following set up procedures must be followed by referring to the Technical Specifications Table 5 in this manual 1 A test kit to measure the smoke flue draft and over fire pressure should be used in order to obtain the proper air band setting Although all of the above measurements are required for optimum set up and efficiency the most important reading that must be taken is the smoke number in the flue pipe downstream from the regulator 2 The proper smoke number as established by way of engineering tests is between 0 and 1 This degree of smoke emission is commonly referred to as a trace It is recommended that a Bacharach True Spot Smoke Test kit or equivalent be used 3 Follow the next steps to do the combustion check verification a Drill a minimum proper diameter about 9 32 test hole in the flue pipe approximately 18 inches from the furnace breech b From a cold start let the unit operate for about 5 minutes c Set the burner air setting until you have between 0 and 1 on the Bacharach Scale or a trace d Take a CO sample at the same test location where the smoke reading was taken and make note of it e Adjust the burner air setting to obtain a CO reading 1 5 lower or a O2 reading 2 0 higher than the reading associated with
62. e oil pump is equipped with a special fitting that facilitates the purging of any air between it and the tank The proper procedure for performing this operation is as follows a Place a piece of 1 4 diameter clear plastic tubing over the purge fitting on the oil pump b Start the oil burner then open the purge fitting and allow the burner to run until the purge tube is completely free of air bubbles c At this point tighten the purge fitting which will allow the oil to run to the nozzle and fire the burner If the purging takes longer than 15 seconds and no flame has been established the burner will stop Push the reset button on top of the Primary Control to restart the burner For detailed information on the operation of the Primary Control please refer to the instructions included with the furnace or the burner 3 4 COMBUSTION CHECK IMPORTANT The heat exchanger metal surfaces may have oil and the baffle insulation also contains binders These products will burn or evaporate when the unit operates for the first time Because of this the smoke reading may be inexact during the first minutes of operation Therefore the unit must operate during at least 60 minutes before taking any readings to adjust the combustion quality Let the unit cool down before making any adjustments IMPORTANT The combustion check verification MUST be performed after the nozzle replacement or the burner cleaning After these manipulations th
63. e que les vitesses du moteur entra nement direct du ventilateur doivent tre chang es pour obtenir le d bit d air de refroidissement requis 3 7 CHAUFFAGE La vitesse du ventilateur a t ajust e en usine pour fournir le d bit d air requis une pression statique normale des conduites 3 8 CLIMATISATION La vitesse du ventilateur peut tre ajust e sur place afin de fournir le d bit d air requis pour la climatisation tel qu indiqu dans le tableau 4 3 9 INTERRUPTEUR DE VENTILATION CONTINUE Cet appareil de chauffage central est muni d une option de ventilation continue vitesse r duite D s que le thermostat de la pi ce ne demande ni chauffage ni refroidissement le ventilateur va fonctionner vitesse r duite de fa on permettre la circulation de l air Si l option de ventilation continue n est pas d sir e utiliser le bouton situ sur le c t de la bo te de contr le pour enlever la vitesse constante 4 0 ENTRETIEN AX AVERTISSEMENT Avant de commencer l entretien s assurer que tous les appareils en amont de l appareil de chauffage central soit teints position OFF a moins que les r parations ne requi rent express ment que le courant soit allum Le non respect de cet avertissement augmente les risques d incendie ou de dommage corporels Ne jamais faire fonctionner cet appareil de chauffage central sans filtre air Les filtres jetables devraient tre remplac s au moins une fo
64. equirements In unconfined spaces in buildings of conventional frame brick or stone construction infiltration may be adequate to provide air for combustion ventilation and dilution of flue gases This determination must be made on an individual installation basis and must take into consideration the overall volume of the unconfined space the number of windows and ventilation openings the number of doors to the outside internal doors which can close off the unconfined space and the overall air tightness of the building construction Many new buildings and homes and older ones that have been weatherized must be considered as being tight construction and therefore infiltration will not be sufficient to supply the necessary air for combustion and ventilation A building can be considered as being of tight construction when a Walls and ceilings exposed to the outside have a continuous water vapour retarder with a rating of one perm or less openings have gaskets or are sealed and or b Weather stripping has been added on operable windows and doors and or c Caulking or sealant has been applied to areas such as joints around window and doorframes between sole plates and floors between wall ceiling joints between wall panels at penetrations for plumbing electrical and fuel lines and at other openings 2 4 2 Duct recommendations WARNING When ducting supplies air to a space other than where the furnace is locate
65. er flow position this furnace must not be installed on combustible flooring unless the approved sub base is used Model KLASBOG01DET Since the flue pipe is in counter flow position be sure that the clearances from the flue pipe to combustible construction are maintained Also it is recommended to use the flue pipe protection kit KLADCO101DET or KLADCO201DET Please refer to the Figure 1 and the installation instructions included with the kit Figure 1 Counterflow position flue pipe protection KLADCO101DET KLADCO201DET DNS 0278 Rev A When installed in an horizontal position the furnace may be suspended by using an angle iron frame as long as the total weight of both the furnace and the frame are included in the calculations Other methods of suspension are acceptable When installed in the horizontal position this furnace must not be installed on combustible flooring unless the approved sub base is used Model KLASBO701DET The required minimum clearances for this furnace in all positions are specified in Tables 7 and 8 The furnace should be located as closely as possible to the chimney or vent in order to keep vent connections short and direct The furnace should also be located near the centre of the air distribution system 2 4 1 Air for combustion and ventilation This furnace should be installed in a location in which the facilities for ventilation permit satisfactory combust
66. euillez vous r f rer aux figures 2 8 aux diagrammes lectriques de Punit figures 12 et 13 et aux instructions d taill es fourni avec le dispositif d arr t anti refoulement Pour que le c blage lectrique fourni avec l unit soit suffisamment long il est important que le dispositif d arr t soit install entre la sortie d vacuation de l unit et le r gulateur de tirage tel qu indiqu sur les instructions fournies avec le dispositif d arr t anti refoulement Pour plus de d tails r f rez vous aux instructions fournies avec le dispositif ainsi que la section 4 de ce manuel AVERTISSEMENT RISQUE DE FEU ET D EMPOISONNEMENT PAR MONOXYDE DE CARBONE Ne pas respecter cet avertissement pourrait entrainer des blessures corporelles la mort et ou des dommages mat riels Ne red marrez pas l appareil ou la fournaise si la cause de l interruption n a pas t identifi e et corrig e par un technicien qualifi Assurez que le dispositif d arr t anti refoulement a t nettoy avant de mettre en service AVERTISSEMENT RISQUE DE FEU ET D EMPOISONNEMENT PAR MONOXYDE DE CARBONE Ne pas respecter cet avertissement pourrait entra ner des blessures corporelles la mort et ou des dommages mat riels Le dispositif d arr t anti refoulement DOIT tre inspect e et entretenue annuellement par une agence qualifi e Le dispositif d arr t doit aussi faire l objet d un entretien annuel R
67. fage central ne doit pas tre vacu dans une chemin e vacuant d j un appareil de chauffage au combustible solide Avant d vacuer l appareil dans une chemin e v rifier l tat de la chemin e et effectuer les r parations n cessaires Le recouvrement et les dimensions de la chemin e doivent respecter les normes des codes locaux ou nationaux La superficie sans obstruction de la chemin e doit tre suffisamment grande pour contenir tous les produits de combustion vacu s dans cette chemin e Les exigences suivantes sont fournies pour assurer un syst me d vacuation s curitaire a S assurer que la fum e de la chemin e est exempte de salet s ou d bris S assurer que la chemin e ne dessert pas de foyers Les tuyaux ne doivent jamais tre plus petits que le diam tre de sortie de l appareil de chauffage central d Tous les tuyaux doivent tre soutenus par des brides de serrage et ou des courroies Compter au moins un support par 1 2 m 45 e Les tuyaux horizontaux doivent tre install s avec une pente ascendante d au moins 20 mm par 1 m 1 4 par 1 f La distance parcourue par les tuyaux devrait tre la plus courte et la plus droite possible g Les soudures doivent tre herm tiques et v rifi es pour viter les fuites h Le rebord du tuyau de fum e doit arriver vis vis la paroi interne de la chemin e et ne doit pas d pass l int rieure de la chemin e i La chem
68. ffage central 2 D connecter le tuyau fum e 3 Enlever le panneau de la bride fum e situ sur le devant de l appareil de chauffage central air chaud 4 Enlever le d flecteur du radiateur 5 D connecter la ligne de mazout et sortir le br leur au mazout de l appareil de chauffage central 6 Ouvrir les deux portes de nettoyage situ es en haut du panneau avant de l appareil de chauffage central air chaud 7 Nettoyer les tuyaux secondaires et le cylindre principal l aide d une brosse rigide et d un aspirateur 8 Avant le r assemblage inspecter l changeur de chaleur et la chambre de combustion afin de d terminer s ils ont besoin d tre remplac s 9 Apr s le nettoyage replacer le d flecteur du radiateur la bride fum e le br leur au mazout et refermer les 2 portes d acc s pour le nettoyage Reconnecter le tuyau fum e et la conduite de mazout 10 R ajuster le br leur pour qu il fonctionne ad quatement 4 2 DEMONTAGE DU VENTILATEUR Pour sortir le ventilateur de l appareil de chauffage central 1 teindre position OFF tous les appareils en amont de l appareil de chauffage central 2 Enlever la porte d acc s du br leur et la porte du ventilateur 3 Enlever la vis de retenue du ventilateur situ e sur le panneau s parateur 4 Enlever le couvercle de la bo te de contr le d brancher le thermostat et les fils lectriques du panneau 5
69. ice functions make sure that all utilities are turned OFF upstream from the appliance unless operations specifically require the power to be on Failure to comply with this warning will cause a fire hazard and or bodily harm This furnace should never be operated without an air filter Disposable filters should be replaced at least once a year If equipped to provide cooling filters should be replaced at a minimum of twice a year To avoid personal injury make sure the power is OFF before servicing ALWAYS KEEP THE OIL VALVE CLOSED IF THE BURNER IS SHUT DOWN FOR AN EXTENDED PERIOD OF TIME For optimum performance the oil burner nozzle should be replaced at least once a year The procedure for the installation and or replacement of a nozzle is outlined in the oil burner instruction manual which is supplied with the furnace After replacing the nozzle the burner should be adjusted in accordance with the COMBUSTION CHECK section of this manual 4 1 HEAT EXCHANGER CLEANING Normally it is not necessary to clean the heat exchanger or flue pipe every year but it is advisable to have a qualified service technician check the unit before each heating season to determine whether cleaning or replacement of parts is required If cleaning is necessary the following steps should be taken 1 Turn OFF all utilities upstream from the furnace 2 Disconnect the flue pipe only with chimney venting and rig
70. icleur ou apr s un nettoyage du br leur Apr s ces manipulations les param tres de combustion sont n cessairement modifi s R f rer aussi au manuel d instructions accompagnant le br leur 13 Pour obtenir des performances optimales du br leur au mazout suivre les proc dures d installation suivantes R f rer au tableau 5 sp cifications techniques 1 l aide de la trousse de test mesurer la densit de la fum e le tirage au tuyau d vacuation et la pression ou le tirage au dessus de la flamme afin d obtenir un bon ajustement de la bande d air M me si toutes ces mesures sont requises pour un ajustement optimal et des donn es efficaces la lecture la plus importante est le niveau de fum e qui doit tre mesur dans le tuyau d vacuation avant le r gulateur de tirage 2 Le niveau de fum e d sir a t tabli entre 0 et 1 par des tests d ing nierie Ce degr d mission de fum e est souvent appel trace de fum e Il est recommand d utiliser la trousse du test de fum e Bacharach ou un quivalent 3 Afin d effectuer la v rification de la combustion suivre les tapes suivantes a Percer un orifice d analyse des gaz de diam tre minimum appropri e environ 9 32 dans le tuyau de raccordement environ 18 pouces de la bride d vacuation de la fournaise b Suite un d part froid laisser fonctionner l unit environ 5 minutes c Ajuster l air au br leur pour avoi
71. id flue pipe 3 Remove the breech plate Remove the radiator baffle 5 Disconnect the oil line and remove the oil burner from the furnace 6 Open the two cleanout doors located in the upper part of the front panel of the furnace 7 Clean the secondary tubes and the primary cylinder with a stiff brush and a vacuum cleaner 8 Before reassembly the heat exchanger and combustion chamber should be inspected to determine if replacement is required 9 After cleaning replace the radiator baffle flue collar plate oil burner and close the two clean out access doors Reconnect the flue pipe and oil line 10 Readjust burner for proper operation 4 2 BLOWER REMOVAL To remove the blower from the furnace 1 Turn OFF all utilities upstream from the furnace 2 Remove the burner access door and blower door 3 Remove the blower retaining screw on the blower partition panel 4 Remove the control box cover and disconnect the thermostat and power wires from the board Slide the blower on the rails toward the front of the unit Reverse the above steps to reinstall the blower Please refer to the wiring diagrams Figures 12 and 13 in this manual or the diagram located on the inside of the blower door to properly rewire the unit CAUTION Be sure that the blower is adequately supported when sliding it off the mounting rails especially in the horizontal or counter flow positions in order to prevent dropping
72. il line joints for signs of leakage f Connect furnace to the chimney g The points in Part 3 Operation are vital to the proper and safe operation of the heating system Take the time to ensure that all steps were followed h Follow the regulations of the NFPA No 31 in the USA and CSA B 139 in Canada or local codes for placing and installing the oil storage tank i Follow a regular service and maintenance schedule for efficient and safe operation j Before servicing allow furnace to cool down Always shut off electricity and fuel to furnace when servicing This will prevent electrical shock or burns k Seal supply and return air ducts The vent system MUST be checked to determine that it is the correct type and size m Install correct filter type and size n Unit MUST be installed so that electrical components are protected from direct contact with water 5 2 3 SAFETY RULES Your unit is built to provide many years of safe and dependable service provided it is properly installed and maintained However abuse and or improper use can shorten the life of the unit and create hazards for you the owner 2 3 1 Detector a The U S Consumer Product Safety Commission recommends that users of oil burning appliances install carbon monoxide detectors There can be various sources of carbon monoxide in a building or dwelling The sources could be gas fired clothes dryers gas cooking stoves water heate
73. in e doit d passer de 0 9 m 3 sa sortie du toit du b timent Elle doit d passer d au moins 0 6 m 2 toute partie d difice se situant dans un rayon horizontal de 3 0 m 10 de la chemin e Elle doit se prolonger d au moins 1 5 m 5 au dessus de la derni re bride a fum e connect e j V rifiez les codes locaux pour toute divergence Chemin es fabriqu es en usine ll est possible d utiliser les chemin es fabriqu es en usine qui sont list es Se r f rer aux instructions du manufacturier de chemin es pour une installation ad quate 2 44 R gulateur de tirage Le r gulateur de tirage fourni avec la fournaise DOIT tre utilis pour assurer un fonctionnement ad quat Les instructions d installation sont incluses avec le r gulateur 2 4 5 Dispositif d arr t anti refoulement BVSO Pour vacuation par chemin e Toutes les fournaises install es au Canada doivent avoir un dispositif d arr t anti refoulement BVSO 4h MISE EN GARDE Le dispositif doit obligatoirement tre install par une agence qualifi e Le dispositif est con u pour d tecter une mauvaise vacuation des gaz de combustion lorsque le tuyau d vacuation est bouch Lors d une anomalie au niveau de P vacuation le refoulement des produits de combustion l interrupteur thermique permet l arr t du br leur au mazout Le dispositif requi re une remise en fonction manuelle Pour installation et le c blage lectrique v
74. ion of oil proper venting and the maintenance of ambient temperatures at safe limits under normal conditions of use The location should not interfere with the proper circulation of air within the confined space Refer to the CAN CSA B139 installation code for complete regulations and for guidance on retrofit applications When this furnace is installed in a closet or similar enclosure 2 ventilation openings are required for combustion air The openings should be located about 15 2 cm 6 from the top and the bottom of the enclosure at the front of the furnace Table 1 indicates the minimum dimensions required for each of these two ventilation openings Table 1 Minimum dimensions required in ventilation openings Input 75 000 105 000 45 72 cm 18 20 32 cm 8 120 000 155 000 50 80 cm 20 25 40 cm 10 4 WARNING Do not block the combustion air openings in the furnace Any blockage will result in improper combustion and may result in a fire hazard and or cause bodily harm The barometric draft regulator included with the furnace shall be installed in the same room or enclosure as the furnace in such a manner as to prevent any difference in pressure between the regulator and the combustion air supply Air requirements for the operation of exhaust fans kitchen ventilation systems clothes dryers and fireplaces shall be considered in determining the adequacy of the space to provide combustion air r
75. is par ann e Si l appareil de chauffage 14 central est quip pour la climatisation les filtres devraient tre remplac s au moins deux fois par ann e Pour viter des blessures s assurer que le courant lectrique est coup AVANT de commencer la maintenance TOUJOURS FERMER LA VALVE DU RESERVOIR AU MAZOUT QUAND LE BRULEUR EST ARRETE POUR DE LONGUES PERIODES Pour obtenir une performance optimale le gicleur du br leur au mazout devrait tre remplac au moins une fois par ann e Contactez le technicien de votre fournisseur pour cette proc dure La proc dure d installation et ou de changement du gicleur est r sum e dans le manuel d instructions du br leur au mazout inclus avec l appareil de chauffage central Une fois le gicleur remplac le br leur doit tre ajust en suivant les directives de la section VERIFICATION DE LA COMBUSTION du manuel d instructions 4 1 NETTOYAGE DE L CHANGEUR DE CHALEUR En g n ral il n est pas n cessaire de nettoyer l changeur de chaleur ou le tuyau fum e tous les ans mais il est recommand de faire v rifier votre unit par le technicien de br leurs au mazout avant chaque saison de chauffage afin de d terminer si le nettoyage ou le remplacement de certains composants est requis Si un nettoyage est n cessaire les tapes suivantes devraient tre effectu es 1 teindre position OFF tous les appareils en amont de l appareil de chau
76. isation ou thermopompe Un serpentin pour la climatisation peut tre install sur l alimentation d air chaud SEULEMENT MISE EN GARDE RISQUE D INTOXICATION AU MONOXYDE DE CARBONE Installer un serpentin de climatisation vaporateur du c t des conduits d alimentation en air chaud Un serpentin install du c t du retour d air peut causer de la condensation et un bris pr matur de l changeur de chaleur Ceci peut entra ner la mort des blessures et ou des dommages mat riels Aucun espace minimum n est requis entre le dessous du serpentin de climatisation et le dessus de l changeur de chaleur Si une thermopompe est install e un thermostat bi nergie ou un autre contr le est requis pour pr venir l op ration simultan e de la fournaise et de la thermopompe Il pr vient aussi la transition directe du mode de chauffage thermopompe au mode de chauffage au mazout Se r f rer aux instructions du thermostat ou du contr le pour un branchement ad quat Si un cabinet souffleur avec serpentin de climatisation vaporateur est utilis installer des volets de contr le de d bit d air tanche motoris et automatique L air froid venant de l vaporateur et passant travers la fournaise peur causer de la condensation et r duire la dur e de vie de l changeur de chaleur 2 4 10 Installation Phorizontale ou d bit descendant 1 Pour l installation horizontale d terminer d abord quel
77. isconnect switch or circuit breaker between the main power panel and the unit Use only copper wire for 115V supply service to the unit Metallic conduit where required used may terminate at the side panel of the unit It is not necessary to extend the conduit inside the unit from the side panel to the control box When replacing any original furnace wiring use only 105 C 16 AWG copper wire Instructions for wiring the thermostat are provided with the thermostat field supplied Wire the connections to the 24 volt terminal board on the primary relay as shown in Figures 12 and 13 When installing optional accessories to this appliance follow the manufacturer s installation instructions included with the accessory Other than wiring for the thermostat wire with a minimum of type T insulation 17 C rise 63 F must be used for accessories 2 4 8 Air filter An external filter rack is provided as standard equipment with this furnace The filter rack can be installed on the right or left side panel or on the bottom of the furnace to accommodate the return air ductwork A sufficient clearance should be provided for air filter access Please refer to Table 2 for filter rack flange dimensions for return air duct Do not use this furnace as a construction heater Use of this furnace as a construction heater exposes it to abnormal conditions contaminated combustion air and the lack of air filters Failure to follow this wa
78. it and injuring yourself or damaging the blower 4 3 BLOCKED VENT SHUT OFF BVSO CLEANING For continued safe operation the Blocked Vent Shut Off System BVSO needs to be inspected and maintained annually by a qualified service technician WARNING ELECTRICAL SHOCK HAZARD Failure to follow this warning could result in personal injury or death Disconnect electrical power supply to the furnace before servicing the blocked vent shut off 1 Remove the two screws holding down the BVSO assembly cover 2 Remove the cover 3 Remove the two screws holding the control box to the heat transfer tube assembly Sliding the control box in the appropriate direction will unlock it form the heat transfer tube assembly 4 Carefully remove any build up from the thermal switch surface CAUTION Do not dent or scratch the surface of the thermal switch If the thermal switch is damaged it must be replaced 5 Clear and remove any build up or obstruction inside the heat transfer tube 6 Re mount lock and fasten the control box with the 2 screws removed in step 3 7 Re attach the assembly cover with the screws removed in step 1 8 Re establish power to the appliance 5 0 FURNACE INFORMATION Model Furnace installation date Service telephone Day Dealer name and address START UP RESULTS Nozzle Burner adjustments Primary air Fine air Drawer Assembly CO Smoke scale Gross stack temper
79. le Any irregularities such as burning to one side or pulsating flame patterns should be corrected by changing the nozzle 3 5 LIMIT CONTROL CHECK After the fumace has been in operation for at least 15 minutes restrict the return air supply by blocking the filters or closing the return registers and allow the furnace to shut down on High Limit The burner will shut OFF but the main blower should continue to run Remove the restriction and the burner should come back on in a few minutes 3 6 YEAR ROUND AIR CONDITIONING The furnace is designed for use in conjunction with cooling equipment to provide year round air conditioning The blower has been sized for both heating and cooling however the fan motor speed may need to be changed to obtain the necessary cooling airflow 3 7 HEATING The blower speed is factory set to deliver the required airflow at normal duct static pressure 3 8 COOLING The blower speed may be adjusted in the field to deliver the required airflow for cooling applications as outlined in Table 4 3 9 CONSTANT BLOWER SWITCH This furnace is equipped with a constant low speed blower option Whenever the room thermostat is not calling for heating or cooling the blower will run on low speed in order to provide air circulation If this constant blower option is not desired the rocker switch on the side of the control box can be used to turn it off 4 0 MAINTENANCE 4 WARNING Before performing any serv
80. let size of the furnace d All pipes should be supported using the proper clamps and or straps These supports should be installed at least every 4 feet e All horizontal runs of pipe should have at least 20 mm of upward slope per 1 m 1 4 per 1 f All runs of pipe should be as short as possible with as few turns as possible g Seams should be tightly joined and checked for leaks h The flue pipe must not extend into the chimney but be flush with the inside wall i The chimney must extend 0 9 m 3 above the highest point where it passes through a roof of a building and at east 0 6 m 2 higher than any portion of a building within a horizontal distance of 3 m 10 It shall also be extended at least 1 5 m 5 above the highest connected equipment flue collar j Check local codes for any variances Factory Built Chimneys Approved factory built chimneys may be used Refer to chimney manufacturer s instructions for proper installation 2 4 4 Draft Regulator The draft regulator supplied with the furnace must be used for proper functioning Installation instructions are included with the control 2 4 5 Blocked vent shut off BVSO For chimney venting All oil furnaces installed in Canada must have a blocked vent shut off WARNING It is imperative that this device be installed by a qualified agency This device is designed to detect the insufficient evacuation of combustion gases in the eve
81. nded that any existing vent system be completely inspected On any chimney or vent this should include the following a Inspection for any deterioration in the chimney or vent lf deterioration is discovered the chimney must be repaired or the vent replaced b Inspection to ascertain that the vent system is clear and free of obstructions Any blockages must be removed before installing this furnace c Cleaning the chimney or vent if previously used for venting a solid fuel burning appliance or fireplace d Confirming that all unused chimney or vent connections are properly sealed e Verification that the chimney is properly lined and sized per the applicable codes Please refer to list of codes in Part 1 2 Masonry Chimneys This furnace may be vented into an existing masonry chimney However it must not be vented into a chimney servicing a solid fuel burning appliance Before venting this furnace into a chimney the chimney must be checked for deterioration and repaired if necessary The chimney must be properly lined and sized per local and or national codes The chimney must be of sufficient area to accommodate the total flue products of all appliances vented into the chimney The following requirements are provided for a safe venting system a Ensure that the chimney flue is clear of any dirt or debris b Ensure that the chimney is not servicing an open fireplace c Never reduce the pipe size below the out
82. nt of a vent blockage In such a case the thermal switch will shut down the oil burner The device will then need to be re armed MANUALLY Please refer to Figures 2 to 8 the wiring diagrams Figures 12 and 13 and the detailed instructions supplied with the BVSO for the installation and wiring procedures The length of wires supplied with the unit is such that the safety device must be installed between the flue outlet of the appliance and the draft regulator as indicated in the instructions For more details refer to the instructions supplied with the device itself as well as section 3 of this manual WARNING FIRE CARBON MONOXIDE POISONINC HAZARD Failure to follow this warning could result in personal injury death and or property damage DO NOT reset the device or restart the furnace unless the cause of the interruption has been identified and corrected by a qualified agency Ensure that the blocked vent shut off has been cleaned by a qualified agency before placing into service Annual inspection and cleaning of the blocked vent shut off by a qualified agency is required a WARNING FIRE CARBON MONOXIDE POISONINC HAZARD Failure to follow this warning could result in personal injury death and or property damage The blocked vent shut off MUST be inspected and maintained annually by a qualified agency It is also essential that the BVSO be maintained annually For more details please refer to the instructi
83. ntral peut se trouver dans un sous sol l tage qui va tre chauff il peut tre suspendu ou install dans un vide sanitaire Dans tous les cas il doit 6tre install au niveau Si l appareil de chauffage central est install dans un sous sol ou sur le sol dans un vide sanitaire par exemple il est recommand d installer l unit sur une base en b ton de 254 mm a 50 8 mm 1 2 d paisseur Quand l appareil de chauffage central est install avec un d bit descendant il ne doit pas tre install sur un plancher combustible moins que la sous base approuv e KLASB0601DET soit utilis e Comme le tuyau fum e est en position de d bit descendant s assurer que le d gagement requis entre le tuyau fum e et la construction combustible est respect De plus il est recommand d utiliser l ensemble de protection de tuyau fum e KLADCO101DET ou KLADCO201DET R f rer au dessin ci dessous et aux instructions d installations inclus avec l ensemble de protection Figure 1 D bit descendant protecteur de tuyau a fum e KLADCO101DET KLADCO201DET 4 PL aa Ee W d DNS O278 Rev A Dans sa position horizontale l appareil de chauffage central peut tre suspendu a l aide d une charpente en fer angle a condition de consid rer la fois le poids total de l appareil de chauffage central et la charpente dans les calculs de support D autres m thodes
84. oires optionnels sur cet appareil suivez les instructions d installation du manufacturier inclus avec l accessoire A part pour le thermostat utilisez du fil avec une isolation de type T minimum hausse de 17 C 63F pour les accessoire s 2 4 8 Filtre air Un tiroir filtre externe est fourni comme quipement de base avec l appareil de chauffage central Ce tiroir peut tre 11 install sur le panneau de gauche ou de droite ou sur le dessous de l appareil pour faciliter le retour d air des conduits Allouer un d gagement suffisant pour permettre l acc s au filtre d air Voir le tableau 2 pour les dimensions du support filtre et du filtre air utiliser Ne pas utiliser l appareil de chauffage central comme appareil de chauffage de construction Une telle utilisation expose l appareil des conditions anormales comme de l air de combustion contamin et l absence de filtres air Le non respect de cet avertissement peut conduire une d faillance pr matur e de l appareil de chauffage central et ou une d faillance du ventilateur ce qui accro t les risques d incendie et ou de dommages corporels Tableau 2 Dimensions de l ouverture du retour z Filtre air Ouverture Mod le S I a Dimensions Dimensions CBM 16 x 24 15 x 23 Capacit 105 40 64 x 60 96 cm 38 10 X 58 42 cm 20 x 30 17 x 29 45 72 X 76 20 cm 43 18 X 73 66 cm CBM Capacit 120 2 4 9 Unit de climat
85. om either The National Fire Protection Agency 1 Batterymarch Park Quincy MA 02269 The Canadian Standards Association 178 Rexdale Blvd Rexdale Ontario M9W 1R3 CAUTION ENVIRONMENTAL HAZARD Failure to follow this caution may result in environmental pollution Remove and recycle all components or materials i e oil electrical and electronic components insulation etc before unit final disposal 2 0 INSTALLATION 2 1 GENERAL This central heating unit is a true multi position unit in that it can operate in four different configurations i e upflow counter flow downflow and horizontal both left to right and right to left airflow Very few modifications are required during installation to change the furnace from one configuration to another The furnace is shipped in the upflow configuration however instructions on how to change to the other configurations are included in this manual The furnace is shipped complete with burner and controls It requires a 115VAC line voltage connection to the control panel thermostat hook up as shown on the wiring diagram one or more oil line connections suitable ductwork and connection to a properly sized vent The air handling capacity of this furnace is designed for cooling as well Please refer to Table 6 for the expected airflow at various external static pressures 2 2 SAFE INSTALLATION REQUIREMENTS WARNING Installation or repairs performed by un
86. ombustibles ASCENDANT A AA CARRIERE FOURVASE _ _ C emm J DESSOUS JFOURNAISE PLANCHER COMBUSTBLEAVEC BASE a a TUYAU FUM E HORIZONTALE OU SOUS LE TUYAU FUM E 10 16 cm 4 10 16 cm 4 10 16 cm 4 VERTICALE AU DESSUS DU TUYAU A FUMEE 22 86 cm 9 22 86 cm 9 22 86 cm 9 DEVANT FOURNAISE 20 32 cm 8 20 32 cm 8 60 96 cm 24 T Lorsque la base KLASB0601DET ou KLASBO701DET est utilis e 18 Figure 11 Mod le CBM Capacit 120 2 1004 mm 608 mm ENTRE DEFON POUR TUYAU 7 31 462 33 1190 mm 844 mm OIL INLET BOTH SIDES yo ENTRE DEFONCABLE POUR Z LIGNE A L HUILE CHAQUE COTES 1346 mm ELECTRICAL CONNECTIONS BOTH SIDES 711 mm 45 L ENTRE DEFONCABLE POUR ALIMENTATION wk d 8 ELECTRIQUE CHAQUE COTES RONT DEVANT SIDE COTE DNS 0141 Rev E Tableau 8 D gagement minimum mat riaux combustibles EMPLACEMENT APPLICATION ASCENDANT DESCENDANT HORIZONTAL See 5080m 2 5 08 cm 27 en CARRIERE FOURNAISE e FER mn g x g DESSOUS FOURNAISE PLANCHER COMBUSTIBLE AVEC BASE o 9 10 16 cm 4 TUYAU A FUMEL EORIZONTALE OU SOUS LE
87. onnexion la limite haute Voir Figure 2 e a a s al DNS 1043 Rev A 2 4 6 Br leur au mazout Cet appareil de chauffage central vient avec un br leur t te de r tention atomisation haute pression Ne pas utiliser du mazout plus lourd que 2 Sur les mod les avec br leur Beckett AFG la bride de montage est fix e au tube d air du br leur et aucun ajustement n est requis pour la longueur d insertion Pour les mod les avec br leur Riello r f rez vous aux Sp cifications Technique tableau 5 afin de connaitre la longueur d insertion MISE EN GARDE Si le br leur est un mod le Beckett AFG NE JAMAIS utiliser la fonction d allumage ignition interrompue Raccordements pour le mazout Des instructions compl tes pour l installation des tuyaux de mazout se trouvent dans les instructions d installation du br leur au mazout incluses avec l appareil de chauffage central Des ouvertures pour l entr e de la ligne de mazout ont t usin es dans les panneaux de c t Deux ouvertures se situent sur chaque panneau pour qu un syst me deux tuyaux puisse tre utilis si d sir Un filtre au mazout 10 microns ou moins devrait tre utilis avec tous les br leurs au mazout et devrait tre install aussi pr s que possible du br leur 2 4 7 Syst me lectrique AVERTISSEMENT L ext rieur de l unit doit poss der une mise la terre ininterrompue pour minimiser les risques de
88. ons supplied with the device itself as well as Section 4 of this Manual WARNING CAUTION ELECTRICAL SHOCK HAZARD CUT HAZARD Failure to follow this warning could result in personal Failure to follow this caution may result in personal injury or death injury Disconnect electrical power supply to the furnace Sheet metal parts may have sharp edges or burrs Use before wiring the blocked vent shut off care and wear appropriate protective clothing safety glasses and gloves when handling parts and servicing furnaces Figure 2 Wiring diagram BVSO EQUIPEMEN ND z e 2 OPERATING LIMIT SWITCH 2 START PRIMARY 1 Eo OH A LIMIT SAFETY LIMIT SWITCH A 27 REMOTE LOW VOLTAGE i AOF AC ALARM IT IF USED AO ON SELECTED MODELS Fee RO Y L2 NEUTRAL H a A APPLIANCE L2 sa P BVSO violet y yc PRIMARY VALVE CONTROL e gt Li IGNITION BLUE IGNITION LEN Beete TBURNER ORANGE MOTOR YELLOW cap CELL gt CELL 24 VAC THERMOSTAT BURNER CONTROL BOX DNS 01340 Rev A FACTORY WIRED Beckett Burner Riello Burner Figure 3 Blocked vent shut off device wiring upflow installation with ver
89. oor of the furnace to facilitate the cut out requirement for the air filter rack and return ductwork We recommend the use of this opening for horizontal and counterflow installations The following recommendations should be followed when installing ductwork a Install locking type dampers in all branches of the individual ducts to facilitate balancing the system Dampers should be adjusted such a way as to ensure the proper static pressure at the outlet of the furnace b A flexible duct connector of non combustible material should be installed at the unit on both the supply and return air side In applications where an extremely quiet operation is necessary the first 3 m 10 of supply and return ducts should be internally lined with acoustical material if possible c In cases where the return air grille is located close to the fan inlet there should be at least one 90 turn between fan inlet and grille Further reduction in sound level can be accomplished by installing acoustical turning vanes or lining the duct as described in item b above d When a single air grille is used the duct between grille and furnace must be the same size as the return air opening in the furnace When installing the furnace with cooling equipment for year round operation the following recommendations must be followed for tandem or parallel air flow WARNING POISONOUS CARBON MONOXIDE GAS HAZARD Install the evaporator coil on the suppl
90. pareil de chauffage central est quip d un moteur entra nement direct 4 vitesses Il faut v rifier que le d bit d air est ajust en fonction de la puissance de chauffage et de climatisation ainsi qu en fonction des pressions statiques du syst me de distribution d air Consulter les tableaux 3 et 4 pour les d bits d air de ventilation sugg r s R f rer aussi au tableau 6 pour les d bits d air en fonction de la pression statique des sp cifications techniques du tableau 5 de ce manuel Tableau 3 Ajustement vitesse de ventilateur moteur 4 vitesses mode chauffage MOD LE CAPACIT DE EN AO FOURNAISE CHAUFFAGE RECOMMEND E 0 50 USGPH MED LOW 0 65 USGPH MED HIGH Dee 105 085USGPH_ MED LOW 110USGPH HIGH Pour faire l ajustement les fils ROUGE et BLEU peuvent tre d plac s sur le moteur V rifier aussi que la position des fils sur le contr le lectronique de l unit est tel que sp cifi sur le diagramme lectrique Si la vitesse de chauffage et de climatisation est identique le fil ROUGE doit tre d plac sur UNUSED LEADS du contr le CBM Capacit 120 12 lectronique et le cavalier fourni avec le fil BLEU doit tre utilis entre les terminaux HEAT et COOL Tableau 4 Ajustement vitesse de ventilateur moteur 4 vitesses mode climatisation MOD LE CAPACIT DE ANS FOURNAISE CHAUFFAGE RECOMMEND E CBM Capacit 105 2 0 TONS MED LOW 2 5 TONS MED HIGH
91. qualified persons can result in hazards to them and others Installation MUST conform to local codes or in the absence of same to codes of the country having jurisdiction The information contained in this manual is intended for use by a qualified service technician familiar with safety procedures and quipped with the proper tools and test instruments Failure to carefully read and follow all instructions in this manual can result in death furnace malfunction and or property damage WARNING FIRE HAZARD The furnace must be installed in a level position never where it will slope toward the front If the furnace is not installed level oil will drain into the furnace vestibule and create a fire hazard NOTE It is the personal responsibility and obligation of the customer to contact a qualified installer to ensure that the installation conforms to governing local and or national codes and ordinances a This furnace is NOT approved for installation in mobile homes trailers or recreational vehicles b Do NOT use this furnace as a construction heater or to heat a building under construction c There must be a sufficient supply of fresh air for combustion as well as ventilation in the area where the furnace is located d Use only the type of fuel oil approved for this furnace see section 1 2 of this manual Overfiring will result in heat exchanger failure and cause dangerous operating conditions e Visually check all o
92. r to Table 3 and 4 as well as the air flow Table 6 based on static pressure in the Technical Specifications Table 5 of this manual Table 3 Blower speed adjustments 4 speed motor heating mode FURNACE HEATING RECOMMENDED CBM SIZE 105 CBM SIZE 120 To effect the adjustment the RED and BLUE wires can be changed on the motor Also please refer to the position of the wires on the electronic board of the unit and consult the wiring diagrams If the heating and the air conditioning speeds are the same the RED wire must be moved to UNUSED LEADS on the electronic board and the jumper provided with the BLUE wire must be used between the HEAT and COOL terminals Table 4 Blower speed adjustments 4 speed motor cooling mode MODEL CAPACITY BLOWER SPEED CBM SIZE 105 CBM SIZE 120 The blower start stop delays can be adjusted by positioning the DIP switches on the electronic board as shown on the Figure 9 Figure 9 Blower Start Stop delays Board 1158 2 Min 30 Sec 1 Min DELAY O OFF DELAY OFF 11 3 2 OPERATIONAL CHECKLIST Before starting up the unit be sure to check that the following items are in compliance 1 The electrical installation the oil supply system the venting system combustion air
93. r une lecture de fum e sur l chelle Bacharach entre 0 et 1 ou une trace d Faire le test de CO2 la m me localisation et prendre en note la lecture e Ajuster la quantit d air pour obtenir une lecture du CO de 1 5 de moins ou O2 de 2 de plus que la lecture correspondant une lecture de fum e Bacharach de une trace f Cette m thode d ajustement du br leur permet une combustion propre lecture de fum e de 0 une trace et assure un bon fonctionnement du syst me 4 Afin d assurer un tirage ad quat dans l appareil de chauffage central installer le r gulateur de tirage barom trique fourni avec l appareil Pour que ce r gulateur fonctionne correctement monter les goupilles pins lhorizontale et le devant du r gulateur a la verticale voir les instructions incluses avec le r gulateur Ajuster le r gulateur de tirage apr s que l appareil de chauffage central ait fonctionn au moins 5 minutes et r gler entre 025 W C et 035 WC 5 La pression au dessus de la flamme mesur e travers la porte d observation situ e au centre au dessus du br leur dans le panneau avant de l appareil de chauffage central est requise pour d terminer s il y a un blocage dans l changeur de chaleur ou le tuyau Les valeurs des pressions sont inscrites dans le tableau 5 sp cifications techniques Une pression excessive peut tre caus e soit par une combustion d air excessive due
94. rning can lead to premature furnace failure and or vent failure that could result in a fire hazard and or bodily harm 10 Table 2 Filter rack flange dimensions for return air duct Model Air Filter Size Flange Opening CBM SIZE 105 16 x 24 40 64 x 60 96 cm 20 x 30 45 72 X 76 20 cm 15 x 23 38 10 X 58 42 cm 17 x 29 43 18 X 73 66 cm CBM SIZE 120 2 4 9 Air Conditioner or Heat Pump An air conditioning coil may be installed on the supply air side ONLY WARNING POISONOUS CARBON MONOXIDE GAS HAZARD Install the evaporator coil on the supply side of the furnace ducting ONLY An evaporator coil installed on the return air side of the ducting can cause condensation to form inside the heat exchanger resulting in heat exchanger failure This in turn can result in death bodily injury No minimum clearance is required between the bottom of the coil drain pan and the top of the heat exchanger If a heat pump is installed a dual energy thermostat or other control is required in order to prevent the simultaneous operation of the furnace and the heat pump It also prevents a direct transition from heating by way of the heat pump to heating with oil Refer to the thermostat instructions or those of another control used for the proper wiring If a coil blower compartment is used install air tight motorized and automatic air dampers Cold air coming from the coil and passing across the furnac
95. rs furnaces gas fired fireplaces wood fireplaces and several other items Carbon monoxide can cause serious bodily injury and or death Therefore to help alert people to potentially dangerous carbon monoxide levels you should have carbon monoxide detectors listed by a nationally recognised agency ex Underwriters Laboratories or International Approval Services installed and maintained in the building or dwelling see Note below b There can be numerous sources of fire or smoke in a building or dwelling Fire or smoke can cause serious bodily injury death and or property damage Therefore in order to alert people to potentially dangerous fire or smoke you should have fire and smoke detectors listed by Underwriters Laboratories installed and maintained in the building or dwelling see Note below NOTE The manufacturer of your furnace does not test any detectors and makes no representations regarding any brand or type of detector AA CAUTION Ensure that the area around the combustion air intake is free of snow ice and debris 2 3 2 Freezing temperatures and your building WARNING FREEZING TEMPERATURE WARNING Turn off water supply If your heater remains shut off during cold weather the water pipes could freeze and burst resulting in serious water damage If the structure is unattended during cold weather you should take the following precautions a Turn off main water supply into the structure and
96. tical exhaut The position of the hole _ ______________ gt in the vent is subject to ja Blocked Vent Shut Off the length of the device BVSO electrical kit Electrical kit supplied Use the three wire fasteners The wires must not come in contact with the flue and Connect the green Ben cleaning pipes ground wire to a LA cabinet screw Connect the wires to the free Limit Control terminals DNS 1043 Rev A Figure 4 Blocked vent shut off device wiring upflow installation with vertical exhaust Connection to high limit contacts See Fiaure 2 Figure 5 Blocked vent shut off device wiring upflow installation with horizontal exhaust Connection to high limit contacts See Fiaure 2 DNS 1043 Rev A Figure 6 Blocked vent shut off device wiring horizontal installation with horizontal exhaust Connection to high limit contacts See Fiaure 2 DNS 1043 Rev A Figure 7 Blocked vent shut off device wiring horizontal installation with vertical exhaust DNS 1043 Rev A Connection to high limit contacts Figure 8 Blocked vent shut off device wiring downflow installation Connection to high limit contacts See Figure 2 2 4 6 Oil burner This furnace is supplied with a high pressure atomizing retention head type burner for use
97. tion verticale 4 10 Branchement dispositif anti refoulement installation d bit ascendant et vacuation horizontale 10 Branchement dispositif anti refoulement installation horizontale avec vacuation horizontale 106424710 Branchement dispositif anti refoulement installation horizontale avec vacuation verticale 10 Branchement dispositif anti refoulement installation descendant iia 10 D lais de d part et d arr t du ventilateur 12 Mod le CBM Capacit 105 18 Mod le CBM Capacit 120 19 Diagramme lectrique br leur Beckett 20 Diagramme lectrique br leur Riello 21 Liste de pi ces CBMAAA036105 22 Liste de pi ces CBMAAA060120 24 Liste de pi ces CBMAAR036105 26 Liste de pi ces CBMAAR060120 TABLEAUX Tableau 1 Dimensions minimales requises pour les ouvertures d V ntilation 52 2 ve u u e asa seere else 6 Tableau 2 Dimensions de l ouverture du retour 11 Tableau 3 Ajustement vitesse de ventilateur moteur 4 vitesses mode chauffage 12 Tableau 4 Ajustement vitesse de ventilateur moteur 4 vitesses mode climatisation
98. ual as follows Immediate hazards which WILL result in death or serious bodily and or material damage WARNING Hazards or unsafe practices which CAN result in death or serious bodily and or material damage CAUTION Hazards or unsafe practices which CAN result in minor bodily and or material damage 1 2 SAFETY INSTALLATION REQUIREMENTS WARNING For use with grade 2 fuel oil maximum Do NOT use gasoline crankcase oil or any oil containing gasoline WARNING Never burn garbage or paper in the heating system and never leave rags or paper around the unit CAUTION These instructions are intended for the sole use of qualified personnel trained in installing this type of furnace Installation of this furnace by an unqualified person can lead to hazardous conditions resulting in bodily harm and or equipment damage IMPORTANT All local and national code requirements governing the installation of oil burning equipment wiring and flue connections must be followed Some of the codes that may be applicable are CSA B139 Installation Code for Oil Burning Equipment ANSI NFPA 31 Installation of Oil Burning Equipment ANSI NFPA 90B Warm Air Heating and Air Conditioning Systems ANSI NFPA 211 Chimneys Fireplaces Vents and Solid Fuel Burning Appliances ANSI NFPA 70 National Electrical Code CSA C22 2 No 3 Canadian Electrical Code Only the latest issues of the above codes should be used and are available fr
99. y side of the furnace ducting ONLY An evaporator coil installed on the return air side of the ducting can cause condensation to form inside the heat exchanger resulting in heat exchanger failure This in turn can result in death bodily injury a On tandem airflow applications the coil is mounted after the furnace in an enclosure in the supply air stream The furnace blower is used for both heating and cooling airflow b On parallel airflow installation dampers must be provided to direct air over the furnace heat exchanger when heat is desired and over the cooling coil when cooling is desired 2 4 3 Venting instructions chimney installation The furnace must be vented to the outside in accordance with local codes and other authorities having jurisdiction CAUTION Oil fired appliances must be connected to flues having sufficient draft at all times to ensure safe and proper combustion For additional venting information please refer to ANSI NFPA 211 Chimneys Fireplaces Vents and Solid Fuel Burning Appliances and or the CSA B139 Installation Code This furnace is certified for use with a Type L vent maximum flue gas temperature 302T 575F The f lue pipe clearance knockout in the front top or side panel should be removed Install the flue elbow so that it exits the furnace cabinet through that opening Pre installation vent system inspection Before this furnace is installed it is strongly recomme

Download Pdf Manuals

image

Related Search

Related Contents

Vol. 2 No 4  OM, CSE1835, CSE1935S, CSE2040, CSE2040S, 2014-04  1:4 Splitter for HDMI® 1.3  ngh_12_user_guide  DVM205AM  Emerson 24000C Data Sheet  JA-12 Fixed Angle Rotor Manual  Betriebsanleitung  Philips BDP5200  Extron electronic Extron Electronics Switch 12800 User's Manual  

Copyright © All rights reserved.
Failed to retrieve file