1. a Leave from all edged of panel w v If an overlay of tiles or carpet i5 to be installed a second layer of OSB or PLYWOOD s recommended to prevent damage to the flooring FLOORING COMPOSITE RESIN BOARD DIAMOND PLATE PLYWOOD AND OSB Try to always lay panels perpendicular to steel deck D eee enw ee noo 1 Use 8 xl 1 2 Use 8 xl 1 2 Wood Screw screw at every 18 wood screw screw at every 16 2 Plywood and OSB Composite resin board eo ci eee enw se oon Use rivet 1 4 1 2 pre drill 1 4 holes at every 197 Stager panels so that joints break on I at different ribs when possible wide x 14 gauge min steel shims are used when joints breaks on a valley Diamond plate STEP 2 FLOORING OPEN STEEL PLANKING A N Cutting and fitting for O S P iS done by installer Piztectsecton ooo joist orientation Vv Drill 23 6 holes in at locations over joists Install 4 flat heak tek screw with Robertson bit Use 15 screws per OOsa tt You must stagger the joints to ensure a solid floor system Attach each O 5 F to it s adjacent O S P at every e4 max using 25 1 6 xl bolts STEP 2 FLOORING BAR GRATING Install bar grating panels starting with
2. FLOORING INSTALLATION MANUAL 3 WALL BRACKET AND OPTIONAL PART a EO Copyright January 2009 Cogan Wire and Metal Products Ltd All rights reserved Cogan raster LEANER BETTER 21 47 1 HEX 21 47 1 3 4 HEX HEAD SCREW HEAD TER SCREW 5 21 47 4 FLAT 21 47 2 FLAT HEAD TEK SCREW HEAD TEK SCREW z QUU HT 1 2 WOOD SCREW gl A x1 2 RIVET 29 16 1 BOLT STEP STEEL DECK ROOF DECK For all types of flooring notching and fitting may occur Column extension post 7 post Kickplate HM 18 enter center TOF VIEW zd SIDE VIEW Install root deck panels starting with row Always begin from edge ot a channel or wall Check on your installation drawings to know where to put the first panel and the lenght of it Continue with row 2 and fix it side by side with an overlap all along the panel Row In order to prevent joist rotation steel deck must be screwed on all joist at 19 max distance Once you ve reached the last row you may trim the roof deck along edge of the channel or toward the wall or you may leave the overlap STEP 2 FLOORING COMPOSITE RESIN BOARD DIAMOND PLATE PLYWOOD AND OSB Cutting and fitting for composite deck 15 done by installer Leave 3 8 gap between walls and edges Channel ot panelsaround perimeter of mezzanine Kickplate
3. row The bar grating panel lenght indicated on your installation drawing plan Lay the panels side by side Kickplate Prost orientation Vv row row 2 row 3 row 4 Install bar clips on all joists at 8 max distance Use g1 A xl 3 4 hex head tek screw N STEP 2 to installation drawings FLOORING CONCRETE a DL tor kickplate instruction After installing kickplate all around the mezzanine make sure there are no possibility of leaking anywhere You can then proceed to lay your steel deck and AFTER lay your concrete floor over the steel deck Handrail post it beam If back to back channel deck Kickplate STEP 3 WALL BRACKET anchor SCrew gt Channel STEP 3 OPTIONAL PART LOADING PLATE Install the loading plate at gate opening swing sliding or lift ovt To attach A N tek screw to the flooring along the edge of loading plate THE LOADING PLATE IF SIZED TO MATCH THE OPENING NO ADJUSTMENT REQUIRED Diamond plate i gt
Download Pdf Manuals
Related Search
Related Contents
MANUAL DO UTILIZADORDA CAIXA TM Getting Started with Freescale MQX™ RTOS - Other SuperMicro Super Server 6013PT (sys-6013p-t) ECK-07 外付けタイプ(B4出力) Copyright © All rights reserved.
Failed to retrieve file