Home
Center Cleanout Installation Manual
Contents
1. D amp R MANUFACTURING Center Cleanout Installation Manual 27 30 Bins Dave Bissett 7 10 2013 1 Locate center of bin Measure from 4 points on the bin wall see Figure 1 ensure that 1 3 and 2 4 are the same Accurate location of this hole is critical to success of installation Bin Wall Figure 1 Finding Bin Center 2 Cut out a hole 31 diameter for vertical auger centered on this hole Suggested method is to drive a self tapping screw through floor at point located in step 1 then using a 15 string to scribe a line around that point 3 Dig out for cleanout Dig about 15 down taper hole to 16 diameter at the bottom See Figure 2 Figure 2 Vertical Cleanout Pit 4 Place vertical cleanout in hole as shown in Figure 3 Point spout roughly in direction desired Do not screw down at this point 5 Locate which side you want auger to exit bin Cut a hole 14 wide by 12 high centered between indicated stiffeners Use bin wall brace to set height and position of hole as shown in Figure 4 Center brace between stiffeners as bolt clearances will be tight later Drill the 4 holes to bolt the brace to the wall at this point but do not attach brace 6 Remove bin wall brace Remove legs from horizontal cleanout auger Feed horizontal auger from outside the bin through the hole twisting as required to allow leg mounts to clear Feed to vertical cleanout and place bolt through mounting ears shown in Fi
2. gure 5 Install chute guides also Figure 5 Replace brace on bin wall but do not bolt into position Reinstall legs Unit should resemble Figure 6 Figure 5 Cleanout mounting ears and guide 7 Carefully lower aeration and rotate vertical auger as required for leg clearance 27 bins will require the colliding leg to be cut away and a new leg to be bent backwards and installed over aeration as shown in Figure 7 Note that aeration skin is not shown for clarity but leg is installed over skin 8 Lift aeration away Without rotating lift edge of vertical auger and caulk Screw down with hex head self tapping screws Drill holes in bin wall for outer covers Note that the lower cover is bolted to the back of the bin wall brace and will force the location of all other parts Suggested method is to place panels on inside while marking holes so brace is not in the way Put foam weather stripping around outside of panels Mount panels outside of bin as shown and bolt into place Caulk anywhere you can see daylight except for rod covers See Figures 8 and 9 for details Ciaqrirna Q Anteida uiar lin ra 19 Il nanatratinn Figure 8 Outside view bin wall penetration Eris OQ lahettaa tnar Ala case ll innianantbsnietai Figure 9 Inside view bin wall penetration
Download Pdf Manuals
Related Search
Related Contents
GE CSHS5UGX User's Manual Télécharger le PDF Epson Perfection V39 Brochure Operating Instructions (summary) User Manual - Congrès Mondial de Linguistique Française Copyright © All rights reserved.
Failed to retrieve file