Home
Sauna Installation Manual
Contents
1. therapy is approx 115 130F The 135F 150F settings on the control panel are for users who prefer higher temperatures 2 How often should I turn on the Air lonizer The Air lonizer should only be used at the end of your session for approx 5min It will act to purify the air for your next sauna session To power on ionizer press the outside light button To operate press on off button on ionizer 3 Can I use my West Coast Sauna outdoors In order to achieve optimal results West Coast Saunas recommends that you install your sauna indoors However we do offer canvas covers for your sauna if your space is limited to outdoors only Please note that if sauna is placed outdoors heating the sauna may take longer 4 How do clean my West Coast Sauna You may wipe down heaters that have accumulated sweat and the wood inside using a damp cotton cloth The exterior may be treated with a wood polish 5 Does West Coast Saunas have any other recommendations We strongly recommend that you gradually introduce your body to infrared sauna therapy You should drink sufficient amount of fluids prior to during and after your sauna session in order to assist with the Detox process and to prevent dehydration Although most clients will sweat during their first few sessions others require more time and therapy Infrared therapy is like any other therapy it will take time for your body to adjust and to produce the desired results WEST COAST SAU
2. FOR THE UNITED STATES AND CANADA Electrical Testing Laboratories ETL was founded in 1896 by Thomas Edison and is one of the oldest product safety testing laboratories in the world Certification by ETL and ETL C assures you that all Signature models have been tested to meet both US and Canadian safety and performance standards CE CERTIFIED EUROPEAN SAFETY STANDARDS The CE Mark is a requirement for products sold to the European Market The CE Mark identifies a product as complying with the health and safety requirements spelled out in European legislation and is mandatory for equipment operating in the European Union EU ROHS DIRECTIVE The RoHS Directive stands for the restriction of the use of certain hazardous substances in electrical and electronic equipment This Directive bans the placing on the EU market of new electrical and electronic equipment containing more than agreed levels of lead cadmium mercury hexavalent chromium polybrominated biphenyl PBB and polybrominated diphenyl ether PBDE flame retardants WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 21
3. Malibu Del Mar WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 8 www MontrealSauna ca Step 1 Open Box C Floor panel Roof panel Bench panel Accessories box Lay the floor panel at your desired location The floor heater is towards the front of the sauna Step 2 Open Box A Front panel Right Front Left Front Install the Front panel first by sliding the panel onto the metal brackets on the floor panel Next install the Left Front panel by raising it above Front panel and guiding it down into the metal brackets Next install Right Front panel by same method as Left Front panel Please remove plastic wrap from Front panel but be careful so that the glass door does not swing open At this point one person should secure both the panels by holding them WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 9 www MontrealSauna ca Step 3 Open Box B Right Back panel Left back Panel Install Right back Panel by sliding panel onto metal brackets on Floor panel Semi tighten Right Back panel to Right Front panel using Installation bolts accessories box Install Left back panel to Right back panel and Left Front panel note there are no metal brackets on this side of the floor panel Semi tighten using installation
4. Montreal Saunas West Coast Saunas id Vi s z AI af WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED www MontrealSauna ca TABLE OF CONTENTS INSTALLATION ELECTRICAL REOUIREMENTS 3 UNPACKING YOUR SAUNA 4 MALIBU AND DEL MAR INSTALLATION INSTRUCTIONS 5 8 NEWPORT INSTALLATION INSTRUCTIONS 9 12 HOLLYWOOD INSTRUCTIONS 13 16 HOW TO USE CONTROL PANEL INSTRUCTIONS 17 FREQUENTLY ASKED QUESTIONS 18 DISCLAIMER 19 WARRANTY AND RETURN POLICY INFORMATION 20 WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 2 www MontrealSauna ca Note The electric cord extends out from the top roof The cord is approximately 9ft long It is recommended that the location of the outlet you are installing be above 75 which is the height of the sauna Dedicated requires that no other appliance should share outlet circuit with sauna Failure to comply with this requirement may cause electrical interruption and diminished sauna performance It is recommended that a qualified electrician install your dedicated electrical wiring for proper sauna function and to avoid any potential electrical hazards ELECTRICAL REQUIREMENTS Malibu 110 120volts 15amp dedicated circuit outlet NEMA 5 15R required NEMA 5 15P included S Heaters 1600 w
5. NAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 18 www MontrealSauna ca Disclaimer West Coast Saunas and its associates do not provide medical guidance Consult a doctor for medical advice All of the information contained in this catalogue is for information purposes only We reserve the right to change without notice anything contained within the catalogue West Coast Saunas shall not be held responsible for printing variations Color variations may occur Some models are shown with optional features Please consult your physician if you are taking medications Please do not use sauna if under the influence of alcohol or drugs Do not use sauna if you are pregnant Do not allow animals inside sauna room Minor children should be supervised in order to prevent injury Do not use sauna for drying clothes bathing suits etc Do not expose heaters to moisture o p ee R K Do not use sauna for any other purpose than originally designed and intended West Coast Saunas and any of its subsidiaries and or associates shall not be held responsible for any misuse of the sauna by the customer West Coast Saunas shall not be held liable for any damage and or injury caused by customer misuse of product WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHT
6. R VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 13 www MontrealSauna ca Step 4 Install Bench Support panels located in Box C This step should be completed prior to installation of Right Panel Make all electrical connections and install Bench panels except for the Right Bench Panel You will need to complete step 5 first then make the Right side electrical connections Step 5 Install Right panel to Front and Back panels using Installation Bolts Semi tighten bolts Once all panels are fully secure tighten all bolts Next enter sauna and make final electrical connections to the Right panel you just installed Finally Install the Right Bench WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 14 www MontrealSauna ca Step 6 Install Roof panel Guide the roof panel over the sauna and secure into position Please feed all the electrical connections that are on the Front Back Right Left panels thru the holes in the roof panel Step 7 Once Roof Panel is securely in place proceed up top to make all electrical connections Please note that there are 3 white ribbon connections 2pin temp sensor 8pin power 9pin chromo Match the male female black electrical cord heater connections Step 8 Install Top Cover Feed the main power cord thru the hol
7. S RESERVED 19 www MontrealSauna ca Warranty We are so confident about our product we offer a Lifetime Warranty on cabinetry electrical and heating panels Just call or email a Customer Service Representative for any replacement parts The CD and or DVD player carries a separate warranty usually 6 months from date of purchase from the original manufacturer West Coast Saunas will perform all labor at our factory free of charge during the warranty period Customer is responsible for shipping warranted parts to West Coast Saunas at their expense Customer may elect to have replacement parts shipped to them when applicable in lieu of labor at the factory The warranty is deemed void if the sauna has been misused altered or left exposed to the elements of weather Cancellation Return Buyer may cancel and return the goods to Seller subject to the terms and conditions of this policy Buyer shall assume all risk of loss associated with the return as well as shipping handling restocking and other fees costs and expenses as described in this policy Seller reserves the right to refuse to refund any deposit or payment or cancel any payment due and any owing until such time as Seller a is in receipt of the goods b has inspected the goods and c in the Seller s discretion has found the goods to be free of damage All returned goods must be in their original packaging Seller may refuse to refund all or any portion of any payment or canc
8. T 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 11 www MontrealSauna ca Step 9 Install Door Handle If you have purchased the LCD Upgrade then you may connect it to the 12volt Cig adapter located on the ceiling if not then cover the adapter with the wood knob provided in your packaging Step 10 Once Installation is complete plug in sauna Please make sure to read the How to Use Instructions at the end of this booklet Newport WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 12 www MontrealSauna ca Step 1 Open Box C Floor panel Roof panel Bench panel Accessories box Lay the floor panel at your desired location The floor heater is towards the front of the sauna Step 2 Open Box A Front panel Back panel Install the Back panel first by sliding the panel onto the metal brackets on the floor panel Next install the Front panel by the same method used for the Back panel Please remove plastic wrap from Front panel but be careful so that the glass door does not swing open At this point one person should secure both Front and Back panels by holding them Step 3 Open Box B Right Panel Left Panel Install Left Panels by lining up the panels to the Front and Back Semi tighten Left panel to Front and Back using Installation bolts accessories box WEST COAST SAUNAS INC 2371 LA MIRADA D
9. atts Del Mar Newport 2 110 120volts 20amp dedicated circuit outlet NEMA 5 20R required NEMA 5 20P included 9 Heaters 2150 watts Hollywood 220 240volts 20amp dedicated circuit outlet NEMA 6 20R required NEMA 6 20P included 15 Heaters 2850 watts WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 3 www MontrealSauna ca Part A Installation Unpacking your Sauna Please identify the 3 boxes A B C that arrived in your shipment Place boxes in an open area All 3 boxes are labeled with the contents inside It is recommended that a minimum of 2 people be present for unpacking and assembly Lay boxes flat on the ground with lettering facing up Please make sure the area is clear of debris _ e aay k t p ee Nee tht WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 4 www MontrealSauna ca Step 1 Open Box C Floor panel Roof panel Bench panel Accessories box Lay the floor panel at your desired location The floor heater is towards the front of the sauna Step 2 Open Box A Front panel Back panel Install the Back panel first by sliding the panel onto the metal brackets on the floor panel Next install the Front panel by the same method used for the Back panel Please re
10. bolts Once all panels are securely in place fully tighten all bolts Step 4 Install Bench Support panels located in Box C Please make all electrical connections to the Back panel Install Bench panels located in Box C Step 5 Install Roof panel located in Box C Guide the roof panel over the sauna and secure into position Please feed all the electrical connections that are on the Front Back Right Left panels thru the holes in the roof panel WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 10 www MontrealSauna ca Step 6 Once Roof Panel is securely in place proceed up top to make all electrical connections Please note that there are 3 white ribbon connections 2pin temp sensor 8pin power 9pin chromo Match the male female black electrical cord heater connections Step 7 Install Top Cover Feed the main power cord thru the hole and secure cover to roof panel Please secure cover with screws provided Failure to properly secure cover may result in heat loss and diminished sauna performance Step 8 Install Cup Holder s Magazine Rack Towel Holder These items may be installed in any location that you desire Mount Air Purifier to Back panel by using a wood screw just like hanging a picture WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGH
11. e and secure cover to roof panel Please secure cover with screws provided Failure to properly secure cover may result in heat loss and diminished sauna performance WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 15 www MontrealSauna ca Step 9 Install Cup Holder s Magazine Rack Towel Holder These items may be installed in any location that you desire Mount Air Purifier to Back panel by using a wood screw just like hanging a picture Step 10 Install Door Handle If you have purchased the LCD Upgrade then you may connect it to the 12volt Cig adapter located on the ceiling if not then cover the adapter with the wood knob provided in your packaging Step 11 Once Installation is complete plug in sauna Please make sure to read the How to Use Instructions at the end of this booklet Hollywood Sauna WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 16 www MontrealSauna ca Part B How to Use 2 Time Display 3 Time Control 1 On Off AA Temp Display 5 Temp Control 7 Reading Light o x 6 Chromo Lights I S 8 Outside Lights Oxygen lonizer On Off Press Button to turn sauna on off Power must be on for CD player to operate Time Display Displays time for your sauna se
12. el payment due and owing if the Buyer fails to fully comply with or violates the terms and conditions of this policy All cancelled or returned goods shall be subject to a storage fees and costs associated with routing the goods b handling and restocking fee in the amount of 495 00 USD for each sauna c all shipping costs to and from the Seller and d Seller providing a return merchandise authorization RMA number Buyer s failure to obtain the RMA number shall result in Seller not accepting any returned shipment and Buyer paying all costs and fees All such costs and fees as determined by Seller shall be paid by Buyer to Seller upon demand by Seller WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 20 SAFETY CERTIFICATIONS We at West Coast Saunas are committed to making safety our 1 Priority Certifications assure you that our infrared saunas have met a certain level of quality construction as well as safety and performance standards Below is a list of our current certifications by companies authorized to approve the sauna safety standards in North America Canada and the European Union INTERNATIONAL ORGANIZATION FOR STANDARDIZATION Our manufacturing facility has implemented a quality management system in order to maintain the highest standards in product development and quality assurance INTERTEK S ETL SEMKO STANDARDS
13. move plastic wrap from Front panel but be careful so that the glass door does not swing open At this point one person should secure both Front and Back panels by holding them WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 5 www MontrealSauna ca Step 3 Open Box B Right Panel Left Panel Install Right and Left Panels by lining up the panels to the Front and Back Right Panel means Right facing the sauna Please semi tighten installation bolts located in accessories box When all 4 panels are securely in place please tighten all installation bolts Step 4 Install Bench Support panel located in Box C Please make all 4 electrical connections to the Back panel w kdl AEA l T SRI AA 1S f aa Step 5 Install Bench by guiding it between the Right and Left panels There are 2 small pieces of wood that may be used to prevent the back of the bench from sliding upward when user sits on front of bench They can be screwed to back wall The pieces of wood are included in the accessories box Wa A Z Wa oi _ s T 7 N h NAN __ ye WAA kam WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 6 www MontrealSauna ca Step 6 Install Roof panel Guide the roof panel o
14. ssion Time Control Adjust time up down Flashing numbers indicate desired time while steady numbers indicate time remaining Once time reaches 0 the heaters will shut off You must reset time to extend sauna session Temp Display Displays Temperature for your sauna session Temp Control Adjust temperature up down Flashing numbers indicate desired temperature while steady numbers indicate current temperature Celsius to Fahrenheit change hold both up down arrows simultaneously Chromo Lights Turn on off chromotherapy lights If you press this button once it will cycle thru all 7 lights If pressed more than once it will stay on the desired color Reading Light Turn on off inside reading light Outside Lights Turn onloff outside lights and oxygen ionizer This button must be pressed on for the oxygen ionizer to have power lonizer has its own on off button WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 17 www MontrealSauna ca 1 What is the optimal time temp for a typical sauna session West Coast Saunas recommends that you start out at approx 110 120F for your first few sessions in order for your body to adjust to infrared therapy After your initial sessions you may start to increase your temp into the higher ranges A typical infrared sauna session is approx 30 45min Please note that the optimal range for infrared
15. ver the sauna and secure into position Please feed all the electrical connections that are on the Front Back Right Left panels thru the holes in the roof panel Step 7 Once Roof Panel is securely in place proceed up top to make all electrical connections Please note that there are 3 white ribbon connections 2pin temp sensor 8pin power 9pin chromo Match the male female black electrical cord heater connections There are 2 in the front and 2 in the back Step 8 Install Top Cover Feed the main power cord thru the hole and secure cover to roof panel Please secure cover with screws provided Failure to properly secure cover may result in heat loss and diminished sauna performance WEST COAST SAUNAS INC 2371 LA MIRADA DR VISTA CA 92081 1 800 975 6180 www westcoastsaunas com COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED 7 www MontrealSauna ca Step 9 Install Cup Holder s Magazine Rack Towel Holder These items may be installed in any location that you desire Mount Air Purifier to Back panel by using a wood screw just like hanging a picture Step 10 Install Door Handle If you have purchased the LCD Upgrade then you may connect it to the 12volt Cig adapter located on the ceiling if not then cover the adapter with the wood knob provided in your packaging Step 11 Once Installation is complete plug in sauna Please make sure to read the How to Use Instructions at the end of this booklet
Download Pdf Manuals
Related Search
Related Contents
Copyright© 2000,2001 All Right Reserved. Manual Edition 1.2 78-520-511 Waxjet Pro.book Gainward 426018336-2401 NVIDIA GeForce GTX 460 1GB graphics card SUPRA FIT User Guide National Instruments NI 6115/6120 User's Manual Copyright © All rights reserved.
Failed to retrieve file