Troubleshooting and test management functionality for efficient

image

Contents

1. vi List of Tables Fable 3 1 LASt OE ideasi accurrit nr ento EEE E DUE Da CEDE UE Ta ATE UR a sion 11 Table 4 1 List of ideas with evaluation information essen nnne nre 18 Table 4 2 List of ideas with their priority ocoonooccnnnnnccccnnnoccnonnnonnnnnnnnonnnnnnnnnnncc nano nnncnnnnn cnc rnnnnnnccnnnnnss 19 Table 5 1 Raw value defimition n ont s Ft FE IS ER Re ERAT Re REEL Feb RUE EE Fe REDE RA RENTA i 23 Table 5 2 Decision Analysis Spreadsheet for all criteria in total eene 23 Table 5 3 Decision Analysis Spreadsheet for Accuracy esee eene 24 Table 5 4 Decision Analysis Spreadsheet for Usability eene 24 Table 5 5 Decision Analysis Spreadsheet for EffiCienhCY sssssersesssrersssrerrsrsesrrrssrrrrssrrrrssrnrrrnrrrrrnnr rn 25 Table 5 6 Decision Analysis Spreadsheet for Maintainability eene 25 Table 5 7 Decision Analysis Spreadsheet for Portability sssssesssssseessssersrsserersssrrrsssnrrsssrrrrnnr rn 25 Table 5 8 Decision Analysis Spreadsheet in total ooooonnnnncccnnonoccccnnooccnononoranononnoncnonnnnnnno rr rss rr rn nn en 26 Table 6 1 Machine decisioni making oerte d m aiti bai ig bestie i ke 28 vii List of Acronyms and Abbreviations C amp C CI EPC EPG EUTRAN FT GTP GUI PDC PDN PDP PDU PGW PIC SAE SGW ST SUT UE Mbps MB Capacity and Characteristic Continuous I
2. A basic test mainly tests if the system can be installed configured and brought to an operational state Five typical basic tests are boot upgrade downgrade light emitting diode diagnostic and command line interface tests Robustness test A robustness test shows the system s resilience in the event of any failure For example if one component of a system goes down by any reason e g power down the system should detect out the failure and restart the component or replace it with a spare component On the other hand with external operation the system should also be able to restart successfully Interoperability test An interoperability test determines if the system can interoperate with other products for example the communication between SGW and MME Performance test A performance test will measure the overall system s capacity e g throughput and response time Stress test A stress test is designed to test the system s performance while the offered load is in excess of the system s designed capacity 1 e push the system beyond its specified limits When the stress exceeds the specified limits the system is expected to start its overload protection mechanisms or to recover in case of failure Load and stability test The purpose of a load and stability test is to measure whether the system can remain stable for a sufficient period of time when the load reaches the maximum specified limits Some typical pro
3. a lot of discussion and comparison with system testers and developers within Ericsson PDU packet Core section each idea was fully discussed and evaluated with amount of work and payoff level as shown in Table 4 1 Table 4 1 List of ideas with evaluation information Idea Functions Amount of work Payoff Relative weeks 1 Pre check 5 weeks Medium 2 Real Time Status Tracking 9 weeks Low 3 Fault detection 11 weeks Low 4 Automatic log analysis 6 weeks High 5 Measurement Storage 6 weeks High 6 Abnormal message database 8 weeks Medium 7 Test requirement 4 weeks Low 8 Test statistics 5 weeks Low Based on the information of payoff and amount of work for each idea s implementation from Table 4 1 a PICK chart was drawn to identify the priority and the most useful ideas among them Implement 5b E Challenge e E Pre Check Abnormal Message DB 4 Possible Kill Easy Difficulty Hard Figure 4 1 Idea implementation PICK chart Finally the most useful ideas are automatic log analysis and measurement storage in online database while the priority of these ideas was shown in Table 4 2 Table 4 2 List of ideas with their priority Priority Functions 1 Automatic log analysis Measurement storage in online database Pre check Abnormal message database Test statistics Test requirement Real Time Status Tracking INIAN EA WIN Fault
4. a more automatic testing procedure decreasing the time required for analyzing logs monitoring the running status of each case in real time etc The result is to ease the work for system testers and thus to improve their efficiency 10 3 Idea Collection and Exhibition This chapter will introduce all the ideas that were collected or developed as the result of investigating current testing procedure within Ericsson PDU Packet Core section These ideas cover a broad area of system testing from real time monitoring and result submission in an online database to automatic log analysis and test statistics etc Some of the ideas originate from a current popular research area big data analysis while other ideas were brought up through a comparison between existing commercial tools and the testing method used within Ericsson Each idea will be described clearly from several different points of view in a section within this chapter Table 3 1 shows the list of the ideas that were thought to help regarding to different aspects of system testing Table 3 1 List of ideas Functions Description Pre check Guarantee the testing environment stability before testing Real time status tracking Real time monitoring the status of each test case run Fault detection Provide fault location and potential suggestions Automatic log analysis To achieve a more automatic analysis procedure after test case run Measurement storage Ma
5. can be recovered automatically after being terminated i e set to a non running state and if a spare PIC can take over the responsibility of the failed PIC The performance metrics of this robustness test case can be classified into the following categories Recovery time the time duration between when one PIC is terminated and the system has totally recovered after invoking self restart mechanism gt Alarms monitoring alarms that are generated during the terminating procedure should be cleared after a successful recovery Inter PIC communication the systems should be able to inform the spare PIC when a PIC is going to be killed In this way the traffic on the failed PIC can be transfered to the spare PIC in advance and the volume of the loss traffic can be decreased during the transfer of responsibility and gt Traffic the volume of traffic during three phases before the PIC failure during the PIC recovery after PIC recovery It is desired that the volume of traffic should be at an approximately same value i e that not traffic is lost 2 3 3 Performance test A performance test also called capacity and characteristic testing is mainly used for measuring the system capacity and response time 14 For example two performance tests are executed to test the EPG node and each test case has a different objective One test case is designed to test the maximum throughput of the node when the average CPU load reaches the maxi
6. for variable channel bandwidth This technology is called Long Term Evolution LTE LTE is the first truly packet switched wide area cellular data system which puts everything into packets and transmits these packets in an IP network With LTE the System Architecture Evolution SAE provides the non radio part of the complete system The Evolved Packet Core EPC together with LTE constitutes the Evolved Packet System EPS which fully supports packet switched data services The LTE SAE architecture and some key interfaces and subsystems are shown in Figure 1 1 Each of these components will be described in more detailed later el Server GW GW PONGW GW Figure 1 1 LTE SAE Architecture As more and more packet data is generated and consumed by subscribers telecommunication system operators are becoming increasingly desperate for suitable equipment in their EPC They are looking for network equipment that is stable supports more functionality and offers both higher uplink and downlink speeds than current equipment In order to guarantee the quality of the equipment testing plays an important role for both the equipment provider and the telecommunication system operators As the equipment in EPC needs to support a large number of functions for instance mobility routing charging session management etc The software system is especially complicated Increasingly the quality of this software determines the quality of the whole s
7. has been passed or not There are already some excellent tools for analyzing logs from system testing cases for example parsing the logs files to get specific values plotting relevant graphs for a better view of the CPU load or memory occupancy and striping out the important messages that need to be checked following each test case run Even though we already have these tools during the analysis a system tester still needs to use each of these tools individually and to manually calculate and start checking log files the lack of integration of these tools makes it difficult to have a fully automatic testing procedure from test case execution test log analysis test result storage and to determine if the SUT works properly The following graph shows the basic way of working for system testing starting from the CLI terminal or Webportal which is a web based management tool to start the test case run It goes through the checking procedure of the test environment and executes the test case After test logs are collected it comes to the analysis part with several tools If system testers need to check the requirement of specific test cases they can login to the test requirement web server and check them Test Semi Auto Requiremen Analysis CLI Terminal Webportal CD Figure 2 4 The current way of system testing Pre Check SSR By looking at system testing from an overall system view this thesis project has proposed
8. log analysis However if the case has failed the measurement stored within the database should be removed and The system tester might correct the problem and initiate a new run of the same test case Figure 5 1 shows the framework of the prototype and explains the data flow TC1 TC2 TC3 Save data TC1 report Fetch data TC2 report Value Trend Data Base Figure 5 1 Framework of prototype TC3 report 21 5 1 Result submission The purpose of this idea is to save key measure of one test case in the online database and the data then can be manipulated in different kind of way to benefit the test case result analysis 5 1 1 Input The input of this idea can be grouped as gt Software Version Software development branch gt Test case and gt The parsed numbers and messages from log analysis 5 1 2 Output The only output is the database tables that save the measurement data which can be used for different purposes such as comparison computing trends of CPU load memory occupancy etc 5 2 Automatic log analysis with analysis report As mentioned in section 3 4 the purpose of this idea is to reduce the workload on the system testers by presenting test case status results with comparison and relevant graphs on a report Due to the limited time the scope of the automatic log analysis only contains basic information check test case status check key measurement value compari
9. occurs after unit testing and is used for verifying all the units or modules can work together as a group and the communication among each interface works as expectation System testing For a complete and integrated system system testing is targeted for evaluating if the whole system performance qualifies the specific requirement During a test the testers are assumed to have no knowledge of the source code and internal module design so it also belongs to black box testing which does not require any knowledge of the system design Acceptance testing After system testing the acceptance testing is used for evaluating the system s compliance with the business requirements and assess whether it is qualified enough for delivery 2 2 2 System testing taxonomy The objective of system testing is to evaluate if a system conforms to the requirements specified by the customers For a large scale complicated system it takes lot of effort to guarantee that the customer s requirements have been met Usually the hardware and software together comprise a complete system so a broad view of the behavior of the system needs to be examined For example if one EPG node functions stable when it has thousands of users connected will it still be stable when the number of users increase to millions which is assumed to be lower than the maximum limitation according to the specification The taxonomy of system testing might be viewed simply as gt Basic test
10. other necessary tools 25 1 25 1 25 E 3 Ease to be integrated within other tools 25 1 25 1 25 E 4 Ease to be extended for single test cases 25 0 5 12 5 1 25 Subtotal 100 87 5 93 75 5 5 Decision Analysis Based on the previous evaluation finally the table was filled out and presents the comparison between the current testing tools and the prototype Table 5 8 Decision Analysis Spreadsheet in total Compared testing system Item Decision Criteria Weight Existing tools Prototype Raw Weight Raw Weight A Accuracy 15 15 15 B Usability 15 13 5 14 25 C Efficiency 3096 9 30 D Maintainability 20 17 25 18 25 E Portability 20 17 5 18 75 Total 100 72 96 25 According to the above decision analysis the weighted value of prototype is 96 25 and the existing tools get 72 weighted score So the prototype has 24 25 advantage over the existing tools However the weighted value 96 25 only shows the relative superiority over other tools within the specified scope but it doesn t mean it s close to the perfect situation 26 6 Conclusions and Future Improvements In this chapter the thesis project is finalized by presenting the results and proposing future improvements that can be further investigated or studied to help improve the system testing efficiency 6 1 Conclusions With higher requirement from customers and also the fierce competition
11. prototype will be used to evaluate how much system testing could be improved if the proposal was implemented as part of the overall system testing procedure of the EPG 1 2 Scope Even though there are lots of software and tools designed for system testing it is still quite difficult for them to cover every aspects of system testing due to the limited knowledge of the detailed operations of the product and the evolving requirements on the final product As a result the company needs to develop the software both for the SUT and for testing this system Both of these software developments are valuable for the company This thesis project should design a pilot that would improve system testing of the EPG node As part of the system testing the testing must demonstrate and evaluate stability and robustness capacity amp characteristic C amp C of the EPG The proposed initial direction is to examine the log analysis part of the existing system testing procedure with the aim of making it faster and to produce more precise results which can provide improved feedback to the software developers of the individual subsystems As part of this work the thesis project should also address how to manage the results of each test run and other related issues 1 3 Target Audience The system tester testing automation designer and software developer should all find useful information in this thesis Companies that want to improve their system testing efficien
12. script and which generate abnormal notification events However if we would like to display more items then the maintenance of the GUI will be challenging which may even increase the effort needed to maintain the test cases as the prerequisites of some test cases might be updated sometimes 13 3 3 Fault detection Fault detection is different from real time status tracking as the later mainly focuses on the test case s running status while fault detection intends to find out the cause in the event of a failure after the test case has finished running Usually it takes a long time for a system tester to figure out the reason for the failure as the necessary information might not be clearly displayed and maybe hidden deeply in the logs 3 3 1 Idea implementation A script can be developed to check relevant information in the logs to see 1f an error or failure has occurred It would be desirable if the script could also suggest solutions to solve the error or failure as not every system tester is familiar with all the areas of system testing 3 3 2 Advantage If the fault can be detected and several solutions can be suggested to system testers then the work load on the system tester can be decreased a lot 3 3 3 Limitation As with the pre checking testing environment for each specific error or failure there might be many potential reasons If the script has enough knowledge of the diagnostic solutions information available it co
13. this algorithm is mature enough maybe system tester can count on it 6 3 Require reflections During this thesis project I have learned a lot from it Even though I worked alone there were lot of conversation discussion and meetings with the employees within Ericsson However in the beginning as the scope of the thesis project was very broad and I can t focus on any of them With the help from my examiner Maguire and my industrial supervisor we have managed to narrow it down I think I need to have a better planning for any projects in the future to have a clear and specific scope 28 References 1 TEEE Standard Computer Dictionary A Compilation of IEEE Standard Computer Glossaries IEEE Std 610 p 197 1991 DOI 10 1109 TEEESTD 1991 106963 2 Software testing Wikipedia the free encyclopedia Software Testing Online Available http en wikipedia org wiki Software_testing Accessed 05 Feb 2013 3 Software testing Wikipedia the free encyclopedia Online Available http en wikipedia org wiki Software_testing cite_note 41 Accessed 12 Feb 2013 4 Continuous integration Wikipedia the free encyclopedia Online Available http en wikipedia org wiki Continuous integration Accessed 14 Feb 2013 5 S Stolberg Enabling Agile Testing through Continuous Integration in Agile Conference 2009 AGILE 09 2009 pp 369 374 DOI 10 1109 AGILE 2009 16 6 Integratio
14. Optimizing System Level Testing of Evolved Packet Gateway din mic GUOJUN WANG KTH VETENSKAP 9 OCH KONST YE 9 9 a ao KTH Information and Communication Technology Degree project in Communication Systems Second level 30 0 HEC Stockholm Sweden Optimizing System Level Testing of Evolved Packet Gateway Guojun Wang 14th May 2013 Industrial advisor Karin Nordling Ericsson Academic adviser and Examiner prof Gerald Q Maguire Jr KTH Royal Institute of Technology School of Information and Communication Technology Stockholm Sweden Abstract The goal of this thesis project is to improve industrial system testing efficiency The thesis is mainly focused on the field of telecommunication Testing is one of the most important steps before selling a product to customers and testing is also an important component of after sale maintenance The work load for testers can be decreased and more projects could be carried out in parallel if the testing efficiency can be improved The thesis project is carried out within the Ericsson Product Development Unit PDU Packet Core System Test section The goal is to improve the system testing efficiency of the Evolved Packet Gateway as system testing has gradually become one of the bottle necks for the whole product release Ericsson wants to accelerate its pace in releasing new products to the market and releasing new software to their customers An initial investigation w
15. W 11 3 1 Pre check of testing environment 2 252 5 o pr HE RERO uns ksra uns era ERRARE FERRE RANN 11 3 2 Realtime status tracking s sswosmsssssvsessstes sees ss res r rr Nr RSKR ER NRA KRK KRA anna senten eene 12 33 Fault ao om 14 34b Automatic log analysis Gini 14 3 5 Measurement storage in online database esee enne 15 3 6 Abnormal message database iro ue REPRE RD ARRIERE ainia 15 357 A AAA NA 16 3 8 A ES Ud LALISUICS ccn INIM 16 4 Implementation Proposal cesssneeccceeeeeeeeenneeeeeeeeeeeeeenneeeeeeeeeeeeeeaaaeeeeeeeeeeeeeeaaeeeeeeeeeeeees 18 4 1 Idea evaluation uuiuneeeseoehhRobRpeOOReOb bpm iniit i tree 18 4 2 Implementation Proposal sssesssserssssrrrrssrrrrssreresserrrsssrrrrssrerrrssrrrrssrrrr rss r nnne nn nennen nennen nnn 20 5 Prototype and Evaluation e I D e 21 5 1 Resultsubmissi0n meo et tea te a te te e e e bte 22 5 1 1 Inp t 24 333222222 A ee AA AAA FERRE REFERRE Coa 22 5 1 2 iiis ERI to 22 5 2 X Automatic log analysis with analysis report oooooocccnnonccccnnooccnnnnnonannnnnnnnnnocnnnnnnnc nana eene 22 5 2 1 Input dr cc e ERR PR ERR EE ERRARE kleine ERE VE ERA RE E E ee 22 25 2 2 UI O eC RESO CCE E DM I AF KD DU DU m ARR TER E 22 9 Metrics for evaluation ace cr re P REP Der annie EXER Re SR Ee bananas 22 5 4 Evaluation and Decision Analysis eese eene 23 5 4 1 AGCULACY o sistitutestibisisisii iiis sisti iciatis Gann hun hana oiii fis tei
16. a should be saved in the database 3 6 Abnormal message database For a complicated product a real time monitoring system is quite necessary to supervise the running of the test in terms of keeping track of the status of the hardware and software and to report any abnormal behavior such as errors warning messages etc As one primary purpose of system testing is to detect any failure or abnormal behavior of a product the system tester may encounter lots of different types of messages including error messages warning message etc If the system tester has better knowledge of the meaning of these abnormal messages it would facilitate troubleshooting 3 6 1 Idea implementation The database used during result submission will be extended to support the implementation of this idea in order to save the time it would require to maintain another database Each abnormal message will be saved in the database gt In different tables according to the type e g error warning alarm critical etc 15 gt With complete information including type of message an example of the message regular expression which can be used to search for this message description of possible root cause the level of severity link with any trouble report s the current status open or closed etc gt In such a manner that it can be easily found when search for a specific message 3 6 2 Advantage If a huge number of abnormal messages can exist in a mo
17. abase should record the overall requirements of a specific test case A script can be developed to search for all the related requirements of a test case in the database combine all of these requirements and insert them as the requirements for a new test in the requirements database 3 7 2 Advantage It would be easier for a system tester to check if a test case has met the overall requirements of this a test case rather than needing to several steps to get the necessary information 3 7 3 Limitation The current format of the requirements is not formalized and it might be difficult for the script to fetch the relevant values for the corresponding items 3 8 Test Statistics When we say testing efficiency do we really know how efficient we are Can we provide an exact figure to show our efficiency In order to get a correct result each test case is rerun for five times after modification for example Does this repeated testing mean the efficiency is low These will be quite 16 tough questions if a company has not done an investigation into what is efficiency what accuracy is required for measures of efficiency what is the expected variance in efficiency 3 8 1 Idea implementation Each time when a test case is finished the system will record some information about the performance of the test case e g pass or fail duration times of each run testing phase debug or regression the reason if a case fails etc This idea will be supp
18. affic in the network becomes stable this status will be maintained for 48 hours During this period some activities are running in parallel 1 Adding UEs deleting UEs modifying the quality of service for connections between UEs and PDN moving UEs between MMEs etc 2 Collecting important data and messages from the EPG node and relevant servers connected with the EPG node and 3 Monitoring the running status of EPG node After the stability test case is finished the logs that were generated during the stability test will be examined From these logs we will extract a number of performance metrics 13 gt Throughput the number of IP packets or bytes that passed through a specific interface of the EPG node within 1 second with separate accounting for uplink and downlink traffic Resource usage the average value of CPU load and memory occupancy i e the fraction of memory utilized of the available memory the peak value CPU load and peak memory occupancy gt Error occurrences errors warnings critical alarms and Failure the number of dropped packets the number of failed connection etc 2 3 2 Robustness testing As described in section 2 2 2 a robustness testing measures the system s resilience in the event of any failure For instance after the traffic has reached a stable phase in the load and stability testing scenario a robustness test is carried out on the EPG node to test if each Physical Interface Card PIC
19. ally thanks all of you Without the support and help from you I couldn t accomplish such a good work 111 Table of Contents ADSUPACE EM 1 SAO aa a 11 ACKMOWlEd SEMEDES miii iii iii iii iii 111 Table Of Contents 2 2 GT DERECHA EUER RE asaltar iv TAS Ol PM A OT vi List OF Tables nome ecnoosocooebbbsbbpeebibiiibiimbibimpiiiebcbbbbibibipiiiiabiiibis vii List of Acronyms and Abbreviations oooccnoooccccnooocnnnononanocononanonnnnonnno non nono rss rn rr rr esse rss sker rss rr rn rerna vili A A O 1 1 1 A NN 2 1 2 aaa aaa aaa ao ao a aa oo 2 1 3 Target Audience MM 3 1 4 MethodoloBy nu p P HE EE E EEFREFEREEFRE AR ERAT ERRARE union 3 1 5 MU cem 3 2 Background EP ERES 4 21 BEPCandEUTRAN eR RERO sisal lil UR R R R 4 2 1 1 Evolved Packet Gateway sees eene nennen nennen nennen sene hnne nennen 4 2 1 2 SGW EE 5 2 1 3 POW OO O 5 2 2 ONYSICHLIESUMEN PC ELEC 5 2 2 1 SoftWare oan 6 2 2 2 System testing TAXONOMY sun 6 2 3 Thesis Project related measurements and metrics sssersssssrrrrssrrrrssserrssssrrssrrrrrssrrrrssrr ers n rna 8 2 3 1 Load and stability testing nein nissan 8 2 3 2 Rob stness testing ine 8 2 3 3 A nsrehehne 9 2 4 Systemtes ng on Prince saic ll 9 2 5 Related WOLK silo ido lidia MIS 10 3 Idea Collecion And EXhibILIOID iro ooo DR ODE OBI MEDIO D
20. alysis spreadsheet was used to evaluate the prototype compared with existing tools Decision analysis is a discipline to address important decisions in a formal manner There are different way to present the decision analysis e g influence diagrams and decision trees However the emphasis of this evaluation was to compare between different tools from several criteria so spreadsheet is more suitable for addressing the difference between them by using the selection criteria and assigning a weighted value to the criteria The tool that has the highest score can be the preferred choice 20 During the decision analysis procedure each criterion and its subgroups were assigned with one weight according to its importance and the individuals carrying out the evaluation assigned a raw value to each subgroup of a criterion which resulted in a weighted score Finally the weighted score were then summed up for each criterion and compared 20 The meaning of each raw value and decision spreadsheet for criteria can be found in the following table 5 1 while the weight for each decision criteria within the evaluation can be seen in table 5 2 Table 5 1 Raw value definition Raw value Definition 1 0 Alternative fully satisfies the requirement or decision criteria 0 75 Alternative partially satisfies the requirement or decision criteria 0 5 Alternative partially satisfies the requirement or decision criteria 0 25 Alternative partially
21. as made to get a clear view about how the complete system testing procedure is currently carried out and then an analysis was made based on this information Ideas were collected for a proposed new implementation and finally a prototype for the most useful ideas was developed and evaluated to show how the system testing efficiency can be improved Finally these ideas were proved to be valuable for Ericsson PDU Packet Core System Test section and two of them have been adopted and are already under developing Keywords system testing EPG optimization prototype test analysis automation database Sammanfattning M let med detta examensarbete r att f rb ttra effektiviteten inom industriell systemtestning Avhandlingen r fr mst inriktad p omr det f r telekommunikation Testning r ett av de viktigaste stegen innan f rs ljning av en produkt till kunder och testning r ocks en viktig komponent under underh llsfasen Genom att f rb ttra effektiviteten i testerna kan arbetsbelastningen f r testare minskas och flera projekt genomf ras parallellt Examensarbetet har utf rts inom Ericssons produktutvecklingsenhet PDU Packet Core avdelning System Test Avhandlingens m l r att effektivisera systemtestning av Evolved Packet Gateway EPG eftersom systemtest gradvis blivit flaskhalsen f r hela produktens release Ericsson vill p skynda takten som de sl pper nya produkter p marknaden och ny mjukvara till sina kunder En f
22. blems that may occur during a load and stability test are 1 system slows down 2 system crashes 3 a counter or gauge malfunction etc Reliability test A reliability test examines the system s ability to continue running for a long period of time without the pressure of a high load Regression test A regression test is designed to ensure there no defects are introduced into the system when delivering new releases as compared with the existing system Regulatory test The requirements from governments or organizations regulatory bodies should also be fulfilled before delivering the system to the market One example of regulation might be that user privacy should be protected and data collected by the company not be exposed publicly 12 2 3 Thesis Project related measurements and metrics The scope of the system testing in this thesis project is mainly focused on load and stability testing robustness testing and performance testing 2 3 1 Load and stability testing Load and stability testing sometimes is also called endurance testing because this testing is usually run for several days with heavy end user load and mixed traffic generated from the network equipment e g UE eNB SGW PGW etc For example a 48 hours stability test case is executed to test the combined SGW PGW EPG node After a specified number of UEs are attached via eNBs and have set up connections with the PDN traffic will be generated After the tr
23. cy should also be able to use this thesis as a reference 1 4 Methodology The thesis project started with a literature study about the system testing procedure and system testing techniques focused mainly on those method utilized within the telecommunication industry An internal investigation was carried out to obtain the knowledge of how system testing is implemented within the specified Ericsson section 8 where this thesis project is being carried out After comparison and analysis ideas that might be helpful for system testing were collected from both internal Ericsson and external web disciplines other companies etc sources These ideas were extended according to the thesis project s practical requirements and a prioritization was done to emphasize the most urgent needs and most important ideas The idea with the highest priority was developed further to specify a prototype This prototype was evaluated to show how much this idea can improve the system testing efficiency 1 5 Structure Chapter 1 gives an overview of the thesis project and should have helped the audience to gain some understanding of this thesis project and its context Chapter 2 introduces the basic knowledge regarding the SUT EPG and also the system testing knowledge relevant to the EPG node testing as well as the previous work that has been done for system testing Chapter 3 lists the ideas that were collected and presents them in ascending priority ord
24. d eNB When a complete test network is set up the system testing cases can be executed in this simulated network First using the GRPS Tunneling Protocol GTP 15 the EPG MME and eNB together set up a Packet Data Protocol PDP context between a UE and the simulated PDN network using the control plane With this PDP context the simulated UE will start requesting content e g webpage audio video stream etc from a server in the simulated PDN network via the EPG directly through the GTP user plane 16 After the sever sends back the requested content one transaction is finished When there are multiple PDP contexts and transaction in this simulate d network the CPU load and memory consumption of the EPG node will also increase In order to meet different testing requirements the simulated tools can be configured for a specific testing scenario and during which they generate different types of traffic in the network The performance of the EPG in these different testing scenarios will be measured 2 5 Related work The execution of test cases has been designed to enable a high automation level of testing in the telecommunication area This is necessary as these systems typically need to support very large numbers of users very large numbers of devices and high aggregate amounts of traffic However when it comes to system testing many factors need to be considered and compared before the final decision of whether the system test case
25. detection 19 4 2 Implementation Proposal These ideas together were used to formulate a proposal for a complete implementation of a prototype to improve system testing The complete proposal and the relationships between the each part are shown in Figure 4 2 Abnormal Message Analysis A Test Requirement Data Base Fault Detection Automatic CLI Terminal Webportal Y t co Monitoring o Figure 4 2 Implementation proposal There are two methods to start a system testing case One is to start it directly from the Linux server s terminal while another method is to operate it from a webportal A website based management tool to manage the software test cases EPG node etc No matter which method is used to start the system testing case the whole procedure will go through the following actions pre check execution with real time monitoring measurement storage in the database and automatic log analysis The measurement stored within database the requirement of test case together with the abnormal message database can be utilized during the automatic log analysis which aims to compare all the key information among different software versions If there is anywhere goes wrong the fault detection can detect out the fault location and provide relevant suggestions about how to solve the fault And finally one analysis report will be generated This report shows more detailed information generated by t
26. ed Universal Terrestrial Radio Access E UTRA and Evolved Universal Terrestrial Radio Access Network E UTRAN Overall description Stage 2 Release 8 Mar 2010 16 C B Barring Digital cellular telecommunications system Phase 2 Universal Mobile Telecommunications System UMTS LTE Anonymous Communication Rejection ACR and Communication 2009 Available at http www etsi org deliver etsi_ts 124600_124699 124611 08 02 00_60 ts_124611v0802 OOp pdf 17 B Plattner Real Time Execution Monitoring IEEE Transactions on Software Engineering vol SE 10 no 6 pp 756 764 November 1984 DOI 10 1109 TSE 1984 5010304 18 M L George and M George Lean six sigma for service McGraw Hill New York 2003 SIBN 13 978 0071418218 19 Pick chart Wikipedia the free encyclopedia Online Available http en wikipedia org wiki Pick_chart Accessed 14 April 2013 20 M S Bandor Quantitative Methods for Software Selection and Evaluation September 2006 21 Cross functional Team Wikipedia the Free Encyclopedia Accessed April 14 2013 http en wikipedia org wiki Cross functional_team 30 TRITA ICT EX 2013 73 www kth se
27. er Chapter 4 proposes an implementation based on the ideas that were collected Chapter 5 describes the prototype based on the idea that had the highest priority and provides an efficiency comparison between using the prototype and the current testing method This comparison is used to evaluate if and by how much the proposal improves the efficiency of system testing of EPG Chapter 6 concludes this thesis and suggests the future work 2 Background This background chapter introduces the basic knowledge regarding the SUT EPG and also the system testing knowledge relevant to the EPG node testing as well as previous work that has been done on system testing 2 1 EPC and EUTRAN The EPC is the core network for a 3GPP standardized mobile network It provides routing charging roaming and other functionality The Evolved Universal Terrestrial Radio Access EUTRAN is the air interface for the mobile network The enodeb eNB and all the associated user equipments UE compose the EUTRAN network as shown in Figure 2 1 The eNB is a radio base station within EUTRAN and handles radio resource management routes the user plane data towards the SGW etc The connection between the UE and eNB is based on wireless transmission MME S GW P GW Evolved EUTRAN Packet Core Figure 2 1 EPC and EUTRAN figure taken from 9 2 1 1 Evolved Packet Gateway Referring to Figure 1 1 the combined EPG node is comprised of the Packet Da
28. ere is severe error or failure especially for a test case that may take a long time to notify the system tester with such a notification window shown in Figure 3 2 An extension to this is to send the system tester e mail which contains this notification This e mail could go to an automatic filter which could send a SMS to the system tester notifying them of either the error or that an error notification has been sent Figure 3 2 Notification window 3 2 2 Advantages Normally when one test case is running system testers need to login to the node and manually type command in order to check on the running test s status for example to make sure the test case has really started and is running as expect ed The advantage of the proposed new function compared with the normal procedure is that we can predefine the expected test case results while leaving the real time checking to script which can notify the system tester when errors occur In this way system testers do not need to check the status quite so often and thus they can spend the saved time on the other tasks 3 2 3 Limitation As there might be a large number of system testing cases and there are likely to be different prerequisites for each case it is hard to make a single GUI that is applicable for all test cases However certain common parts of each test scenario could be displayed on the GUI If the GUI only displays several simple items then the GUI could be replaced by a
29. fon as in us 24 5 4 2 DU SER REITER E ERE EER t AER ERE REPRE EERERREEERRER 24 5 4 3 SETI CIENCY E OO DD d M EA 25 5 4 4 Mamtamabiity stein 25 5 4 5 Portability x tete te donee uU 25 5 5 Decision Analysis 5 9 eds ees re 000000 Er 26 6 Conclusions and Future Improvements esses eene nnne nnne 27 6 1 Svid itor 27 62 F Uture WOR ne gA E 27 6 3 RequiretetlectiOnS oroso neo eO DO HE ER RR REM EEEE ERR MERE Eak 28 ROTOR e 29 List of Figures Ligure 1 1 LTE S AE Architect re essen ertt rentre rera urn 1 Figure 2 1 EPC and BUTRAN figure taken from 9 missstnsssserrssserrrsseerrsssserssserrssserrrssrrrrsnrrrrrnrrr rr nr rn 4 Figure 2 2 Routing path between UE and a device connected to an IP network 5 Figure 2 3 EPG under test architecture oooooocccnnnnoccncnnnoonnnnnnonnnononnonnonnnnno cnn c nano eene nennen nenne nre 9 Figure 2 4 The current way of system testing oooocccnnoocccnnnnoannnnnnnannnnnanonnnnnnnrn eene menn nennen rennen 10 Figure 3 1 Real time monitoring GUl oononocccnnnnoacnnnnnonnnonanonnnononnnnnnnnnnnn non nana ee emen nennen 13 Figure 3 2 Notification WindOW sscccssssseccssecscssssssecssssccesosseesesessesecsssscseessessnsesssseeseeseseseessesece 13 Figure 4 1 Idea implementation PICK chart esee 19 Figure 4 2 Implementation proposal esses eene enne 20 Figure 5 1 Framework of prototype eene n nennen nnne 21
30. from other companies within telecommunication area accelerating the speed to deliver new products with high quality becomes more and more necessary for Ericsson PDU packet core section One CI project was initiated to fulfill this mission However when it comes to the system testing phase due to the complexity of system testing case result analysis the procedure is slowed down This thesis project aims to solve the current concern of system testing on packet core product EPG node by coming up one proposal to improve the testing efficiency After lot of investigation and study of current way of system testing eight ideas were brought up and evaluated by system testers designers and managers within the relevant section Among these eight ideas two of them were considered to have a high payoff for Ericsson while two ideas with medium payoff and another four ideas with low payoff see Table 4 1 One PICK chart was used to identify the most useful ideas for this thesis project and 1t turns out to be the two ideas that have the highest payoff for Ericsson Automatic log analysis and Measurement storage in online database These two ideas were further implemented within one prototype which is used to compare with the existing tools from several aspects and evaluated to show the advantage over the existing tools The figure from evaluation has shown that this prototype has 24 25 superiority over the existing tools The most time consuming parts of
31. he automated analysis In parallel with the testing process the statistics from running test case will be collected and saved into a test statistics database 20 5 Prototype and Evaluation The two ideas with the highest priority as described in Chapter 4 were chosen to be developed as a prototype 1 e Automatic log analysis and Measurement storage in online database An evaluation was also carried out to show how this prototype can help to improve the system testing efficiency within Ericsson s system test section The prototype was divided into several steps gt gt First the logs obtained from test case run is parsed and stored within the online database associated with the software version that is used during test case run Based on the test case number one script is generated from the modules in the pre defined library The script collects all the required data from the online database and carries out proper calculation to compare the measurement among different software versions One analysis report that contains a lot of information from the above step will be generated in Portable Document Format PDF After presenting the analysis report to the system tester the system tester needs to make a decision about whether the case was passed or failed according to the information If the results are considered valid from the view of system tester then the data will be kept in the database and can be reused in other
32. king to help system testers to make a preliminary decision of the quality of the test case run After the automatic log analysis is ready one algorithm can be developed to calculate all the difference together with relevant weight values from the log analysis which is similar as the decision analysis used in section 5 4 Instead of using raw and weight values this idea can make use of different 27 percentage from comparison and weight values Taking the data in table 6 1 as example the measurements that are crucial can be associated with high weight value while less important measurements can have a lower value The final difference from the comparison can be obtained from equation 5x100 23x100 4x20 0x20 100 100 20 20 Diff The final difference between these two versions is 12 Then the decision depends on the value of threshold If the threshold is 3 this test run might be failed Otherwise the result can be taken as valid Table 6 1 Machine decision making is Current Veriosn Previous Veriosn Value Value Diff Weight EPS Context Number 2000 1900 5 100 Packet Rate Mbps 300 230 23 100 CPU Load 50 48 4 20 Memory occupancy MB 450 450 0 20 Final difference 12 The intention of this idea is to help system tester to evaluate the comparison and provide any suggestions about pass or failure However in the beginning system tester still holds the power to make a decision When
33. mum limitation while the other test is designed to measure the maximum number of Packet Data Protocol PDP contexts that can be established between the UEs and PDNs when there is no failed connection setup The performance metrics of the capacity and characteristic testing can be described as follow gt Maximum throughput the highest throughput of the EPG node can support without exceeding the maximum allowed CPU load or packet loss gt Maximum signaling rate the minimum time required to set up a PDP request and response loop between UEs and PDNs without any failure and Resource usage the highest CPU load without any traffic being dropped or connection failures 2 4 System testing on EPG When it is said that the EPG is the SUT this usually means the EPG node is the actual entity and all the nodes and UEs around EPG e g MME eNB SGSN etc are simulated by tools as shown in Figure 2 3 en Control plane traffic User plane traffic Simulated HSS Simulated I 4 MME EPG Simulated r PCRF M SGW PGW Simulated SR Simulated UE eNB PDN network Figure 2 3 EPG under test architecture Before starting the system testing the equipment around the EPG should be simulated This means that the EPG should think that it is connected with this equipment For example the simulated MME should be connected with the EPG and the simulate
34. n Hell Online Available http c2 com cgi wiki IntegrationHell Accessed 14 Feb 2013 7 Ericsson EPG Real Entity Online Available http archive ericsson net service internet picov get DocNo 28701 EN LZT1105300 amp Lang EN amp HighestFree Y Accessed 12 Feb 2013 8 Evolved Packet Gateway Ericsson Online Available http www ericsson com ourportfolio products evolved packet gateway Accessed 12 Feb 2013 9 File EUTRAN arch op svg Wikipedia the free encyclopedia Online Available http en wikipedia org wiki File EUTRAN_arch op svg Accessed 10 March 2013 10 3GPP TS 23 203 General Packet Radio Service GPRS enhancements for Evolved Universal Terrestrial Radio Access Network E UTRAN access Release 10 Mar 2012 11 Kshirasagar Naik and Priyadarshi Tripathy Software Testing and Quality Assurance Theory and Practice 2008 John Wiley Sons Inc ISBN 978 0 471 78911 6 12 Privacy protection Graham Greenleaf Global Data Privacy Laws 89 Countries and Accelerating http papers ssrn com sol3 papers cfm abstract_id 2000034 13 B Eric Design for Reliability Information and Computer Based Systems A John Wiley amp Sons Inc 2010 14 Software performance testing Wikipedia the free encyclopedia Online Available http en wikipedia org wiki Software_performance_testing Accessed 05 Feb 2013 29 15 3GPP TS 36 300 V8 12 0 Evolv
35. nage the test results and logs in an online database Abnormal message database For better understanding of the error warning and alarm messages Test requirement To have a well structured set of test requirements Test statistics Statistics of test case run e g failure rate and failed reason etc 3 1 Pre check of testing environment This idea was brought up to guarantee a stable testing environment before starting the system test case For system testing the system under test SUT needs to cooperate with other simulator or tools and save a huge amount of log information to disk According to experienced system testers everyday there are lots of system test cases executed and high portion of them fail due to an unstable testing environment 3 1 1 Idea implementation The proposal is to check all the related testing aspects in order to ensure a stable test environment specifically Check if there is enough space to save the generated logs after a test case is finished Check if the software has good quality according to previous test cases before running additional test cases gt Check if the EPG node and any Physical Interface Cards PICs are reachable gt Check if the software can be used for different types of EPG nodes and gt Check if the versions of the different tools are correct for a specific test case 11 In most of these cases if the result is negative then we may be able to fix the problem automatically u
36. nformation in the report 2 Ease to reduce the information in report 3 Ability to handle change Table 5 6 Decision Analysis Spreadsheet for Maintainability Compared testing system Item Decision Criteria Weight Existing tools Existing tools Raw Weight Raw Weight D Maintainability 20 17259 18 25 D 1 Ease to add information for analysis 25 0 75 18 75 1 25 D 2 Ease to reduce information for analysis 25 0 75 18 75 1 25 D 3 Ability to handle changes 20 0 75 18 75 0 75 18 75 D 4 Ease to manage the database 30 1 30 0 75 22 5 Subtotal 100 86 25 91 25 5 4 5 Portability In order to make use of this tool the first step is to adapt it into current testing system The following parts will be affected 1 Interaction with existing database 2 Integration of testing tools 3 Interaction with other supplementary tools The criteria for portability includes 1 Ease to switch to existing online database 2 Ease to interact with other necessary tools 3 Ease to be integrated within other tools 4 Ease to be extended for other test cases Table 5 7 Decision Analysis Spreadsheet for Portability Compared testing system Item Decision Criteria Weight Existing tools Existing tools Raw Weight Raw Weight CE SS ee x 23 E 1 Ease to switch to existing online database 25 1 25 0 75 18 75 E 2 Ease to interact with
37. nitoring system the system tester may not be able to know and understand all of them through their own experience especially for a new comer that does not yet have much knowledge of the specific product With this database a system tester can search for a specific abnormal message that is hard to understand and learn some basic information about it This abnormal message database can also benefit for the log analysis automation Scripts can search for each abnormal message in the database by using the regular expression and then take different actions based upon the level of severity for this specific message 3 6 3 Limitation The main concern is to collect all the information relevant to each abnormal message which may cause extra work for the designer who is most familiar with the root cause of a specific This actually means that all such messages and their descriptions needs to be part of what is recorded when the developer inserts the message into the code 3 7 Test requirement This idea was come up due to the complexity of determining the overall requirements for a specific test case For example what is the minimum throughput or maximum signaling rate that should be reached during this test i e what are the expected values of some of the important variables that are associated with this test 3 7 1 Idea implementation A test requirement database using the same database as mentioned in section 3 5 should be supported This dat
38. ns that a system tester usually needs to do manually it can save a lot of time for the system tester and thus enable them to make a decision if a test case runs properly or not 3 4 3 Limitation As there are different test objectives in system testing e g stability robustness C amp C and they all have different checklists during log analysis thus the report should contain different information depending upon the objective of a specific test 3 5 Measurement storage in online database This idea was come up due to the need for a lot of data for example to be reused as comparison in a subsequent test plotting the trend of a specific value or for other purposes If the data from a test case s log can be saved in an online database then it can be fetched and reused for different purposes 3 5 1 Idea implementation Data will be organized in a good structure according to practical needs and saved in an online database that is accessible to the relevant members of the staff 3 5 2 Advantage Having the data stored in a database will be much more convenient for the testers and will facilitate comparison of this data with other test runs for example this can be used in conjunction with regression testing As the data can be fetched from the database comparisons can be done by scripts automatically rather than manually by system tester 3 5 3 Limitation There is no technical issue for this idea The main concern is more about what dat
39. ntegration Evolved Packet Core Evolved Packet Gateway Evolved Universal Terrestrial Radio Access Function Test GPRS Tunneling Protocol Graphical User Interface Packet Data Core Packet Data Network Packet Data Protocol Product Development Unit PDN Gateway Physical Interface Card System Architecture Evolution Serving Gateway System Test System Under Test User Equipment Megabits per second Megabyte viii 1 Introduction In the nearly 100 years since Marconi received his Nobel Prize thousands of engineers have dedicated themselves to the standardization of mobile communication systems Mobile communication technology has gone through the first generation analog cellular systems such as AMPS The Global System for Mobile Communications GSM and CDMA 2000 dominated the second generation GSM evolved with the introduction of general packet radio service GPRS and Enhanced Data rates for GSM Evolution EDGE The third generation WCDMA increased data rates with the introduction of High Speed Packet Access HSPA The focus of the initial version of GSM was mainly on the transmission of voice However the desire for surfing the internet and watching videos via a mobile phone requires high data rates This requirement leads to the creation of the 3rd generation WCDMA system defined by the third generation partnership 3GPP Through 3GPP another more advanced radio technology was introduced to provide even higher data rates and to allow
40. ocation and gt Charging 2 2 System testing System testing is part of the overall hardware and software testing A common element of this testing is to evaluate the performance of the software so within this project the system testing was mainly taken within the software testing scope 2 2 1 Software Testing Software testing is usually used to validate and verify that software or another type of product meets its requirements and also to detect any defects and failures before a new software version is released As the software testing plays an increasingly important role during system development in the current culture of system development there are two types of existence of system testing one independent organization for testing separated from the development team one cross functional team 21 which includes system testing system developer etc In the testing organization there are assigned roles for manger test lead test designer system tester function tester test automation developer etc Classified by the testing period and different levels software testing includes 11 Unit testing Unit testing which is also known as component testing or function testing the target of it is the individual units of source code or the modules of a software application The purpose is to isolate each part of the program and show that each individual works properly And it is usually performed by the developer Integration testing It
41. open the report 3 Ease to view the content in report 4 Ease to catch the key information Table 5 4 Decision Analysis Spreadsheet for Usability Compared testing system Item Decision Criteria Weight Existing tools Existing tools Raw Weight Raw Weight B 1 Ease to execute 15 1 15 1 15 B 2 Ease to open the report 15 1 15 1 15 B 3 Ease to view the content in report 20 0 5 10 0 75 15 B 4 Ease to catch the key information 30 0 5 15 0 75 15 B 5 Enough information for analysis 20 1 20 0 75 30 Subtotal 100 85 95 24 5 4 3 Efficiency The time spent on analyzing the same information from existing tools and prototype will be listed out and compare The information includes the status of dallas sever core dump situation comparison between previous build and foundation baseline build the value trend over a series of builds Table 5 5 Decision Analysis Spreadsheet for Efficiency Compared testing system Item Decision Criteria Weight Existing tools Prototype Raw Weight Raw Weight iciency 309 Cl Time for Analysis min X X 10 X 3 Subtotal X X X X X 5 4 4 Maintainability Designers will take responsibility of the maintainability evaluation part Looking from a long term view it should be able to use this prototype continuously update or add more features etc The criteria for maintainability includes 1 Ease to add more i
42. orted by three calculating statistics gt The failure rate of all the test cases run gt The portion of time spent on failed cases in the different testing phases and gt The list of the root causes of these failures 3 8 2 Advantage With the above three statistics the system testing section may have a better understanding of its testing efficiency and take appropriate actions when the efficiency is not sufficient 3 8 3 Limitation It is not yet know what level of efficiency is sufficient nor what the expected values of these three statistics and their variance should be 17 4 Implementation Proposal After the above ideas were brought up and extended with concrete ideas to implement this chapter presents the output from the evaluation of each idea with one PICK chart and shows how these ideas all together formulate one complete implementation proposal as well 4 1 Idea evaluation When determining the priority and most useful idea among multiple improvement ideas a PICK chart can be very helpful A PICK chart is a Lean Six Sigma 18 tool for organizing process improvement ideas and categorizing them during the identify 19 A PICK chart is divided into 4 quadrants Possible Implement Challenge and Kill That s also how we get the name of PICK Horizontal is scale of payoff while vertical is ease of implementation The Ideas that fall within Implementation quadrant should the ones that are most useful among all of them After
43. rsta unders kning gjordes f r att fa en tydlig bild av hur systemtest utf rs f r n rvarande och d refter gjordes en analys baserat p denna information Id er samlades in f r att f resl en ny implementering och slutligen utvecklades en prototyp aven specifik id och den harutv rderats f r att visa hur effektiviteten hos systemtest kan f rb ttras Slutligen var dessa id er visade sig vara v rdefullt f r Ericsson PDU Packet Core System Test avsnitt och tv av dem har antagits och h ller redan p att utveckla Nyckelord systemtest EPG optimering prototyp test analys automation databas Acknowledgements I would like to express my gratitude to many people during this thesis project Thanks Per sterstr m the former Ericsson PDU Packet Core LSV section manager for providing me this precious opportunity of the thesis project Karin Nordling the current manager in this section has provided strong support behind to give me suggestions The system testers within this section especially Rohit Guilian have helped me a lot to evaluate and improve my proposals out of the thesis project I also would like to acknowledge the special help from my academic examiner Gerald Maguire who has helped me from the beginning refining the thesis scope polishing the thesis paper until the end of my thesis presentation My girlfriend also has supported me with the thesis paper format so that it looks much more professional now Fin
44. satisfies the requirement or decision criteria 0 0 Unknown or null Table 5 2 Decision Analysis Spreadsheet for all criteria in total Compared testing system Item Decision Criteria Weight Existing tools Prototype Raw Weight Raw Weight A Accuracy 1596 B Usability 1596 C Efficiency 30 D Maintainability 20 E Portability 20 Total 100 The evaluation of each criterion was further performed in independent decision analysis spreadsheets and afterwards the decision analysis spreadsheet for all criteria will be filled out 23 5 4 1 Accuracy This prototype was utilized by test objective leaders and system testers in real testing projects The criteria for accuracy includes 1 show the information correctly 2 the calculation is correct 3 The mark is done correctly Table 5 3 Decision Analysis Spreadsheet for Accuracy Compared testing system Item Decision Criteria Weight Existing tools Prototype Raw Weight Raw Weight NS ASA A l Show the information correctly 30 1 30 1 3090 A 2 The calculation is correct 40 1 40 1 40 A 3 The mark is done correctly 30 1 30 1 30 Subtotal 100 100 100 5 4 2 Usability System testers will provide relevant information about the usability of the prototype if it s easy to use and provide clear information to them The criteria for usability includes 1 Ease to execute 2 Ease to
45. sing scripts 3 1 2 Advantage If the above list of issues can be checked and fixed properly before executing the test case it can save a lot of time that would otherwise be spent trying to figure out the reason for some abnormal behavior or failure that is not relevant to the purpose of the desired system testing 3 1 3 Limitation To check these items is feasible the challenging part is how to fix them automatically when the reason for a specific Kind of error is not easily defined For example there might be a large number of reasons for a node not being accessible then the script for fixing the failure may cause a greater risk than the failure itself in such a case we will simply notify the tester of the problem that has been detected 3 2 Realtime status tracking The purpose of this idea is to facilitate earlier fault detection Usually before one case reaches it s finally result there are prerequisites that first need to be fulfilled The number of prerequisites for system testing is especially large as compared with unit testing and integration testing For example to start a stability test case the node software should be installed on the EPG then the relevant severs and tools need to be configured and started before there is any further operation on the EPG node Afterwards simulated UEs send traffic to PDN and traffic will be generated in the reverse direction through the network If we start a 24 hours stability test case i
46. sk of code conflict as known as integration hell 6 can be reduced In order to achieve the target for early integration and fast delivery the testing efficiency becomes the main constraint in how fast the process can be As there still has room for improving testing efficiency Ericsson has started a Fast Feedback Testing Improvement FFID project to increase the testing efficiency in each testing phase in the hope of releasing new products at a faster pace Due to the limited time and the human resources dedicated for this thesis project the scope of the thesis project will mainly focus on system testing efficiency optimization of the Evolved Packet Gateway EPG node 7 as a pilot for system testing part of the FFTI project 1 1 Goal Testing is one of the most important procedures for any company to assess the quality of a product With proper management procedures testing is also used to maintain and enhance the quality of a product The specific goals of this thesis project are 1 Investigate the current system testing procedure for the EPG 2 Collect or develop new ideas that could help testing the EPG s specified functionalities in several aspects These improvements will hopefully make the test analysis and troubleshooting more automatic and thus enhance the efficiency of evaluating functions as part of the system testing 3 One of these proposals should be implemented and evaluated to show the overall idea s This
47. son which are part of the normal complete analysis procedure and can be automated relative easily compared with others e g graph comparison 5 2 1 Input In order to generate a test report the following input is required gt Log files from test case Script for parsing values messages and automatic comparison gt Library for generating PDF file and gt Necessary data from the database 5 2 2 Output The only output of this prototype is the test case based analysis PDF report 5 3 Metrics for evaluation The evaluation will be carried out from several different aspects gt Accuracy If the information in analysis report is accurate and can be trusted by system tester gt Usability How convenient is this new method in comparison with the current method for log analysis Efficiency The time spent on the logs analysis compared with the one using the traditional method 22 gt Maintainability Can be maintained in a systematic way in the future gt Portability The ease of adapting this prototype to the existing testing system 5 4 Evaluation and Decision Analysis This prototype was evaluated from different aspects within Ericsson system testing section by test objective leaders system testers test automation designers to provide practical and empirical figure about the performance of this prototype After the selection criteria and subgroups for each criterion were determined for the evaluation decision an
48. system testing are test log analysis and troubleshooting A well done test log analysis can help troubleshooting a lot as well At the end of this thesis project Ericsson already has assigned one team to start a new project based on the prototype to upload key test measurement into online database and have a more automatic log analysis 6 2 Future work Even though eight ideas were brought up to help out with the system testing optimization only two of them were already implemented within a project while other two were listed out in the future work The rest of the four ideas are still useful but not so valuable compared with other ideas But 1t would be beneficial if they can be investigated further Taking test statistics as one example it will provide everyone a clear figure about how efficient they are during the test execution These figures could be very interesting for the managers and stakeholders as they may affect the progress of a project Except for all the above mentioned ideas in this paper I also have several suggestions for future work One is using software libraries for distributed processing of large data sets using simple programming models for example Apache Hadoop and Pig when there are large set of data for automatic log analysis These software libraries are well developed and can be downloaded from Apache official website In addition it also might be helpful to look into another one which is about machine decision ma
49. t may take half an hour to finish the preparation phase and only after 24 hours will we can get all the logs and then begin our further analyze of them The idea is that we should monitor the running status of one test case from the beginning preparation phase until the end thus we could process the logs and error reports in real time 17 In this way if there is any early failure occurs in the beginning or middle of the test run for example a sever does not start or there are already too many failed connections the system tester will not need to wait until the end to find out about this failure This many enable the system tester to either terminate the test early or to change the configuration of the test environment or the SUT before continuing with testing Either of these actions will increase the system testing efficiency by avoiding wasting testing time and other resources This idea can be utilized by developing as one application tool and started in the beginning of one test case run 3 2 1 Idea implementation The implementation can be divided into two parts gt A graphical user interface GUI could be used to show the status of each server and tool as well as the values and messages that are important for system testers to check during the case run Figure 3 1 shows what such a GUI might look like Figure 3 1 Real time monitoring GUI gt The second part is a friendly notification window which can be generated when th
50. ta Network Gateway PGW and the Serving Gateway SGW The EPG provides an interface between the radio access network e g EUTRAN and the internet corporate intranet or other packet data networks For example in order to surf the internet the UE e g mobile phone tablet or other device equipped with an EUTRAN interface first needs to set up a connection to the desired IP network from the eNB to the SGW PGW node then the data can be transferred either from the UE to the IP network or from the IP network to the UE as shown in Figure 2 2 remote hosts internet Gi interface SGW PGW Figure 2 2 Routing path between UE and a device connected to an IP network 2 1 2 SGW The SGW is the gateway that terminates the core network s packet network interface towards EUTRAN It is responsible for transferring user data packets between the EUTRAN and EPC This means it has to support handovers with neighboring eNBs The handover process is controlled by the mobility management entity MME The SGW functions include 10 gt UE mobility anchor point gt Packet routing and forwarding and gt User plane data transmission between EPC and EUTRAN 2 1 3 PGW Packet Data Network PDN Gateway provides the connection between the EPC and a number of external data network The PGW functions include 10 gt Per user based packet filtering for example deep packet inspection gt Lawful Interception gt UE IP address all
51. uld at least show a list of possible solutions even though it does not specify any detailed reason for the error or failure 3 4 Automatic log analysis The main goal of this idea is to have automatic log analysis by the script instead of the system tester manually processing the logs after a test is finished An analysis report should be generated to showing 1f the test case runs properly and if the results fulfill our expectation as to the capacity or quality of the SUT 3 4 1 Idea implementation There are several rules that need to be observed during test case analysis gt Comprehensive The analysis report should contain the most important messages relevant calculations or graphs of CPU load memory occupancy PDP context number etc These values are those that a system tester usually calculates and examines during log analysis The content on the report should present all the relevant data that can be extracted by scripts gt Distinctive mark and notification The report should highlight marking in different color the part of the report that needs attention by the system tester For example marking red values that has a large difference from the expected reference value The purpose of this marking is to make the analysis report easy for someone to read and understand even someone that does not have that much experience with system testing 3 4 2 Advantage If the test report provides most of the information and calculatio
52. ystem Software testing is a common process used to collect information about the quality of a product or system under test SUT Software testing can be also grouped into classes unit testing integration testing system testing 1 and acceptance testing 2 These different types of testing ranges from testing an individual subsystem unit testing to testing the entire system in operation acceptance testing Normally a testing cycle follows the order Requirement Analysis Test Planning Test Development Test Execution Test Reporting Test Result Analysis Defect Retesting Regression Testing and Test Closure 3 If the whole procedure is well managed both the testers and the company can improve their productivity When working with complicated software which has more features and modifications added to it regularly the time of executing and analyzing test cases can determine how often the new software can be delivered However more time is needed when it comes to a more sophisticated testing objective due to the increasing difficulty of testing e g function test and system test which leads to a slow pace for Continuous Integration CI 4 during software development The concept of CI was come up to reduce the work of merging all the code changes to the main software baseline when developing a new feature or making modifications 5 By frequently integrating the changes with the existing code repository and software delivery the ri

Download Pdf Manuals

image

Related Search

Related Contents

MANUAL DE USUARIO - Repositorio Digital UTN  RCA P52939 User's Manual  "取扱説明書"  Phonix LGL52CFF mobile phone case  Philips Adapter SWV3475H  

Copyright © All rights reserved.
Failed to retrieve file