Home
Installation Manual CDM-ISO-FLOAT
Contents
1. N V EU 01 je Ia Installation Manual CDM ISO FLOAT Discrete Isolator System for Floors CDM ISO FLOOR CDM T 32 2 6877907 Reutenbeek 9 11 BE 3090 Overijse Belgium F 32 2 6873552 E general cdm be www cdm be Is H noise amp vibration control A J Ins Contents A Lateral Isolation B CDM ISO FLOAT C Tolerance Zones D Protection Foil E Reinforcement Grid and Concrete F Finishing Figures 1 Installation of prefabricated CDM ISO FLOAT panels 2 Covering the tolerance zones 3 Finishing Page 1 of 4 CDM ISO FLOOR CDM T 32 2 6877907 Reutenbeek 9 11 CDM F 32 2 6873552 BE 3090 Overijse Belgium E general cdm be j li A p www cdm be noise amp vibration control A Q m li STEPS TO FOLLOW A Lateral Isolation Ensure that the structural floor is dry and free of obstacles discontinuities dust etc Along the perimeter of the slab install lateral isolation with mineral wool to ensure a complete decoupling with respect to surrounding walls and structure also islands like columns ducting etc The height must be up to the finishing level of the floor see figure on left B CDM ISO FLOAT For correct installation of the panels use the installation plan provided which clearly shows the individual panels and their reference numbers as indicated in the factory on the panels Lay the panels making sure to follow the se
2. ation control e J Is ji E Reinforcement Grid and Concrete Install reinforcement grid In the case concrete is e 4 100 mm thick a single grid is sufficient e 6 150 mm thick gt advised to use 2 grids bottom and top e 8 200 mm thick always 2 grids bottom and top Once this is ready pour layer of concrete up to desired level Install finishing floor covering plinth skirting board The floating floor should have no rigid contact with the surrounding structure Please note that since the isolators are made of rubber there will be some deflection over time couple of millimeters called creep In case the concerning room is finished with plinths along the perimeter directly after the installation it is advised to use a very flexible putty between the floor and the plinth in order to cope with the creep issue Lateral Isolation Finishing Concrete Protection Foil Tolerance Zone CDM ISO FLOAT Figure 3 Finishing Page 4 of 4 CDM ISO FLOOR CDM T 32 2 6877907 Reutenbeek 9 11 CDM F 32 2 6873552 BE 3090 Overijse Belgium E general cdm be m Mi a p www cdm be noise amp vibration control
3. quence as indicated Lateral Isolation amp CDM ISO FLOAT Figure 1 Installation of prefabricated CDM ISO FLOAT panels Page 2 of 4 CDM ISO FLOOR CDM T 32 2 6877907 Reutenbeek 9 11 CDM F 32 2 6873552 BE 3090 Overijse E general cdm be Belgium Im a p www cdm be noise amp vibration control A J ji Mr C Tolerance Zones EE In order to cope with the dimensional discrepancies between the plan according to este Epa which the system is produced and the real situation on site it is good practice to integrate so called tolerance zones in 2 perpendicular directions as shown in figure 2 Close off the tolerance zones by means of a larger cover plate in the same material as the formwork usually supplied with the system The tolerance capacity is dependent on the overlap T see figure on the left Lateral Isolation gt CDM ISO FLOAT Tolerance Zones Figure 2 Covering the tolerance zones D Protection Foil Install protection foil over the panels tolerance zones and lateral isolation in order to make sure that no concrete water can penetrate the system It is recommended to install this foil with sufficient overlaps Page 3 of 4 CDM ISO FLOOR CDM T 32 2 6877907 Reutenbeek 9 11 CDM F 32 2 6873552 BE 3090 Overijse E general cdm be Belgium Mi oe oOo A p www cdm be noise amp vibr
Download Pdf Manuals
Related Search
Related Contents
LES CULTURES Le programme de setup los proyectos hacen los objetos eternos, las modas los Acme United MP-01 Cornelius CCM0322 User's Manual Manuel d`Utilisation IRWIN T240 TrafficMASTER Allure Ultra 11242 Instructions / Assembly Resteenplace OWNERS SERVICE MANUAL Copyright © All rights reserved.
Failed to retrieve file