Home
J750 Test System Probe Card Debug Tool Installation Manual T
Contents
1. DIB when installing or removing it from the DIB fixture on the tester 4 finstalled properly ground the Customer PIB or Calibration DIB as outlined in the Grounding Calibration and Customer DIBs section of the Maintenance Chapter of the J750 512 Pin Test System Service Reference Manual or the J750 1024 Pin Test System Service Reference Manual as appropriate J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 5 Pushthe red Power Off switch on the front of the J750 tester to turn off power 6 Place the DIB vacuum switch on the tester to the UNLOCK off position 7 Remove the Customer PIB or Calibration DIB from the tester then remove the ground connection Place the PIB DIB onto a proper work surface Installing the Probe Card Debug Tool Always wear a tested grounding strap while working on the J750 tester 1 Properly ground the customer PIB then place it onto the DIB fixture of the tester The figure below shows the PIB Installed onto the tester PIB Installed on Tester 2 Place the DIB vacuum switch on the tester to the LOCK on position 3 Press down on the PIB to ensure it seats properly Apply pressure to the PIB in the area directly above the pogo blocks 4 Remove the ground connection from the PIB 5 Removethe four 4 phillips head screws from the bottom cover of the probe tower using the no 2 phillips screwdriver then remove the cover from the tower J750 Test System P
2. J750 Test System Probe Card Debug Tool Installation Manual 7J75 O gt 613 504 00 Rev A daas Because Testing Matters J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 PN 613 504 00 Rev A LIMITED REPRODUCTION RIGHTS This document may be reproduced by a Teradyne Customer solely for internal use with authorized systems by operators who have agreed to observe this restriction Any copy of this document or portions thereof must contain the copyright and proprietary rights notice as stated on the original Copyright 2010 Teradyne Inc All rights reserved Printed in the U S A The material in this document is subject to change without notice Teradyne Inc assumes no responsibility for any errors which may appear in this document This document contains trade secrets and confidential information and is furnished pursuant to a license to the user from Teradyne Inc Use or reproduction of this document is restricted under the terms of the license RESTRICTED RIGHTS LEGEND Use duplication or disclosure by the Government is subject to restrictions as set forth in subdivision b 3 ii of the Rights in Technical Data and Computer Software clause at 52 227 7013 CREDITS AND TRADEMARKS Teradyne is a registered trademark of Teradyne Inc in the U S and other countries All product names are trademarks or registered trademarks of Teradyne Inc including its subsidiaries or their respective o
3. e figure below shows the alignment pin location Mount Alignment Pin Location J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 17 Secure the Probe Card and Top Ring Assy to the Base Ring Assy by tightening the four knobs Tighten the knobs in an alternating pattern to ensure even compression of the signal pins in the Signal Delivery tower as shown in the figure Securing the Probe Card Using an Alternating Pattern Tighten two knobs across from each other simultaneously Knob Location 1 and 2 Knob Location 3 and 4 Securing the Probe Card Using an Alternating Pattern J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 Personal Notes J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 Manual Comment Form We appreciate your feedback Your comments are a valuable source of information for continuous improvement in our documentation effort Please return this form together with a copy of the pages of concern from the manual marked with your comments to the address at the end of this form Name Manual pocument No Revision No and Date Name Sender Company Job Title Address 1 Briefly in the space below how would you describe this manual 2 How do you use this manual lread it from beginning to end lonly read the sections that pertain to my immediate needs lonly read the sections that per
4. ee ee eee eee ee ee eee e tete eee eese e sese eso a 2 PIB Installed on Tester 4 Probe Tower Installed on PIB ire 5 Spacer Position for both 1024 and 512 pin Tester Configuration 5 Base Ring Assy Assembled to Probe TOWer ecce eee ee eee eee eee eee esee eee eee esee eaae 6 Top Ring Assembly with Latches and Probe Card e ecce eee e eere ee eee eene 6 Probe Card Installed in Ring Assembly eee ee ee eee eee ee ee eee eene eee eese eee ee eae ao 7 Mount Alignment Pin LOCATION cccccsssscsccsccecsesesssssssssnscessnceosasconesesenseseeseseesesenssenavesiiesssionees 7 Securing the Probe Card Using an Alternating Pattern eere 8 J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 About This Manual Installation Manual This manual describes how to install the J750 Test System Probe Card Debug Tool p n 610 115 00 to the customer s probe tower and probe card All instructions assume that both the J750 tester and the prober are installed and fully operational This manual is intended for trained maintenance personnel The local Teradyne Service office can assist with any additional questions you may have about the J750 Test System or this tool We welcome any comments or feedback you have about this manual the debug tool or the 4750 Test System Please send feedback to J750Suppor
5. lation section provides information and procedures for the following Unpacking the Probe Card Debug Tool Installing the Probe Card Debug Tool Unpacking the Probe Card Debug Tool The tool is shipped in a single case Prior to starting installation open the case and ensure that the following items are present ME J750 Debug Tool Top Ring Assy p n 608 736 00 ME J750 Debug Tool Base Ring Assy p n 608 737 00 J750 Test System Probe Card Debug Tool Installation Manual p n 613 504 00 Installing the Probe Card Debug Tool This section of the manual describes the procedures for installing the J750 Test System Probe Card Debug Tool Note These instructions assume that both the tester and prober are installed and are fully operational Do not attempt to install the kit if this is not the case The following tools are required to install the kit 1 phillips screwdriver 5 32 hex wrench 3 16 hex wrench Perform the following steps to install the debug tool Preparing the Tester Prior to installing the Probe Card Debug Tool the J750 tester must be prepared as follows Always wear a tested grounding strap while working on the J750 tester 1 Ensure that the tester is fully undocked and a sufficient distance from the mating equipment 2 Position the tester so that the DIB mounting surface faces up 3 If installed remove the probe tower form the tester Always ground the Customer PIB or calibration
6. rews Tighten the screws using the 3 16 hex wrench 10 Place the Top Ring Assy 608 736 00 onto a proper anti static work surface so that the four 4 captive screw knobs face down and the two 2 lever assemblies face up 11 Lift and turn the knobs on the ring assembly so that the latches are in the open position The figure below shows the latches open 71 i E 227 EE AN SN X Latch Assembly x ZII TINA in open position Top Ring Assembly with Latches and Probe Card J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 12 Place the probe card onto the ring assembly with the probe side down Note Be sure to line up the pins on the ring assembly with the mating holes in the probe card 13 Once the probe card is properly oriented in the ring assembly close the latches to secure the card in place The figure below shows the probe card installed in the ring assembly et 14 Remove the four 4 phillips head screws from the top cover of the probe tower using the no 2 phillips screwdriver then remove the cover from the tower 15 Turn the Top Ring 608 736 00 over so that the probe side of the probe card faces down Note Make sure to keep the ring assembly parallel to the tester as you place it onto the probe tower 16 While sliding the holes in the ring assembly over the alignment pins on the mounts place the ring assembly onto the probe tower Th
7. robe Card Debug Tool Installation Manual 613 504 00 6 Place the probe tower onto the PIB Probe Tower Installed on PIB 7 Thedebugtoolis shipped for use with a 1024 Pin Tester if it is being used on a 512 Pin Tester perform the following steps Remove four 4 1 4 20 BHCS 10 32 x3 8 SS Remove the spacers from the counter bore hole and flip it over so that the 512 engraved on the bottom of spacer faces up Replace the spacer so that 512 engraving is visible Secure the spacers with four 4 1 4 20 BHCS 110 32 x3 8 SS Replace the spacer so that 512 engraving is visible Secure the spacers with four 4 1 4 20 BHCS 10 32 x3 8 SS The figure below shows setting for both 1024 and 512 pin tester Using 1024 pin Tower Flip to use with 512 pin Tower Spacer Position for both 1024 and 512 pin Tester Configuration J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 8 Once the spacers are properly configured place 608 737 00 onto the probe tower The figure shows the mounts on probe tower Short side of these pins align to tower hole and slot long side faces upwards to align debug tool top ring Base Ring Assy Assembled to Probe Tower Note Tighten the screws in a cross pattern tightening each screw a little bit each time until they are secure 9 Secure the Base Ring Assy 608 737 00 to the probe tower using the four 4 1 4 20 x 3 supplied with 608 737 00 long socket head sc
8. t teradyne com For your convenience we have also included a Manual Comment Form at the end of this document Viewing This Document Online When viewing this document online you may click any hyperlink cross reference or page number to jump to that topic Additional Documentation The following documents may provide additional information when using this document e J750 512 Pin Test System Service Reference Manual p n 552 360 33 J750 1024 Pin Test System Service Reference Manual p n 552 360 34 Revision History Revision Date Reason for Change A Initial Release J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 Overview The J750 Test System Probe Card Debug Tool p n 610 114 00 comes ready to assemble to the customer s probe tower and probe card The main components of the tool are ME J750 Debug Tool Top Ring Assy p n 608 736 00 ME J750 Debug Tool Base Ring Assy p n 608 737 00 The tool is used to facilitate probe card troubleshooting by holding the card to the probe tower while the tester is undocked from the prober The figure below shows the main components of the debug tool ME J750 Debug Tool Top Ring Assy p n 608 736 00 ME J750 Debug Tool Base Ring Assy p n 608 737 00 Probe Card Debug Tool Main Components J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 Installation Overview The Instal
9. tain to my job luse this manual for training purposes luse this manual for reference purposes 3 When you need to find information in this manual where is the first place that you look Table of Contents Thumb through the pages until find what am looking for 4 How easily can you find information in this manual 1 2 3 4 5 Not easily Very easy 5 How clear is the information in this manual 1 2 3 4 5 Not clear Very clear 6 When you actually try instructions in this manual how easily can you follow them 1 2 3 4 5 Not easily Very easy 7 How well did you understand the product before reading this manual 1 2 3 4 5 Not at all Very well 10 J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 8 After 1 2 3 4 5 Not at all Very well 9 Was all of the information you needed included in this manual __ Yes No If not what was missing 10 The best aspect of this manual is 1l If you could change one aspect of this manual what would it be Other comments Return to Teradyne Inc 500 Riverpark Drive North Reading MA 01864 USA Attn J750 Product Support Department Email ITD PSG teradyne com
10. wners Teradyne Inc 600 Riverpark Drive North Reading MA 01864 J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 Table of Contents About Insmli ica Installation Manual 1 Viewing This Document Online sescssissscssssccssscesssercresesensesesscceesesencesssvestadessscesensesueseness 1 Additional Documentation iie aria 1 R vision HiStoOFV aos acres vivet eei vx EE PR EMNE REIN a pao a 1 Overview 0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 2 Installation 0909090900000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 3 OVER VIGW m 3 Unpacking the Probe Card Debug Tool eee ee ee eee eee ee ee eee eese eese eee 3 Installing the Probe Card Debug Tool ccce eee ee eee ette eee eee ee 3 Preparing UTR ARTE EE m 3 Installing the Probe Card Debug Tool cesser eene eene enero serie renee nere se teas sica setas e soa a esta 4 Personal NOTES A TIWNNTARSEETINSI NIU ET E TTV E FEREPER EVER A NISeIN NNI IMEEM M Oo Manual Comment Form arci LO J750 Test System Probe Card Debug Tool Installation Manual 613 504 00 List of Images Probe Card Debug Tool Main Components eee
Download Pdf Manuals
Related Search
Related Contents
Disposición 6935 - 15 JVC XV-K503TN User's Manual Navman 11 GPS Receiver User Manual Losi LOS05000 Introduction AmpXpress™ Manual Xigmatek Bifrost VD1065 Copyright © All rights reserved.
Failed to retrieve file