Home
PATHWAY 12 Volt OPERATORS MANUAL
Contents
1. e Water weighs kg per litre however conversion factors must be used when spraying liguids that are heavier or lighter than water Example liguid area has a density of 1 28 kg L and will therefore be significantly heavier than water if the tank is filled completely Suitable care should be taken when driving with the eguipment attached to the vehicle Consideration should be given to both the carrying capacity of the vehicle and the gradient of the terrain when determining Warnings continued the speed at which the vehicle can be driven safely Ensure that the maximum speed of the vehicle when loaded is within the vehicle manufacturers limitations Ensure equipment is securely fastened or attached to the vehicle at all times Cautions A supply of fresh water should be with the equipment at all times Standard polyethylene tanks are not designed for use with diesel fuel or any flammable iguid Do not use this machine in ambient temperatures exceeding 40 degrees Celsius Ensure that all bolts are tightened and secured before operation e Never stand within the radius of boom wings e Regularly check the pump mounting bolts The pump will always vibrate to some degree when operating and this may work the bolts loose The nozzles supplied with this equipment may not suit all chemical applications Always ensure that the nozzles that are fitted match the recommended spray qu
2. Product Description Serial No Predelivered and Inspected by Name Sign Date WARRANTY TERMS AND CONDITIONS i here has been no inadequate or incorrect use storage handling or application of the Goods Goldacres Pathway Goods described are only available for purchase upon the warranty terms and j here has been no use or operation of the Goods outside of the physical electrical conditions set out below or environmental specifications of the Goods here has been no inadequate or incorrect site preparations Interpretation here has been no inadequate or improper maintenance of the Goods 1 In these warranty terms and conditions it has not been caused by fair wear and tear and 1 Goldacres or Pathway means Goldacres Trading Pty Ltd A C N 061 306 732 of firstly the Goods have been thoroughly inspected and any damage from whatever 1 3 North Western Rd St Arnaud trading as Goldacres Agricultural Equipment cause to the Goods and in particular the structure welding seams bolts its successors and assigns which is the seller of the Goods booms has been repaired prior to the Goods being operated used driven or Purchaser means the purchaser of the Goods moved and on each occasion the tanks are filled and Goods means the product and if nay the services provided here has been no failure to comply with the requirements of all present or future Nothing in these warranty terms and conditio
3. GOLDACRES FARM GARDEN INDUSTRIAL PATHWAY 12 Volt OPERATORS MANUAL For further information about any of the products shown please visit www goldacres com au Goldacres Trading 2010 This publication and all designs are copyright No part products or designs may be reproduced by any process except in accordance with the Copyright act 1968 All information in this operators manual is based on the latest product information available at the time of printing The policy of Pathway Goldacres is one of continuous improvement and as such Pathway Goldacres reserve the right to alter any specifications and designs without notice and without incurring any obligation regarding such changes No part of this manual may be reproduced without written permission from Pathway Goldacres All photographs and technical information remain the property of Pathway Goldacres Goldacres Pathway 3 North Western Road ST ARNAUD VICTORIA 3478 Ph 03 5477 3999 Fax 03 5477 3908 Revision number 2 1 08 10 2010 Part GA5049305 Contents I Introduction I Welcome 2 Safety 7 General 7 The Operator 7 Safety Precautions 8 Notes 8 Warnings 8 Warnings continued 9 Cautions 9 Safe use of chemicals 10 Personal Protective Equipment PPE Safety Decals 3 General Information amp Specs 13 Spotmate amp Traymate Overview 13 dentification 14 Dimensions 15 ey features 15 4 Operation
4. Spotmate Traymate Operator Manual Further information on ChemCert courses can be supplied by the ChemCert organisation in your state Victoria www chemcertvic org au Ph 03 5622 2055 South Australia www chemcertsa com au Ph 08 8842 4048 Queensland www chemcertgld org au Ph 07 5466 5850 Western Australia www chemcertwa com au Ph 08 9341 5325 New South Wales www chemcert com au Ph 02 9387 4714 Personal Protective Equipment PPE Always wear close fitting clothing and safety equipment designed for the job Chemicals can be harmful to humans appropriate PPE should be used when handling chemicals Always refer to the chemical manufacturers label for guidelines on the appropriate PPE to use with the chemicals you are using Pathway Goldacres also suggest that you read and understand the following Australian standards e Australian Standard for Chemical protective clothing AS3765 e Australian Standard for Respiratory protection devices ASI 15 Safety Decals Air borne particles Always stand well clear of equipment during operation Any spray drift is dangerous and may be hazardous to humans and animals Fluids under pressure Do not disconnect any hoses nozzles or filters while equipment is operating Disconnecting these components while under pressure may result in uncontrolled fluid discharge which may be hazardous When the repair is complete ensure that all fittings
5. 20407 020 Valve Kit 20404 007 Upper Housing 20381 009 Hose Barb Elbow 1 2 20381 015 Hose Barb 1 2 2095 100 Pressure Switch Chapter 5 Maintenance amp Troubleshooting 23 24 Spotmate Traymate Operator Manual www goldacrespathway com au
6. above Acknowledges that the owner is trained and is fully responsible for the safe and correct operation of the Product and Agrees that the Owner will fully train any person who might be required to operate the Product as to how to operate the Product in a safe and proper manner Date 2 The Dealer undertakes that the Dealership has met the obligations of Product pre delivery installation service and warranty start up Owner s Name Print Dealership Name Print Email Email Signature of Owner Signature of Dealer Representative Q Please advise me of updates that relate to my product OWNER COPY GOLDACRES PATHWAY TERMS AND CONDITIONS OF SALE Goldacres Pathway Goods are only available for purchase upon the terms and conditions set out below In these warranty terms and conditions 1 Goldacres or Pathway means Goldacres Trading Pty Ltd A C N 061 306 732 of 1 3 North Westem Rd St Arnaud trading as Gokdacres Agricultural Equipment its Successors and assigns which is the seller of the Goods 2 Purchaser means the purchaser of the Goods 3 Goods means the product and if nay the services provided 4 Nothing in these warranty terms and conditions shall be read or applied so as to exclude restrict or modify or have the effect of excluding restricting or modifying any condition warranty guarantee right or remedy implie
7. are connected up to the correct terminals red to positive black to negative Always flush pump with clean water after every use Prolonged chemical contact can severely damage valves diaphragms and seals Do not leave water in pump if sprayer is to be left in a cold environment The water may freeze and cause damage to pump Empty pump of all water and cover the pump to ensure this situation does not arise If this has not been done and there is a possibility there may be frozen water in the pump wait until any ice has thawed before using the pump The 12 volt pumps are positive displacement diaphragm pumps which provide delivery upon demand Itration is a critical part of the sprayer s performance They are self priming and are fitted with a pressure switch which senses the outlet pressure of the pump The pressure switch turns the electrical power off to the pump at a pre determined high pressure point As the outlet side of the pump is opened the pressure starts to drop and at a pre determined point typically 40 75 psi contacts in the switch will lose causing the pump to start automatically The pump will then pump until the pressure reaches the shut off pressure point CAUTION Do not adjust the pressure switch out so that the pumping pressure exceeds the maximum pressure for the pump f the flow demand is very low the pump may reach this high pressure point and cause cycling pump turns o
8. than s 69 is hereby limited to 1 inthe case of Goods any one or more of the following a the replacement of the Goods or the supply of equivalent Goods b the repair of the Goods c the payment of the cost of replacing the Goods or acquiring the equivalent Goods d the payment of having the Goods repaired or 2 inthe case of services a the supplying of the services again or b the payment of the cost of having the services supplied again Goldacres Pathway liability under s 68A and s 74H of the Trade Practices Act 1974 is expressly limited to a liability to pay to the purchaser an amount equal to 1 the cost of replacing the Goods 2 the cost of obtaining the equivalent Goods or 3 the cost of having the Goods repaired whichever is the lowest amount SAFETY General Chapter 2 The following pages outline important safety information At Pathway Goldacres safety is a high priority These safety and warning instructions MUST be followed to ensure the safe operation of your Pathway Goldacres equipment Explanation of key terms used in this operators manual are The Operator Danger You will be killed or seriously hurt if you don t follow instructions Warning You can be seriously hurt if you don t follow instructions Caution You can be hurt if you don t follow instructions Note Is used to notify people of installation operation or maintenance information that is important but not haz
9. 0It 400lt A B C Weight 970 460 550 560 500 700 950 700 750 950 700 950 1150 200 900 Please note Dimensions are approximate only and may be subject to change without notice Key features Number u A we Description Tank lid Pump Carry handle Triggerjet lance Main tank Number ON o U A we Description Main tank Pump Gunjet Bypass ball valve Tank level gauge Tank lid Main tank drain Support cradle Chapter 3 General Information amp Specs 15 16 Spotmate Traymate Operator Manual OPERATION Connections Chapter 4 The following steps should be followed when connecting to a power source Ensure that the battery is 12V DC 2 Connect the red connector to the positive terminal and the black connector to the negative terminal Filling When filling the sprayer it is necessary to use an external water source and wear the appropriate PPE The following steps should be followed when filling the tank Turn the pump off 2 Remove the tank lid Calibration 3 Add chemical as required When filling with water after adding the chemical some agitation will take place 4 Use external water source to fill main tank Do not exceed the tank capacity 5 Replace the tank lid and ensure that it is secure prior to switching on pump You are now ready to use the sprayer All sprayers need to be calibrated and kept in good condition This
10. 17 Connections 7 Filling 7 Calibration 7 Spray Application 8 Agitation 8 Flushing 8 Storage 8 Contents continued over page 5 Maintenance amp Troubleshooting Troubleshooting Gunjet and Triggerjet Information Triggerjet spray gun AA30L Gunjet Adjustable Conejet Nozzle Pump Diagrams 2v Pump wiring diagram Flojet 7 6 It min 70 psi Flojet 4it min 45 psi 21 21 22 22 22 23 24 25 25 Chapter INTRODUCTION Welcome Congratulations on your purchase of your new sprayer am proud of the reputation that Pathway Goldacres has established for providing technologically advanced equipment to a wide variety of industries This operators manual has been designed to ensure that you will get the optimum performance from your equipment Please take the time to read and understand this manual prior to using your equipment For further information on the Pathway Goldacres product range please visit our website www goldacrespathway com au STEPHEN RICHARDS General Manager Pathway St Arnaud Chapter Introduction I 2 Spotmate Traymate Operator Manual GOLDACRES PATHWAY INSTALLATION AND WARRANTY REGISTRATION This warranty registration form must be returned to Goldacres by the owner operator within 14 days of taking delivery of the product Only when warranty registration is completed and returned can Goldacres fulfill all warranty obligations Dealer Address Postcode
11. BLE bar CONJET PERFORMANCE TIP NO 1 5 2 3 A B A B A B A 5500 X 18 a mel msn oe an ar EOG sm wur KU EN EN EN LA EH r wo mo s me s oz Gmi NA art io 454 ro 520 aor oa rese see Pet LAKA ee re NEN KEIN BEN er KLA Chapter 5 Maintenance amp Troubleshooting 21 Pump Diagrams 12v Pump wiring diagram Important Use 14 gauge stranded wire up to 6 metres from power source and 2 gauge up to 18 metres from power source 22 Spotmate Traymate Operator Manual Connect Red to Positive terminal and Black to Negative terminal Flojet 7 6 It min 70 psi 1 02009 004 12 v motor DC 2 29115 116 Brush Endbell Assy DC 4 11028 101 Baseplate Assy Plastic Inc 5 amp 6 5 20132 000 Grommets 6 20131 002 Baseplate screws 7 Only in kit Screw 9 Only in kit Cam bearing 10 20428 100 Bearing cover Polypro Il Only in kit Piston 12 21010 004 Diaphragm kit 13 20028 008 Valve kit 14 20316 011 Upper housing Switch assy 15 20131 001 Pump screws 2095 100 Pressure switch Flojet I 4lt min 45 psi Position No Part Number Description 20097 001 Brush Kit 20132 005 Fan Shroud Kit 11028 101 Baseplate Assy Kit 20132 000 Grommet Kit 20400 002 Cam Bearing Kit 20401 000 Bearing Cover 20403 040 Diaphragm Kit
12. ality on the chemical label where fitted always ensure that the boom where fitted is securely supported when travelling Area surrounding equipment may become slippery when wet Chapter 2 Safety 9 Safe use of chemicals The safe use of AgVet chemicals with this equipment is the responsibility of the owner operators All operators should be trained in the safe use of AgVet chemicals Pathway Goldacres suggest that a relevant ChemCert course is completed by owners operators prior to operation of this equipment as a spray unit ChemCert Course Overview The ChemCert course is aimed at providing the level of training needed by producers to make sure that they understand the requirements to use agricultural and veterinary chemicals safely and effectively The course also encourages people to think about using alternatives to chemicals in their production systems by taking a risk management approach The ChemCert course has become the industry standard for AgVet chemical training Satisfactory completion of the ChemCert AgVet Chemical Users Course results in ChemCert registration and the award by the training provider of a Statement of Attainment for two nationally recognised competency standards RTC 3704A Prepare and apply chemicals RTC 3705A Transport handle and store chemicals The ChemCert course is generally delivered by trainers over two days plus additional assessment activities 10
13. and subject to the recognised tolerances applicable to such figures The suitability of chemicals Goldacres Pathway shall not be liable for physical or financial injury loss or damage or and other liquids for any application and the application methods and the environmental for consequential loss or damage of any kind arising out of the supply layout assembly effects shall be sole decision and responsibility of the purchaser and the user of the Goods installation or operation of the Goods or arising out of Goldacres Pathway negligence or Goldacres Pathway gives no warranty as to the suitability of any chemicals or other liquids for in any other way whatsoever any application nor the application methods nor the environmental effects which may result 7 this warranty shall only be available to the Purchaser and shall not be from the use of the Goods Goldacres Pathway shall be under no liability for damages arising transferable by the Purchaser out of the use of any chemicals liquids or mixtures in the Goods nor for any application nor 8 this warranty in no way extends to any used Goods for the application methods nor for the environmental effects which may result from the use of the Goods Goldacres Pathway liability for a breach of condition or warranty implied by Div 2 of Pt 5 of the Trade Practices Act 1974 other than s 69 is hereby limited to Limit of Liability 1 in the case of Goods any one or more of the following 6 1 Goldacres P
14. and lines are secured before re applying pressure Understanding safety decals and their purpose assists in the safe operation of your sprayer Safety decals are there for your protection and it is the responsibility of the owner operator to replace damaged and or missing safety decals Regularly review safety decals with operators It is very important to ensure that all new machine components and replacement parts include current hazard identification decals Replacement safety decals can be ordered from all Pathway Goldacres dealers Chapter 2 Safety II 12 Spotmate Traymate Operator Manual Chapter 3 GENERAL INFORMATION amp SPECS Spotmate amp Traymate Overview Paint Colours Steel work G13 Dark Green Tank All tanks are constructed from UV resistant polyethylene Polyethylene tanks have a very high chemical resistance Due to the rotomoulding process there can be a variance in the overall dimensions of the tank which in turn results in variations to the tank capacity For this reason any calibration markings should be used as a guide only Filtration Fi Spotmate and Traymate sprayers are fitted with an inline suction strainer It is important that the strainer is cleaned out regularly Pump The pump is critical to any sprayer performance Correct operation and maintenance of the pump will ensure the sprayer is able to perform to its capabilities Make sure the pump wires
15. ard related All operators of this equipment should be adequately trained in the safe operation of this equipment It is important that all operators have read and fully understand the operators manual prior to using this equipment All new operators should be trained in an area without bystanders or obstructions and become familiar with the sprayer prior to operation Chapter 2 Safety 7 Safety Precautions Notes Always read and understand the Operators manual prior to operation of this equipment It is the responsibility of the operator to ensure that there are no decals missing from the equipment and that any damaged or missing decals are replaced prior to operation Pathway Goldacres equipment ordered or operated outside the guideline limitations may not be warranted by Pathway Goldacres for successful performance Operators working outside these limitations do so at their own risk unless specific advice has been sought from and provided by Pathway Goldacres in writing Always read and follow the chemical manufacturer s guidelines for safe application as per the chemical label Particular attention should be given to the recommended target application rate of the chemical being applied as per the chemical label Inspect the equipment thoroughly for damage and wear before operation Warnings 8 FOR QUAD USE REFERTO THE QUAD OPERATORS MANUAL Any unauthorised m
16. athway liability for Goods manufactured by it is limited to making good any a the replacement of the Goods or the supply of equivalent Goods defects by repairing the same or at Goldacres Pathway option by replacement within a b the repair of the Goods period not exceeding either 1000 hours or twelve calendar months whichever comes c the payment of the cost of replacing the Goods or acquiring the equivalent irst after the Goods have been dispatched provided that Goods the defects have arisen solely from faulty materials or workmanship d the payment of having the Goods repaired or the Goods have not received maltreatment inattention or interference 2 in the case of services accessories of any kind used by the purchaser are manufactured or approved by a the supplying of the services again or Goldacres Pathway b the payment of the cost of having the services supplied again where applicable the seals on the Goods remain unbroken there has been no improper adjustment calibration or operation Goldacres Pathway liability under s 68A and s 74H of the Trade Practices Act 1974 is the use of accessories including consumables hardware or software not expressly limited to a liability to pay to the purchaser an amount equal to manufactured by Goldacres Pathway has been approved in writing by 1 the cost of replacing the Goods Goldacres Pathway 2 the cost of obtaining the equivalent Goods or no contamination or leakage has been caused o
17. ause to the Goods and in particular the structure welding seams bolts its successors and assigns which is the seller of the Goods booms has been repaired prior to the Goods being operated used driven or 2 Purchaser means the purchaser of the Goods moved and on each occasion the tanks are filled and Goods means the product and if nay the services provided here has been no failure to comply with the reguirements of all present or future Nothing in these warranty terms and conditions shall be read or applied so as to laws or regulations relating to the Goods and or the use and or the operation of exclude restrict or modify or have the effect of excluding restricting or modifying he Goods and any condition warranty guarantee right or remedy implied by law including the Trade p there has been no failure to maintain a record of hours of operation which record Practices Act 1974 and which by law cannot be excluded restricted or modified shall contain full details of all inspections repairs and maintenance and produce same to Goldacres Pathway at the time of the warranty claim q the defective Goods or any damaged part of the Goods are promptly returned free These warranty terms and conditions which shall only be waived in writing signed by of cost to Goldacres Pathway or a representative of Goldacres Pathway Goldacres Pathway shall prevail over all terms and conditions of the purchaser to the r all warranty related r
18. be accepted by the purchaser and is the only 3 The warranty relating to the Goods and all other products sold and if any services sold or guarantee given to the purchaser in respect of the Goods or that part provided by Goldacres Pathway are contained in these warranty terms and conditions in the case of hydraulic systems Goldacres Pathway shall replace defective parts in accordance with section 6 1 of these conditions provided that the failure of Specifications etc Catalogues etc Quantities the part was not related to contamination within the system Goldacres Pathway 4 All specifications without limiting the generality of same including drawings particulars of shall not be liable for labour in the case of repairing hydraulic system defects weights volumes capacities dimensions load factors are approximate only and any this warranty does not extend to components considered as normal wear items deviation shall not be taken to vitiate any contract with Goldacres Pathway or form any claim including but not limited to nozzles chains belts filters brake pads against Goldacres Pathway The descriptions illustrations and performances contained in polyethylene bushes and liquid pump valves valve O rings diaphragms and catalogues price lists and other advertising matter do not form part of the contract of sale of seals the Goods Where specifications drawings or other particulars are supplied by Purchaser Goldacres Pathway shall not be
19. d by law including the Trade Practices Act 1974 and which by law cannot be excluded restricted or modified General 2 1 These warranty terms and conditions which shall only be waived in writing signed by Goldacres Pathway shall prevail over all terms and conditions of the purchaser to the extent of any inconsistency 2 This warranty may not be modified or added to without the expressed written consent endorsed hereon of the Managing Director of Goldacres Trading PIL Warranty Terms 3 The warranty relating to the Goods and all other products sold and if any services sold or provided by Goldacres Pathway are contained in these warranty terms and conditions and additional terms and conditions as described by the documents Pathway Forklifts warranty terms and conditions or Pathway Pumps warranty terms and conditions ae etc Catalogues etc Quantities All specifications without limiting the generality of same including drawings particulars of weights volumes capacities dimensions load factors are approximate only and nanne n ome Boal n ne The descriptions illustrations and performances contained in catalogues price Ests and other advertising matter do not form part of the contract of sale of the Goods Where specifications drawings or other particulars are supplied by Purchaser Gokiacres Pathway price is made on estimates of quantities required Should there be any adjustments in quantities above or below th
20. e quantities estimated by Goldacres Pathway and set out in a quotation then any such increase or decrease shall be adjusted on a unit rate basis according to unit prices set out herein p Capacities Chemicals Liquids Application Methods Environmental Effects Any performance volumes and or capacity figures given by Goldacres Pathway are estimates only Goldacres Pathway shall be under no lability for damages for failure to obtain such figures unless specifically guaranteed m writing and any such written guarantee shall be subject to the recognised tolerances applicable to such figures The suitability of chemicals and other liquids for any application and the application methods and the environmental effects shall be sole decision and responsibilty of the purchaser and the user of the Goods Goldacres Pathway gives no warranty as to the suitability of any chemicals or other liquids for any application nor the application methods nor the environmental effects which may result from the use of the Goods Goldacres Pathway shall be under no liability for damages arising out of the use of any chemicals liquids or mixtures in the Goods nor for any application nor for the application methods nor for the environmental effects which may result from the use of the Goods Limit of Liability 6 1 pate done degli i voor L krazy ever ate deep dii ae within a period not exceeding either 1000 hours or twelve calendar months whichever comes first after the G
21. epairs have been carried out with the prior authorisation of extent of any inconsistency Goldacres Pathway This warranty may not be modified or added to without the expressed written if Goods or any part thereof are not manufactured by Goldacres Pathway in consent endorsed hereon of the Managing Director of Goldacres Trading P L particular engines engine accessories transmissions transfer cases differentials tyres tubes batteries and radios and UHFs the guarantee of the Warranty Terms manufacturer thereof shall be accepted by the purchaser and is the only 3 The warranty relating to the Goods and all other products sold and if any services sold or guarantee given to the purchaser in respect of the Goods or that part provided by Goldacres Pathway are contained in these warranty terms and conditions in the case of hydraulic systems Goldacres Pathway shall replace defective parts in accordance with section 6 1 of these conditions provided that the failure ofi Specifications etc Catalogues etc Guantities the part was not related to contamination within the system Goldacres Pathway 4 All specifications without limiting the generality of same including drawings particulars of shall not be liable for labour in the case of repairing hydraulic system defects weights volumes capacities dimensions load factors are approximate only and any this warranty does not extend to components considered as normal wear items deviation shall not be
22. eplaceable internal working components Locking valve in open position for contiuous flow e Accepts all standard spray tips and strainers AA30L Gunjet CP17103 IZP Zinc Plated Steel Screw CP19684 1 NYB Right and Left Hand Nylon Housing Set CP7890 INP Nickel Plated Steel Cap CP7490 BRTF Brass and Teflon Valve Seat Assy CP22136 Brass Inlet Body CP22137 BR302S Brass and Stainless Steel Stem Assy CP14255 1 AL Buna Packing Cup CP19812 AL Aluminium Gasket CP19811 Brass Packing Screw CP7484 INP Nickel Plated Steel Stem Nut CP7489 SS Stainless Steel Trigger Stop Spring CP7622 IZP Zinc Plated Steel Washer CP17720 420SS Stainless Steel Roll Pin CP19820 420SS Stainless Steel Roll Pin CP17703 FRP Fibreglass Reinforced Polyester Trigger CP19810 Brass Trigger Guide CP19815 Brass Spring Guide CP22138 302SS Stainless Steel Spring CP19816 Brass Spring Retainer CP19819 SS Stainless Steel Washer CP19818 IZP Zinc Plated Steel Screw CP19806 FRP Fibreglass Reinforced Polyester Trigger Lock CP19805 CE Celcon Lock Spring Ring 1 2 3 4 5 6 7 8 9 AB30L KIT AA30L Gunjet repair kit 20 Spotmate Traymate Operator Manual Adjustable Conejet Nozzle The adjustable brass Conejet nozzle rotates through Tip settings A and B represent two extreme points a half turn to provide spray selection from wide angle of rotation in tip adjustment finely atomized cone spray to a straight stream spray LIQUID PRESSURE ADJUSTA
23. er out of the use of any chemicals liquids or mixtures in the Goods nor for any application nor 8 this warranty in no way extends to any used Goods for the application methods nor for the environmental effects which may result from the use of he Goods Goldacres Pathway liability for a breach of condition or warranty implied by Div 2 of Pt 5 of the Trade Practices Act 1974 other than s 69 is hereby limited to Limit of Liability 1 in the case of Goods any one or more of the following 6 1 Goldacres Pathway liability for Goods manufactured by it is limited to making good any a the replacement of the Goods or the supply of equivalent Goods defects by repairing the same or at Goldacres Pathway option by replacement within a b the repair of the Goods period not exceeding either 1000 hours or twelve calendar months whichever comes c the payment of the cost of replacing the Goods or acguiring the equivalent first after the Goods have been dispatched provided that Goods the defects have arisen solely from faulty materials or workmanship d the paymentof having the Goods repaired or the Goods have not received maltreatment inattention or interference 2 in the case of services accessories of any kind used by the purchaser are manufactured or approved by a the supplying of the services again or Goldacres Pathway b the payment of the cost of having the services supplied again where applicable the seals on the Goods remain unbro
24. guide to spray nozzles are available from Goldacres dealers or as a free download from the TeeJet website www teejet com Custom built equipment Where the owner of this sprayer has requested that custom built equipment or options be fitted to this sprayer it is necessary to understand that custom fabrication and engineering is subject to many variables Goldacres cannot fully field test all custom built options prior to despatch and owners of Identification new sprayers fitted with custom built equipment or options need to understand that the functionality of these items may require refining in order to operate as desired Optional Equipment An extensive range of optional equipment is available for fitting to Goldacres sprayers Specific information regarding optional equipment fitted to your machine can be found in the rear of this manual When ordering parts or requesting service information for your sprayer it is important to quote the serial number of your machine and the purchase date in order to receive accurate information The location of the serial number is shown in the picture This number is stamped into the tank 14 Spotmate Traymate Operator Manual Serial number location Dimensions Spotmate dimensions Model 20lt 50lt I00lt 200It 450lt A B 500 300 900 350 850 500 850 500 1000 950 c 300 350 680 410 700 Traymate dimensions Model I00lt 120lt 200It 30
25. ing your sprayer after a spray application For more specific information regarding flushing and decontamination specific to the products that you are applying it is recommended that you consult the chemical label or your chemical supplier Turn pump off 2 Drain main tank by removing drain plug 3 Add a guantity of fresh water to main tank and Storage allow to drain through plug Replace plug and add a guantity of fresh water and decontaminating agents if reguired to main tank Turn on pump and spray fresh water through the lance This will ensure that fresh water has circulated through the pump and lance Drain remaining contents of fresh water and replace tan for storage drain plug The sprayer is now ready Ifthe sprayer is to be stored for a long period of time without use there are several tasks that need to be performed Clean the sprayer thoroughly as described under flushing 18 Spotmate Traymate Operator Manual Store the sprayer out of direct sunlight and where it will not be affected by frosts Ensure that the main tank is empty Protect hoses and electrical connections Chapter 5 MAINTENANCE amp TROUBLESHOOTING Troubleshooting The troubleshooting information is provided as a reference when your sprayer is not functioning correctly To ensure that you receive the best possible service it is recommended that you exhaust all applicable
26. ken there has been no improper adjustment calibration or operation Goldacres Pathway liability under s 68A and s 74H of the Trade Practices Act 1974 is the use of accessories including consumables hardware or software not expressly limited to a liability to pay to the purchaser an amount egual to manufactured by Goldacres Pathway has been approved in writing by 1 the cost of replacing the Goods Goldacres Pathway 2 the cost of obtaining the equivalent Goods or no contamination or leakage has been caused or induced 3 the cost of having the Goods repaired whichever is the lowest amount any modification to the Goods have been authorised in writing by Goldacres Pathway IMPORTANT OWNER DEALERSHIP By executing this Warranty Registration 1 The Owner a Agrees that the Owner will read the Operator s Manual before using the Product will follow all procedures in the operator s manual for the use of the Product and will exercise due care in Address Address the use of the Product Agrees that Goldacres Pathway liability for any loss or damage ostcode Postcode suffered by the Owner in connection with the Owners use of the 7 i Product is limited to the cost of repair or replacement of the Product Phone Mobile Phone Mobile Agrees that the Owner will bear any loss the Owner suffers as a consequence of any failure by the Owner to comply with 1 a
27. liable for and the purchaser releases Goldacres Pathway price is made on estimates of quantities required Should there be any Goldacres Pathway from any claims in respect of faulty or defective design of any adjustments in quantities above or below the quantities estimated by Goldacres Pathway and Goods supplied unless such a design has been wholly prepared by set out in a quotation then any such increase or decrease shall be adjusted on a unit rate Goldacres Pathway and the responsibility for any claim has been specifically basis according to unit prices set out herein accepted by Goldacres Pathway in writing and in any event Goldacres Pathway liability hereunder shall be strictly limited to the replacement of defective parts in Performance Capacities Chemicals Liquids Application Methods accordance with paragraph 6 1 of these conditions Environmental Effects except as provided herein all express and implied warranties guarantees and 5 Any performance volumes and or capacity figures given by Goldacres Pathway are estimates conditions under statute or general law as to the merchantability description quality only Goldacres Pathway shall be under no liability for damages for failure to obtain such suitability or fitness of the Goods for any purpose or as to design assembly installation figures unless specifically guaranteed in writing and any such written guarantee shall be materials or workmanship or otherwise are hereby expressly excluded
28. n and off rapidly This is not a problem unless the pump is subject to continuous cycling within two second intervals for long periods of time Altering the setting of the pressure switch or adjusting the agitation ball valve so that there is some bypass back to the tank and altering the adjustable conejet nozzle on the gunjet will all remedy this situation depending on what is most suitable Chemical Induction Chemical should be put into the main tank through the main tank lid It is important to ensure that chemical is thoroughly mixed prior to spray application Booms Booms are available for connection as an option Nozzles As information regarding nozzles is specific to those being used in your application no specific reference is made to nozzle application rates or nozzle types in Chapter 3 General Information amp Specs 13 this operator s manual Goldacres suggest the use of a current Teejet nozzle selection catalogue for reference to nozzle sizes outputs spray patterns and general spraying information For more technical information on the function of spray nozzles and factors affecting their performance you can also use the Teejet User s guide to spray nozzles The nozzles supplied with this equipment may not suit all chemical applications Always ensure that the nozzles fitted match the recommended spray quality on the chemical label The Teejet nozzle selection catalogue and Users
29. ns shall be read or applied so as to laws or regulations relating to the Goods and or the use and or the operation of exclude restrict or modify or have the effect of excluding restricting or modifying he Goods and any condition warranty guarantee right or remedy implied by law including the Trade here has been no failure to maintain a record of hours of operation which record Practices Act 1974 and which by law cannot be excluded restricted or modified shall contain full details of all inspections repairs and maintenance and produce same to Goldacres Pathway at the time of the warranty claim he defective Goods or any damaged part of the Goods are promptly returned free These warranty terms and conditions which shall only be waived in writing signed by of cost to Goldacres Pathway or a representative of Goldacres Pathway Goldacres Pathway shall prevail over all terms and conditions of the purchaser to the all warranty related repairs have been carried out with the prior authorisation of extent of any inconsistency Goldacres Pathway This warranty may not be modified or added to without the expressed written if Goods or any part thereof are not manufactured by Goldacres Pathway in consent endorsed hereon of the Managing Director of Goldacres Trading P L particular engines engine accessories transmissions transfer cases differentials tyres tubes batteries and radios and UHFs the guarantee of the Warranty Terms manufacturer thereof shall
30. odifications to this equipment may affect its function and create a serious safety risk Never attempt to clean parts or nozzles by blowing with mouth Never attempt to siphon chemicals or substances by sucking It is imperative that the vehicle manufacturer s specifications be checked and all instructions for use when transporting or towing be adhered to at all times Care should be taken when transferring liquid into the tank to ensure that the gross weight of the equipment does not exceed Spotmate Traymate Operator Manual Flush chemicals from equipment immediately after use Certain chemicals may be unsuitable for use with Pathway Goldacres standard plumbing designs Consult your Pathway Goldacres dealer if in doubt Do not operate the equipment while under the influence of any drugs alcohol or if excessively tired Make sure that the equipment complies with all relevant road regulations when transporting When draining fluids from the equipment use appropriate leak proof containers Do not use food or beverage containers as someone may consume the contents by mistake After reading the Operators manual if there is any thing that you do not understand please contact your Pathway Goldacres dealer or Pathway Goldacres the carrying braking and or towing capacity of the vehicle to which the equipment is attached as specified by the vehicle manufacturer NOTE LITRE WATER IKG
31. oods have been dispatched provided that a the defects have arisen solely from faulty materials or workmanship b the Goods have not received maltreatment inattention or interference c accessories of any kind used by the purchaser are manufactured or approved by Goklacres Pathway d where applicable the seals on the Goods remain unbroken e there has been no improper adjustment calibration or operation ih the use of accessories including consumables hardware or software not manufactured by Goklacres Pathway has been approved in writing by Goklacres Pathway g no contamination or leakage has been caused or induced h any modification to the Goods have been authorised in writing by Goldacres Pathway 10 there has been no inadequate or incorrect use storage handling or appkcaton of the Goods 0 there has been no use or operation of the Goods outside of the physical electrical or environmental specifications of the Goods x there has been no inadequate or incorrect site preparations 0 there has been no inadequate or improper maintenance of the Goods m it has not been caused by fair wear and tear and n firstly the Goods have been thoroughly inspected and any damage from whatever cause to the Goods and in particular the structure welding seams bolts booms has been repaired prior to the Goods being operated used driven or moved and on each occasion the tanks are filled and 0 there has been no fail
32. r induced 3 the cost of having the Goods repaired whichever is the lowest amount any modification to the Goods have been authorised in writing by Goldacres Pathway IMPORTANT OWNER DEALERSHIP By executing this Warranty Registration 1 The Owner a Agrees that the Owner will read the Operator s Manual before using the Product will follow all procedures in the operator s manual for the use of the Product and will exercise due care in Address Address the use of the Product Agrees that Goldacres Pathway liability for any loss or damage Postcode Postcode suffered by the Owner in connection with the Owner s use of the d Product is limited to the cost of repair or replacement of the Product Phone Mobile Phone Mobile Agrees that the Owner will bear any loss the Owner suffers as a consequence of any failure by the Owner to comply with 1 a above Acknowledges that the owner is trained and is fully responsible for the safe and correct operation of the Product and Agrees that the Owner will fully train any person who might be required to operate the Product as to how to operate the Product in a safe and proper manner Date Owner s Name Print Dealership Name Print Email Email Signature of Owner Signature of Dealer Representative 2 The Dealer undertakes that the Dealership has me
33. s and 5 Any performance volumes and or capacity figures given by Goldacres Pathway are estimates conditions under statute or general law as to the merchantability description quality only Goldacres Pathway shall be under no liability for damages for failure to obtain such suitability or fitness of the Goods for any purpose or as to design assembly installation igures unless specifically guaranteed in writing and any such written guarantee shall be materials or workmanship or otherwise are hereby expressly excluded and subject to the recognised tolerances applicable to such figures The suitability of chemicals Goldacres Pathway shall not be liable for physical or financial injury loss or damage or and other liquids for any application and the application methods and the environmental for consequential loss or damage of any kind arising out of the supply layout assembly effects shall be sole decision and responsibility of the purchaser and the user of the Goods installation or operation of the Goods or arising out of Goldacres Pathway negligence or Goldacres Pathway gives no warranty as to the suitability of any chemicals or other liquids for in any other way whatsoever any application nor the application methods nor the environmental effects which may result 7 this warranty shall only be available to the Purchaser and shall not be rom the use of the Goods Goldacres Pathway shall be under no liability for damages arising transferable by the Purchas
34. t the obligations of Product pre delivery installation service and warranty start up U Please advise me of updates that relate to my product GOLDACRES COPY GOLDACRES PATHWAY INSTALLATION AND WARRANTY REGISTRATION This warranty registration form must be returned to Goldacres by the owner operator within 14 days of taking delivery of the product Only when warranty registration is completed and returned can Goldacres fulfill all warranty obligations Dealer Address Postcode Product Description Serial No Predelivered and Inspected by Name Sign Date WARRANTY TERMS AND CONDITIONS i here has been no inadequate or incorrect use storage handling or application of the Goods Goldacres Pathway Goods described are only available for purchase upon the warranty terms and j here has been no use or operation of the Goods outside of the physical electrical conditions set out below or environmental specifications of the Goods here has been no inadequate or incorrect site preparations Interpretation here has been no inadequate or improper maintenance of the Goods 1 In these warranty terms and conditions it has not been caused by fair wear and tear and 1 Goldacres or Pathway means Goldacres Trading Pty Ltd A C N 061 306 732 of irstly the Goods have been thoroughly inspected and any damage from whatever 1 3 North Western Rd St Arnaud trading as Goldacres Agricultural Equipment c
35. taken to vitiate any contract with Goldacres Pathway or form any claim including but not limited to nozzles chains belts filters brake pads against Goldacres Pathway The descriptions illustrations and performances contained in polyethylene bushes and liquid pump valves valve O rings diaphragms and catalogues price lists and other advertising matter do not form part of the contract of sale of seals he Goods Where specifications drawings or other particulars are supplied by Purchaser Goldacres Pathway shall not be liable for and the purchaser releases Goldacres Pathway price is made on estimates of quantities required Should there be any Goldacres Pathway from any claims in respect of faulty or defective design of any adjustments in quantities above or below the quantities estimated by Goldacres Pathway and Goods supplied unless such a design has been wholly prepared by set out in a quotation then any such increase or decrease shall be adjusted on a unit rate Goldacres Pathway and the responsibility for any claim has been specifically basis according to unit prices set out herein accepted by Goldacres Pathway in writing and in any event Goldacres Pathway liability hereunder shall be strictly limited to the replacement of defective parts in Performance Capacities Chemicals Liquids Application Methods accordance with paragraph 6 1 of these conditions Environmental Effects except as provided herein all express and implied warranties guarantee
36. troubleshooting solutions shown prior to calling your dealer or Pathway Goldacres for service advice Problem Possible Cause Possible Remedy Pump not priming Valves damaged e Check clean and or replace valve kit Restriction in suction line e Check suction line e Restriction in delivery line e Diaphragm damaged Check delivery line Replace diaphragm Pulsating liquid flow e Pump switching on and off due to pressure switch e Pump sucking air Alter settings of the pressure switch Alter the adjustable conejet nozzle Restricted pump delivery e Check suction line Pump pressure lower than Suction filter screen blocked e Clean screen expected e Restriction in suction line e Check hoses fittings and tank outlet Valves damaged e Check or replace valve kit e Diaphragm damaged e Check or replace diaphragm e Pump sucking air e Check suction line e Insufficient voltage e Check power supply Pump stopping and starting Valves damaged e Check valves when not in use Insufficient voltage e Check power supply Damaged diaphragm e Check or replace diaphragm Chapter 5 Maintenance amp Troubleshooting 19 Gunjet and Triggerjet Information Triggerjet spray gun The model 38700 Triggerjet spray gun is a lightweight spray gun designed for use with low pressure spraying systems The Triggerjet is made of moulded polypropylene for excellent chemical resistance and durability Features e 381mm extension e R
37. ts filters brake pads polyethylene bushes and liquid pump valves valve O rings diaphragms and seals 5 Goldacres Pathway shall not be liable for and the purchaser releases Goldacres Pathway from any claims in respect of faulty or defective design of any Goods supplied unless such a design has been wholly prepared by Goldacres Pathway and the responsibility for any claim has been specifically accepted by Goldacres Pathway in writing and in any event Goldacres Pathway liability hereunder shall be strictly limited to the replacement of defective parts in accordance with paragraph 6 1 of these conditions 6 except as provided herein all express and implied warranties guarantees and conditions under statute or general law as to the merchantability description quality Suitability or fitness of the Goods for any purpose or as to design assembly installation materials or workmanship or otherwise are hereby expressly excluded and Goklacres Pathway shall not be liable for physical or financial injury loss or damage or for consequential loss or damage of any kind arising out of the supply layout assembly r z pl vr bov dn ft pet queer or An anty obier ae asi 7 this warranty shall only be available to the Purchaser and shall not be transferable by the Purchaser 8 this warranty in no way extends to any used Goods Goldacres Pathway liability for a breach of condition or warranty implied by Div 2 of Pt 5 of the Trade Practices Act 1974 other
38. ure to comp y with the requirements of all present or future laws or regulations relating to the Goods and or the use and or the operation of the Goods and tp there has been no failure to maintain a record of hours of operation which record shall contain full details of all inspections repairs and maintenance and produce same to Goklacres Pathway at the time of the warranty claim a the defective Goods or any damaged part of the Goods are promptly returned free of cost to Goldacres Pathway or a representative of Goldacres Pathway r ali warranty related repairs have been carried out with the prior authorisation of Goklacres Pathway 2 if Goods or any part thereof are not manufactured by Goldacres Pathway in particular engines engine accessories transmissions transfer cases differentials tyres tubes batteries and radios and UHFs the guarantee of the manufacturer thereof shall be accepted by the purchaser and is the only guarantee given to the purchaser in respect of the Goods or that part 3 inthe case of hydraulic systems Goldacres Pathway shall replace defective parts in accordance with section 6 1 of these conditions provided that the failure of the part was not related to contamination within the system Goldacres Pathway shall not be liable for labour in the case of repairing hydraulic system defects 4 this warranty does not extend to components considered as normal wear items including but not limited to nozzles chains bel
39. will ensure that the correct rate of chemical is applied to the target Follow these steps to calibrate the sprayer Measure the spray width of the nozzle on a dry surface in metres 2 Spray a test area at the intended pressure and speed Record distance in metres covered in one minute minute 3 Measure the nozzle output in litres over one minute in a measuring jug l min The spray volume can be calculated by the following formula Nozzle output l min x 10 000 Application rate L Ha Spray width m x speed m min Chapter 4 Operation 17 Spray Application After completing the filling process you are now ready to start spraying NOTE It is the responsibility of the operator to ensure that the chemical mix is sufficiently agitated and that the conditions are right to start spraying Operators must wear the appropriate PPE Switch On pump 2 Allow pump to build pressure LJ Engage the trigger on the spray lance to start spraying Adjust the nozzle pattern as required by rotating the nozzle in the appropriate direction as required Use a consistent speed or swath pattern to ensure even coverage of the target or adjust the method of application according to your target Agitation Agitation should take place when filling or through another method as deemed suitable by the operator Flushing The following information is provided as a general guide for flush
Download Pdf Manuals
Related Search
Related Contents
USER`S MANUAL - American Weigh Scales Inc eifel-230_17-c-frz.4132_-azul-_0423018219021 Graco 307879R User's Manual Philips Norelco 8200 series Electric razor 8260XL Sennheiser Microphone SDC 8200 User's Manual Pro II Manual - poplocks.com BEDIENUNGSANLEITUNG Copyright © All rights reserved.
Failed to retrieve file