Home

INSTALLATION AND OPERATING INSTRUCTIONS CM Series

image

Contents

1. NE motors except for hazardous location motors For i Check stator resistance compare to original and SGAE SGAN and SGAD motors maintenance must enter in log book be carried out by an authorized service agent Contact ii Check supply voltage at mato terminals CMC for detailed instructions iii Check bearings for noise overheating F Onan annual basis in addition to the items in D To obtain maximum service life from your electric and E eee motor it is recommended the following maintenance be i Re grease bearings in line withehart pe B implemented and recorded in a plant log book Note As indicated in the chart some bearings Ensure air intake space is unobstructed may require more frequent grease replacement On a weekly basis use an air hose to ensure all li Strip motor down and clean thoroughly airways are clear and free of dust iii Check bearings for wear damage replace as B C Do not wash the motor down unless it is IP66 rated sx ee eeral D Ona quarterly basis iv Check all machine bolts for cracks or damage i Check motor terminals for tightness and contact replace as Ere l ii If terminal lug lugs are discolored re terminate v Check all holding bolts for signs of fatigue a damage replace as necessary Check t f starting e ment ensurin i all aiaro A tight Fep ai vi After re assembly check and record l Full Load Current heck mech t f thermal iv Chec echanical operation of ther
2. loss or damage resulting from misuse or negligent handling improper use for which the product was not designed or advertised failure to properly follow the provided installation and operating instructions failure to carry out maintenance corrosive or abrasive water or other liquid lightning or high voltage spikes or unauthorized persons attempting repairs Where applicable your Davey product must only be connected to the voltage shown on the nameplate Your Davey One Year Guarantee does not cover freight or any other costs incurred in making a claim Please retain your receipt as proof of purchase you MUST provide evidence of the date of original purchase when claiming under the Davey One Year Guarantee Davey shall not be liable for any loss of profits or any consequential indirect or special loss damage or injury of any kind whatsoever arising directly or indirectly from Davey products This limitation does not apply to any liability of Davey for failure to comply with a consumer guarantee applicable to your Davey product under the Australian or New Zealand legislation and does not affect any rights or remedies that may be available to you under the Australian or New Zealand Consumer Legislation In Australia you are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptab
3. should be applied to the motor without express approval Operation Standard motors are designed for a 415 volt 5 3 phase 50 Hertz supply Use of standard motors on other supply systems should be verified with our office prior to installation All units are S1 rated to AS1359 and associated standards for operation below 1000 metres at a maximum ambient temperature of 40 C For operation in conditions other than that above please contact Davey Electric motor starting imposes severe thermal stress on the motor the frequency of starting should be minimized to ensure optimum machine life Number of Starts per hour The number of starts per hour is dependant on the inertia of the driven load and the load torque demand A guide to generally acceptable starts per hour would be as per table For greater number of starts per hour please contact Davey Starts per hour Permitted Starting Time In respect to the temperature rise of the motor starting time i e from rest to operational speed should not exceed the time indicated in the following table Motor must be allowed to cool prior to each start Maximum starting time sec Starting Frame Method 2 pole 4 pole 6 pole 8 pole 71 26 160 355 D O L 160 355 star delta MOTOR OPERATION AND MAINTENANCE Maintenance Instructions E Ona six 6 monthly basis in addition to the items in The following maintenance instructions apply to all SGA D 7
4. DEPEND OW DAV EY WATER PRODUCTS INSTALLATION AND OPERATING INSTRUCTIONS DAVEY spec ISO J ieg p ee a a a A a E a a a A ooa H A s Se ie a CM Series IS02858 Heavy Duty Industrial Centrifugal Pump Please pass these instructions on to the operator of this equipment Introduction Thank you for purchasing a quality Davey product It is our commitment to satisfy our customers by offering our very best service This manual contains instruction for installation operation and maintenance of ISOspec CM series of single stage non self priming centrifugal pumps Therefore please read it carefully before use to obtain a long satisfying service life of the purchased unit Davey ISOspec CM series centrifugal pumps are designed with high efficiency and low maintenance features Specifications Model designation example CM 125x100 200 Nominal dia of impeller mm Dia of outlet mm Dia of inlet mm Series code of pump Inspection of Pump Always check on receipt of delivery you have received the correct pump unit To identify see above specifications and label below Check correct motor kW amp speed on motor nameplate attached to motor prior to installation DAVEY spec DEPEND ON DAVEY ISO WATER PRODUCTS MOUELNO s s sSCSCSY SERANO L o MPDA m MAXSPEED RPM MAX PRESS si Pa DAVEY PRODUCTS Pty Ltd Melbourne Austr
5. alia Delivery Upon receipt the unit should be thoroughly inspected for any damage sustained during transit Any equipment damage or shortfall should be immediately advised to your nearest Davey office or Davey customer service centre Storage If the unit is not to be installed immediately it should be stored in a clean dry and preferably warm environment Shafts of stored motors should be rotated occasionally Specific vibration during storage may lead to brinelling of the bearings therefore motors that are subject to extended storage where vibration exists should be fitted with bearing locks Installation Location It is important to select a site as close to the liquid source as possible When a suction lift is unavoidable install the pump as near to the water level as possible see suction piping You should always check the maximum permissible lift of the pump from its performance curve Foundations The pump unit should be mounted on a foundation that is substantial enough to withstand the weight of the unit amp large enough to accommodate all mounting feet so they can be securely fixed to avoid movement Suction Piping r qo a ae ell T A T 4 0 STRAIGHT LENET CF SUCTION va _ STRAH LENGTH OF EUCTICN PREFERRED ARRANGEMENT FOR SUCTION LIFTS All fittings amp suction piping should be free of air leaks When a suction lift or long suction lengths are unavo
6. are calculated on the basis of normal working conditions Note Air operated grease guns should not be used Replenishment of grease media should be by means of a hand held grease gun whilst motor is running with relief plate removed Recommended Lubricant Use Lithium based grease such as Shell Alvania R3 unless otherwise specified SGAH SGASS and SGAHS require extra high temperature grease Magnalube G or equivalent Davey Repair or Replacement Guarantee In the unlikely event in Australia or New Zealand that this Davey product develops any malfunction within one year of the date of original purchase due to faulty materials or manufacture Davey will at our option repair or replace it for you free of charge subject to the conditions below Should you experience any difficulties with your Davey product we suggest in the first instance that you contact the Davey Dealer from which you purchased the Davey product Alternatively you can phone our Customer Service line on 1300 367 866 in Australia or 0800 654 333 in New Zealand or send a written letter to Davey at the address listed below On receipt of your claim Davey will seek to resolve your difficulties or if the product is faulty or defective advise you on how to have your Davey product repaired obtain a replacement or a refund Your Davey One Year Guarantee naturally does not cover normal wear or tear replacement of product consumables i e mechanical seals bearings or capacitors
7. idable consideration should be given to over sizing the suction line to reduce suction losses On suction lifts a foot valve will be required sized equal to the suction line size For applications on creek beds or dams please install a foot valve amp strainer well submerged below the surface to reduce whirlpools amp air inclusion Air inclusion can result in cavitation reducing the pump performance amp eventually destroying the pump or its components If bends are required long radius bends should be used To help ensure a less turbulent entry into the pump a Straight length of pipe should be installed between any bends and the pump inlet This straight length should be at least 2 5 times the pump inlet diameter in length Pipework supports should be installed to both inlet and outlet pipes to ensure that they are supported independently of the pump flanges DISCHARGE PIPING Typizel Arrangement Discharge piping must be selected of a size that would equal the discharge of the pump For long discharge lengths consideration should be given to using larger diameter pipework Larger size pipes have lower pressure losses for a given flow rate and may help reduce the running costs for your pumping system Talk to your nearest Davey dealer to calculate all system losses To avoid air pockets in discharge lines at high points vent cocks may be required to release air blocks accumulated within the system Air pockets may affect
8. le quality and the failure does not amount to a major failure Should your Davey product require repair or service after the guarantee period contact your nearest Davey Dealer or phone the Davey Customer Service Centre on the number listed below For a complete list of Davey Dealers visit our website davey com au or call AUSTRALIA NEW ZEALAND DEPEND ON Customer Service Centre Customer Service Centre 6 Lakeview Drive 7 Rockridge Avenue DAVEY Scoresby Australia 3179 Penrose Auckland 1061 Ph 1300 367 866 Ph 0800 654 333 WATER PRODUCTS Fax 1300 369 119 Fax 09 527 7654 Website davey com au Website daveynz co nz Davey Water Products Pty Ltd Member of the GUD Group ABN 18 066 327 517 Davey amp ISOspec are registered trade marks of Davey Water Products Pty Ltd Davey Water Products Pty Ltd 2011 P N 49720 6 supersedes P N 49720 5 Installation and operating instructions are included with the product when purchased new They may also be found on our website
9. lications NL Excessive Vibration Turn the unit off 2 Check the motor is rotating in correct direction 3 Check both motor feet amp pump feet are secured properly 4 Check drive coupling is secured tightly to the motor shaft 5 Check motor bearings are OK 6 Impeller could be partially blocked causing imbalance Noisy Operation 1 N Turn the unit off 2 Check motor bearings 3 Check pump is primed 4 Check suction line is not damaged causing insufficient supply amp resulting in cavitation 5 Check you are not pumping solids High Power Consumption 1 Check direction of rotation 2 Check operating speed on the motor matches the intended performance curve speed Check that the estimated head is correct as pump may be running down on its curve producing high flow but drawing more power Throttle the pump back on to its curve via discharge gate valve or reduce impeller diameter The Specific Gravity or Density of the liquid is greater than 1kg litre affecting power draw Check impeller diameter for the correct size to establish maximum power requirement at duty point 3 Lubrication Motor bearings are lubricated with lithium based rolling contact bearing grease suitable for operation with in the cooling air temperature range of 20 C to 55 C For operation outside this temperature range special lubricants are required Special lubricants or additional maintenance may be requi
10. ma Full Load Voltages gt overload S no v Check mechanical operation of thermistor relay ae se oad agen if fitted vii Ensure cooling fan is operational G Ensure plant log book records commissioning data vi Check operation of space heaters if fitted aeo oaen ena adaa Nio dinal Sealed Bearings erp The required replacement interval for sealed bearings t Average grease life hours is generally determined by the grease life which is n Speed RPM Sa dependant on operating temperature operating speed N Bearing limiting speed with grease lubrication RPM the limiting speed of the bearing and the type of grease T Operating temperature C Under normal operating conditions the following relationship applies _ n B n log t 6 54 2 6 47 0 025 0 012 4 T For further information please contact your nearest CMG office for advice Open Regreasable Bearings Recommended Grease Replenishment Intervals Hours Bearing 3000 r min 1500 r min 1000 r min 750 r min bore mm Bal Roler Bal Roler Bal Roller Bali Roler 6312 NU312 6313 NU313 6314 NU314 6315 NU315 6316 NU316 6317 NU317 6318 NU318 6319 NU319 6322 NU322 D Based on maximum grease service life of 20 000 hours It should be noted that for motors fitted with Ball and Roller bearings the lubrication intervals for both bearings should be based on the roller bearing data The re lubrication intervals recommended
11. meplate ratings e Ensure shaft turns freely before initial start e Measure stator resistance and record in Log Book 6 If this is correct you may now start the pump when it reaches full soeed you will see the pressure in the discharge line rise Slowly open the discharge valve until the pump adjusts to maintain its duty point Structural Representation sgl rr Scape tee Sereseeeeetes j Reece eee a cr 6 6 4 3 21 1 Pump casing 2 Impeller 3 Rear casing cover 4 Stub shaft 5 Bell housing 6 Motor 7 Bolt 8 Bolt 9 Bolt 10 O ring 11 Bronze wear ring 12 Mechanical shaft seal 13 Impeller washer 14 Impeller nut 15 Impeller key 16 Muff coupling 17 Volute drain plug Trouble Shooting Pump is running but failing to deliver water or desired pressure Turn the unit off 2 Check suction line is free of debris or blockages amp check that the pump has not lost its prime If so remove blockage amp repeat Starting at step 1 3 Check that the suction valve is open 4 Check that the discharge valve is open 5 Check for air leaks These may not always be visible to the naked eye unless pressure is applied to the suction line Check that the suction line is not too long Is suction line to pump excessive Is the foot valve stuck open or undersized Is speed too slow Check motor direction rotation Check for possible clogging in impeller vanes Is the discharge piping undersized for app
12. red in the case of motors exposed to comparatively high degrees of pollution high humidity increased or changed bearing loads or prolonged continuous operation MOTOR OPERATION AND MAINTENANCE Installation All motors must be installed in such a manner as to ensure the air intake is not obstructed Refer to dimension BL in the cooling section of this catalogue Bed plates or slide rails should be firmly fixed to a solid level foundation to ensure the motor remains rigid and vibration free Shims or packers if required must be of adequate size and placed adjacent to and between base fixings Protective transport coatings on shafts and or flanges must be removed prior to connection to the driven load Coupling Drive Service In fitting couplings or pulleys to the motor shaft care must be taken to ensure the roller ball bearings are not damaged Tapped holes are provided in shaft extensions to assist in the fitment of couplings and or pulleys Under no circumstances should couplings and or pulleys be impact driven onto the shaft Couplings or pulleys should be independently balanced with a half key Alignment Service Great care must be taken in aligning the complete unit since misalignment can cause rapid deterioration of bearings and lead to other mechanical failures due to the stress produced After final tightening of foundation bolts machine alignment should be rechecked as bed plates could distort No end thrust
13. the performance of the pump A throttling valve should be installed in the discharge line to ensure the pump works within the performance curve Electrical Connection WARNING When installing servicing or attending pump always ensure power is switched off and lead unplugged Electrical connections should be serviced only by qualified persons If the electrical supply lead is damaged it must be replaced Ensure all electrical connections are solid and continuous Check motor starter and overloads for correct rating and trip setting All circuit breakers HRC fuses or protective devices associated with the motor must be rated to suit motor running current and starting characteristics Starting Caution Do not attempt to run pump if it has not been filled with water primed Severe damage will result to shaft seal Ensure the suction line amp pump casing is full of water open suction valve if fitted Check power is off amp rotate the pump shaft slowly to release any trapped air within the pump casing Close the discharge valve Check the direction of rotation on the pump casing or motor cover Prior to initial start up the following steps must be taken e Insulation resistance test On machines up to 600 volt the minimum value should be 1MQ e Thermistors if fitted should be checked for continuity with a multimeter and never mega tested e Ensure supply voltage and frequency correspond to the motor na

Download Pdf Manuals

image

Related Search

Related Contents

Gran Turismo Brake System  EA707D-20 マルチテスター  TRIFORZA ENERGY ACTIVATION Mixed Berries  KDC-364U KDC-264UB KDC-164UR KDC-164UG KDC  

Copyright © All rights reserved.
Failed to retrieve file