Home

Sniper Manual - Rutherford Electrical Engineering Services

image

Contents

1. e e 7 av PP gt 7 zm Gs gt A 7 LES x Pa Rutherford Electrical Engineering Services Phone 02 4932 7344 Sere st aai A 11 kV COUPLER VOLTAGE DETECTOR KIT OPERATING INSTRUCTIONS MANUAL 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 SNIPER 11kV COUPLER VOLTAGE DETECTOR KIT 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 1 Check last tested date The kit contains Modiewark REES voltage detector B Modie Live Field Generator Operating Stick D Mines Discharge Stick Container inc 2 special limit pins 2 spacers and 4 humpback clips 2 spares All equipment in the kit will have a sticker showing the test date and the next test due date 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 Wark Safe the life you save may be yours AERE 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 Coupler pictures displayed are top view B Rutherford Electrical Engineering Services m TREES NN 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 xX e bel Op O fed NG lewar Attach Modi 3 ing hten the wi 19 irm and ti nut f ly IS la Ensure the aer clean and dry Ice ineering Servi bel c m 3 K Fi ud T i 2 ver ET f s 3 E 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 4 Te
2. risks not assessed and controls to mitigate those risks not in place This risk assessment identifies hazards known to REES Other hazards which REES are unaware of may exist Electric shock Equipment not fit for purpose Electric shock Used on 11kV couplers other than that specified Electric shock Operators not trained and authorised to use this equipment Electric shock Operating instructions not understood Note MDS Mines Discharge Stick Electric shock System energised Electric shock Exceeding the rated working voltage of equipment Ensure that you complete a written risk assessment which includes all hazards which apply to your industry and or place of work Carefully consider your local OH amp S requirements and company procedures This risk assessment is a guideline only This kit should be assessed and verified fit for the required purpose BEFORE being placed into service The REES Sniper Kit equipment is designed for use on specific mining couplers only and should NOT be used on other couplers or for any other purpose Suitable for 6 6kV and 11kV Ausproof and CMI couplers and combinations thereof Personnel should be trained assessed competent and authorised before using this equipment REES can provide operational training for use of the Sniper kit with a prerequisite that personnel are currently trained in HV safety and operating procedures The following list of information should be studied prior to us
3. this may vary Equipment protective equipment from site to site 13 Before Use Of Electric shock Equipment not routinely tested Ensure that the REES Modiewark Modie Live TMAC operating stick and Mines Equipment Discharge stick all have current labels indicating that they have been routinely tested in accordance with local requirements The modiewark aerial must be additionally power proof tested annually 14 Before Use Of Electric shock Equipment damaged Visually inspect the modiewark modie live operating stick and mines discharge stick Equipment before each use ensuring that there is no visible signs of damage The surfaces of insulating sections should not be scratched or fouled Safe Work Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 2 of 4 JREES Rutherford Hectrical Engineering Services Pty Ltd SEES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES ham Mmads Conr Measures 15 Before Use Of Electric shock Operating stick insulating properties degraded DO NOT use the sniper kit equipment in wet conditions ALWAYS ensure that all items Equipment of the kit are clean and dry before use 16 Before Use Of Electric shock Modiewark inoperable Ensure that the modiewark batteries are in a serviceable condition When the Modiewark modiewark is turned on not near live source the batteries are servic
4. 10 Before Taking Incorrect use due to items not being in kit Before taking equipment to the test site ensure that the kit is complete and all items To Test Site are serviceable Ensure that the operating instructions for all equipment are located inside the kit 11 Lifting And Back injury from lifting case into awkward locations The Sniper Kit has a combined weight of 14kg and dimensions 135cm x 45cm x 15cm Moving Sniper Kit Use correct lifting techniques when lifting the kit Be particularly cautious when loading the kit into transport vehicles where required use two persons to load the kit 12 Before Use Of Electric shock burns User not wearing correct personal Carefully consider what PPE should be worn when using the Sniper Kit this may vary Equipment protective equipment from site to site 13 Before Use Of Electric shock Equipment not routinely tested Ensure that the REES Modiewark Modie Live TMAC operating stick and Mines Equipment Discharge stick all have current labels indicating that they have been routinely tested in accordance with local requirements The modiewark aerial must be additionally power proof tested annually 14 Before Use Of Electric shock Equipment damaged Visually inspect the modiewark modie live operating stick and mines discharge stick Equipment before each use ensuring that there is no visible signs of damage The surfaces of insulating sections should not be scratched or fouled Safe W
5. that the MDS is connected to the supply side coupler known earth Electric shock Application of mines discharge stick to lives Prove the system de energised prior to applying the mines discharge stick The mines system discharge stick is NOT a fault rated device and should NOT be used as a device for proving a HV system de energised 24 Using Mines Electric shock Operator too close to test point Ensure that you are aware of the safe working distance from the system voltage being Discharge Stick tested and ensure that you do not encroach this distance ALWAYS grip the MDS by the handgrip Reviewed By competent person Date Name Of Persons On Job Name OF Persons On Job Safe Work Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 4 of 4
6. to possibly energised specimen Never use the modiewark unless it is securely fitted to the supplied insulating operating Stick Electric shock Operator too close to possibly energised system Ensure that you are aware of the safe working distance from the system voltage being tested and ensure that you do not encroach this distance ALWAYS grip the insulated operating stick below the handgrip Electric shock Incorrect use of modiewark causes failure to The limit pins must be fitted to the top and bottom bolt holes of the coupler The detect live coupler There are areas around the coupler where the modiewark aerial must be inserted in the top or bottom of the couplers preferably modiewark can be placed in a null field areas where electric both between the guide pins and the limit pins Null fields exist at the sides direct top field cancels out and direct bottom of the coupler Safe Work Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 3 of 4 SEES Rutherford Hectrical Engineering Services Pty Ltd REES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES ham mem Corral Measures Electric shock Failure to correctly connect the mines discharge Ensure that the mines discharge stick is connected to a known system earth prior to stick to the system earth application Ensure that the coupler earth bond remains in place during discharging and
7. SION AREA POWER ON PUSH AND HOLD 3 SECONDS Green Power On Low Battery 1 This unit will test Non Contact Voltage Detectors that require a frequency of 50 or 60 Hz and other testers with an open frequency response 2 By holding the unit under test with the power on in one hand hold the Modie Live in the other hand and activate 3 To activate the unit depress and hold the button for a period of three seconds a Green light will indicate the unit is producing an electric field 4 If an Orange light appears on the Modie Live this indicates the battery level is 7 5 volts and a replacement battery is required 5 The unit under test will display an activation if this does not occur refer to the units under test manual 6 It is recommended that a unit test be conducted at regular intervals throughout the working period G L McGAVIN PTY ABN 73 383 170 955 MODIEWARK To be used with Non Contact Voltage Detectors requiring 50 60 Hz HIGH VOLTAGE TESTING SHOULD ONLY BE CARRIED OUT BY TRAINED PERSONNEL DO NOT HOLD THIS INSTRUMENT WITH ANY ELECTRICAL CONDUCTOR DO NOT REMOVE COVER NO REPAIRABLE PARTS HIGH VOLTAGE CONTAINED WITHIN On the front panel of the Modie Live a Green indicator will illuminate when activated This will indicate an operating circuit An Orange light will illuminate when the battery level falls below 7 5 volts This requires a battery replacement replace with a 9 volt PP3 1
8. TEST BEFORE YOU TOUCH SAFETY FIRST Page 4 of 4 Emitted EMF 200 volts Frequency 57 Hz Light source High Intensity LED Operating Temperature 10 to 65 C 14 to 149 F IP Rating IP64 Weight 700g includes Battery Dimensions Length 172mm Dia 47mm max Battery 9 volt PP3 Alkaline Battery Life 500mA Alkaline Activated 1 Hours Standby 3 Months WARNINGS DO NOT remove casing DO NOT use if casing is worn or damaged as voltage generated may cause personal harm d G L McGAVIN PTY LTD ABN 73 383 170 955 Address 43 Orlando Road LAMBTON NSW 2299 Ph 02 4952 6304 Fax 02 4956 1054 E mail sales dn eng com au Website www dn eng com au EMISSION AREA POWER ON PUSH AND HOLD 3 SECONDS Green Power On Low Battery 1 This unit will test Non Contact Voltage Detectors that require a frequency of 50 or 60 Hz and other testers with an open frequency response 2 By holding the unit under test with the power on in one hand hold the Modie Live in the other hand and activate 3 To activate the unit depress and hold the button for a period of three seconds a Green light will indicate the unit is producing an electric field 4 If an Orange light appears on the Modie Live this indicates the battery level is 7 5 volts and a replacement battery is required 5 The unit under test will display an activation if this does not occur refer to the units under test manual 6 It is recomme
9. To replace battery unscrew the rear of the Modie Live in an anticlockwise direction and pull apart 2 Unclip the PP3 battery from battery lead Remove battery from holder and replace with a new battery 4 Reconnect the battery clip to the battery the correct way 5 Place the wires and battery into the slot and screw in a clockwise direction 7 MAI SAFETY INSTRUCTIONS SICAME E mm MINES DISCHARGE STICK CLA MDS Series The purpose of a Mines Discharge Stick MDS series is to safely discharge any residual charge on HV equipment after it has previously been de energised and proven to be earthed by first applying a fault rated earth system DO NOT 1 2 3 Do not use the stick as a first earth device to prove that HV equipment is de energised It is not a fault rated device Do not use the stick for any other purpose other than for the purpose above Do not use the stick in a wet environment DO 1 Before use visually check that the lead is in good condition and is connected to an appropriate earth point Always keep the handle and lead clean and free of dust and moisture Appropriate personal protective equipment such as eye protection and gloves should be worn when applying the stick It is recommended that the location condition lead continuity from brass top end to lead end lug and insulation integrity of the handle are included in regular safety equipment inspections and audit plans If t
10. d SEES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES ham mem Corral Measures 8 Storage And Electric shock Equipment insulation failure due to damage in Ensure that all Sniper kit items are cleaned and stored in the supplied protective case Transportation storage or transportation when not in use 9 Storage And Electric shock Use by untrained or unauthorised personnel The sniper kit should be stored in a secure location accessible only to those authorised Transportation to use the equipment When removed from its secure storage location the kit should remain under the direct supervision of a person authorised to use the equipment 10 Before Taking Incorrect use due to items not being in kit Before taking equipment to the test site ensure that the kit is complete and all items To Test Site are serviceable Ensure that the operating instructions for all equipment are located inside the kit 11 Lifting And Back injury from lifting case into awkward locations The Sniper Kit has a combined weight of 14kg and dimensions 135cm x 45cm x 15cm Moving Sniper Kit Use correct lifting techniques when lifting the kit Be particularly cautious when loading the kit into transport vehicles where required use two persons to load the kit 12 Before Use Of Electric shock burns User not wearing correct personal Carefully consider what PPE should be worn when using the Sniper Kit
11. e Stick 11 Use the Mines Discharge Stick on each phase 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 Annual testing per local guidelines The Modiewark aerial must be power proof tested annually Training on correct use of the Sniper Kit is available For more information contact Luke Roper 02 4932 344 luke ruthelect com au 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 Couplers Tested with the Sniper Kit as at 20 04 08 Ausproof Ausproof 6600V and11000V Ausproof CMI 300A 6600V and 300A 11000V Ausproof CMI 150A 6600V and 150A 11000V CMI 300A CMI 300A 6600V and 300A 11000V CMI 300A CMI 150A 6600V and 150A 11000V CMI 150A CMI 150A 6600V and 150A 11000V 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 Emitted EMF 200 volts Frequency 57 Hz Light source High Intensity LED Operating Temperature 10 to 65 C 14 to 149 F IP Rating IP64 Weight 700g includes Battery Dimensions Length 172mm Dia 47mm max Battery 9 volt PP3 Alkaline Battery Life 500mA Alkaline Activated 1 Hours Standby 3 Months WARNINGS DO NOT remove casing DO NOT use if casing is worn or damaged as voltage generated may cause personal harm d G L McGAVIN PTY LTD ABN 73 383 170 955 Address 43 Orlando Road LAMBTON NSW 2299 Ph 02 4952 6304 Fax 02 4956 1054 E mail sales dn eng com au Website www dn eng com au EMIS
12. eable if the beeper sounds and the indicating light flashes at 1 second intervals 17 Before Use Of Electric shock Live circuit not detected due to modiewark fault Prior to and after using the modiewark for voltage detection verify that the modiewark is Modiewark functioning correctly using Modie Live self tester supplied in the Sniper kit 18 Before Initial Electric shock 11kV couplers inadvertently separated totally Before initially separating couplers ensure that the supplied limit pins are installed in before testing the top and bottom holes of the couplers as per the operating instructions and that the humpback securing pins and spacers are correctly in place Electric shock User too close to possibly energised specimen Never use the modiewark unless it is securely fitted to the supplied insulating operating Stick Electric shock Operator too close to possibly energised system Ensure that you are aware of the safe working distance from the system voltage being tested and ensure that you do not encroach this distance ALWAYS grip the insulated operating stick below the handgrip Electric shock Incorrect use of modiewark causes failure to The limit pins must be fitted to the top and bottom bolt holes of the coupler The detect live coupler There are areas around the coupler where the modiewark aerial must be inserted in the top or bottom of the couplers preferably modiewark can be placed in a null field areas where el
13. ectric both between the guide pins and the limit pins Null fields exist at the sides direct top field cancels out and direct bottom of the coupler Safe Work Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 3 of 4 SEES Rutherford Hectrical Engineering Services Pty Ltd REES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES ham mem Corral Measures Electric shock Failure to correctly connect the mines discharge Ensure that the mines discharge stick is connected to a known system earth prior to stick to the system earth application Ensure that the coupler earth bond remains in place during discharging and that the MDS is connected to the supply side coupler known earth Electric shock Application of mines discharge stick to lives Prove the system de energised prior to applying the mines discharge stick The mines system discharge stick is NOT a fault rated device and should NOT be used as a device for proving a HV system de energised 24 Using Mines Electric shock Operator too close to test point Ensure that you are aware of the safe working distance from the system voltage being Discharge Stick tested and ensure that you do not encroach this distance ALWAYS grip the MDS by the handgrip Reviewed By competent person Date Name Of Persons On Job Name OF Persons On Job Safe Work Method Statement 52 NO LIVE LINE WORK
14. his product requires repair or maintenance please contact the manufacturer below Sicame Australia Pty Ltd ABN 20 009 408 879 Corporate Head Office amp Factory 19 Computer Road Yatala Queensland 4207 Ph 61 7 3807 7022 Fax 61 7 3807 7522 MDS Safety Instructions v1 Page 1 of 1 REES Rutherford Hectrical Engineering Services Pty Ltd SEES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES Ad mem Corral Measures 1 Before Being ALL Hazards not identified risks not assessed and controls to Ensure that you complete a written risk assessment which includes all hazards which Placed Into Service mitigate those risks not in place apply to your industry and or place of work Carefully consider your local OH amp S This risk assessment identifies hazards known to REES Other requirements and company procedures This risk assessment is a guideline only hazards which REES are unaware of may exist 2 Before Being Electric shock Equipment not fit for purpose This kit should be assessed and verified fit for the required purpose BEFORE being Placed Into Service placed into service 3 Before Being Electric shock Used on 11kV couplers other than that specified The REES Sniper Kit equipment is designed for use on specific mining couplers only Placed Into Service and should NOT be used on other couplers or for any other purpose Suitable for 6 6kV and 11kV Ausproof and CMI coup
15. ing the sniper kit REES Sniper Kit instructions WI 3 Rev 0 OEM warning labels printed on the modiewark modie live and T MAC operating stick OEM operating instructions for the modie live and MDS Ensure that the system under test has been isolated and earthed using site isolation procedures All precautions including physically tracing above ground cables should be completed prior to verifying the isolation with the Sniper Kit All test equipment supplied in the Sniper kit is rated for use on 11kV AC systems only DO NOT apply the equipment to voltages greater than 11kV AC nominal Safe Work Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 1 of 4 SEES Rutherford Hectrical Engineering Services Pty Ltd REES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES ham mem Corral Measures 8 Storage And Electric shock Equipment insulation failure due to damage in Ensure that all Sniper kit items are cleaned and stored in the supplied protective case Transportation storage or transportation when not in use 9 Storage And Electric shock Use by untrained or unauthorised personnel The sniper kit should be stored in a secure location accessible only to those authorised Transportation to use the equipment When removed from its secure storage location the kit should remain under the direct supervision of a person authorised to use the equipment
16. lers and combinations thereof 4 Before Use Of Electric shock Operators not trained and authorised to use this Personnel should be trained assessed competent and authorised before using this Equipment equipment equipment REES can provide operational training for use of the Sniper kit with a prerequisite that personnel are currently trained in HV safety and operating procedures 5 Before Use Of Electric shock Operating instructions not understood The following list of information should be studied prior to using the sniper kit REES Equipment Note MDS Mines Discharge Stick Sniper Kit instructions WI 3 Rev 0 OEM warning labels printed on the modiewark modie live and T MAC operating stick OEM operating instructions for the modie live and MDS 6 Before Use Of Electric shock System energised Ensure that the system under test has been isolated and earthed using site isolation Equipment procedures All precautions including physically tracing above ground cables should be completed prior to verifying the isolation with the Sniper Kit 7 Before Use Of Electric shock Exceeding the rated working voltage of equipment All test equipment supplied in the Sniper kit is rated for use on 11kV AC systems only Equipment DO NOT apply the equipment to voltages greater than 11kV AC nominal Safe Work Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 1 of 4 SEES Rutherford Hectrical Engineering Services Pty Lt
17. nded that a unit test be conducted at regular intervals throughout the working period G L McGAVIN PTY ABN 73 383 170 955 MODIEWARK To be used with Non Contact Voltage Detectors requiring 50 60 Hz HIGH VOLTAGE TESTING SHOULD ONLY BE CARRIED OUT BY TRAINED PERSONNEL DO NOT HOLD THIS INSTRUMENT WITH ANY ELECTRICAL CONDUCTOR DO NOT REMOVE COVER NO REPAIRABLE PARTS HIGH VOLTAGE CONTAINED WITHIN On the front panel of the Modie Live a Green indicator will illuminate when activated This will indicate an operating circuit An Orange light will illuminate when the battery level falls below 7 5 volts This requires a battery replacement replace with a 9 volt PP3 1 To replace battery unscrew the rear of the Modie Live in an anticlockwise direction and pull apart 2 Unclip the PP3 battery from battery lead Remove battery from holder and replace with a new battery 4 Reconnect the battery clip to the battery the correct way 5 Place the wires and battery into the slot and screw in a clockwise direction 7 MAI SAFETY INSTRUCTIONS SICAME E mm MINES DISCHARGE STICK CLA MDS Series The purpose of a Mines Discharge Stick MDS series is to safely discharge any residual charge on HV equipment after it has previously been de energised and proven to be earthed by first applying a fault rated earth system DO NOT 1 2 3 Do not use the stick as a first earth device to prove that HV eq
18. ork Method Statement 52 NO LIVE LINE WORK TEST BEFORE YOU TOUCH SAFETY FIRST Page 2 of 4 JREES Rutherford Hectrical Engineering Services Pty Ltd SEES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES ham Mmads Conr Measures 15 Before Use Of Electric shock Operating stick insulating properties degraded DO NOT use the sniper kit equipment in wet conditions ALWAYS ensure that all items Equipment of the kit are clean and dry before use 16 Before Use Of Electric shock Modiewark inoperable Ensure that the modiewark batteries are in a serviceable condition When the Modiewark modiewark is turned on not near live source the batteries are serviceable if the beeper sounds and the indicating light flashes at 1 second intervals 17 Before Use Of Electric shock Live circuit not detected due to modiewark fault Prior to and after using the modiewark for voltage detection verify that the modiewark is Modiewark functioning correctly using Modie Live self tester supplied in the Sniper kit 18 Before Initial Electric shock 11kV couplers inadvertently separated totally Before initially separating couplers ensure that the supplied limit pins are installed in before testing the top and bottom holes of the couplers as per the operating instructions and that the humpback securing pins and spacers are correctly in place Electric shock User too close
19. r and Humpback Pins Place Pins and Fittings back into Case Separate the Coupler Connections 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 9 Connecting the Mines Discharge Stick Firmiy attach tne eartn TOES Ji the Mines Discharge Stick to the supply side coupler earth 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 10 Holding the Mines Discharge Stick Incorrect bh Rutherford Electrical Engineering Services 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 11 Using the Mines 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 Keeping a safe working distance from possible live parts and holding the stick by the handle only touch the tip onto the part be earthed Repeat for all phases parts Rutherford Electrical Engineering Services 12 Storage when not in use Clean and replace all items into the case to prevent damage during storage Fully close and lock the case gt to prevent ingress of dirt and moisture 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 3 Attach Modiewark to stick 4 Test the Modiewark with the Mode Live 5 Always hold the stick behind the hand guard when in use 6 Test for power in the coupler joint 7 Re test the Modiewark with the Modie Live 8 Separate the Coupler 9 Connect the Mines Discharge Stick to the plug earth lug 10 Correctly Hold the Mines Discharg
20. st the Modiewark with the Modie Live buzzer will sound and the light will A flash at regular intervals ush and HOLD the POWER ON button on the Modie Live and move it toward the tip of the Modiewark The Modiewark light should illuminate continuously and the buzzer beeps continuously 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 1 4 E a TT 4 E CH Kl 5 E E ur bh i d i d P ei P E Place both hands behind hand guard 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 6 Test for power in the coupler joint Modiewark from the ore or bottom of the couplers NOT THE SIDE The aerial must be inserted fully and towards the connecting pins G It is essential that the aerial is moved slowly between the special limit bolt and the location pin If power is present the buzzer will sound and the light will illuminate AN 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revision 0 7 Re test the Modiewark with the Modie Live POWER ON button on the Modie Live and move it toward the tip of the Modiewark The Modiewark light should illuminate continuously and the buzzer beep continuously 2008 Sniper 11kV Coupler Voltage Detector Kit W1 3 Revisioro 8 Separating the Coupler Connections Return Clean Modiewark and Stick back to the Case Remove Retaining Pins Space
21. uipment is de energised It is not a fault rated device Do not use the stick for any other purpose other than for the purpose above Do not use the stick in a wet environment DO 1 Before use visually check that the lead is in good condition and is connected to an appropriate earth point Always keep the handle and lead clean and free of dust and moisture Appropriate personal protective equipment such as eye protection and gloves should be worn when applying the stick It is recommended that the location condition lead continuity from brass top end to lead end lug and insulation integrity of the handle are included in regular safety equipment inspections and audit plans If this product requires repair or maintenance please contact the manufacturer below Sicame Australia Pty Ltd ABN 20 009 408 879 Corporate Head Office amp Factory 19 Computer Road Yatala Queensland 4207 Ph 61 7 3807 7022 Fax 61 7 3807 7522 MDS Safety Instructions v1 Page 1 of 1 REEI Rutherford Hectrical Engineering Services Pty Ltd REES Task Suppliers Guideline Risk Assessment For REES Sniper Kit Mk 1 Date 23 04 2008 Compiled By REES Ad mem Corral Measures 1 Before Being Placed Into Service 2 Before Being Placed Into Service 3 Before Being Placed Into Service 4 Before Use Of Equipment 5 Before Use Of Equipment 6 Before Use Of Equipment 7 Before Use Of Equipment ALL Hazards not identified

Download Pdf Manuals

image

Related Search

Related Contents

especificaciones tecnicas  Samsung NJ0201VXB1 User Manual    Ecouter  AMBER SELECT / AMBER SELECTX  Eglo CABO  Sony HDR-CX130E+Bundle  Binks AA4000 Air Assisted Airless Spray Gun Operation and  Toshiba Qosmio X505  34511.1 EFL Edge 540QQ 280 BNF Manual.indb - E  

Copyright © All rights reserved.
Failed to retrieve file