Home

INSTALLATION MANUAL - McKinnon Heating & Cooling

image

Contents

1. PCB connection point is at lower right corner for SH25 1 Control loom models and lower left corner for SH18 models Push loom end connector onto connector marked FRONT PANEL on PCB Fit Screws G WF25 CONSOLE FRONT COVER INSTALLATION NO FLUE COVER 6 Fitting front covers 1 Move locating tab to front holes on pre installed top mounting bracket 2 Connect earth lead from heater cover to bodv of heater 3 Locate slots in top of cover over locating tabs on top mounting bracket 4 Locate lower grille section on outlet spigot at bottom of heater If cover is not flush against wall surface adjust locating tabs 5 Fit 2 screws to secure front cover to bodv of heater Locating tabs Top mounting bracket Earth lead Fit Screws WF25 FLUE COVER INSTALLATION Install ceiling trim frame 1 Install the ceiling trim frame between the cut out as per flue kit installation instructions in the cornice with the back edge against the wall and the top edge against the ceiling Fix in place bv screwing from below into ceiling using toggle bolts or wood screws supplied Attach the flue cover bottom support bracket to the top of the front cover using 2 screws supplied in kit Fit the front cover to heater as described on page 3 C
2. INTERNATIONAL INSTALLATION MANUAL CONSOLE KIT FOR SEELEY INTERNATIONAL BRAEMAR ECO SUPERSTAR SH18 SH25 amp WF25 HEATERS SEELEVSAR SH18 25 Braemar HEATING COOLING ATTACHING CONSOLE TO FRONT COVER SH18 25 WF25 Attach console top panel to side panels Attach console sides to heater front cover 1 Use the supplied rivets two on each side to fix both 1 Using the supplied screws attach the console console side plates to the console top plate extension to the front cover as shown Ensure the side panels are fixed to the inside of the top panel Top panel Side panel Attach console panels to heater front cover 2 Using the supplied screws attach the console extension to the front cover as shown R y i SH18 25 COVER INSTALLATION Fitting front cover 1 Connect earth lead from heater cover to bodv of heater 2 Connect control loom multi coloured ribbon cable to main PCB on electrical mount panel connection is labelled FRONT PANEL The loom will fit in only the correct position 3 Locate lower grille section on outlet spigot at bottom of heater ensure that plastic spigot fits around sheetmetal spigot at top and bottom and both sides Guide the top grille section onto the top cover retaining bracket and ensure that cover fits flush against the wall surface 4 Fit 4 screws to secure front cover to body of heater Earth lead
3. ut the flue cover to length to suit the ceiling height Calculate the length required as shown below Slide cut end of flue cover into ceiling trim frame Push bottom of flue cover in towards wall spring lower sides out to clear heater cover Lower flue cover into lower support bracket on top of heater cover Flue cover bottom support bracket Q Ceiling trim frame Cornice Ceiling f DISTANCE X i Front cover FLUE COVER CUT LENGTH DISTANCE X 80 mm UU 636702b Warrantv Service Australia 1 300 650 644 seeleyinternational com It is the policy of Seeley International to introduce continual product improvement Accordingly specifications are subject to change without notice Please consult with your dealer to confirm the specifications of the model selected Braemar HEATING COOLING

Download Pdf Manuals

image

Related Search

Related Contents

    DreamStar Auto Evolve    DMX16 User  600VAC - Soligent  

Copyright © All rights reserved.
Failed to retrieve file