Home

Brief Installation Manual GTTS-2000B V1.3

image

Contents

1. Ss gtts Brief Installation Manual GTTS 2000B V1 3 Prior to mechanical installation the GTTS unit shall be activated in the Iridium Satellite Network Send an email to GTTSactivate gtts eu with a list of IMEI numbers from the units that needs to be activated Only activation requests from authorized dealers will be processed The IMEI numbers can be found on 2 different barcode labels on the bottom of the unit and also on a barcode label on the carton packing IMEI nr always starts with 300034 or 300234 Activation is normally realized the same day during GT TSystems B V business hours Your subscription starts from this day The GTTS 2000B is very easy to install It shall be installed in horizontal position onto a ferro steel surface with no obstructions to the sky above As soon as the GTTS 2000B is mounted onto ferrous metal it will be switched on automatically Make sure that bottom center touches steel The ferro sensor is located at this position If the GTTS is provided with magnets be aware These magnets are very strong The GTTS 2000B will send a first GPS position immediately to confirm the unit is switched on and working properly Please note that it can take several minutes before a message from the unit is received depending on satellites in sight GPS takes typically 40 50 seconds for a cold start fix Latency in the Iridium Network is very low Typical values measured 12 15 seconds When
2. the GTTS 2000B is removed from ferrous metal it will be triggered to send a sabotage message As soon as the sabotage message is sent the GI TS 2000B will switch into the power down state again factory power down state When not in power down mode the GI TS 2000B will send a battery status message every 10080 minutes 1 week The complete Installation and User s manual can be found on http www gits eu products php in pdf format Installation with magnet mounting Holding the GI TS 2000B with both hands hold it over the area where it shall be placed Tilt the GTTS 2000B appr 45 degrees as shown in figure 3 below Then lower it onto the steel surface and turn the GTTS 2000B until the magnets make contact with the steel surface Try to do this as controlled as possible to avoid a slam and keep your fingers free from the GT TS 2000B surface contact area Slamming the unit onto the steel surface could cause damage due to extreme G forces that might occur Reverse this procedure to remove an unit Never try to slide a unit This will damage the magnetic s corrosion protective coating and the steel paint surface it is mounted on GTTSystems B V Herfordstraat 16 7418 EX Deventer T 0570 605075 F 0570 677755 E info gtts eu W www gtts eu 2 3 2 Installation with screw mounting If the GT TS 2000B should be installed using 4 pieces M5 bolts the bolts shall not be longer then 18mm plus the steel surface thickness Dr
3. ill 4 holes 5 5 mm according the drill plan See figure below 346 DIAM HOLE 3 5mm 34 3 m L 100 307 3 me ee OC X 18 E at MS FERRO SENSUR X is steel surface thickness Bolt M5 maximum length is X 18 mm Make sure that bottom center touches steel The ferro sensor is located at this position

Download Pdf Manuals

image

Related Search

Related Contents

ポータブルナビ カタログ CN-GPA600FVD  BF-101SR  User Manual BAS-3000BC Series  ` ` ー` 國、 " ー ` ` 施工説明書 _ Panas。nーc・ ` ` 取扱説明書    COMPTE RENDU DE REUNION  Sony CDX-4005 User's Manual    LC-104-PIMW (Form A) LC-124-PIMW (Form C)  取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file