INSTALLATION MANUAL

image

Contents

1. A i ji A i Di iat 3 iz Te x d INSTALLATION MANUAL IEC VERSION Trinasolar Smart Energy Together INSTALLATION MANUAL IEC version 1 DISCLAIMER OF LIABILITY The installation handling and use of Trina Solar Crystalline series modules are beyond company control Accordingly Trina Solar does not assume responsibility for loss damage injury or expense resulting from improper installation handling use or maintenance Trina Solar assumes no responsibility for any infringement of patents or other rights of third parties that may result from use of the module No license is granted by implication or under any patent or patent rights Specifications included in this manual are subject to change without prior notice 2 SAFETY PRECAUTIONS Solar photovoltaic SPV modules generate electricity when exposed to light An array of many modules can cause lethal shocks and or burn hazards Only authorized and trained personnel should have access to the modules Use properly insulated tools and appropriate protective equipment to reduce risk of electric shock Do not stand or step on the module Do not damage or scratch the front or backside surfaces of the module e Never use a module with broken glass or torn substrate Broken modules cannot be repaired and contact with any module surface or frame can lead to electrical shock Do not disass
2. to use at least four clamps on each module two clamps should be attached on the long sides of the module for portrait orientation and short sides of the module for landscape orientation Depending on local wind and snow loads additional clamps may be required to ensure modules can bear the load Applied torque should be 8 Newton meters Please find detailed mounting information in Figure 2 Fringe modules installation Middle modules installation Figure2 SPV module installed with clamp fitting method Note Clearance between modules frames and surface of the wall or roof is required to prevent wiring damage and to allow air to circulate behind the module Recommended stand off height is 115mm When mounting be sure that the module s drain holes are not blocked We recommend installing modules in landscape and or portrait orientation Please refer to the following diagrams Figure 3 8 4 Trinasolor INSTALLATION MANUAL IEC version Mounting 1 5 Module Width Area Mounting 1 5 Module Width Area 1 20 Module Width q Figure3 Mechanical dimensions when modules installed in landscape orientation with clamp fitting method 2 Portrait orientation installation 1 8 Module Length Mounting 1 4 Module Length Area 1 4 Module Length Mounting Area 1 8 Module Length Figure4 Mechanical dimensions when modules installed in portrait orientation with clamp fitting method 6 2 GROUNDING All module fr
3. when handling modules e Cover the front surface of modules by an opaque material when repairing When exposed to sunlight modules generate high voltage and thus dangerous Trina Solar SPV modules are equipped with bypass diodes in the junction box This minimizes module heating and current losses Do not try to open the junction box to change the diodes even if it malfunctions This should be done by qualified personnel only In a system that uses a battery blocking diodes are typically placed between the battery and the SPV module output to prevent battery discharge at night Trina Solar is a member of the European PV Cycle Association Through the pre financed PV Cycle program Trina Solar SPV modules will be taken back and treated in an environmentally sustainable manner WARNING For any electrical maintenance the SPV system must first be shut down Improper maintenance can cause lethal electric shock and or burns Trinasolor China Changzhou Corporate Headguarters 2 Tianhe Road Trina PV Industrial Park New District Changzhou Jiangsu 213031 T 86 519 8548 2008 F 86 519 8517 6021 E sales trinasolar com Shanghai 333 North Caoxi Road CCIG International Plaza Building B Offices 1704 1706 Shanghai 200030 T 86 021 6057 5300 F 86 021 6057 5333 E sales trinasolar com Beijing 48 Dongzhimenwai Street Oriental Kenzo Office Building X 17KL Dongcheng District Beijing 100027 T 86 10 5817 408
4. 0 F 86 10 5817 4020 E sales_china trinasolar com APMEA Singapore Regional Headquarters Trina Solar Singapore Pte Ltd Three Temasek Avenue 16 03 Centennial Tower Singapore 039190 T 65 6808 1111 F 65 6835 7225 E apmea trinasolar com Korea Trina Solar Korea Ltd B1 140 Daewoo Dovile 117 Hap dong Seodaemun gu 120 030 Seoul T 02 392 1588 F 02 362 8820 E korea trinasolar com For more info www trinasolar com APMEA refers to Asia Pacific Middle East and Africa Japan Trina Solar Japan Limited World Trade Center Building 21st floor 4 1 2 Chome Hamamatsu cho Minato ku Tokyo 105 6121 T 81 3 3437 7000 F 81 3 3437 7001 E japan trinasolar com Malaysia Trina Solar Malaysia SDN BHD Plot 201 Lebuhraya Kampung Jawa Bayan Lepas FTZ Phase 3 11900 Pulau Pinang T 60 4685 2008 F 60 4685 2080 E malaysia trinasolar com Australia Trina Solar Australia Pty Ltd Macquarie House LEVEL 13 Office Number 1315 167 Macquarie Street Sydney NSW 2000 T 61 2 8667 3088 F 61 2 8667 3200 E australia trinasolar com United Arab Emirates Trina Solar Middle East Ltd Office 306 Injazat Building Mohamed Bin Zayed City Abu Dhabi P O Box 135084 T 971 562047969 E uae trinasolar com Europe Switzerland Regional Headquarters Trina Solar Schweiz AG Richtistrae 11 8304 Wallisellen Schweiz T 41 43 299 6800 F 41 43 299 6810 E europe trinasolar com Germany Trina Sol
5. ames and mounting racks must be properly grounded in accordance with respective national electrical code Proper grounding is achieved by bonding the module frame s and all metallic structural members together continuously using a suitable grounding conductor The grounding conductor or strap may be copper copper alloy or other material acceptable for use as an electrical conductor per respective National Electrical Codes The grounding conductor must then make a connection to earth using a suitable earth ground electrode We recommending using the following methods to ground properly Method 1 The Ilsco GBL 4DBT Lay in lug as shown in the following picture 8 screw 2 Nut Tooth washer A luminu mfan e Stainless steel washer La y inl ug 4 12 AWG cable Stainless steel screw CON BK FigureS Ilsco GBL 4DBT Lay in lug e Secure a grounding lug e g tin plated copper with a stainless steel bolt and nut e Insert a stainless steel washer e g flat locking between the grounding lug and frame Make electrical contact by penetrating the anodized coating of the aluminium frame usually a stainless steel toothed washer can be inserted between the nut and the frame to break the anodized layer of frame Trinasolor j INSTALLATION MANUAL IEC version 63 MODULE WIRING Each module has two 4mm diameter standard 90 C sunlight resistant output cables each terminated with plug amp play connectors This cabl
6. ar Germany GmbH Einsteinring 26 D 85609 Aschheim Miunchen T 49 89 122 8492 50 F 49 89 122 8492 51 E germany trinasolar com Italy Trina Solar Italy Srl Via Santa Maria Valle 3 20123 Milan T 39 02 0068 1521 F 39 02 0068 1400 E italy trinasolar com Spain Trina Solar Spain Slu Paseo de la Castellana 141 8th Floor 28046 Madrid T 34 91 572 6576 F 34 91 572 6621 E spain trinasolar com United Kingdom Trina Solar UK Ltd Regus East Midlands Airport Pegasus Business Park Herald Way Castle Donington Leicestershire DE74 2TZ T 44 1332 638 700 F 44 1332 638160 France Trina Solar France SAS 21 Avenue Georges Pompidou 69486 Lyon Cedex 03 T 33 0 472 91 3000 F 33 0 4 7291 3030 Americas United States Regional Headquarters Trina Solar U S Inc 100 Century Center Suite 340 San Jose CA 95112 T 1 800 696 7114 F 1 800 696 0166 E usa trinasolar com
7. attached to the backsheet next to the product sticker 5 ENVIRONMENTAL CONDITIONS AND SITE SELECTION 5 1 CLIMATE CONDITION Install Trina Solar Crystalline series modules in the following conditions Note Mechanical load bearing including wind and 40 C to 40 C snow loads of each module is based on mounting 40 C 485 C Methods Professional system installers must be 50 C to 440 C responsible for calculating mechanical loads according See Ty to system design elow 85RH The modules have been designed according to IEC61215 below 112 78 0 ft2 5400Pa edition 2 and IEC61730 standards 5 2 SITE SELECTION In most applications Trina Solar SPV modules should be installed in a location where they will receive maximum sunlight throughout the year e Modules should be free from shaded at any time of the day because of buildings trees chimney etc Do not install SPV modules in environments subject to corrosion such as costal areas or areas with high levels of sulfur etc Trinasolor INSTALLATION MANUAL IEC version Do not install SPV modules in a location where it would be immersed in water or continually exposed to water from a sprinkler or fountain etc e For roof installations modules should be mounted over a fire resistant covering with adequate ventilation between the module backsheet and the mounting surface 53 MODULE TILT ANGLE Trina Solar SPV modules connected in series should be i
8. e is suitable for applications where wiring is exposed to the direct sunlight We recommend that all wiring and electrical connections comply with the appropriate national electrical code For field connections use the minimum 4mm2 diameter copper wires insulated for a minimum of 90 C and Sunlight resistance as well The minimum and maximum outer diameters of the cable are 5 to 7mm 7 MAINTENANCE AND CARE e Under most weather conditions normal rainfall is sufficient to keep the PV module glass surface clean If dust or dirt build up becomes excessive clean the glass only with a soft cloth using mild detergent and water Do not clean the modules with cold water during the warmer hours of the day in order to avoid creating any thermal shock that may damage the module e Be cautious when cleaning the back surface of the module to avoid penetrating the substrate material Modules that are mounted flat 0 tilt angle should be cleaned more often as they will not self clean as effectively as modules mounted at a 15 tilt or greater At least once a year it is recommended to check the torque of terminal screws and the general condition of wiring Also check that mounting hardware is properly torqued Loose connections will result in damage to the array e Modules that have been replaced must be of the same type Do not touch live parts of cables and connectors Use appropriate safety equipment insulated tools insulating gloves etc
9. emble the modules or remove any part of the module e Protect plug contacts against soiling do not make any plug connections using soiled plug contacts Do not install or handle modules when they are wet or during periods of high wind e Do not short the positive and the negative of a single SPV module Do not disconnect under load e Make sure connectors have no gap between insulators A gap can cause fire hazard and or danger of an electrical shock e Make sure that the polarity of each module or a string is not reversed considering the rest of the modules or strings Artificially concentrated sunlight should not be used on the SPV module e Maximum system voltage must not exceed 1000V DC e Under normal conditions a SPV module is likely to produce more current and or voltage than reported under standard test conditions Accordingly the value of Isc marked on this module should be multiplied by a factor of 1 25 when determining the conductor current ratings fuse sizes and size of controls connected to the SPV output 3 UNPACKING AND STORAGE Before installation keep all modules and electrical contacts clean and dry e If it is necessary to store modules temporarily a dry ventilated room should be used e When unpacking carry modules with both hands Do not place modules on top of each other 4 PRODUCT IDENTIFICATION We recommend that you take note of the serial number each individual module has a unique serial number It is
10. nstalled at the same orientation and angle Differing orientations or angles may cause a loss of power output due to differing amounts of sunlight exposure for each module Typically the optimal tilt for a SPV module is roughly the same as the latitude of installation location 6 MOUNTING INSTRUCTIONS 6 1 MOUNTING METHODS SPV modules can be mounted to the substructure using two methods 1 Screw fitting Using corrosion proof screws M8 in the existing installing holes in the module frame The frame of each module has 4 mounting holes used to secure the modules to supporting structure The module frame must be attached to a mounting rail using M8 corrosion proof screws together with spring washers and flat washers in four symmetrical locations on the SPV module Applied torque should be 8 Newton meters Please find detailed mounting information in Figure 1 Figurel SPV module installed with screw fitting method 2 Clamp fitting Using suitable module clamps on the side of the module frame to mount the modules including portrait orientation and landscape orientation Use a certain number of clamps to fix modules on the mounting rail Modules clamps should not come into contact with the front glass and must not deform the frame Be sure to avoid shadowing effects from the module clamps The module frame is not to be modified under any circumstances When choosing this type of clamp mounting method please be sure

Download Pdf Manuals

image

Related Search

Related Contents

Hoover Domestic Appliance User Manual  新潟市民芸術文化会館構内電話交換機更改 (PDF:502KB)  Domo DO9090W personal scale    SUUNTO EON STEEL  取扱説明書  User Manual LabSwift-aw water activity Labor  PRT GCU433D1(4977)  AS1  Manual de Instalación y Mantenimiento - Q  

Copyright © All rights reserved.
Failed to retrieve file