AIRA RADIANT TUBE HEATERS INSTALLATION
Contents
1. Reassemble in reverse order after having fitted pilot line and pipe fittings to new gas control if required Ensure all gas fittings are properly sealed To remove gas combination valve unit RTH 60 82 amp 110 only Remove burner cone injector and air switch as above 2 Disconnect gas line at union fitting and remove union connection at back of controls box 3 Remove two bolts from valve retaining bracket 4 Slide gas control backwards and out and disconnect connecting wires as necessary noting their positions k Reassemble in reverse order after having fitted pilot line and pipe fittings to new gas control if require Ensure all gas fittings area properly sealed To remove gas combination valve unit RTH 160 only 1 Remove burner cones injectors and air switch as above 2 Disconnect gas line at union fitting 3 Pull gas control forwards and out and disconnect connecting wires as necessary noting their positions Reassemble in reverse order after having fitted pilot line and pipe fittings to new gas control if required Ensure all gas fittings are properly sealed To replace timer unit Pull off direct out of its octal socket Ensure replacement is 24v operation and if a different brand ensure that pin connections are unchanged To replace control unit Pull of connecting wires noting colours and positions and remove control unit after unscrewing mounting bolts Ensure replacement has similar model code to origi
2. Short reflectors should be located at burner box end On RTH 60 80 and RTH 110 attach fan unit to return tube using U clamp Note that flue outlet must be horizontal on unflued appliances vertical on flued appliances For RTH 160 refer section 9 5 below 7 9 ASSEMBLY OF WALL MOUNTED UNITS T he unit is assembled as above however the wall mounting kit will be require to install the appliance Do not attach the fan unit until the tube reflector assembly has been mounted on the wall 8 SUSPENSION STANDARD UNITS Refer to Technical Data to ensure minimum mounting height detail is observed The heaters incorporate 3 or 4 pairs of hanging points one pair at each end of the tubes and one pair at each intermediate hanger The suspension holes give clearance for 10mm dia bolts or hooks Alternatively shackles and turnbuckles may be used as recommended The heaters should be suspended with 5mm welded galvanized link chain 10mm drop rods or brackets Firm anchorage must be mad onto the roof structure to carry the whole weight of the heater Beam clamps joist clips or 12mm bolts should be used on metal structures and at least a 20mm coach bolt with hook on wooden beams 9 FLUE INSTALLATIONS ALL FLUED RTH HEATERS MUST E FITTED WITH A DRAUGHT DIVERTER THIS COMPONENT MUST BE ORDERED WITH THE HEATER 9 1 On RTH 60 80 amp 110 locate the fan outlet so that the 75mm square outlet spigot is vertical Attach the draught diverter with screws as requi
3. U tubed versions only Overall length 5575 18 6 RTH 60 80 or 7000 21 RTH 110 10360 34 RTH 160 Distance between outermost suspension points 4810 6500 or 10000 Overall width 480 1 7 RTH 60 80 amp RTH 160 or 600 24 RTH 110 Overall height 275 11 RTH 60 80 amp RTH 160 or 6000 24 RTH 160 MOUNTING HEIGHT RTH 60 80 3 6m minimum RTH 110 4 5m minimum RTH 160 3 6m minimum INPUT RTH 60 17 5 kW 60 000 Btu h RTH 80 23 5 kW 80 000 Btu h RTH 110 32 0 kW 110 000 Btu h RTH 160 47 0 kW 160 000 Btu h GAS SUPPLY NG Inlet pressure Minimum 1 0 kPa Maximum 2 0 kPa LPG Inlet pressure Minimum 2 5 kPa Maximum 3 5 kPa TG TLP Inlet pressure Minimum 0 6 kPa Maximum 1 0 kPa RTH 110 amp RTH 160 Applies RTH 60 80 Only GAS CONNECTION All Units All Gases 2 BSP WEIGHT RTH 60 80 60kg RTH 110 80kg RTH 160 120kg ELECTRICAL SUPPLY 240V 1 Phase 50 Hz 3 Amp REFLECTORS 1 00mm aluminum EMITTER TUBES 77 OD 1 6mm spiral wound steel 102 OD firing tube on RTH 110 OPTIONAL EXTRAS OW OT G8 Toe N 0 6mm stainless steel reflectors 900mm flexible gas line Chain shackles and turnbuckles for mounting Wall mounting brackets 100mm draught diverter for flued installations Installation kit set of parts 2 amp 3 above ASSEMBLY OF SUSPENDED UNITS Refer to figures attached 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 Set
4. 11 Turn on gas supply and reconnect power supply Allow appliance to operate normally 11 12 If multiple units are being installed ensure that when some or all appliances are running that gas pressure remains adequate for correct operation 12 BURNER SEQUENCE 12 1 Three light appliances RTH60 80 amp 110 As fan starts up indicator lights will change from red to amber Pre purge stage will last approximately 30 seconds Pilot valve will open and inbuilt Ht spark generator will energize to ignite pilot flame After pilot flame has been burning for about 10 seconds main valve will open and a green light will be displayed in addition to the amber light 12 2 One light appliances RTH 60 80 amp 110 Operating sequence for valve and fan is identical to three light units except that no light indicates until main flame is established On one light unit a red light is displayed after main flame is established 12 3 One light appliances RTH 160 Operating sequence for valve and fan is as above except that appliance incorporates a Technical Components controller which senses flames in both burner compartments Flame failure in either section will cause lockout which will be indicated by a red light Normal operation is not signaled by a light The heaters will follow the above sequences each time they are switched on manually or via a time clock or thermostat Instruct the user how to operate the appliance and ensure that the cont
5. also check flexible tube connected to air switch and bulk head Check pressure switch for faults Check bulkhead adaptor holes are clear c See e above Power and gas on fan running switch OK Cause Action a No ignition sequence Timer set wrongly max delay 100 seconds reset to 30 seconds b Ignition attempted but no light up Check gas is on Check location of flame sensor c No ignition spark Check ignition lead is connected to electrode and gas control unit d Solenoid valve suspect Check gas pressure at test point during sequence Check connections on gas control Pilot lights but no main flame Cause Action a Second stage not connected Check connections on gas control b Pilot main switch set to Pilot Switch to main 10
6. can be met a building volume of 420m3 would be required for an unflued RTH 80 If in doubt contact the gas supply authority or install a flued appliance For FLUED installations the following ventilation areas must be proved If ventilation to outside two openings are required one near ground level and one near the eaves of the building Each vent shall have a free area of not less then 6cm2 per 5MJ of hourly gas consumption If ventilating to another room in the building the ventilation areas shall be doubled Refer to table below MODEL VENT AREA TO OUTSIDE VENT AREA TO ADJACENT ROOM 2x cm2 2x cm2 RTH 60 76 152 RTH 80 102 205 RTH 110 140 280 RTH 160 200 410 5 FLUE INSTALLATION Flue must be 100mm twin skin type and shall be AGA Approved Flue installation shall also comply with AG 601 installation code Flues extending through the roof shall terminate no less than 600mm from the nearest part of the roof Flues terminating on an outside building wall shall be specifically approved by the gas authority No damper may be installed in the flue and the flue must be terminated with an AGA Approved cowl Flued RTH appliances shall be fitted with a draught diverter These and approved twin skin flue components are available from AIRA Pty Ltd 6 TECHNICAL DATA Data below applies to NATURAL GAS units only Refer to maintenance instructions and data plate for injector size setting pressures wtc For other gases DIMENSIONS Standard length
7. for damage and or missing components and shall ensure that the appliance is designed and supplied for the gas with which it is to be used Any discrepancies or damage shall immediately be reported to the supplier NOTE GAS SAFETY REGULATIONS It is the law that all gas appliances are installed and commissioned by competent persons in accordance with the above regulations Failure to install appliances correctly could lead to prosecution and may void building insurance It is in your own interests and those of safety to ensure that the law is complied with 3 LOCATION AND CLEARANCES RTH radiant tube heaters are suitable for indoor installation only The units shall be installed in locations which allow for easy service access and in which ventilation and other requirements can be met Clearances from combustible materials shall be provided in accordance with manufacturer s data Mounting heights shall be as detailed below Minimum mounting height Horizontal mounting standard suspended 3 6m 4 5m RTH 110 Wall angled mounting 3 0m 3 6m RTH 110 RTH 160 may not be wall mounted 4 VENTILATION REQUIREMENTS Ventilation shall be in accordance with requirements for FLUELESS radiant tube heaters if an unflued system is required and with AG 601 Installation Code Specific requirements for unflued radiant tube heaters are also given in AGL or Gas and Fuel Corporation Regulations As a guide provided ventilation and height requirements
8. AIRA RADIANT TUBE HEATERS INSTALLATION OPERATION AND SERVICE MANUAL U TUBE SERIES OWNER OPERATING INSTRUCTIONS FOR RTH RADIANT TUBE HEATERS The RTH is an overhead radiant heating system for industrial and commercial buildings The RTH heaters are suspended from the roof or mounted at an angle on the wall They heat by radiation in the same was as the sun IMPORTANT This appliance shall only be installed by a qualified person in accordance with the Gas Safety Regulations This appliance must be earthed Never rest anything especially ladders against the heater Do not store flammable materials near the appliance Do not spray aerosols etc near the appliance while it is in operation Or E ON WARNING Should the presence of any of the following materials be likely in the room or building where the appliance is installed then the appliance burner air intake and the fan must be vented to the outside air GENKLENE TRIKLONE PERKLONE METHOKLONE ARKLONE FREONI TO START HEATER 1 Turn on the gas supply 2 Ensure that the time switch and room thermostat if fitted are set and calling for heat 3 Switch on electrical system Appliance should start up After about 45 seconds unit will indicate either amber and green lights 3 light unit or a red light 1 light units to indicate main flame is on On RTH160 there is a red light only if lockout has occurred If lockout occurs on any appliance switch off power supply che
9. ck gas is on and turn power back on to rest unit In the gas of frequent lockout contact the service engineer supplier or installer TO STOP HEATER 1 Switch off electrical supply 2 If unit is to be off for more than a few days turn off gas supply at appliance gas cock IT IS IMPORTANT TO ENSURE EFFICIENT OPERATION OF THE HEATER THAT IT IS SERVICED AND INSPECTED REGULARLY INSTALLATION INSTRUCTIONS RTH RADIANT HEATERS MODEL 60 80 110 amp 160 AGA APPROVAL NO 4258 NG TG TLP and LPG RTH 110 NG amp LPG ONLY amp RTH 160 NG ONLY SEC ACCEPTANCE NO LA 86435 Appliance ratings injector sizes gas pressures etc are detailed in the maintenance section and stamped on the appliance data plate READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE COMMENCING INSTALLATION 1 GENERAL The appliance shall be installed in accordance with the manufacturer s instructions the Uniform Building Regulations the Australian Gas Association s Installation Code for Gas Burning Appliances and or Equipment AGA Installation Code for Gas Pipe Sizing Local Gas Fitting Regulations Local electric Supply Authority Regulations and any other statutory regulations A Notice of Intent to Install should be lodged with the relevant Municipal Authority and local gas authority prior to installation 2 DELIVERY The customer or installer upon delivery of the appliance shall immediately remove any packaging material and inspect the appliance
10. cket provided The mains supply lead is fitted with a standard 3 pin plug Note colour code as follows Green Yellow Earth Blue Neutral Brown Active If desired the unit may be hard wired to a central control panel In this case each unit must have an individual on off switch for reset and servicing purposes 9 9 The gas connection must be made with a quarter turn gas cock located in an accessible location The final gas connection to the heater must be made with an approved armoured flexible hose Copper tube may be used only if an anti vibration loop is incorporated in the tube 9 10 The wall plate carrying the operating instructions must be located adjacent to the master electric switch preferably at eye level 10 WALL MOUNTED INSTALLATIONS RTH 60 80 amp RTH 110 ONLY The heater must be mounted on a vertical surface using the wall mounting kit complete with flue extension piece This allows the heater to be mounted at an angle of 45 degrees where perimeter heating is required Fit the wall brackets in place using at least two fixing positions on each bracket The brackets must be fitted at least 3 metres above floor level and spaced accurately to accept tube reflector oracket assembly Use M10 or 3 8W bolts to attach assembly to wall brackets Fit fan and control unit assemblies but ensure fan unit outlet is upright and burner unit parallel to wall Fit flue extension piece on all wall mounted units followed by draught div
11. ents of the operating instructions are understood Leave these instructions with the user 13 SERVICING ELECTRICAL SUPPLY MUST BE DISCONNECTED BEFORE ANY WORK IS COMMENCED ON THE UNIT Under normal operating conditions it is recommended that the heater is serviced once a year In exceptionally dry or dusty conditions it is recommended that more frequent servicing is carried out Servicing work must be carried out by a qualified service engineer 13 1 MODEL RANGE AND THERMAL OUTPUTS NOMINAL HOURLY GAS CONSUMPTION INJECTOR SIZES GAS PRESSURES GAS TYPES NG TG TLP LPG INJ NHGC GAS INJ NHGC GAS INJ NHGC GAS DIAM PRES DIAM PRES DIAM PRES MODEL MM MJ h KPa MM MJ h KPa MM MJ h KPa RTH 60 3 8 63 6 0 9 6 0 63 3 0 6 2 0 63 3 2 75 RTH 80 4 3 84 4 0 9 6 5 84 4 0 6 2 6 84 4 2 75 RTH 110 4 9 116 0 0 9 NOT AVAILABLE 3 0 116 0 2 75 RTH160 2x43 160 0 0 8 NOT AVAILABLE 2x 2 6 168 0 2 75 NOTE Pilot is operated through main injector IMPORTANT 1 Never rest anything especially ladders against the unit 2 Isolate gas and electrical supplies before commencing any servicing work or component exchange 3 Unless otherwise instructed reassemble parts in reverse order to the instructions given blow ROUTINE SERVICE Access to the controls is achieved by removing the side panel of the controls box and the inner cover s of the burner compartment s the unit may be operated with the main cover removed but will not when the inner cover s are
12. erter and flue if appliance is to be flued Gas supply pipe should be run to the heater and at least 300mm above and to one side of the line of the flue outlet An approved armoured flexible gas hose shall be used and fitted with a quarter turn gas cock in an accessible position Connect electrical supply and mount wall plate as for standard units 11 COMMISSIONING Check that appliance is installed in accordance with installation instructions above With the main gas cock off and the electrical supply isolated turn on the main gas cock and purge all gas lines 11 3 Check that no foreign material is left on top of the heater or restricting the flue outlet or air inlet to the heater controls 11 4 Check that the fan impeller is free to spin and that the fan is plugged into the control unit 11 5 Turn any thermostat if fitted on and any time controls on 11 6 Turn on the gas supply cock 11 7 Remove control box outer cover 11 8 Fit a gas manometer to the outlet test pint on the gas valve 11 9 Connect mains electricity and witch on The fan should now start and the burner should fire up and operate as described below Check that gas pressure is correct and adjst governor on gas valve as necessary Sht down appliance by disconnecting power supply If appliance goes to lockout disconnect power supply wait five seconds and switch back on 11 10 Turn off gas supply disconnect manometer and seal test point Refit controls cover 11
13. nal unit To replace transformer 1 Disconnect 240v and 24v wires from transformer 2 Unscrew retaining bolts and lift out transformer When replacing transformer ensure that 240v and 24v connections are properly located To replace indicator light s Unclip light unit and withdraw removing wires as necessary When replacing unit ensure lens is same colour lenses may be interchanged and light is 24 volt To remove fan assembly 1 Disconnect from controls box by pulling out plug 2 Disconnect outlet from flue extension or draught diverter if fitted 3 Remove 3 screws holding fan to flanged pipe adaptor or loosen nuts on U clamp holding the adaptor to the pipe Reassemble in reverse order taking care that the fan outlet is returned to the same position and that the U clamp is properly tightened CHECK FOR GAS TIGHTNESS AFTER SERVICE 14 FAULT FINDING Power and gas on Fan no running Cause Action a Time clock off Check and reset b Thermostat Satisfied Check and reset c Supply fuse down Check and replace d Fan disconnected Check and plug in e Fan blocked Remove fan assembly clean and refit f Fan motor faulty Remove fan assembly and replace Power and gas on fan running no run light after 1 minute Cause Action a Insufficient suction in controls box Ensure controls box doors are tightly closed Check all U clamps are tight b pressure switch controls remain open As above
14. not fitted a there will be insufficient suction to allow the air pressure switch in the control sequence If it is necessary to operate the unit with the main cover removed keep the inner cover s in place and observe the flame through the inbuilt sight glass es To remove the igniter assembly 1 Disconnect leads from the igniter probe and earth rod 2 Release screws and nuts holding the assembly bracket in place at the front of the burner compartment 3 To remove separate components undo the two brass hexagon set screws Replace in reverse order To remove burner and injector assembly 1 Release burner done by loosening the small set screw attaching cone to injector and slide forward to remove cone 2 Unscrew injector When replacing injector ensure sealing compound is used to provide a gas tight seal To remove air pressure switch 1 Unscrew 2 screws attaching switch to its mounting bracket 2 Pull off electrical leads noting colour position of leads 3 Pull plastic air tubes off noting positions Reassemble in reverse order To remove combined gas valve unit amp sequence controller Early RTH 60 80 amp 110 only 1 Remove burner cone injector and air switch as above 2 Disconnect gas line at union fitting and remove union connection at back of controls box 3 Remove two bolts from valve retaining bracket 4 Slide gas control backwards and out and disconnecting wires as necessary noting their positions
15. red For RTH 160 see section 9 5 below 9 2 Install twin skin 100mm flue in accordance with instructions and regulations FLUE MUST BE SUPPORTED AND NOT WEIGH DOWN ON HEATER UNIT A split flue socket should be used on the outlet of the draught diverter to enable the fan assembly to be removed without disturbing the flue 9 3 Complete the flue with an approved terminal and ensure the flue outer skin is sealed where it passes through the roof 9 4 On RTH 60 80 and RTH 110 fit the burner assembly to the RIGHT HAND tube alongside the fan unit using the remaining 3 U clamp Ensure unit is pushed not more than 50mm onto firing tube 9 5 On RTH 160 fir the complete burner and fan assembly to the return and firing tubes using the remaining 4 U clamps Ensure burner spigots are pushed not more than 50mm onto firing tubes Check that return tube expansion pieces are free to move Adjust central hanger chains to ensure that unit hangs level RADIANT TUBES MUST NOT PROJECT INSIDE THE ADAPTOR BEYOND THE PARALLEL SECTION 9 6 On flued RTH 160 fit right angle adaptor to square fan outlet spigot so that new outlet spigot is vertical then fit draught diverter and flue as in 9 1 to 9 3 above 9 7 Adjust the suspension chains and or turnbuckles to ensure the unit hangs square Tighten all U clamp nuts 9 8 On RTH 60 80 and RTH 110 plug the fan unit into the electrical socket on the burner box On RTH 160 plug fan into cord extension so
16. the radiant tubes at least 150mm above the floor preferably under the suspension points and parallel about 200mm apart Locate end hanger on U bend This plate always has two equally sized holes Locate U clamp on each U bend end On RTH 110 units only fit 75 100mm adaptor on U bend and secure U clamp Locate 100mm U clamp on adaptor Slide firing tube and return tubes 50mm into U bend ends and tighten U clamps Slide remaining hanger plates along tube assembly as follows RTH 60 80 1 to approximate centre of tube length 1 at burner box end RTH 110 1 to approximately 3 metres from U bend 1 to approximately 1 2 metres from burner box end 1 at burner box end For RTH 160 assemble as for RTH 60 80 except that two sets of parts are used If supplied unassembled attach reflector brackets to hanger plates using bolts and nuts provided On end hangers fit one bracket only flange point towards centre of appliance On intermediate hangers fit one bracket each side of hanger PLASTIC COATING MUST BE PEELED OFF BEFORE REFLECTORS ARE FITTED Attach reflectors to reflector brackets using nuts and bolts provided Bolts must point upwards and nuts must only hand tight If tube reflector bracket set has been preassembled before delivery reflector attachment bolts must be loosened after erecting appliance and before commissioning On RTH 110 use remaining nuts and bolts to join halves of reflectors together Nuts must only be hand tight