1. 7 Take away the protective cover from the base union F and mount the poles F48 onto the base plate locking with the nuts F05 Then slide down the cover F47 onto the floor 3 Connect the hot cold water inlets with the feeding pipes 2. Installation Manual Installation steps Floor A Pa 8813 1501 Exposed drawing YY A 4 Pave the wood or ground tile and cut the exceeded part of the plastic box Floor Level gauge a aN F47 5 The effect drawing after the wood or ground tile paved ma Q o n Ri yo 3 3 yee 4 4r F00 as 1 Mount the base union F onto the cement ground with FOO and keep it ime horizontal pE aes N 40 6 Put the covers F47onto the pole F48 and mount the fixing round plate F03 Voz 25 onto the end of pole F48 Meanwhile fix the spout F46 onto the body locking X r D om with hexagonal spanner 7 K 7 Qe Water _ Water pressure C Water testing facility Ke gl gt R ql 5 2 VA cage EI 2 Make pressure test for the base union F by 10 hours in 10 bar to assure there is no leakage before the next step RITR Ne 4 E5 F05 N E i Lnn HoT Sale ep 7 COLD COLD