Home
GenieMat™ Technical Installation Manual
Contents
1. If vapor emissions exceed acceptable limits the installation should not proceed until the problem has been corrected 12 Moisture can also be measured using the RH Relative Humidity test method per the ASTM F2170 standard Moisture content should not exceed 75 RH If levels are higher using either test method a Pliteq recommended vapor retardant must be used IV HAZARDS A SILICA WARNING 1 Concrete floor patching compounds toppings and levelling compounds can contain free crystalline silica Cutting sawing grinding or drilling can produce respirable crystalline silica particles 1 10 micrometers Respirable silica is classified by OSHA as a 1A carcinogen and is known to cause respiratory diseases like silicosis Avoid actions that cause dust to become airborne Use local or general ventilation or protective equipment to reduce exposure below applicable exposure limits B LEAD WARNING 1 Certain paints may contain lead Exposure to excessive amounts of lead dust presents a health hazard Refer to applicable federal state and local laws and the publication Lead Based Paint Guidelines for Hazard Identification and Abatement in Public and Indian Housing available from the United States Department of Housing and Urban Development C ASBESTOS WARNING 1 Resilient flooring backing lining felt paint or asphaltic cutback adhesives could contain asbestos fibers Avoid actions that cause dust to become airborne DO NOT
2. The recommendations for applications and installation are based on our extensive experience and on current technological practice Our liability and responsibility in the event of damages is limited to the extent defined in our General Terms and Conditions of Business and is not in any way increased by the above recommendations or by advice given by our sales representatives or applications engineering staff Pliteq Inc is a corporation duly organized and validly existing under the laws of the province of Ontario Pliteq offers a limited lifetime warranty on the GenieMat brand of Impact Sound Insulation products against defects in material and workmanship and GenieMat shall meet all published specifications and shall perform effectively Pliteq warranties that during the warranty period GenieMat shall not harden become brittle chip crack tear or exhibit any signs of excessive deterioration except for normal wear and tear All other warranties including implied warranties for a particular purpose are expressly excluded The sole remedy against the seller will be the replacement or repair of the defective goods or at seller s option credit may be issued not exceeding the selling price of the defective good
3. Attach GenieMat PMI perimeter isolation strips to the wall see Diagram 1 GENIEMAT RST AND FF h s gt LITEQ TECHNICAL INSTALLATION MANUAL 2 Assume the walls you are butting up against are not square Using a chalk line create a starting point for an edge of the material to follow 3 If you have not already done so remove the shrink wrap from the roll of GenieMat FF and unroll it onto the floor Shaking the material once it is unrolled can help it to relax 4 Always lay the GenieMat FF so that the dimples are down against the subfloor and the membrane surface is on top 5 Trim the ends of each section as necessary in order to fit the surface area to be covered Maintain the required ambient conditions for any adhesive application and bonding 6 Align the lengthwise edge of the material exactly with that of the neighboring section Edges must contact but not overlap 7 Dry lay the rolls onto the subfloor Use high quality 3 wide duct tape to secure all joints and seams including between the GenieMat FF and PMI B INSTALLATION OF GYPSUM TOPPING 1 Install gypsum flooring underlayment product to the thickness as specified Install the gypsum layer according to the recommendations of the gypsum manufacturer Thickness of the gypsum layer may depend on thickness of the GenieMat FF layer 2 Properly heat and ventilate the building interior before during and after the installation of the gypsum produ
4. to GenieMat using the flooring manufacturer s recommended adhesive 3 If a flooring manufacturer recommends the installation of a layer of plywood or cement board between the GenieMat and the finished flooring glue the recommended board using a suitable adhesive 4 Install grouted flooring materials in a thin or thick set mortar bed applied directly on the GenieMat RST Tile and stone sizes smaller than 4 x 4 shall be pre approved by Pliteq s Engineering Department 5 When the flooring installation is complete trim any excess GenieMat material so that it is flush with the surface of the finished floor VI BASEBOARD A INSTALLATION OF BASEBOARD 1 After perimeter installation strip has been trimmed to finished floor height install the baseboard 2 Fix the baseboard to the wall above the GenieMat and finished floor layers The baseboard must be 1 4 min above the finished floor and not come into contact with it see Diagram 5 GENIEMAT RST AND FF h s PLITEQ TECHNICAL INSTALLATION MANUAL Diagram 5 Baseboard Perimeter Isolation Strip Finished Floor Do not allow baseboard to touch finished floor 3 Seal the entire perimeter with a permanently flexible acoustical caulk Page 2 The information provided is accurate to the best of our knowledge at the time of issue However we reserve the right to make changes when necessary without further notification Suggested applications m
5. ay need to be modified to conform with local building codes and conditions We cannot accept responsibility for products that are not used or installed to our specifications GENIEMAT RST AND FF h s gt LITEQ TECHNICAL INSTALLATION MANUAL VII RECOMMENDED MATERIALS NOTE All materials shall be delivered to the job site in the original containers with the manufacturer s identification on each package Unauthorized modification to any product is not permitted The following materials are listed because of their extensive testing and field experience with GenieMat products If you would like us to evaluate any materials as alternatives call Pliteq s Engineering Department at 416 449 0049 A URETHANE ADHESIVES 1 GenieMat FAS by Pliteq Inc 416 449 0049 2 Bostik s Best by Bostik 800 592 8858 3 DriTac 7500 7600 by DriTac 800 394 9310 4 Henry 971 800 232 4832 B THIN SET MATERIALS 1 Laticrete 253 Gold 2 Laticrete 254 Platinum 3 Laticrete Sure Set 4 Bostik Hydroment Single Flex Mortar 5 ARDEX FB9L 724 203 5000 6 ARDEX X701 7 ARDEX X7G Plus 8 ARDEX S16 C GROUT MATERIALS 1 Laticrete PermaColor Grout 2 Laticrete SpectraLOCK Grout 3 Bostik Hydroment Joint Filler 4 ARDEX Flex Grout D ACOUSTICAL CAULKING 1 GenieClip ACS by Pliteq Inc 416 449 0049 GENIEMAT RST AND FF h s gt LITEQ TECHNICAL INSTALLATION MANUAL Warranty 1 WARRANTY INFORMATION
6. ct to a constant room temperature of 50 F min and controlled humidity of 50 max Under these conditions a 1 thick gypsum floor underlayment should be cured in about seven to ten days 3 Open windows daily a minimum of 2 to allow for the evaporation of moisture NOTE A building without all of these conditions present will significantly increase the curing time of the gypsum product 4 Before applying the sealer or installing the finished floor goods be sure that the gypsum underlayment is sufficiently cured by testing it using the plastic sheet method per ASTM D4263 or a method recommended by the gypsum manufacturer 5 Install the finished floor in accordance with the flooring manufacturer s directions After installing the finished floor trim the excess GenieMat PMI around the entire perimeter of the finished floor see Diagram 2 You may consult with the floor covering installer to see if they would like the GenieMat PMI to remain in place GENIEMAT RST AND FF oe N gt LITEQ TECHNICAL INSTALLATION MANUAL Finished Floor Ill GenieMat RST GenieMat RST reduced sound transmission is a flat resilient sound control underlayment that is used directly under a variety of floor finishes including ceramic tile vinyl wood laminate and stone yielding exceptional results over both concrete and wood joist constructions GenieMat RST is available in rolls and five standard thicknesses 2mm 5m
7. ified to conform with local building codes and conditions We cannot accept responsibility for products that are not used or installed to our specifications GENIEMAT RST AND FF oe SN gt LITEQ TECHNICAL INSTALLATION MANUAL Installation l GenieMat PMI A GENERAL NOTE It is essential to install the GenieMat PMI perimeter isolation strips before placing and trimming GenieMat RST or FF impact sound insulation material 1 Attach the GenieMat PMI to the perimeter wall of the entire subfloor as well as around the perimeter of any protrusions in order to isolate or break the vibration transmission path between the floor and the wall see Diagram 1 Diagram 1 GenieMat Perimeter Isolation Strip glued to base of wall 2 Temporarily fasten the GenieMat perimeter isolation strips in place with masking tape duct tape carpet tape or spot gluing The perimeter isolation strip will later be trimmed flush with the new top layer of flooring above the GenieMat RST or FF layer Il GenieMat FF GenieMat FF floating floor material is a dimpled resilient base mat for installation under monolithic underlayment to produce some of the thinnest sound rated systems in the industry Available in rolls and four standard thicknesses 6mm 10mm 17mm and 25mm Custom sizes and thicknesses are available upon request It is also available with a reinforcing fabric membrane A INSTALLING GenieMat FF 1
8. m 10mm 12mm and 15mm Custom sizes and thicknesses are available upon request A INSTALLING GenieMat RST 1 Attach the GenieMat PMI perimeter isolation strips to the wall see Diagram 1 2 Assume the walls you are butting up against are not square Using a chalk line create a starting point for an edge of the material to follow 3 If not already done remove the shrink wrap from the roll of GenieMat RST and unroll it onto the floor Shaking the material once it is unrolled can help it to relax 4 Place the GenieMat RST material so that it is perpendicular to the subsequent installation direction of the topping material see Diagram 8 GENIEMAT RST AND FF eo N gt LITEQ TECHNICAL INSTALLATION MANUAL Diagram 3 Perimeter Isolation Strip GenieMat RST i 8 i 3 2 E i 5 Trim the ends of each section as necessary in order to fit the surface area to be covered You may trim section ends to exact dimensions required e g joints with walls etc 6 Align the lengthwise edge of the material exactly with that of the neighboring section Edges may be butted up against each other or overlapped B GLUING GenieMat RST NOTE When using grouted or fully adhered flooring materials the GenieMat RST shall be fully adhered to the substrate with a suitable adhesive No substitutions are permitted 1 Fold the first drop lengthwise half the width of the roll Spread adhesive using proper
9. must be fully cured and permanently dry Subfloor shall be dry clean smooth level and structurally sound It should be free of dust solvent paint wax oil grease asphalt sealers curing and hardening compounds alkaline salts old adhesive residue and other extraneous materials according to ASTM F710 6 Subfloor should be smooth to prevent irregularities roughness or other defects from affecting the material above it The surface should be flat to the equivalent of 3 16 in 10 as described in ACI 117R or as recommended by the floor manufacturer GENIEMAT RST AND FF h s gt LITEQ TECHNICAL INSTALLATION MANUAL 7 Mechanically remove all traces of old adhesives paint or other debris by scraping sanding or scarifying the substrate DO NOT use solvents 8 Grind high spots until level and fill low spots with an approved leveling compound 9 All saw cuts control joints cracks indentations and other non moving joints in the concrete must be filled with an approved patching levelling compound Allow patching material to dry thoroughly 10 Any concrete subfloor can be a source of moisture related flooring failures It is the installer s responsibility to test the concrete or other cement like material for moisture 11 Maximum moisture vapor emission of the concrete must not exceed 5 12 Ibs 1 000 ft in a 24 hour period as measured by the calcium chloride test method in accordance with the ASTM F1869 standard
10. ne PLITEQ It s not magic it s engineering Impact and Airborne Sound Control Sound Control For Floors I o GENIEMAT TECHNICAL INSTALLATION MANUAL GENIEMAT RST AND FF TECHNICAL INSTALLATION MANUAL PLITEQ Table of Contents Base Preparation l General Information Il Job Site Conditions III Subfloor Requirements amp Preparation IV Hazards V Material Storage and Handling Installation l GenieMat PMI Il GenieMat FF Ill GenieMat RST IV Alternative Installation Methods V Floor Finish VI Baseboard VII Recommended Materials Warranty l Warranty Information aAKRWWH A 10 11 11 12 13 14 The information provided is accurate to the best of our knowledge at the time of issue However we reserve the right to make changes when necessary without further notification Suggested applications may need to be modified to conform with local building codes and conditions We cannot accept responsibility for products that are not used or installed to our specifications GENIEMAT RST AND FF h s gt LITEQ TECHNICAL INSTALLATION MANUAL Base Preparation I GENERAL INFORMATION The GenieMat line of products for impact sound insulation is engineered to provide better performance than any other sound control product available and has been rigorously tested to achieve proven results Made from up to 94 recycled rubber content and backed by over 100 independent labo
11. notch trowel NOTE Temperature and humidity affect the open time of adhesive The installer should monitor on site conditions and adjust open time accordingly 2 Carefully lay the material into the wet adhesive DO NOT let the material fall because this will trap air beneath the material 3 Fold over second half of first sheet and first half of second sheet see Diagram 4 GENIEMAT RST AND FF oe N gt LITEQ TECHNICAL INSTALLATION MANUAL Diagram 4 4 Spread the adhesive At seam area spread adhesive at 90 degrees to seam to prevent excessive adhesive oozing up to the surface of the material 5 Continue the process for each consecutive drop Always work at a pace so that you are always folding material back into wet adhesive 6 Never leave adhesive ridges or puddles as they may affect the above material 7 Use a 30 to 50 Ib roller to roll over the floor within 45 minutes to ensure proper transfer of adhesive Overlap each pass of the roller by 50 of the previous pass to ensure that the floor is properly rolled IV ALTERNATIVE INSTALLATION METHODS A USING TAPE FOR FLOATING FLOOR COVERING INSTALLATIONS 1 Dry lay the rolls onto the subfloor following the directions on page 8 2 Use duct tape or a high quality carpet tape to secure the butt joints and seams 3 A high quality 3 wide duct tape can be used to prevent the GenieMat RST from moving on the substrate NOTE Gluing down of the GenieMat RST is n
12. ot required for floating floors B SAME ASSEMBLY USING BOTH GenieMat FF AND GenieMat RST 1 The most common method for this type of installation begins by installing GenieMat FF 2 Install the dimpled material in accordance with the instructions provided in the section Installing GenieMat FF beginning on page 6 of this manual 3 Have the monolithic underlayment material installed per the manufacturer s recommendations GENIEMAT RST AND FF h s gt LITEQ TECHNICAL INSTALLATION MANUAL 4 Once set to the manufacturer s specifications start the installation of the GenieMat RST with the instructions provided in the section Installing GenieMat RST beginning on page 8 of this manual C ADDITIONAL ALTERNATIVE INSTALLATION METHODS 1 For additional alternative installation methods contact Pliteq s Engineering Department V FLOOR FINISH A GENERAL 1 Follow the flooring manufacturer s directions for installing the flooring Use their recommended adhesives procedures and equipment 2 Do not mechanically fasten any material through GenieMat Any mechanical connection such as nails screws staples etc will transmit noise through to the building structure compromising the performance of GenieMat B INSTALLATION 1 Install self locking floors such as wood laminates over GenieMat RST following the manufacturer s recommendations 2 Glue standard wood flooring directly
13. ratory and field tests GenieMat has been selected and used in some of the best hotels and condominiums in the world It can be installed under most types of grouted glued and floating floors including ceramic tile stone marble pavers hardwood engineered wood laminate parquet vinyl VCT LVT and carpet All floor covering assemblies shall have prior approval before installation Il JOB SITE CONDITIONS Areas to receive GenieMat should be weather tight and maintained at minimum a constant room temperature of 65 F 10 C for 48 hours before during and after installation Ill SUBFLOOR REQUIREMENTS amp PREPARATION A GENERAL NOTE Please follow the subfloor requirements and preparation recommendations determined by the flooring manufacturer Use the following subfloor requirements and preparation guidelines only when no such recommendations exist for the floor finishing product 1 All subfloors substrates must be inspected prior to installation 2 Install GenieMat over concrete approved self levelling materials and wood 3 Wood subfloors should be double construction with a minimum thickness of one inch The floor must be rigid and free from movement with a minimum of 18 inches of well ventilated air space below 4 Wood subfloors when installed with use of grouted floor coverings like tile must be prepared according to ANSI L 360 standards as required by the floor covering manufacturer 5 Concrete floors
14. sand dry sweep dry scrape drill saw beadblast mechanically chip or pulverize Regulations may require that the material be tested to determine asbestos content Consult the documents titled Recommended Work Practices for Removal of Existing Resilient Floor Coverings available from the Resilient Floor Covering Institute GENIEMAT RST AND FF h s PLITEQ TECHNICAL INSTALLATION MANUAL V MATERIAL STORAGE AND HANDLING A GENERAL 1 Deliver the material to the job site in its original unopened packaging with all labels intact and stored appropriately to prevent damage 2 Inspect all material for visual defects before beginning the installation Pliteq will honor no labor claim on material installed with any visually apparent defects 3 Verify the material delivered is the correct type thickness and amount Report any discrepancies immediately 4 The material and any adhesive must be acclimated at room temperature for a minimum of 24 hours before starting the installation 5 Roll material is stretched slightly when it is rolled at the factory At the job site the installer should allow all cuts to relax before gluing down Shaking the material once it is unrolled can help it to relax more quickly Page 5 The information provided is accurate to the best of our knowledge at the time of issue However we reserve the right to make changes when necessary without further notification Suggested applications may need to be mod
Download Pdf Manuals
Related Search
Related Contents
Version pdf - Le Supramental HD191P 赤外線付ドライブレコーダー 取扱説明書 User Manual User Manual instroducción Dell 7330dn Installation Instructions Epoxy User Manual 2015 - Pipeline Paddle Boards TEFAL SW370310 Instruction Manual Philips DLA2246 Copyright © All rights reserved.
Failed to retrieve file