Home

Installing the Battery

image

Contents

1. 7 Installing the battery 1 Turn off the meter by pressing the M button and hold for 2 seconds before replacing the batteries Slide down the battery cover on the back of the meter by pushing the cover in the direction of the arrow and put the cover aside 2 Remove the two used batteries 3 Insert 2 new batteries with correct direction Battery AAA 1 5V 2 Alkaline 24A LRO3 4 Put the battery cover back in place by pushing the cover in the opposite direction of the arrow to close the cover into position Note 1 It is suggested that batteries need to be replaced when the battery icon appears empty If you keep using the meter the battery icon will start flashing and an error message E_3 will appear on the screen 2 Note that replacing the battery will not reset the stored testing results 3 You need to reset the time and date after the batteries are replaced 4 If there is any unexpected symbol on the display please follow the above procedure to replace the batteries again 5 Please dispose of batteries according to your local ordinances 11

Download Pdf Manuals

image

Related Search

Related Contents

HP Smart Array (RAID) Host Bus Adapters Installation Manual    슬라이드 1 - CONCEPT International GmbH      USER MANUAL/SETUP GUIDE - United Security Products  Aqua-Vu Z-Series Digital Camera User Manual  3億4104万円及びこれに対する平成17年2月1 9日か  Sécurité au travail et protection de la santé dans les PME du    

Copyright © All rights reserved.
Failed to retrieve file