Home

COMMODITY USER GUIDE

image

Contents

1. COMMODITY OVERVIEW SCOTTISH 55 WATER _ COMMODITY USER GUIDE please refer to the Framework Guideline Document for an overview of how SW s Frameworks should be used COMMODITY TITLE Fixed Standby Generators COMMODITY NO 3 035 02 SCOPE The scope of the Framework is to procure install and test Fixed Standby Generation either on a first time supply basis or as an upgrade to existing sites This will include all materials plant manpower and equipment etc necessary to completely supply the Fixed Standby Generator and integrate into the site electrical supply The scope of supply is for the design manufacture works testing where required installation and delivery of Fixed Standby Generation and all necessary ancillary equipment for new sites and to refurbish replace existing installations across Scottish Water The Fixed Standby Generation sets shall ensure security of supply and assist with such as load management and other functional features as may be required from time to time to suit energy tariffs and loadings This would include but not be limited to such as the supply of diesel standby generators and may include all ancillary equipment including generator control panels fuel bulk and day storage tanks and transfer systems pipework cabling instrumentation acoustic coverings containers gauges amp valves and optional extra metering to demonstrate power supplied In addition there must be additional conne
2. MANAGER Sonia Hubbard 01506 678698 Mobile 07875 872119 Email sonia hubbard scottishwater co uk SUPPLIERS COVERAGE SUPPLIERS see Framework Supplier Manual for details Supplier 1 name N A Dieselec Supplier 2 name Thistle Generators Supplier 3 name Finnings SUPPLIER ENGAGEMENT CAPEX 1 Yes CAPEX 2 Yes Presently Mini competition May move to Preferred Supplier Status at a later date CAPEX 3 Yes CONTRACTUAL OPTIONS CONTRACT N A SW Procurement Commodity User Guide Issue 1 27 March 2007 NEC 3 SUBCONTRACT YES PURCHASE ORDER YES SUBCONTRACT spares only SELECTION CRITERIA Pis note there is currently a review ongoing of SW specs Upon completion of the spec review the suppliers will provide final pricing and we may move to a preferred supplier status SW Procurement Commodity User Guide Issue 1 27 March 2007
3. ction panels and controls to enable both auto start on mains power failure changeover back to mains on mains power restoration with the option of additional equipment to allow seamless changeover The fixed Standby Generation shall have the ability to load test whilst on mains supply without interruption to the works The provision of an optional load testing service will be provided at extra cost Additional connection panels and controls which are G5 9 compliant will be supplied as an option Generator sizes are likely to be in the range of 6OKVA to 1MVA 400VAC 50Hz 3 Phase The work would include provision of services to carry out all of the above as well as existing asset surveys and condition reporting either as a complete service and supply or by clearly defined work packages There will be the need to work closely with Scottish Water and their partner contractors as well as SW operations and maintenance teams It must be borne in mind that many assets are in remote and difficult locations including difficult to access and remote islands and regional presence would be beneficial SUB CATEGORY if applicable N A SUPPLIER SELECTION OPTIONS i e single source selection criteria mini comp allocation Presently Mini comp Pls note there is currently a review ongoing of SW specs Upon completion of the spec review the suppliers will provide final pricing and we may move to a preferred supplier status FRAMEWORK

Download Pdf Manuals

image

Related Search

Related Contents

BTPC-700DC-B-N-A-R  Operating instructions Heki 3plus rooflight  Configuración de la impresora de red  UF-6030 取扱説明書 (インターネットファクシミリ編) - psn  Philips 1700 series Steam iron GC1705  

Copyright © All rights reserved.
Failed to retrieve file