Home

Solar Installation PV150 Operating Instructions

image

Contents

1. 3 SOLAR FROM SEAWARD Solar Installation PV150 Operating Instructions E SEAWARD Bracken Hill South West Industrial Estate Peterlee Co Durham SR8 2SW ENGLAND Tel 44 0 191 5863511 www seaward co uk sales seaward co uk service seaward co uk Part Number 388A567 Revision 2 0 February 2012 2012 Seaward Electronic You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions Limited Warranty amp Limitation of Liability SEAWARD Electronic Limited guarantees this product to be free from defects in material and workmanship under normal use and service for a period of 2 year provided that the instrument is serviced and calibrated by a Seaward approved agent in accordance with the manufactures instructions The period of warranty will be effective at the day of delivery c Copyright 2012 All rights reserved Nothing from this edition may be multiplied or made public in any form or manner either electronically mechanically by photocopying recording or in any manner without prior written consent from SEAWARD Electronic Limited This also applies to accompanying drawings and diagrams Due to a policy of continuous development SEAWARD Electronic Limited reserves the right to alter the equipment specification and description outlined in this publication without prior notice and no part of this publication sh
2. Turn off both the PV150 and Survey 200R unit On the Survey 200R press and hold the On Off keys keep both keys pressed On the PV150 press and hold the Rpe and Auto keys keep both buttons pressed The Survey 200R will now send its Pairing signal When the PV150 detects this signal it will remember the serial number of the Survey 200R and will look for that particular serial number in all future Communications When the PV150 has successfully paired it will beep and display the serial number of the Survey 200R This should normally happen within a couple of seconds Note The top line of the PV150 display will now show the W m2 icon 6 2 Un Pairing from the Survey 200R Make sure there are no other units operating nearby Turn the PV150 off On the PV150 press and hold the Rpe and Auto keys keep both buttons pressed Keep both buttons pressed for about 10 seconds The PV150 will then beep and clear its screen The unit is now not paired to any Survey 200R Note that the top line of the LCD will display Rpe ohms 6 3 Put the Survey 200R into transmit mode The Survey 200R can be put in and out of transmit mode by pressing and holding the temperature key and then momentarily pressing the OK key When in transmit mode there will be a flashing icon above the temperature key Note When in transmit mode the auto shut down feature is disabled You must remember to turn the Survey 200R off in order to save battery power
3. In order to ensure safe operation of this instrument all notes and warnings in these instructions must be observed at all times The PV150 is intended for use in a dry environment only The PV150 RED and BLACK 4mm test terminals may be used to make measurements on circuits rated up to CAT III 300 V AC DC with reference to earth Do not connect the PV150 to voltages which may exceed this rating The PV test terminals maximum rating 1000V DC open circuit voltage 15A short circuit current Do not exceed this rating The DC supply must be isolated from earth during testing High voltages are present at the probe tips of the PV150 during insulation resistance measurement Always hold test probes behind the hand guards Check the PV150 and all associated cables and leads before operating the equipment Do not use if there are signs of damage Only used the test leads supplied with the PV150 PP Pee R You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions A Do not touch any exposed metal parts of the solar PV installation during testing AN Always ensure that the circuit under test is electrically isolated from the mains supply before attempting an earth resistance measurement A Do not leave the PV150 permanently connected to a PV installation Always disconnect all test leads immediately after use Where safe operation
4. control and laboratory user EMC Requirements Performance The instrument operates within specification when used under the conditions in the above standards EMC and Safety Standards The product identified above conforms to the requirements of Council Directive 2004 108 EC and 2006 95 EC Seaward Electronic Ltd is registered under BS EN 1SO9001 2000 Certificate No Q05356 A You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions Introduction The Solar Installation PV150 is a hand held battery powered multi function solar photovoltaic installation test instrument capable of performing all of the electrical tests required by IEC 62446 including Earth continuity 200mA Open circuit module string or array voltage Voltage polarity Short circuit module string or array current Insulation resistance at 250V 500V and 1000V AC or DC Operating current 1 User Notes This instrument and its operating instructions are intended for use by adequately trained personnel The following symbols are used in these operating instructions and on the Solar Installation PV150 Warning of electrical danger Indicates instructions must be followed to avoid danger to persons Important follow the documentation This symbol indicates that the operating instructions must be adhered to in order to avoid danger 2 Safety Notes
5. multi function electrical installation test instrument capable of performing all of the required electrical tests 4 1 Identifying parts of the unit The numbering below refers to figure 1 and figure 2 Figure 2 PV150 End view 1 2 3 4 5 6 7 8 9 250V 1000V eee LCD Display Rpe test key Auto test sequence key Test lead resistance null key Insulation test voltage select key Memory recall key Memory store key te PV test lead input RED ve PV test lead input BLACK 10 ve 4mm test lead input BLACK 11 ve 4mm test lead input RED SOLAR Installation Pv150 Figure 1 PV150 Front view 7 You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions 4 2 LCD display DRAE 98 88 HHBHv 46 8 amp az 5 250V j sov L Riso 1000V Figure 3 LCD display icons Rpe voltage polarity For AC voltages alternating and is shown Current clamp measurement active Rpe Null offset indicates that test lead resistance offset is active anoo Caution hot surface If this icon appears the PV150 must be disconnected immediately from the PV system until the icon is no longer shown on the LCD e Solar module polarity indicator indicates the polarity of the DC v
6. 6 4 Normal operation When the PV150 has been paired with a Survey 200R the top line of the display is used to show the irradiance value measured by the Survey 200R The Survey 200R must be put into transmit mode as described above When the PV150 is in range of the Survey 200R it will mimic the Survey 200R irradiance value and display it on the top line of the LCD 17 You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions When an Auto test is performed the PV150 captures the irradiance ambient temperature and module temperature measurements from the Survey 200R Press Store and all these values will be stored along with any measurements made using by the PV150 6 5 Downloading data to PC When the PV150 has been paired with a Survey 200R the top line of the display is used to show irradiance Connect the PV150 to PC using the USB cable This will create a COM port on the PC Run the Seaward Solar Datalogger application on the PC Select the correct COM port Use the Help menu Trouble shooting guide to help finding the correct COM port Click the Download button and then press and hold the Recall key 6 on the PV150 After a few seconds the PV150 will transfer all its stored data to the PC By default the Datalogger application will save the data in CSV format This can be opened using Microsoft Excel Note that
7. icon If the measured voltage is AC alternating and is shown 4n You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 5 4 Auto Sequence Measurement Operating Instructions A Always ensure that the circuit under test is electrically isolated from the mains supply N Due to the high input impedance of the red 4mm test terminal voltage caused by leakage currents may be detected on the prior to starting a test AR SOLAR Installation Pv150 10 Connect the PV150 to the PV module as shown using the supplied test lead adaptors The red test probe should be connected to earth Where the structure frame is bonded to earth the earth connection maybe to any suitable earth or to the array frame Where the array frame is not bonded to earth a commissioning engineer may choose to do two tests I Between array cables and earth ll Between array cables and frame The PV 100 will automatically detect any DC voltage connected to the PV test socket inputs 8 and 9 and display the measured voltage If the PV voltage polarity is reversed the polarity indicator will flash a cross next to the voltage icon If the incoming voltage is gt 30v then the shock hazard icon will flash Use the Viso button to select either the 250V 500V or 1000V insulation test voltage Press th
8. of the PV150 is no longer possible it should be immediately shut down and secured to prevent accidental operation It must be assumed that safe operation is no longer possible e if the instrument or leads show visible signs of damage or e the instrument does not function or e after long periods of storage under adverse environmental conditions A If the PV150 is being used to determine the presence or absence of hazardous voltages always prove the operation of voltage measurement function before and after use by means of a known voltage source or proving unit A If the PV150 is used in a manner not specified by this document then the protection provided by the equipment may be impaired 3 Accessories 3 1 Standard Contents The Solar Installation PV150 test kit is supplied with the following items 1 off PV150 unit 1 off professional carry case 1 set 1 2 M red and black test lead with test probe and alligator clip 1 set MC4 PV test lead adaptors 1 set Sunclix PV test lead adaptors 1 off Quick Reference Guide 6 off MN1500 AA 1 5v Batteries 1 off current clamp adapter 1 off Support CD 3 2 Optional Accessories 500mA FA 1000V Fuse f Do not open unit no other user serviceable parts a You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions 4 Unit Description The Solar Installation PV150 is a hand held
9. 0 C Es Operating Error B H Al 1 15 E E E IEC 61557 4 Resistance of earth connection and equipotential bonding Intrinsic error or Reference conditions or Designation code influence quantity specified operating range Intrinsic error Reference conditions A Position Reference position 90 Ei Supply voltage At the limits stated by the E manufacturer Temperature 0 C and 40 C Es Operating Error B 4 A 1 15E E E OA You created this PDF from an application that is not licensed to print to novaPDF printer htto www novapdf com
10. 0Hz 1V 5 2 digits 7 6 Operating Current via AC DC Current Clamp Display Range Current Measuring Range Resolution Accuracy 0 1A 40 0A 0 1A 40 0ADC 0 1A 40 0AAC 50 60Hz 0 1A 5 2 digits 1A You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions 7 6 DC Power via AC DC Current Clamp Display Range 0 00kW 40kW Current Measuring Range 0 5kW 40kW Resolution 0 1kW Accuracy 5 2 digits 8 Environmental Conditions The Solar PV150 has been designed to perform tests and measurements in a dry environment Maximum barometric elevation for making measurements is 2000M Overvoltage category IEC 60664 IEC 61010 300V Category Ill Red and Black 4mm terminals only Pollution degree 2 according to IEC 61010 1 Protective system IP51 according to IEC 60529 Electromagnetic compatibility EMC Interference immunity and emitted interference conforming to IEC 61326 1 Operating temperature range of 0 C to 40 C without moisture condensation The Solar PV150 can be stored at any temperature in the range 25 C to 65 C relative humidity up to 90 The batteries should be taken out of the instrument for storage Operating Altitude 0 to 2000 metres aon You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Instal
11. 6 Use with the Solar Survey 200R cccccececeeeeeeeeeeeeseeeeeecaeeeeseeaeeeeeeeaeeeeeseaeeeeeecaeeeesesneeeeeseaas 17 6 1 Pairing with the SS2OOR esccceceeenceeeeeeeeaeeeeeeaeeeeeeaaeeseeeeaeesesaaaeeeeeeaaeeseeeeaeeseeenaaeseneeaes 17 6 2 Un Pairing from the SS200R ccccceceeeeeeeeeeeeeeeeeeeeeeeaeeeeeeaeeeeeeeaeeeeesaeeeesecaeeeeseeneeeeeteaas 17 6 3 Put the SS200R into transmit mode ecceeccceeeeeeeeeeeeeaeeeeeeeeeeeeeaeeeeseaeeeesecaeeeseeteeeeseeaas 17 6 4 NOMiial Op Craton niiina iaai AEE E A E E A EA E A E A A 17 6 5 Downloading data to PC nmsiismananomana uaan a Aaa 18 T Electrical Specifications sisien A N A 19 7 1 Open Circuit Voltage Measurement PV Terminals ccccccccceccccessssesseeeeeeeseessstteeeeeees 19 7 2 Short Circuit Current Measurement ccccceeeeeeeeeeeeeaeeeeeeeeeeseaeeeeecaeeeesecceeeeeeeneeeeeseaas 19 7 3 Earth Continuity 2 000 c cece eee ee eee ccna ee ee ee eee eae eases eee ee eecaaaeeeeeeeeegeecaaeeeeeeeeeeeeciaeeeeeees 19 7 4 Insulation Resistance ceeceeeeeceeeeeenceeeeceeeeeeseaaeeeeseaaeeeeeeaeeeesecaaeeeeseaeeeeseceeeeseeneeeeeseaas 19 7 5 Rpe Voltage Measurement 4mm Terminals cccccccccccsssseeeeeseeeeessesseeeeeeeeesessssneeeeeees 19 7 6 Operating Current via AC DC Current Clamp c ccceeeeeeeeeeeeeeaeeeeeneeeeeeecaeeeeeeseeeeeeees 19 8 Environmental Conditions onnaa aaa aaa Ea NE ANa T Naa aaa 20 SREE e E a E E E S 21 9 1 P
12. A position 4 Press the zero button on the current clamp 5 Place the clamp around the DC cable of the solar installation 6 Press the Viso button until the clamp icon figure 3 icon b appears on the LCD 7 The measured current is shown on the LCD next to the clamp icon Installation Pv150 49 You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 5 9 DC Operating Power Operating Instructions The PV150 can be used to measure the DC operating power of a solar PV installation as shown AR SOLAR Installation Pv150 un A W Disconnect all cables from the PV test inputs 8 amp 9 in figure 2 Connect the current clamp to the red black 4mm probe inputs Move the current clamp switch to the 40A position Press and hold the zero button on the current clamp for a few seconds Place the clamp around the DC cable of the solar installation Press the Viso button until the clamp icon figure 3 icon b appears on the LCD The measured DC current is shown on the LCD next to the clamp icon Connect the PV voltage to the PV inputs T or Y test adaptors are required if the DC power is to be measured whilst the PV system is operationa
13. all be deemed to be part of any contract for the equipment unless specifically referred to as an inclusion within such contract N You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions Table of Contents Limited Warranty amp Limitation of Liability cc eeccecceeeceeceeeeeneeeeeeeeeeeeeeecaeeeeeeaaeeeeseneeeeesenaeees 2 Table of COntents ennn a nisi bra aN 3 CERTIFICATE OF CONFORMITY ccscesecavstetsaaderssevedsnessntsepetevansnedevadenctepadaxenes aala 4 NMG OCWGUO Me nnee E E EE E sis E eee E EE E E EE E 5 LUSOr NOLES sicascaascnasddasiuascnandcased atzasdaanasancnanasaacuasanasie sataasduanceancnanasancuananasie saduascuanccancnanasancnananacn 5 2 Safety NOES svescssssscsescnasaieesnssnages sivsaasagsasiapnaaasuapeacae Gon eanseasteggeeassacgaaavenasnd a AAE 5 BPC CESS ONMOS ose h tec E E AOA A AA 6 3 1 Standard Contents ccccccccecceceeeeeeceeeeeeeceeeeeeecaeeeeeeaaeeeseeseeeeesecaeeeeeseceeeeesecneeesessieeeeeseaes 6 3 2 Optional Accessories cccccceceeeeeeeeeneeeeeeeeeeeceeeaeeeeseaaeeeseeaaeeeeseaeeeeeseaeeeesecaeeeeseeiaeeeeeaas 6 4 Unit Description eee eeeeceeceeeneeeeeeceaeeeeeceaeeeeeeeaaeeeeecaaeeeeseaaeeeeseeaaeeesseaaeeeescaaeeeesecaeeeesssneeeeeseaas 7 AL identifying parts OF HhecUnit iss caeiene vie euneeciseeeaeec ras eens ti es vanteaeabesteaeatantest a E E a 7 A 2 LCD display ssec
14. e Auto button and the Solar PV150 will automatically perform the following tests Open Circuit Voltage Short Circuit Current Insulation Resistance The measurement results will remain on the LCD for 20 seconds or until a key is pressed A tick or cross will be displayed next to the insulation resistance measurement indicating whether the result is above or below the threshold values shown in Table 1 Table 1 Viso Pass Fail Limit 250v 0 5 M ohms 500v 1 0 M ohms 1000v 1 0 M ohms Note During the insulation test the PV150 applies a short circuit across the PV string The insulation test voltage is then applied between the RED 4mm test lead and the two PV test terminals Note If the DC voltage polarity is incorrect or the voltage is lt 5V or gt 1000V the Auto Test will be inhibited until the problem is corrected 44 You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions 5 5 Memory Store The Solar PV150 can store up to 200 complete sets of measurements Press Memory Store button to store all measured values on the display If there is sufficient memory space to store a set of readings then the Store icon will appear and the readings will be stored in the next available memory location If there is insufficient memory space then the buzzer will sound If there are no valid readings on the dis
15. each row of data will have the readings from the Survey 200R where possible 10 You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 7 Electrical Specifications Operating Instructions 7 1 Open Circuit Voltage Measurement PV Terminals Display Range Measuring Range Resolution Accuracy 0 0VDC 1000VDC 5 0VDC 1000VDC 0 1VDC 0 5 2 digits 7 2 Short Circuit Current Measurement Display Range Measuring Range Resolution Accuracy 7 3 Earth Continuity Test Voltage Open Circuit Test Current into 2Q Display Range Measuring Range EN 61557 4 Resolution Accuracy Number of repeat tests as per IEC 61557 4 7 4 Insulation Resistance Test Voltage Specification Test Voltage 1mA Test Current Short Circuit Display Range Measuring Range EN 61557 2 Resolution Accuracy Number of repeat tests as per IEC61557 2 0 00ADC 15 00ADC 0 50ADC 15 00ADC 0 01 ADC 1 2 digits gt 4V gt 200mA 0 009 199Q 0 05Q 199Q 0 012 maximum 2 2 digits Approx 4000 0 20 open circuit gt 1mA into U x 1000Q V lt 2mA 0 05MQ 199MQ 0 20MQ 199MQ 0 01MQ maximum 0 05MQ 100MQ 5 5 digits 101MQ 199MQ 10 5 digits Approx 3000 7 5 Rpe Voltage Measurement 4mm Terminals Display Range Voltage Measuring Range Resolution Accuracy 30V 440V 30V 440V DC 30V 440V AC 50 6
16. int to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions Ensure that the new fuse is seated and centred in the fuse holder Relocate the battery cover over the battery compartment and fasten in position with the battery cover captive screw 9 6 Service and Calibration To maintain the specified accuracy of the measurement results the instrument must be recalibrated at regular intervals by either the manufacturer or an authorised Seaward Service Agent We recommend a recalibration period of one year 9 7 Spare Parts Seaward Part No Test lead set 328A950 Cordless Probe 328A952 Carrying Case 388A951 500mA 1000V 1 27B098 For help or advice on Service and Calibration contact Service Department Seaward Electronic Bracken Hill South West Industrial Estate Peterlee Co Durham SR8 2SW England Tel 0191 5878739 0191 5878737 Email service seaward co uk 992 You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions Appendix A IEC 61557 2 Insulation Intrinsic error or Reference conditions or Designation code influence quantity specified operating range Intrinsic error Reference conditions A Position Reference position 90 Ey Supply voltage At the limits stated by the E manufacturer Temperature 0 C and 4
17. l The DC Voltage current and power will be displayed Note The Auto button is disabled whilst 4A the DC power measurement is in use Under no circumstances should and Auto test sequence be attempted whilst the PV150 is connected to the inverter DC inputs as this may result in damage to the instrument You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions 5 10 Auto Shutdown After 1 minute of being idle the PV150 will turn itself off in order to conserve battery power This auto shutdown period can be extended as follows 1 Turn the PV150 unit off 2 Press and hold the NULL key then press both the ON OFF keys together Keep holding the NULL key 3 The display will show OFF on line 1 and the turnoff time on line 2 in minutes 4 Keep holding the NULL key and press the Viso key Each press of the Viso key will increment the turnoff time 5 Increment beyond 10 to set the time back to 1 minute Note When displaying DC Operating Power section 5 9 the Auto Shutdown function is deactivated whilst DC voltage or current are detected This will allow extended time for monitoring DC power 5 11 Error Messages Under certain conditions the PV150 may indicate an error message 5 11 1 User serviceable error codes Error message FUSE HUE Remedy The internal fuse has blown Refer to sectio
18. lation PV150 Operating Instructions 9 Maintenance AN Before removing the PV150 battery cover ensure that all test leads have been disconnected from the instrument Electric shock danger Do not operate the PV150 without the battery cover securely in place 9 1 Preparing to work on the Solar PV150 Make sure the Solar PV150 is voltage free as follows before opening the instrument Power the unit off Disconnect all of the test leads from the unit 9 2 Securing the Solar PV150 Under certain conditions safe operation of the Solar PV150 can no longer be assumed Visible damage of the instrument case Incorrect measurement results Recognisable abuse to the instrument due to prolonged storage under improper conditions Recognisable abuse to the instrument due to extraordinary transportation stress Check the battery compartment for signs of battery electrolyte leakage In these cases the PV150 should be immediately switched off disconnected from any test or measurement function and secured to prevent any further use 9 3 Cleaning the Solar PV150 Clean the external case of the Solar PV150 with a clean dry cloth Avoid using solvents and abrasive scouring agents to clean the external case of the Solar PV150 Check the battery contacts and compartment are free of electrolytic contamination Any contamination of the battery contacts or compartment should be cleaned with a dry cloth oi You created this PDF from an application
19. n 8 5 in the Operating instructions for details on how to replace the fuse The electronics within the PV150 have reached the maximum safe temperature This can occur after repeated short circuit current measurements at high current levels Allow the unit to cool down before further use The DC short circuit current has exceeded the maximum H 5 C rated value of 15A The measurement sequence has been aborted HiPR High Power ie combined Voc and Isc is gt 10kW HiOc High Open Circuit Voltage ie gt 1000v 5 11 2 Non user serviceable error codes Error message Remedy LHL The PV150 is not correctly calibrated Return the unit to an authorised Service Agent Z cr C etc Return the unit to an authorised Service Agent HUE F Return the unit to an authorised Service Agent FEE Return the unit to an authorised Service Agent 1R You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions Return the unit to an authorised Service Agent rL tego 4a You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions 6 Use with the Solar Survey 200R 6 1 Pairing with the Survey 200R Make sure there are no other units operating nearby
20. oltage applied to the PV test terminals e g correct or reversed f Caution hazardous voltage detected Rpe test lock active when continuous Rpe measurement has been enabled h Caution refer to operating instruction When this icon is active the operating instructions must be followed to avoid risk of danger i Riso PASS FAIL indicates whether the measured insulation resistance is above or below the factory set acceptable value j Insulation Test Voltage selection indicates the test voltage selected for insulation resistance measurements k Error Refer to the specific error codes for further details STORE LCD data is being stored in the onboard memory m RECALL the data shown on the LCD has been recalled from the onboard memory n User Memory display indicates the memory location of the results stored or recalled on the LCD o Voltage current variation indicates in the measured voltage and current values deviate by more than or less than 5 p Battery status icon o You created this PDF from an application that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions 5 Using the Solar Installation PV150 5 1 Power On Solar PV150 To turn the PV150 on press and hold the Rpe and Auto buttons simultaneously 5 2 Battery Condition Check The PV150 automatically performs battery condition checks whilst idle and during measurements When
21. play then nothing will be stored 5 6 Memory Recall Each press of the Recall button will increment the user memory location indicator and display the measured values stored in that memory location The location number is shown on the bottom of the LCD display After the first press of Recall the Store button can be used to decrement the user memory location indicator to recall previous memory location Press and hold the Recall button to download data to a PC via the USB port 5 Variation warning If the recall data has Voc or Isc reading then the average of all the stored readings is calculated If the current recalled reading is more than 5 different from the average then the 5 warning icon will flash Average value Keep pressing the Memory Recall button until the location number is 0 The display now shows the average Voc and Isc of all stored results 5 7 Memory Clear Press the Store and Recall buttons together to clear all the user memory locations 49 You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions 5 8 Operating Current The PV150 can be used to measure the DC operating current of a solar PV installation as shown 1 Disconnect all cables from the PV test inputs 8 amp 9 in figure 2 2 Connect the current clamp to the red black 4mm probe inputs 3 Move the current clamp switch to the 40
22. r Installation Pv150 Note For ease of use the PV150 will store the lead compensation when switched off and recall this value when next switched on The stored value is only applicable to the test leads used when the compensation measurement was made If the test leads are replaced the Rpe null function should be repeated using the replacement test leads a You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 5 3 2 Resistance measurement SQsoLar Installation Pv150 5 3 3 Voltage measurement Installation Pv150 Operating Instructions To make a Single measurement 1 Connect the red and black test leads as shown 2 Press the Rpe key 3 The resistance between the test probes is displayed To make a continuous measurement 1 2 3 Connect the red and black test leads as shown Press and hold the Rpe key until the lock icon appears on the LCD The resistance between the test probes is displayed Press the Rpe key to terminate the continuous measurement mode Connect the red and black test probes to a voltage source The PV150 will automatically measure the voltage between the probes The polarity of the voltage is shown using the icon next to the Rpe
23. reparing to work on the Solar PV150 sssssssssssesssinnssenissinnssrennssrnnnnsrtnnnsstnnnnennnnnsnn 21 9 2 Securing the Solar PV150 nssssosssneesnnnseennnsetrnrertnntettnnnsrtnnnsrtnnnerennnettnnnntnnnnnnnnnnenn 21 9 3 Cleaning the Solar PV150 0 cccccccceeeeeeeeeeeeaeeeeeeeeeeeeaeeeeseaeeeeseaeeeeeseeeeessenaeeeetenieeeees 21 g AnBattery Replacement rusaseriii iin enaa cade E EEE E ena tleat ean fav evees tate 22 O75 Replacing the FUSE sa a E E E E I E T 22 9 6 Service and Calibratioi scinenisisaiooineinaiie nnana a a a a 23 DT SAO P AMS yoiini aaa E a a aE AE 23 APPENDIX A aeiae E E E AE EEE EEE A E E 24 i You created this PDF from an application that is not licensed to print to novaPDF printer http Awww novapdf com Solar Installation PV150 Operating Instructions CERTIFICATE OF CONFORMITY As the manufacturer of the apparatus listed declare under our sole responsibility that the product Solar Installation PV150 To which this declaration relates are in conformity with the relevant clauses of the following standard BS EN 61010 1 2010 Safety requirements for electrical equipment for measurement control and laboratory use Part 1 General requirements BS EN 61557 1 2 4 2007 amp 10 2001 Electrical safety in low voltage distribution systems up to 1000V a c and 1500V d c Equipment for testing measuring and monitoring of protective measures BS EN 61326 2006 Electrical equipment for measurement
24. saceweedsiesvessacuausstagna caste aaa a a aaa T aE E E EEN EENE rR 8 5 Using the Solar Installation PV150 eeececeeeeseeeeeeeeeeaeeeeeaeeeeeeeeaeeeeeeaeeeeeseaeeeeeseeaeeeeseeeeeeeteaas 9 SLPoweron Solar PV LS 0 ace eas cats et etic ese Sta eich aea ee tin thea ta atten Rae ana tates that nasa 9 5 2 Battery C ndition CHECK sesana annie aaa aa aaa aa aa a aa Eaa aaa a aaa a a a Dia 9 5 3 Protective Earth Resistance Rpe FUNCTION ccccccceccccesssteeeeceeeeeseeseeeeeeeeeeeesesaeeeeeeeeeeses 9 5 3 L Testlead resistance nulh sie ze cecevacscasageniead ates OEE E A EE duet ete 9 5 3 2 Resistance measurement ranra arinina iiaia E E Ea E A a a A 10 5 3 3 Voltage measurement ccccccceceeenceeeeeeeeeeeeeeaeeeeeeeaaeeeeeeeaeeseeaaeeeeeeeaaeeseeeaeeseeecaeeeneeaes 10 5 4 Auto Sequence Me aSUreMent cccceeeeeeeeeeeeeeecteeeeeeeeeeeeeeaaaeeeeeeeeeeeeeesaaeeeeeeeseteeceaeeeeeees 11 3 9 MEMO YS LO Einonen aiia a a 12 5 6 Memory REC al esc cceednnncnnuenntennesustiedenanaticp anennapbawnnpashanniedeedentenadnasarinetpesscnndpastatitanuavarnsn abatiee 12 5 7 Memory Clear 0 ceccceccceeeneceeeeeeeeaeeeeeaceeeeecaeeeeccaaeeeeseaaaeeseqaaeeseeeeaaeeeeseaaeeseseeaneeeeenaeseseeaes 12 SO perating CUNEN rana EE E tree 13 DDC Operating P OWEN ataa a a eieaa aa a a E crete a e a E a 14 510 A to SHUTGOWN ssia aaa a eE aA aa AENEA EAEE ERa anaa Ea aa aa 15 DLL EMmOn MCSSAGES siroce eaaa a aa Da naaa aan aa a a eaaa aaa aai ainia 15
25. that is not licensed to print to novaPDF printer http www novapdf com Solar Installation PV150 Operating Instructions 9 4 Battery Replacement AN Before opening the Solar PV150 ensure that it is disconnected from all voltage Electric shock danger Power the unit off Disconnect all the test leads from the unit Position the Solar PV150 face down and release the captive screw in the battery compartment cover Remove the battery compartment cover Remove the discharged batteries from the compartment Fit a new set of alkaline batteries Relocate the battery cover over the battery compartment and fasten in position with the battery cover captive screw 9 5 Replacing the Fuse voltages h Before opening the Solar PV150 ensure that it is disconnected from all Electric shock danger All replacement fuse types are specified for ratings and size on the AN battery compartment cover on the rear of the Solar PV150 Power the unit off Disconnect all the test leads from the unit Position the Solar PV150 face down and release the captive screw in the battery compartment cover Remove the battery compartment cover Lift one end of the fuse out of the fuse holder with the help of a flat bladed screwdriver Lift the defective fuse completely out of the fuse holder Insert a new fuse as described and specified by the text on the battery compartment cover 99 You created this PDF from an application that is not licensed to pr
26. the battery level is low the battery symbol icon will appear on the PV150 display The PV150 will continue to function however the batteries should be replaced Note When the battery symbol icon is flashing all tests will be inhibited and the batteries immediately must be replaced as described in section 8 4 5 3 Protective Earth Resistance Rpe Function AN Always ensure that the circuit under test is electrically isolated A If the test probes are connected to a voltage gt 5V the measured voltage will be displayed on the LCD If the voltage exceeds 30V the Rpe measurement function is inhibited 5 3 1 Test lead resistance null The PV150 can automatically compensate for the resistance of the test leads as follows 1 Hold the tips of the test probes firmly together as shown to ensure a good electrical connection Press and hold the Rpe Null key 4 The measured resistance of the test leads is shown in the primary display until a beep is heard 4 The Rpe display will now 0 00 and the Null icon is illuminated 5 All subsequent measurements will take into account the test lead resistance compensation until the function is disabled by pressing the Rpe Null key 4 Note A maximum test lead resistance of 1092 ohms can be taken into account If the test lead resistance is greater than 1092 an error beep will indicate that the Lead Zero function has failed wn fh fE SQsoLa

Download Pdf Manuals

image

Related Search

Related Contents

DAV-S550  注意 注意 注意  Erste Schritte mit Ubuntu 13.04  Cor.4U® Cardiomyocytes  WT-C80  Département de publication : 69 Annonce No 14  Samsung SM-352F User Manual  Progress Lighting P4509-81 Instructions / Assembly  取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file