1. WORLD STANDARD OF SWAGING F j a Bark P amp v E T ie 5 Choose the pair of roller dies that cor Attach the terminal to the attachment fixture responds to the cable diameter and slip them on the drawbar and adjust the length so the onto the cogwheel synchronizing pins The roller dies meet the terminal shank at desired arrows on the dies should always be in the position swaging direction Apply just enough hydraulic pressure so that Move the transparent protective shield into the roller dies holds the terminal firmly Then position Apply hydraulic pressure to draw the mark and insert the cable into the bottom of the terminal between the roller dies terminal throat When the roller dies rotate they will press the Measure the diameter of the terminal after terminal shank onto the wire rope swaging and compare with the swage dimen sions list The swager is designed to reduce the terminal shank to required diameter in one pass However dimension variations of terminals cables or material hardness could make It necessary to pass the terminal twice Note When swaging solid rods a special swaging compound must be used After swaging wipe off the roller dies and swaging machine and apply a corro sion preventative WWW WIRETEKNIK SE WIRETEKNIK AB P O BOX 4053 SE 102 61 STOCKHOLM SWEDEN TELEPHONE 46 8 643 67 33 TELEFAX 46 8 641 7008 E MAIL SWAGERS WIRETEKNIK SE