Home

Fitting and operating instructions

image

Contents

1. Figure 9 Remove the transit fixing 0 on the side tracks Discard the fixing Figures 10 1 10 4 Position the bottom weather strip p against the timber frame see figure 10 1 Secure using 3 No round head nails see figure 10 2 Position and fix bottom security bracket s to timber frame using three 10mm hex head screws see figure 10 3 Remove the wooden wedges f see figure 10 4 Ensuring that both cables are positioned over the cable drum correctly and engaged in the outer grooves of the cable drum If spring tension requires adjustment see figures 11 1 11 2 Figures 11 1 11 2 Spring tension adjustment Before starting oil all pivot points and springs as this may prevent the need for retensioning 1 Tighten both grub screws already in spring bush on far left hand side of the spring assembley 2 Now on right hand side adjustment bush hold spring tension firmly with tension bar 3 Slacken off both grub screws with Allen Key 3 mm see fig 11 1 Take note that it is important that at least one tension bar is engaged in the spring tension bush at all times when one or more of the grub screws are slackened off Failure to do this will cause loss of spring tension and possible injury to persons or property 4 Increase or decrease spring tension using both tensioning bars see fig 11 2 5 Re tighten both grub screws Textbuch Canopy 01 2003 31 01 2003 15 09 Uh
2. Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 1 Fitting and operating instructions Canopy Door 01 2008 Issue 01 2003 Art Nr 1818011 Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 2 F LD E Copyright No reproduction even in part is allowed without our permission All details subject to change Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 3 F DL E This part of the fitting instruction must be General Information 4 used in combination with the illustrated part Fitting to steel frame uunnnnnnnn 7 8 Fitting to timber frame 9 11 Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 4 ENGLISH Important information for the consumer 4 Door with steel infill The powder coating process on the door is environmental friendly If you chose to paint the door then prepare the surface lightly with wet and dry Then treat with a solvent based 2 pack expoxy wash primer and a normal commercial paint cellulose paint must not be used Door with timber or GRP infill See separate instruction label on inside face of door panel Door prepared for site infill Max permissible weight for this size of door is 6 9 Kg m2 max 17 mm Infill within the Door leaf frame overlapping the frame Liability In the event that any functional parts are altered or the maximum infill weight is exceeded to su
3. ch an extent that this can no longer be counterbalanced by the specified torsion tension springs no liability on our part will be assumed Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 5 ENGLISH Operating instructions e Manual operation via outside or inside handle The pull cord should only be used to start the closing cycle by pulling vertically down e Lock function a One complete turn of the key allows the door to be permanently opened and closed without a key b One quarter turn of the key allows the door to be opened and locked automatically on closing c Moving the inside locking snib allows the door to be opened and closed without a key e Depending on the door type the lower part of the door opens automatically and closes automatically when the upper part closes When closing the door allow the locking latches to engage fully and securely Maintenance instructions Do not apply oil to the profile cylinder If sluggish it may be possible to improve the action by applying graphite dust After fitting the door and on completing approx 5 000 door cycles at least once a year oil the pivot points of the door Check that screws and clamped joints are still firmly in place Keep the tracks clean and free of dirt Do not apply oil or grease to the tracks Check the cables every month Have the cables replaced by a specialist if any wear is found Ensure adequate ventilat
4. fixing h from the side tracks i Discard the fixing Figures 8 1 8 3 For installation behind openings The 6 bracket screws Q see figure 8 1 must remain in their factory set position A Always fix brackets b to the frame Cf first B The brackets b should be fixed using suitable plugs and screws Secure the door frame F with brackets b The door leaf and door frame f must be in absolute alignment See figure 8 2 Fix the top centre and bottom brackets to the wall using suitable plugs and screws see figure 8 3 0 Figure 9 Remove the transit fixing h from the side tracks i Discard the fixing Carefully open the door to the fully open position in order to check the door action If spring tension requires adjustment see figures 10 1 10 2 Figures 10 1 10 2 Spring tension adjustment Before starting oil all pivot points and springs as this may prevent the need for retensioning 1 Tighten both grub screws already in spring bush on far left hand side of the spring assembley 2 Now on right hand side adjustment bush hold spring tension firmly with tension bar 3 Slacken off both grub screws with Allen Key 3 mm see fig 10 1 Take note that it is important that at least one tension bar is engaged in the spring tension bush at all times when one or more of the grub screws are slackened off Failure to do this will cause loss of spring tension and possible i
5. ion drying of the side frame Water drainage must be provided to prevent the risk of corrosion Protect the door from caustic aggressive substances such as acids alcali solutions de icing salt etc Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 6 F ENGLISH e The springs of the anti fall safeguard together with the wire cable should be checked at regular intervals In the event of a spring breaking the spring or the entire roller holder must be replaced by a specialist e Suitable surface protection should be applied to the door at appropriate intervals in accordance with local atmospheric conditions Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 7 ENGLISH Fitting instructions for canopy door with steel frame Figure 1 For fitting you will need Spirit level metre rule Open ended or socket spanner 10 mm Open ended or socket spanner 13 mm Cross tip screwdriver size 2 Racket spanner 10mm amp 13mm For seating the plugs Drill Masonry drill 10 mm Plugs 10 mm Hex head screws 8 x 50 mm Plain washers 8 4 mm Figures 2 1 2 4 Fitting instructions for the adjustable handle Insert shaft 2 into handle and in accordance with measurement A fasten with pin 3 If measurement A is less then 36 mm then shorten spigot 8 Position adjusting nut 4 in such a way that when the inside handle is screwed tightly in place the closing function is assured For fit
6. njury to persons or property 4 Increase or decrease spring tension using both tensioning bars see fig 10 2 5 Re tighten both grub screws 6 Release grub screws on far left hand side of spring bush 7 Test door action Should further adjust ment be required repeat again until door balance is correct Figure 11 Affix absorption pad Z to head frame directly under latch keep fig 11 Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 9 ENGLISH Fitting instructions for canopy doors with timber frame Before fitting the door check carefully the opening size and the squareness of the timber frame the door is manufactured slightly smaller to give the correct clearance between door leaf and timber frame The timber frame should be of the Goalpost type with nominal size of 70 mm x 70 mm 2 3 4 x 2 3 4 minimum size of 55 mm x 70 mm 2 3 16 x 2 3 4 Figure 1 For fitting you will need Hammer Drill Metre rule Spirit level Socket spanner 10 mm ideally 1 4 drive Screwdriver slotted head Screwdriver phillips head 4 5mm twist drill for pilot holes Figures 2 1 2 3 Position the closer angle a and ensure that the edge of the closer is flush with the inside face of the timber head see fig 2 2 Secure with 4 No 3 mm wood screws b see figure 2 3 Figures 3 1 3 2 Position and secure spring support latch bracket c to the timber f
7. r Seite 11 F ENGLISH 6 Release grub screws on far left hand side of spring bush 7 Test door action Should further adjust ment be required repeat again until door balance is correct Figure 12 Affix absorption pad to steel closer angle directly under the latch keep fig 12 Absorption pad may need to be trimmed to fit Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 12 F
8. rame d with 10 mm hex head screws e see figure 3 1 Please refer to the table of dimensions for centre line of bracket see fig 3 2 taking note of the width of the door being fitted Figures 4 1 4 2 Stand the door centerally in the timber opening on wooden wedges and ensure that the door leaf O and timber frame d are in line and that the lock catches h are engaged centerally with the spring support latch bracket Figures 5 1 5 3 Insert a 10 mm hex head screw into the cable drum bracket i Remove the 10 mm hex head screws holding the top transit bracket k see figure 5 2 Figure 6 Equal distance must be maintained between the door leaf O and the timber frame d or the door opening check from the outside Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 10 ENGLISH Figure 7 Fix 3 further 10 mm hex head screws into the cable drum bracket 1 and tighten fully the first 10 mm screw previously fitted to the arm mounting bracket Figures 8 1 8 4 Fit two 10mm hex head screws at the bottom of the vertical side tracks see figure 8 1 Remove the clip and washer to release lifting arm m from bracket see figure 8 2 Lift arm m clear to allow fixing of 10mm hex head screw to remaining location in cable drum bracket 1 see figure 8 3 Fit the top of the vertical side tracks n with two 10mm hex head screws see figure 8 4 Refix lifting arm 10
9. ting using an escutcheon plate 7 see figs 2 2 and 2 4 use screw hole B as a template Figures 3 1 3 3 Introduce round handle from the outside From the inside fit internal handle to the shaft 2 using screw 6 For designs with a central profile and for horizontal style use spacer ring 9 included in the accessories pack as shown in figure 3 1 2 and 3 1 3 Figures 4 1 4 7 Depending on the fitting method place the door behind the opening fig 4 1 or between the walls fig 4 2 Align the door and wedge with wooden wedges c fig 4 3 Provisionally fix the door frame in place with bracket b Fig 4 4 4 7 Figure 5 Equal distances must be maintained between the door leaf e and the door frame D and the door opening check from the outside Figures 6 1 6 3 For installation between openings The 6 bracket screws Q see figure 6 1 must be re set and screwed into the inside face of the frame A Always fix brackets to the frame Cf first B The brackets b should be fixed using suitable plugs and screws Secure brackets b to the door frame f see figure 6 2 The door leaf e and door frame f must be in absolute alignment Fix the top centre and bottom bracket b to the frame Then with suitable plugs and screws fit to the wall see fig 6 3 Textbuch Canopy 01 2003 31 01 2003 15 09 Uhr Seite 8 ENGLISH Figure 7 Remove the transit

Download Pdf Manuals

image

Related Search

Related Contents

Uniden D3588-2 telephone  Lego Minecraft The Ender Dragon    MC_4_11_10_400_FR_3  MyScreen Mix antiBacterial    Burnham PF-5 Series Installation and Operation Manual  Samsung SGH-E760 Brugervejledning  Prevents Weeds Before They Start  平成26年度社会福祉経営支援セミナーのご案内(1メガバイト)  

Copyright © All rights reserved.
Failed to retrieve file