Home

21522 Installation Manual V2

image

Contents

1. M YS O N MYSON Eastern Avenue Team Valley Gateshead Tyne amp Wear NE11 OPG T 0845 402 3434 F 0191 491 7465 underfloor myson co uk www myson co uk Cliprail Zone Pack Installation Guide FLOORTEC eee Underfloor Heating o T 01 04 2011 Contents 1 0 2 0 3 0 4 0 5 0 6 0 Do s and Don ts General Description Preparation Installation Post Screeding Risk Assessment for Screed Application General Underfloor Heating Installation COSHH Assessment 03 03 04 o5 06 07 07 07 07 1 0 Do s and Don ts Plan the installation carefully and consider the following The underfloor heating must be connected to a traditional two pipe heating system Carefully consider the manifold position so it is both near the area s to be heated and also easily connected to the heating pipework We recommend that the underfloor heating be connected as Cliprail Zone Pack 03 a separate timed heating zone This may require an additional timer and zone valve which are not supplied Should it be connected into an existing heating zone consideration must be given to the response time of the heating system If you are unsure of any of the above points contact your heating engineer 2 0 General Description The Cliprail Zone Pack consists of a MYSON FLOORTEC Compact Underfloor Heating Control Unit that takes heat from a normal heating system and distributes it into
2. a screeded floor via manifolds and 17 2 PeX a pipe The installation instructions for the MYSON FLOORTEC Compact Underfloor Heating Control Unit are supplied in its box and are not covered in detail here Flow Temperature C Floor Covering Outputs Watts sq m ceramic 71 40 carpet wood 46 thick carpet ay ceramic 94 45 carpet wood 61 thick carpet 52 ceramic Wl 50 carpet wood 76 thick carpet 65 ceramic 140 55 carpet wood 91 thick carpet 78 Important Notes These figures assume 200mm pipe spacings a 75mm deep screed 8 C difference between the 17 2 PeX a underfloor heating flow and return and an air temperature of 20 C Calculated in accordance with BSEN 1254 1997 Care must be taken when using underfloor heating with floor coverings which may be affected by heat such as wood or vinyl products Consult the flooring manufacturer for guidance The underfloor heating installer must ensure the heat requirement of the area to be heated is within the potential outputs detailed above Supplementary heating may be required if the heat requirement is in excess of the above outputs if the system is to be operated intermittently or a swift response time is required MYSON is not responsible for providing any form of temperature guarantee 04 Cliprail Zone Pack 3 0 Preparation Ensure that the surface of the concrete slab onto which the system is to be laid is both clean and dry and the area is cordoned off to pr
3. ced according to the design drawing requirements Insert the pipe into the pre formed slots of the Cliprail ensuring snap fit Insert the pipe into Cliprail at the following spacings a Straight runs 1 per 3 metres b Bends 1 at 300mm from bend The maximum bend radius for PeX a pipe is 8 x pipe diameter i e 17 x 2mm pipe 136mm radius Additional Anchor Clips are provided to secure the pipe during changes of direction These red clips are screwed into the insulation and provide a robust fixing where required Cliprail Zone Pack 05 Black pipe bend supports are placed where the pipe direction changes from horizontal to vertical under the manifolds These supports are designed to relieve stress on the manifold connections and must be fitted PeX a Pipe Coupling Set Gradually complete the layout of piping according to the required configuration Final pipe run should be returned to the opposing flow or return connection as in 5 above PeX a Pipe Length PeX a pipe is marked in metre lengths Note the pipe length marking at both flow and return connections and record the length of each loop to ensure the pipe in economically utilised Complete Steps 4 to 8 for Each Loop 9 Filling Venting and Pressure Test Attach a temporary mains water connection to the flow red connection on the MYSON Underfloor Heating Compact Control Unit and connect a temporary drain connection to the return b
4. e not to over tighten PTFE or a similar jointing compound may be used in making the fittings Set the pump speed to 2 for a single loop system with a floor area of up to 20m and to 3 for a two loop system with a floor area between 20m and 40m 4 0 Installation continued FLOW MANIFOLD MANUAL AIR VENT aH LOOP 1 FLOW LOOP 2 FLOW PRESSURE GAUGE 4 RETURN MANIFOLD i E LOOP 1 RETURN LOOP 2 RETURN PUMP ra a i HEE FLOW FROM PRIMARY MIXING VALVE RETURN TO PRIMARY HEATING CIRCUIT HEATING CIRCUIT if only one heating loop is used cap off the second loose connection with the supplied fitting 5 PeX a Pipe Cliprail Carefully remove protective strip along the underside of Cliprail and fit to the insulated floor as required Align Cliprail to securely grip the pipework and facilitate a uniform floor coverage Prove adhesion Provide additional fixing of Cliprail by securing each end using special plastic Cliprail pins Continue to butt joint Cliprails in accordance with pipe configuration requirements Holding the pipe coil in both arms walk backwards away from the manifold turning the coil whilst playing out the pipe Walk along the pipe and ensure piping is spa
5. eding The required insulation is not supplied by MYSON FLOORTEC 3 Loop Layouts Coil Cuts Survey the area to be used and carefully plan the heating loop configuration underfloor heating pipework is supplied in 120m and 240m rolls for the 20m and 40m packs respectfully One pipe loop is generally acceptable for an area of up to 20m and two pipe loops should be used for areas between 20m and 40m If two loops are utilised it is important that both loops lengths are equal 4 MYSON FLOORTEC Underfloor Heating Compact Control Unit This must be attached to the wall with the heating flow and return isolating valves facing downwards The mini manifolds are connected to control unit with the flow manifold containing the air vent to the pump outlet and the return manifold containing the pressure gauge to the appropriate return connection The pipe couplings and pressure gauge are supplied with the mini manifolds PTFE or a similar jointing compound should be used in making all connections 17mm PeX a Pipe Coupling Set Note PeX a pipe cannot be installed when ambient temperature is below freezing Attach the end of the pipe coil to the flow or return port of the manifold using the coupling set The coupling set is made up of a nut pipe insert and split olive The nut is slipped over the pipe the insert is then pushed into the end of the pipe and the split olive is used as a compression ring for the fitting Take car
6. event unauthorised access Underfloor heating pipework is much easier to handle when warm If possible store the pipework in a heated room for 24 hours prior to installation Do not install underfloor heating in temperatures below 0 C Plan the pipe route carefully to ensure each heating loop does not exceed 120m in length A basic typical pipe layout is shown below See Figure 1 Manifold E GaN NGS Cee ioe ICD Single Zone Fig 1 The two port manifold is installed at a convenient location in or near the area to be heated The heating pipework is connected to the flow manifold which contains the air vent and then laid out in the required configuration Pipes are held in place with a clip rail system which is fixed with self adhesive strips to a separation membrane supplied and laid by others placed over the insulation supplied and laid by others The tails of return pipework are then cut to length and connected to the return manifold which contains the pressure gauge All pipework is fed to the manifold using pre formed pipe bend supports to ensure no creasing occurs during transition from horizontal to vertical alignment The pipework is inserted into manifold ports and secured using brass compression ring manifold connectors The underfloor heating layout is desi
7. gned such as to have no joints other than the connections at the manifold Prior to the screed being laid the underfloor heating pipework should be filled with water and tested to a pressure of 3 bar gauge The area under full test is to be protected from site personnel during the test period This pressure should be maintained for a minimum of 2 hours and then reduced to a working pressure of 1 bar gauge in accordance with current H amp S requirements This should then be held during concreting to ensure any damage resulting in a leak is identified immediately Once concreting is completed the pressure may be released Following curing of the screed the underfloor heating system can be filled with water turned on and the flow temperatures slowly elevated in accordance with our recommendations 4 0 Installation 1 Border Edge Strip MYSON FLOORTEC Border Insulation Part No 50220 is placed around the perimeter of the room It may be fixed to the walls by nails or clips positioned above the screed level Care must be taken to ensure any damp proof membrane in the wall is not perforated The polythene skirt of the Border insulation must be lifted and placed over the floor insulation prior to the screed being laid 2 Insulation It is the responsibility of the builder to ensure the floor insulation to which the Cliprail is fitted complies with the Building Regulations The insulation must be securely fitted and taped before scre
8. hen fixed to a wall or temporary structure using wall plugs and screws Tools Power drill cordless power drill screw driver spanners pipe wrench Risk With power tools there is always the risk of flying chips Due to the exposed nature of some sites and the presence of other trades there is an increased risk of electrocution from trailing cables and the like Action Safety glasses are to be worn whilst drilling issued under PPE See electrical section for use of electrical equipment Fitting Pipe to Control System Pipework is cut and fitted to the manifold using a mechanical joint Tools Pipe cutters Risk No significant risk Laying of Pipe Pipe is decoiled and fixed to the insulation by means of a plastic clip Risk Pipe coils are heavy and must be considered under manual handling Coils are available in 120m and 240m lengths Both the 120m and 240m can be utilised without mechanical assistance No other significant risks Action Operatives should be trained in manual handling Filling and Pressure Testing Hydraulic Pressure Test to be Used on Site The underfloor heating system should be filled with mains potable water A suitable hydraulic pressure pump may be required Tools Hydraulic pressure pump Spanners Pipe wrench Risk Use of hydraulic pressure tests has a medium risk however the following procedure must be followed i Ensure the area to be tested is cordoned off and that no other s
9. ite personnel are able to readily access the area signage to be erected ii Whilst filling the system check for leaks iii Gradually raise the pressure to a maximum 3bar Check for leaks at all joints and mechanical fittings iv Re check that all other site personnel are kept clear of the test area v Leave pressurised for 2 hours to check for leaks There may be a small drop in pressure initially due to the pipe work relaxing temperature vi After 2 hours the pressure should be released to 1 bar gauge which should be held during concreting COSHH Assessment The installation of MYSON underfloor heating does not involve the use of any substances as defined by the Control of Substances Hazardous to Health regulations
10. le with MYSON underfloor heating systems however you must ensure that it is stored in the room in which it is to be laid 2 weeks prior to installation Carpets Carpets are generally compatible with MYSON underfloor heating systems however heavy carpets with felt underlay should be avoided as this may reduce the heat output in the floor 6 0 Risk Assessment for Screed Application General Construction sites have a number of general risks associated with them and these should be detailed in the main contractors site Health and Safety policy or Risk Assessment Any special risks with a particular site should highlighted The use of hard hats high visibility jackets and safety boots is normal practice for all installation operatives Where necessary ear protection and goggles will be worn during the use of certain items of plant and equipment Installation of MYSON FLOORTEC underfloor heating systems do not significantly add to these risks and normally applied safety actions by other contractors on site should be satisfactory Underfloor Heating Installation The following is a detailed examination of each stage of the installation of MYSON underfloor heating MYSON underfloor heating method statements are used as a reference copies available from MYSON Risks associated with each stage of the installation are detailed and the appropriate actions to limit any risk are given Fitting of Control System The manifold is made up and t
11. lue connection Open the isolating valves and allow mains pressure water to enter the system Run water through the system until the drain water contains no air Close the return isolating valve and allow mains pressure to raise the water pressure of the underfloor heating system to 3 bar If the mains water pressure is inadequate a separate hydraulic pump may be utilised Close both isolating valves and leave the system pressure at 3 bar for 30 minutes Check for any leaks and rectify if necessary Once system integrity has been proven reduce the pressure to 1 bar and prepare for screeding 06 Cliprail Zone Pack 4 1 Zone Value All wiring should be undertaken by a qualified installer and conform to IEE regulations To comply with IEE regulations the pump on the unit is provided with an earth connection via the connection box A fused spur should be provided adjacent to the unit The mains cable should be connected to the spur and fused at 3 amps BOILER UFH ZONE VALVE Room Stal Terminals Radiator Zone Valve Flow i Return Underfloor heating Circuit With Zone Value BOILER gt eE Without Zone Value Please note this will not provide independent time and temperature control We would always advise where possible independent control should be achieved by means of a zone valve Switched live If fitting a room thermostat fix in a position on the wall as recommended in the manufac
12. turer s instructions If a room thermostat is fitted remove the link between the terminals as indicated on the wiring diagram UFH ROOMSTAT O L 230v Supply Flow Return Leave link in when using zone valve UFH PUMP Boiler feed stat 42 deg Close 31 deg Open From mains Jamp fused spur ROOMSTAT Flow Return Remove Link i iy mies L ee i I i q eee UFH PUMP Boiler feed stat l d2 deg Close L 31 deg Open i N E From mains 3amp fused spur 5 0 Post Screeding The slab must be allowed to cure for a minimum of 21 days before the heating system can be turned on Following this period the heating system should be allowed to reach operating temperature by increasing the temperature 3 C per day from a commencing temperature of 30 C until the final operating temperature is reached Failure to observe these instructions could result in damage to the screed Floor Coverings Underfloor heating doesn t dictate to you in any way It can be used with almost any kind of flooring or floor covering There are four basic floor finish types which should be considered ceramic tiles vinyl timber and carpets Ceramic Cliprail Zone Pack 07 finished has the least thermal resistance with carpets having the greatest Ceramic amp Vinyl Ceramic plastic or vinyl flooring have a low thermal resistance and will function very well with MYSON underfloor heating systems Timber Timber flooring is compatib

Download Pdf Manuals

image

Related Search

Related Contents

OPERATING MANUAL 308/616/824/832/1264 INTRODUCTION The    Originalbedienungsanleitung ZETLIGHT Controller i200  GE RS Series Installation Guide  GE Monogram ZGG36N31CSS All-in  Acrystal Prima  Neutron Engineering Inc.  User`s Manual - minus zero degrees  

Copyright © All rights reserved.
Failed to retrieve file