Home

User Manual - Doughty Engineering Ltd.

image

Contents

1. 006 dad 55 7001 voe 133 5 VIVO Q115NId33NIDN3 ALHDNOG AMONT WWS8e 3715 www doughty engineering co uk DOUGHTY PRODUCTS MUST ONLY BE SERVICED REPAIRED BY AN AUTHORISED SERVICE AGENT SPARE PARTS ARE ONLY AVAILABLE TO THESE AGENTS ITEM NO PART NUMBER DESCRIPTION Spores QTY 1 TH134 MACHINED 38MM ATOM CLAMP BASE 2 TH705 MACHINED 38MM ATOM CLAMP TOP 3 778010 6 X 39 EYEBOLT 4 771 5 x 25 Stainless Steel Roll Pin 2 5 F994 M10 X 20 SET BZP 6 173390 M10 BEAMER SPIGOT DRAWN AW 158994 38MM ATOM DATE 07 04 2011 BEAMER LAMP NOT TO SCALE Rev 1 www doughty engineering co uk Declaration of Conformity Doughty Engineering Limited CROW ARCH LANE RINGWOOD HANTS BH24 1NZ ENGLAND Telephone 44 0 1425 478961 Fax 44 0 1425 474481 www doughty engineering co uk email sales doughty engineering co uk EC DECLARATION OF CONFORMITY Doughty Engineering Limited hereby certify that the equipment stated below has been designed to comply with all relevant sections of the specifications referenced below and complies with all the applicable Essential Requirements of the EC Directives and amendments a
2. User Manual www doughty engineering co uk 158894 5889401 25mm Atom Beamer Version 04 11 www doughty engineering co uk Parts amp Features Eyebolt Assembly Roll Pin Roll Pin Hex Nut Beamer Spigot Year of Manufacturer Month of Manufacturer i e 09 2009 i e Jan 10 2010 B Feb 11 2011 March Safe Working Load www doughty engineering co uk Never exceed the Safe Working Load SWL shown on the clamp N Only use the clamp within the designed tube parameters 25mm All clamps should be visually inspected before use In the event of any damage the clamp should be taken out of service and returned to an Approved Doughty Service for inspection see our dealer locator on our web site for a comprehensive list of Authorised Service Agents 4 When used in conjunction with other accessories care must be taken to ensure that the minimum SWL of any component is not exceeded Doughty Engineering Ltd does not recommend using clamps which do not fully encompass the tube for overhanging All open clamps including hookclamps should be THE FOLLOWING APPLICATIONS WILL RESULT IN THE RECOMMENDED SWL BEING REDUCED DEPENDANT ON THE TUBE SURFACE FINISH amp TORQUE SETTINGS APPLIED PROOF LOADING ON INSTALLATIONS IS RECOMMENDED used in a vertical orientation only RECOMMENDED SWL LOAD OF TIGHTEN BY HAND
3. N Only use the clamp within the designed tube parameters 38mm All clamps should be visually inspected before use In the event of any damage the clamp should be taken out of service and returned to an Approved Doughty Service for inspection see our dealer locator on our web site for a comprehensive list of Authorised Service Agents 4 When used in conjunction with other accessories care must be taken to ensure that the minimum SWL of any component is not exceeded Doughty Engineering Ltd does not recommend using clamps which do not fully encompass the tube for overhanging All open clamps including hookclamps should be used in a vertical orientation only RECOMMENDED SWL LOAD TIGHTEN BY HAND ONLY THE FOLLOWING APPLICATIONS WILL RESULT IN THE RECOMMENDED SWL BEING REDUCED DEPENDANT ON THE TUBE SURFACE FINISH amp TORQUE SETTINGS APPLIED PROOF LOADING ON INSTALLATIONS IS RECOMMENDED REDUCED SWL LOAD www doughty engineering co uk Data Sheet 4 GYIHL QF 54504 3 15 S31ON OVI 4 10766851 G3HSI1Od 766851 HSINI4 IMS 1HDI3AA WAINIWNTY 2 1 18 10766851 AAAS 66861 LuVd dWV O 8 WOLY
4. BY AN AUTHORISED SERVICE AGENT SPARE PARTS ARE ONLY AVAILABLE TO THESE AGENTS ITEM NO PART NUMBER DESCRIPTION Spares QTY 1 TH320 MACHINED 32MM ATOM CLAMP BASE 2 TH321 MACHINED 32MM ATOM CLAMP TOP 3 178010 6 X 39 EYEBOLT 4 771 5 x 25 Stainless Steel Roll Pin 2 5 T73391 M BEAMER SPIGOT F920 M X 16 HEX SET SCREW BZP DRAWN AW 158855 32MM ATOM DATE 06 04 2011 BEAMER CLAMP NOT TO SCALE 1 www doughty engineering co uk Declaration of Conformity Doughty Engineering Limited CROW ARCH LANE RINGWOOD HANTS BH24 1NZ ENGLAND Telephone 44 0 1425 478961 Fax 44 0 1425 474481 www doughty engineering co uk email sales doughty engineering co uk EC DECLARATION OF CONFORMITY Doughty Engineering Limited hereby certify that the equipment stated below has been designed to comply with all relevant sections of the specifications referenced below and complies with all the applicable Essential Requirements of the EC Directives and amendments and the National Laws and Regulations adopting these Directives Description 832mm Atom Beamer Model s Part No T58855 T5885501 SWL 100Kg Factor 5 1 are in conformity with the provision of the following EC Directives MACHINERY DIRECTIVE 98 37 EC Harmonised Standards applied EN 292 1 2 1991 BS EN ISO 9001 1994 Safety Tested DIN 31000 03 79 Safety Tested DIN EN 74 12 88 National Technical St
5. ONLY REDUCED SWL LOAD www doughty engineering co uk Data Sheet 4 GYIHL QF 54504 3 15 S31ON OVI CGSLNIVd 323QAOd 10768851 768851 HSINI4 3001 1 IMS 1HDI3AA WAINIWNTY 1Vld31VW AOV1E 10768861 AAAS 68861 LuVd dWV O 8 WOLY 133 5 VIVO Q115NId33NIDN3 ALHDNOG AMONT dad 012 P 0910 Leb dad ZS 16 WWSZ 3715 481 www doughty engineering co uk DOUGHTY PRODUCTS MUST ONLY BE SERVICED REPAIRED BY AN AUTHORISED SERVICE AGENT SPARE PARTS ARE ONLY AVAILABLE TO THESE AGENTS ITEM NO PART NUMBER DESCRIPTION Defoult QTY 1 655 MACHINED 25MM ATOM CLAMP BASE 2 TH133 MACHINED 25MM ATOM CLAMP TOP 3 178015 M X 35 DOUGHTY EYEBOLT ASSEMBLY 4 772 5 x 16 ROLL PIN STAINLESS STEEL 2 5 F920 6 X 16 HEX SET SCREW BZP 6 173391 6 5 DRAWN AW 158894 25 DATE 05 04 2011 LAMP NOT SCALE R
6. SWL of any component is not exceeded Doughty Engineering Ltd does not recommend using clamps which do not fully encompass the tube for overhanging All open clamps including hookclamps should be used in a vertical orientation only RECOMMENDED SWL LOAD TIGHTEN BY HAND ONLY THE FOLLOWING APPLICATIONS WILL RESULT IN THE RECOMMENDED SWL BEING REDUCED DEPENDANT ON THE TUBE SURFACE FINISH amp TORQUE SETTINGS APPLIED PROOF LOADING ON INSTALLATIONS IS RECOMMENDED REDUCED SWL LOAD www doughty engineering co uk Data Sheet 4 GYIHL QF 54504 3 15 S31ON OVI G3INIVd 10558851 G3HSI1Od 558851 HSINId 3001 1 IMS Y N LHDISM 1 18 10558851 AAAS 558851 LYYd dWY10 8 WOLY 434 8 ooe 091 8726 133 5 VIVO Q115NId33NIDN3 ALHDNOG AMONT dad 09 814 ddd 85 3715 3801 www doughty engineering co uk DOUGHTY PRODUCTS MUST ONLY BE SERVICED REPAIRED
7. andards amp Specifications applied BS 7905 1 2001 2 23 Signed Date 23 04 08 Name Nigel Curtis Position Technical Director Being the responsible person appointed by the manufacturer C DEQ 083 Rev 4 Company Registration No London 972614 in Registered Office Crow Arch Lane Ringwood Hants 24 1NZ BUSA Directors M B Lister J C G Chiverton N D Curtis S C Wright www doughty engineering co uk Doughty Engineering Ltd Crow Arch Lane Ringwood Hampshire BH24 1NZ Tel 44 0 1425 478961 Fax 44 0 1425 474481 email sales doughty engineering co uk Web www doughty engineering co uk Note Whilst every effort has been made to ensure that the information contained within this manual is correct Doughty Engineering does not accept any liability for errors or omissions Specifications and technical data are intended for guidance purposes only and may vary www doughty engineering co uk User Manual www doughty engineering co uk 158994 5899401 38mm Atom Beamer Version 04 11 www doughty engineering co uk Parts amp Features Eyebolt Assembly Roll Pin Roll Pin Hex Nut Beamer Spigot Year of Manufacturer Month of Manufacturer i e 09 2009 i e Jan 10 2010 B Feb 11 2011 March Safe Working Load www doughty engineering co uk Never exceed the Safe Working Load SWL shown on the clamp
8. ev 1 www doughty engineering co uk Declaration of Conformity Doughty Engineering Limited CROW ARCH LANE RINGWOOD HANTS BH24 1NZ ENGLAND Telephone 44 0 1425 478961 Fax 44 0 1425 474481 www doughty engineering co uk email sales doughty engineering co uk EC DECLARATION OF CONFORMITY Doughty Engineering Limited hereby certify that the equipment stated below has been designed to comply with all relevant sections of the specifications referenced below and complies with all the applicable Essential Requirements of the EC Directives and amendments and the National Laws and Regulations adopting these Directives Description 25mm Atom Beamer Model s Part No T58894 T5889401 SWL 100Kg Factor 5 1 are in conformity with the provision of the following EC Directives MACHINERY DIRECTIVE 98 37 EC Harmonised Standards applied EN 292 1 2 1991 BS EN ISO 9001 1994 Safety Tested DIN 31000 03 79 Safety Tested DIN EN 74 12 88 National Technical Standards amp Specifications applied BS 7905 1 2001 2 23 Signed Date 23 04 08 Name Nigel Curtis Position Technical Director Being the responsible person appointed by the manufacturer C DEQ 083 Rev 4 Company Registration No London 972614 in Registered Office Crow Arch Lane Ringwood Hants 24 1NZ BUSA Directors M B Lister J C G Chiverton N D Curtis S C Wright www doughty engineering co u
9. k Doughty Engineering Ltd Crow Arch Lane Ringwood Hampshire BH24 1NZ Tel 44 0 1425 478961 Fax 44 0 1425 474481 email sales doughty engineering co uk Web www doughty engineering co uk Note Whilst every effort has been made to ensure that the information contained within this manual is correct Doughty Engineering does not accept any liability for errors or omissions Specifications and technical data are intended for guidance purposes only and may vary www doughty engineering co uk User Manual www doughty engineering co uk 158855 5885501 32mm Atom Beamer Version 04 11 www doughty engineering co uk Parts amp Features Eyebolt Assembly Roll Pin Roll Pin Hex Nut Beamer Spigot Year of Manufacturer Month of Manufacturer i e 09 2009 i e Jan 10 2010 B Feb 11 2011 March Safe Working Load www doughty engineering co uk Never exceed the Safe Working Load SWL shown on the clamp N Only use the clamp within the designed tube parameters 32mm All clamps should be visually inspected before use In the event of any damage the clamp should be taken out of service and returned to an Approved Doughty Service for inspection see our dealer locator on our web site for a comprehensive list of Authorised Service Agents 4 When used in conjunction with other accessories care must be taken to ensure that the minimum
10. nd the National Laws and Regulations adopting these Directives Description 38mm Atom Beamer Model s Part No T58994 T5899401 SWL 100Kg Factor 5 1 are in conformity with the provision of the following EC Directives MACHINERY DIRECTIVE 98 37 EC Harmonised Standards applied EN 292 1 2 1991 BS EN ISO 9001 1994 Safety Tested DIN 31000 03 79 Safety Tested DIN EN 74 12 88 National Technical Standards amp Specifications applied BS 7905 1 2001 2 23 Signed Date 23 04 08 Name Nigel Curtis Position Technical Director Being the responsible person appointed by the manufacturer C DEQ 083 Rev 4 Company Registration No London 972614 in Registered Office Crow Arch Lane Ringwood Hants 24 1NZ BUSA Directors M B Lister J C G Chiverton N D Curtis S C Wright www doughty engineering co uk Doughty Engineering Ltd Crow Arch Lane Ringwood Hampshire BH24 1NZ Tel 44 0 1425 478961 Fax 44 0 1425 474481 email sales doughty engineering co uk Web www doughty engineering co uk Note Whilst every effort has been made to ensure that the information contained within this manual is correct Doughty Engineering does not accept any liability for errors or omissions Specifications and technical data are intended for guidance purposes only and may vary www doughty engineering co uk

Download Pdf Manuals

image

Related Search

Related Contents

L`approche processus - par où commencer  Quick start guide  GUIDE DE L`AUTO-SONDAGE TELEFLEX  DreamLine DL-6973R-01FR Installation Guide  Daltile MA031818HD1P2 Instructions / Assembly  the county office building is closed on friday  Using Your Klic-N-Kut for Rhinestone Applications1  Sharp KC-840E W  Johnson Hardware 2204F User's Manual  Voir - OPTEX  

Copyright © All rights reserved.
Failed to retrieve file