Home
METALWORKS C-PLANK INSTALLATION MANUAL
Contents
1. ji A C channel D gt r XN LQ f ND a ED XN VI gt a gt ma haa 2 fa 5 L 2 2 3 Profile Hanger Wire spacing between 1200mm Fishbone Grid Hanger C channel Hanger JUL Fishbone Grid ieee Eee C channel AC MK CP75 N NE bal 5 9 3 5 q U U U ONY EJ U Y 4 u l 300 C plank C300 ann JU JUU 300 Inspiring Great Spaces Ar mstrong CEILING SVSTEMS METALWORKS C PLANK INSTALLATION MANUAL 2 2 4 Isometric Drawings LE 2 2 3 Clean and Adjust The installers need to wear gloves to avoid damage and pollute the ceiling panels Before installing cleaning surfaces of the metal ceilings Use a clean soft white cloth and mild detergent and water to wipe off anv dirt or fingerprints The dust in the back side of metal ceiling is normal Inspiring Great Spaces Ar mstrong CEILING SVSTEMS
2. METALWORKS C PLANK INSTALLATION MANUAL METALWORKS C PLANK AMM U N Inspiring Great Spaces A mstrong CEILING SVSTEMS METALWORKS C PLANK INSTALLATION MANUAL 1 GENERAL 1 1 Product Description C plank svstem forms distinct V shaped grooves after installed and become classical 1 2 Materials and Finishes MetalWorks C plank system is made of hot dipped galvanized steel or aluminium structure It has good corrosion resistance MetalWorks C plank svstem is available in unperforated standard perforated microperforated or extra microperforated and the surface is finished with pre coated the standard color is global white and white RAL9010 available in other RAL colors to choose from 1 3 Product Size Standard size WxHxT Aluminum 85x15x0 5mm 100x15x0 5mm 150x15x0 6mm 200x15x0 6mm 300x30x0 7mm Steel 300x30x0 5mm 1 4 Suspension Svstem MetalWorks C plank system use Armstrong C85 C100 C150 C200 C300 fishbone grids 1 5 Storage and Handling Metal ceiling shall be stored in a dry interior location and shall remain in cartons prior to installation to avoid damage The cartons shall be stored in accordance with the instruction son the carton Proper care should be taken when handling to avoid damage or soiling NOTE The horizontal cartons shall not be laying exceed three floors to avoid damaging the lower metal panel Cartons shall be packed with wooden stand and carton loading should be uniform According
3. ceilings Perforated work must be carried out on the ground lightings diffusers and other equipment should be installed simultaneousiv with the metal ceiling 2 2 Installation Procedures 2 2 1 MetalWorks Panel and Installation Accessories Drawings MetalWorks C plank System C plank panel 300mm C channel C channel Hanger C channel Connector Fishbone Grid Fishbone Grid Hanger Fishbone Grid Connector C plank panel C300 Inspiring Great Spaces A mstrong CEILING SVSTEMS METALWORKS C PLANK INSTALLATION MANUAL Installation Accessories f Step 1 Hanger Wire Step 2 C channel Hanger Step 3 C channel 2 2 2 Floor Plan A According to the ceiling floor plans draw the line for location of the grid B Determine the hanging point location C Install the hanger wire hanger wire spacing between lt 1200mm D Installing leveling straightening the grids C channel spacing between lt 1200mm Fishbone grid spacing between lt 1200mm Using Fishbone grid hanger to fix Fishbone grid on C channel The location of Fishbone grid hanger is the intersection of C channel upper and Fishbone grid lower C channel and Fishbone grid are required straightening and leveling Please follow the installation drawings and installation Inspiring Great Spaces Ar mstrong CEILING SVSTEMS METALWORKS C PLANK INSTALLATION MANUAL 4 Fishbone Grid Hanger __ Fishbone Grid
4. to the carton indicating direction cartons shall not be stacked more than 1 5m 1 6 Jobsite Conditions Building areas to receive metal ceiling shall be free of construction dust and debris Products can be installed in conditions between 32 F 0 C and 120 F 49 C and in spaces before the building is enclosed where HVAC systems are cycled or not operating Cannot be used in exterior applications where standing water is present or where moisture will come in direct contact with the ceiling Inspiring Great Spaces A mstrong CEILING SVSTEMS METALWORKS C PLANK INSTALLATION MANUAL 1 7 Fire Performance Metal ceiling as with other architectural features located in the ceiling plane mav obstruct or skew the existing or planned fire sprinkler water distribution pattern or possibiv delav the activation of the fire sprinkler or fire detection svstem Designers and installers are advised to consult a fire protection engineer NFPA 13 and their local codes for guidance on the proper installation techniques where fire detection or suppression svstems are present 2 INSTALLATION 2 1 General After opening the product carton and before installation be sure to locate remove and set aside the hardware kit before proceeding Metal ceiling must not be used to support anv other material and are also not approved for exterior application When installing lightings diffusers smoke and sprav devices required leaving holes in the metal
Download Pdf Manuals
Related Search
Related Contents
BLANCO TIPO 6 BASIC Toshiba Satellite P50t-A100X 太陽電池モジュール (3V01) 取扱説明書 パピロトミーナイフ Beverage Center and Wine Chiller Notice d`utilisation Iphysio 2015 Longshine LCS-WA3-50 WLAN access point Manual de instrucciones Sapphire Audio Sapphire XLs User's Manual Copyright © All rights reserved.
Failed to retrieve file