Home
pre-installation- Manual
Contents
1. Installation Processor Darkroom Exit to light N Positive Air Pressure yB lkeg D Feqiqe ME Stop cock Colenta page 7 8 recommended Installation Infeed in Darkroom processor in daylight Positive Air Pressure Daylight Stop cock Colenta page 8 8
2. Supply Drain connection and Replenishment 3 4 Watersupply Exhaust port see more on page 5 2x30L Replenishment containers are supplied with the processor Colenta page 3 8 Water supply kit assy Order No 90 60 008 Water IN di Pos No PartNo Beschreibung Description ____Quantity Schlauchholl nder 3 4 Hose connector 3 4in 2 90 45 001 Kugelhahn 3 4 In Line Tap 3 39045002 Doppelnippel 34 3 4in straight fiting 8 4 9045003 T St ck 3 4 T Fitting 3 4in 5 9045004 Bogen 3 4 90 3 4in Elbow 90 EEE eison Mheerder Fie merone 7 90 45 007 Holl nder Filter inlet outlet fitting n a e 90 45 027 Filtergehause Fiter Housing 11 90 70420 Schlauch 1 2 Hose 1 2 1219081826 Schlauchklemme Colenta page 4 8 As mentioned earlier to protect the processor as well as any equipment that may be directly interfaced to or with the processor the processor must be connected to an external exhaust system failure to correctly ventilate the processor and dryer exhaust will result in corrosion within the processor and interfaced equipment in addition the probability of processor related film artifacts is increased The exhaust system provided at the installation site should comply as follows 1 The disposal of the effluent air must comply with all local environmental safetly codes and regulations 2 The following calculation should be used to determine the fficiency of the system provided and that
3. oid a backwash of the drained used chemicals the drain hoses should be free of bends and with a constant fall The drain must be correctly ventilated A floor or wall drain may be used which should include an anti syphon system Note Do not use brass or copper in the drain lines The minimum diameter of the drain lines should be 40 mm Electrical For operation a seperate 16 Amp fused socket with earth leakage protection is required for further information consult the processor datasheet Replenishment Each replenisher storage tank has a 30 litre capacity and should be located on ground level with easy access please take notice of the required minimum wall clearence for servicing and cleaning Automatic Cooling The processor electronics will automatically detect over temperature developer conditions and then activate a cold water cooling system Chiller Where a Chiller is not used the temperature of the incoming mains cold water supply should be between 7 15 C in order for the cooling system to operate efficiently Processor ventilation The MP 902 903 is supplied with an exhaust port located at the feed end of the processor During installation the safety cover of the port should be removed by a qualified person and the open port must then connected to the main exhaust facility at the installation site with sufficient power to ventilate the warm exhaust air away see more about this on page 5 Colenta page 2 8 Water
4. pre installation Manual MEDIPHOT 902 903 X Ray Filmprocessor Colenta COLENTA Medical X Ray Film Processor TYPE MP902 and MP903 For processing all type of standard X Ray Films Colenta page 1 8 Colenta MEDIPHOT 902 903 X Ray Filmprocessor The processor is designed in such a way that only a cold water supply drain and power connection are necessary The plumbing is carried out according to DIN 1986 1988 and must comply with local plumbing codes The cold water supply must have a shut off valve tap system connected with a 3 4 outlet washing machine connection to the processor Make sure that the water supply tap is always accessable as it must be opened before work and closed after work By means of the pressure flow regulator integrated into the water solenoid valve of the processor the flow rate is controlled to 2 5Lt min assuming a water supply pressure of 0 3 10 bar It is recommended to install a second water supply outlet with shut off tap and with approx 2 5 mtr 8ft of hose for rack cleaning purposes The drain tubes of the processor can be drained separately or together according to local regulations and health safety requirements The hose connections from the processor to the outlet drain are enclosed The fixer can be collected separately in a plastic container storage tank or directly connected to a silverrecovery unit The developer overflow can be collected in a plastic container In order to av
5. s When processors are installed in darkroom wall openings it is most important that darkroom air pressure exceeds the air pressure of the area surrounding the darkroom This is intended to prevent air cascading through the processor into the darkroom area Proper balancing of dark lighted room air in addition to correct dryer venting will not only maximize containment of chemical fumes and vapors within the processor and its dryer exhausting system but the incidence of film artifacts occurring in the out of solution transport roller sections will be greatly reduced To prevent positive airflow from flowing back into the processor from the building exhaust there should be an air gap not exceeding more than 5 08 cm 2 0 in between the processor exhaust hose and the building exhaust thiswill benefit the site in two ways 1 The gap can be adjusted to provide correct negative flow in cases where building exhaust exceeds requirements 2 Prevent positive flow returning to the processor Colenta recommended Installation Free standing X Positive Air Pressure Stop cock Colenta page 6 8 recommended
6. the the correct amount of end to be connected to the processor To prevent venturi effect at the duct opening all measurements should be made at a point 30cm from the open end of the duct to be attached to the processor 3 Measurement can be made typically using a Dwyer Air Meter see the image below 4 If solid metal or rigid plastic ducting is attached to the processor in a manner which would prevent easy removal asmall hole may be created at a point approximately 30 cm from the processor ventilation port The L shaped metal tube provided with the Dwyer Air Meter can then be inserted through the opening When measuring negative air the tube tip opening should be pointed in the direction of airflow away from the processor The processor must be de energized when making air measurements The air meter should be held in the vertical position to assure the greatest accuracy The meter tubing must not be kinked airflow processor exhaust port external exhaust fan ee Fe dis 100mm flexible hose or fixed piping system dia 100mm eu position formeasurement ee L 1 V HI I 7 x en of NOTE If the ventilation tubing is connectet to house internal exhaust system an air gab of 5cm 2 inch has to be provided accordinghly Itis most important that negative airflow in the processor exhaust duct remains constant when the processor is in the run standby and shut down mode
Download Pdf Manuals
Related Search
Related Contents
Axis 207W 取扱説明書|家に入る前のお留守番チェッカー リモコン inverter system multi type outdoor unit installation manual système à Y`elloSMS User Manual 音声ICユニットAT Panp。t s。ra Netzwerk-Videorecorder NVR308 / NVR316 Ultra ElectronicS M9005-725 User's Manual Copyright © All rights reserved.
Failed to retrieve file