Home
Installation manual for service lifts
Contents
1. Pa a 24 Drive machine machine supporter and divertor unit 25 Sheave drive 2 1 7 Chain rive machine The machine supporter is pre installed It needs to be installed gt di The machine room floor is to be layed on top of the crossbeam There are 2 chain openings and 1 cable center on the buffer support angles The sheave needs to be front 7 anchorage opening in the machine room floor The drillings on the crossbeam need to be made on site IZ machine supporter the motor behind fel The machine supporter with the chain deflector need to be installed center on the crossbeam of the top pulley supporter The needed clamp plates for this installation are pre installed on the machine room floor The pulley supporter is to be installed in between the two 77 structure part The drive machine is to be fixed on the machine supporter The chains are to be led from the crossbeams MT balance weight over the small chain wheels and the drive machine to the cabin The machine room floor is to be fixed on the crossbeam and the AG e of The ropes are running from the rope anchorages on the machine supporter to the pulley on the cabin The rope then runs to the drive machine where the ropes are splitted one rope on each pulley on the counterweight From the counterweight the ropes run to the anchorages above the counterweight a du cabin ma ee m ee eee
2. Push button element The push button element is to be inserted in the cut out in the door frame Tighten the screws on the clamp plates regularly The push button elements must be installed in the corresponding floors They are marked on the back side from bottom to top starting with the number 1 This marking does not correspond with the floor markings on the layout drawings If there are 2 loading stations in one floor through car the floor switch is connected to the push button element with the index marking A Please see the wiring diagrams and the AS 3 manual for the exact cabling Special features on drive machine with chain wheels On lift units with chain drives a second trailing cable for the slack chain switch must be installed on the balance weight The trailing cable is to be fed through the conduit at the side on the cabin then fixed on the trailing cable fixing The trailing cable then lead underneath the bottom profile through the screw joint from underneath in the balance weight Fix the trailing cable along the bar and lead it through the pipe to the chain rocker Please ensure that the trailing cable is not dragging on the shaft floor when the cabin is in the lower floor The control current limit switches are to be installed in the lowest and highest floor The switches are to be fixed in the rails and are vertically adjustable The rails are to be clamped on the profiles at the structure The operator for th
3. E ll 777 maa l RT The protective grid made of perforate plate is to be installed on the drive machine so to cover the sheave Holding bracket for chain cover Protective grid The chains are to be fixed with chain locks at their ends The chain rocker on the cabin and the balance weight must be in a horizontal position If the chains are too long they need to be shortened with an angle grinder Before cutting the chains the rivet heads need to be grinded down Wear protective glasses The protective grid is to be installed on the drive machine so to cover the chain wheels Optional overload contact RA NIN The chain rocker on the Chain rocker cabin and the balance weight must be in a horizontal position No m li m n l m m N si n i The machine supporter is pre installed It needs to be installed center on the buffer supporter angles The drive machine needs to be in front position the motor in back position Motor behind Drum front The ropes are to be led from the machine supporter to the cabin Then the ropes are to be led through the rope anchorages und fixed with the rope clamps Please ensure that the rope rocker is in a horizontal position because the slack rope switch must not be activated by the switch cam Svvitch cam The machine supporter is pre installed It needs to be installed center on the buffer supporter a
4. The riding on the cabin ceiling is strictly forbidden You are only allowed to step onto the cabin ceiling see EN81 3 0 3 12 1 Therefore the safety rope on the cabin must be put around the guide rail and must be secured with the shackle The electrical bridge next to the emergency stop switch will be opened when necessarily so the safety circuit is open Closed electrical bridge Electrical Prise b Wy Shackle Opened electrical bridge Safety rope Riding forbidden D Special features on different constructions 150 6 Bi parting doors on serving height The landing doors will be unlocked by a fixed type cam There are 2 types of door locks without fail safety device TV90 and TV3074 Fixed type cam ISO C Bi parting doors with serving height lower than 700 mm The landing doors will be operated by an electrical retiring cam EMT 15 The door lock with fail safety device is called TV90a Electrical retiring cam 18 Cabin ISO D Swing doors serving at floor level The landing doors will be operated by an electrical retiring cam EMT 14 Drive machine with chain wheel or rope drum The cabin is equipped with an additional switch activation cam for the control current limit switch The additional safety switch is activated automatically if the floor limit switch fails The position left or right of the control current limit switch depends on the cabin depth Activation cam Activation
5. 35 x 3 mm Locking plate for guide rail 160 x 485x2mm Connection piece for guide rail 160 x 45 X 3 mm L b TE 1 2 Tu nr r o iz La Ta a io a LE Structure bracket 215x35x3mm VVoodscrevvs 8x70 PVC dovvels S 12 VVashers A 8 4 for structure fixing Emergency release key Self locking nuts M 8x16 Round head screws M 8x16 Washers A 8 4 DIN 9021 Hexagon screws M 8x20 for structure straps brackets for structure brackets structure straps diagonals foot brackets wall anchors and guide rails Washers A 8 4 DIN 125 for structure brackets Straight wall anchor 135 x 35x 3 mm Hexagon nut M 8 Contact washers A 8 2 for structure brackets structure straps and guide rails Clamp plates for structure straps 50 x 50x3 mm Balance plate 90 x 90 mm J b LA la UN i Ha wa Metal plate for guide rail x 40 x 1 25 mm 100 Safety bar GV 36 with chain Wooden wedges as installation support 8 Structure Top part of structure part on counterweight side Structure straps Left structure part Right on counterweight structure part on side installation side Structure diagonal Pe di Bottom 1 structure part The structure consists of the right and left structure parts the structure straps and the structure diagonals The cable conduits and the guide rails are p
6. afety bar is available only when the cabin is not equipped with buffers The narrow safety bar is to be fixed on the counterweight side U profile the wide safety bar on the installation side L profile wide safety bar on the installation side narrow safety bar on the counterweight side LL Sliding brackets are pre installed on top of the structure parts These serve as additional structure brackets for the further fixing of the structure parts Structure bracket Pre installed sliding bracket Misplaced sliding bracket The sliding bracket is to be inserted into the end of the guide rail This facilitates the alignment of the guide rails The guide rail ends are to be screwed together with 2 connection pieces These screws should be tightened after the alignment of the guide rails Before the installation of the top structure part the counterweight must be inserted in the U profile Le wt mm ev Structure bracket Guide rail 2 connection pieces U profile 12 Structure The counterweight is adjustable between the guides Unscrew the screws of the frame for inserting the counterweight inserts After inserting the screws must be tightened again Adjustment of the counterweight When the complete structure is installed it is to be plumb adjusted with the wooden wedges and then fixed securely with the wall anchors dowels and screws The screw joint in the brickwood only serves for the f
7. cam for control current limit switch for control current limit switch Activation cam for floor switch Cabin shelf The cabin shelves need to be layed on the plastic rings in the cabin to prevent any slipping 19 Heated cabin shelf cabin floor or cabin ceiling Heated cabin shelves are screwed inside the cabin ceiling and can not be taken out The switch switches for switching on or off the heater is are located at the front of the cabin ceiling Special angles for cabin shelf In this design the cabin is equipped with several angles for trays Cabin roller shutter The cabin roller shutter is pre installed and its tension is pre adjusted During the installation of the roller shutter the proper closing and the function of the switch need to be checked The roller shutter switch is positioned underneath the cover of the tension device The tension of the roller shutter spring can be adjusted at the side Hold the spring at first then loose the tension screws pm Ti Za Tension device Tension screws p 20 Cabin 21 Cabin door Fixed type or hinged type lattice gate The cabin door is to be fixed with the M 6 x 16 screws to the cabin During the installation of the cabin door The lattice gates are pre installed and pre adjusted During the installation of the lattice gate the proper the proper closing and the function of the switch needs to be checked The car door switc
8. d light must not be lightning Bi parting door Screw joint installation side Screw joint counterweight side 31 Swing doors The landing doors are fitted with the threshold angle towards the floor The landing doors are fixed to the installation side by clamp plates The swing doors are to be screwed together with the structure on the counterweight side Swing door front side a i I I e Pe ae Screw joint installation side Screw joint counterweight side When the door is open the door lock and the door contact is visible The clutch of the door contact is positioned in the frame The plug on the door contact is adjustable The door contact bridge must be installed on the door wing The emergency release holes are in the upper frame They are covered with plastic covers The holding plate of the door lock is to be clamped on the structure Door contact bridge Swing door back side Fixing screws for door contact bridge 32 Doors Electrical components 33 Machine room door Sheave The machine room door is to be screwed together with the structure on the counterweight side by using screws and nut stones On the installation side the machine room door is clamped on the L profile Single hinged machine room door Double hinged machine room door Screw joint counterweight side The controller is mounted on a plate The plate is to be fixed by clamp plates on the corner profiles The main swi
9. e control current limit switches are at the side of the cabin If the cabin depth is less than 800 mm the operator is positioned on the counterweight side The control current limit switches will be activated after the floor switches They are additional safety switches which are activated if the floor switches fail Special features on drive machine with drum drive The control current limit switches are to be installed in the lowest and highest floor The switches are to be fixed in the rails and are vertically adjustable The rails are to be clamped on the profiles at the structure The operator for the control current limit switches are at the side of the cabin If the cabin depth is less than 800 mm the operator is positioned on the counterweight side The control current limit switches will be activated after the floor switches They are additional safety switches which are activated if the floor switches fail op Uonegiala jnoxkeq 6002 11 3682 61 5
10. h is positioned on closing and the function of the switch need to be checked top of the cabin Car door switch Lattice gate switch Drop bar Cabin light The drop bar is pre installed and pre adjusted During the installation of the drop bar the proper closing and The lamp is mechanically pre installed For wiring please see the wiring diagrams the function of the switch needs to be checked The drop bar switch is positioned at the outside of the cabin behind the opening of the drop bar in closed position Drop bar switch Drop bar in closed position On the cabin the ropes are then to be led through the rope anchorages and be fixed with rope clamps The top structure part with the drive machine is pre installed The advised torques of the bolted connection NV need to be checked The pulley supporter is to be installed in between the 2 crossbeams 3 Rope rocker gigia Pulley supporter D d a Di The machine room floor is to be fixed to the crossbeam and the pulley supporter The needed clamp plates are pre installed on the machine room floor These pictures show the machine room floor on a lift type with cabin roller shutter IE ca me un di ELI DI 220 rev Cota uu dudus ee III ISO a esa z Ye inn TERILI n i EEE 20 ma RE aaa a ar ci Po y n ao ee ico ia Mi Tan RA a mo
11. ixing of the spacers wall anchor and foot bracket The screws must not be loaded on strain 13 The safety bar yellovv is to be fixed on the structure vvith the chain On all vvorks in the shaft the safety bar must be put in the structure betvveen 5 to 25 mm next to the guide rail at a minimum height of 1 6 m for blocking the cabin and the counterweight Special features on different constructions Rear guard plates optional The rear guard plates are to be screwed together with the structure straps on the opposite side of the landing doors On through car lift cabins they prevent that the goods projecting the shaft structure The rear guard plates need to be installed at the same time as the the structure straps When installing the rear guard plates retrospectively the stucture straps must be removed from the rear guard plates Rear guard plates Rear guard plates Counterweight side 14 Structure Cabin 15 Baffle plates optional The cabin is pre installed It needs to be inserted with a suitable hoist into the guide rails The cabin guide shoes can be adjusted inside the holding brackets with the M 10 screws The retiring cam for opening the The baffle plates optional are to be installed on the structure to the full travel height As a support 2 landing doors is positioned on the installation side brackets are bent so the baffle plates can be hooked on the structure straps Then the baffle plates a
12. ngles The drive machine needs to be in front position the motor in back position The ropes are to be led from the machine supporter on the cabin then under the pulley and back to the machine supporter The ropes are to be led through the rope anchorages on the machine supporter and fixed vvith rope clamps Please ensure that the rope rocker is in a horizontal position because the slack rope switch must not be activated by the svvitch cam Motor behind Rope rocker Drum front The pulley supporter is to be screwed together with the crossbeam The aluminium rings 2 30 mm x 20 mm are serving as spacers between the pulley supporter and the crossbeam The drive machine is to be screwed together with the machine supporter Pulley supporter i f 1 1 i TL 14 bal Ar 4 bi d 29 28 Drive machine machine supporter and divertor unit The ropes are to be held on the top over both pulleys to the cabin On the cabin they are to be led through the rope anchorages and fixed with rope clamps Please ensure that the rope rocker is in a horizontal position because the slack rope switch must not be activated by the switch cam The rope rocker must be in a horizontal position Under the rope drum is a contact plate If the rope is unwinding itself from the rope drum and touching this plate the lift will stop immediately For wiring please see the wiring diagrams Con
13. nstallation manudi for SKG service lifts Preliminary remarks The existing shaft dimensions need to be checked for conformity with the layout drawings In case of deviations please make a technical clearification with us before the installation process The installation must be made in compliance with the relevant safety standards Don t stand underneath the unsecured cabin Danger of life This installation manual is a recommendation based on our experience it is not a working instruction Please take the installation details from our layout drawings Front side which is side X on the layout drawings always means the side on which the machine room door is positioned Please install along the described order in this manual Deviations to these photos are always possible due to technical variations Table of contents 3 Installation order 4 5 View example 6 7 iccessories 8 14 Structure 22 29 33 35 Electrical components The controller is delivered in a separate box Next to this installation manual you will also find in the box Wiring diagrams Capacity signs Operation manual Layout drawings All bolted connections need to be fastened with the torques as mentioned in the table strength class 8 8 Fastening torques of 5 Nm all screws 7 1 Nm 12 Nm 30 Nm 60 Nm 105 Nm Exception the round head screws M 8 need to be fastened to 25 Nm Drive machine machine supporter and dive
14. re screwed with the drilling bolts 4 2 x 16 onto the structure straps Baffle plate sheet Cam for opening the landing doors Safety gear optional On lifts with safety gear the guide rails are made of blank steel On this construction the alignment sheets are not applicable There is no need for the balance weight A govenor tension weight will be installed instead Cam for the floor switches Guide rails made of blank steel Cam for opening the landing doors Only on lifts with more than 2 stops a holding metal sheet with adjustable magnets is used The holding metal sheet with the magnets replaces the floor switch cam Shaft partition wall optional A shaft partition wall needs to be installed if 2 lift units are sharing a common shaft Only then a shaft partition wall is delivered with the lift You can see on the layout drawings to which lift unit the shaft partition wall has been packed 16 Cabin The cabin apron is to be fixed with the round head screws to the lower cabin stripe not applicable on cabin door Cabin stripe Cabin apron The trainling cable fixing is to be installed center the cabin and then to be fixed with clamp plates to the stripes at the side Trailing cable fixing Trailing cable A trailing cable is applicable only if safety switches or electrical retiring cams EMT14 or 15 are installed on the cabin Please see wiring diagrams 17
15. re installed on the structure parts i Guide rails Structure part i n nterweight si Structure diagonal on cou s eight side long Structure diagonal short Bottom structure part red painted 9 Top part of structure Please consider that the cabin needs to be inserted in the gulde rails VVe recommend to insert the cabin on installation side with a suitable hoist after the installation of the first structure parts Please make sure that the structure parts with the elongated hole row U profile is mounted on the counterweight side In the following the structure side with the U profile is called counterweight side The structure side with the L profile is called installation side Installation side L profile Counterweight side U profile with elongated hole row Cable conduit Structure part on counterweight side Please adjust the support points before positioning the bottom red painted structure parts The difference in height is to be adjusted by balance plates sl Metal plate Structure bracket Locking plate n Guide rail p 10 Structure The structure straps are to be screwed together with the structure parts as shown on the photos Counterweight side Installation side The safety bars are to be installed with 2 pieces M 6 screws on the bottom structure part guide rails This kind of s
16. rtor unit Installation order 3 10 Il 12 13 14 Installation of the bottom structure part Installation of the safety bar Inserting the cabin Inserting the counterweight Installation of the other structure parts Installation of the machine supporter Installation of the drive machine Inserting the suspension elements Installation of the landing doors Installation of the controller Installation of the shaft electrics Check of overran Pat lift in operation Security related final check ion side Ea Installat Counterweight side View example 2 5 Main switch Drive machine Double hinged machine room door Pulley supporter Protective grid on sheave Structure strap Machine room lightning Top part of structure Ropes Push button element Guide rail Bi parting door Structure strap Structure strap Structure diagonal Safety bolt on weight Electrical bridge Cabin Structure strap Counterweight with weight inserts Emergency stop switch Push button element Trailing cable Safety bar Guide rail Bi parting door Bottom structure part Structure strap To O O O o s 5 5 Hexagon bolts M 10x30 Contact washers A 10 2 Hexagon bolts M 10 for machine supporter and drive machine Foot brackets for structure fixing to ground Wall anchors 90 folded 85 x 55 x
17. s lightning overload reached The potentiometer screw can be turned several times until a soft fence Check if the overload device stops the lift unit with a load of 75 kg Note By turning the potentiometer screw clockwise the overload device reacts on small weights The type signs must be visible afterwards 30 Doors Bi parting doors The landing doors are to be clamped with the structure straps in the structure in the relevant heights resp screwed together with the structure The emergency release holes are in the door frames on the installation side The are covered with plastic cover The door locks are to be screwed together with the door frame on the back sides of the doors The counter parts of the door locks are to be screwed together with the door leafs The door locks are delivered in a separate box The landing doors may just open when the cabin is in the corresponding floor The landing door must be adjusted in that way so the door contact can not open when the landing door is closed and locked Otherwise flattering contacts can effect the damage or misfunction of the controller Checking the electrical door contact 1 Parking the cabin between the floor 2 Close the landing door Try to open the upper door leaf the leaf can move approx 1 2 mm 4 The indication in the push button board must not change door contact must not open On the AS controller the X must not appear On the relay controller the occupie
18. tact plate SKT1 Drum below 2 1 The pulley supporter is to be screwed together with the crossbeam The aluminium rings 30 mm x 20 mm are serving as spacers between the pulley supporter and the crossbeam The drive machine with the drum is to be screwed together with the machine supporter The ropes are to be led upwards over both pulleys of the pulley supporter to the pulley on the cabin From there the ropes are to be led to the rope rockeron the pulley supporter and are to be fixed with rope anchorages The cover for the machine room is to be layed on the L profiles and fixed with the clamp platess Under the rope drum is a contact plate If the rope is unwinding itself from the rope drum and touching this plate the lift will stop immediately For wiring please see the wiring diagrams bro O O i da S oe d un Contact plate SKT1 Option overload The overload device consists of a stretch measuring instrument DMS and the measurement amplifier The measurement amplifier is installed in a cable box The cable box is to be clamped vertically on the structure The DMS is to be screwed on the described fixing points The connection cables of DMS and measurement amplifier are soldered up Adjustment the operable lift unit is to be loadad with 25 kg The potentiometer screw in blue cuboid on the measurement amplifier needs to be turned clockwise slowly until the red diode next to the black cuboid stop
19. tch and the machine room lightning is to be fixed on a proper position on the corner profiles also Nut stone Main switch Controller The emergency stop button is to be fixed on the corner profiles in a good reachable position It needs to be installed to the structure in the height of the lower landing door For reaching the emergency stop button you must not grab over energized components 34 Electrical components The floor switches are to be fixed inside the corresponding rails and can be adjusted vertically The rails are to be clamped on the profiles on the shaft structure For a flush stopping of the cabin in the floor please adjust the floor switches accordingly The switches are activated by the operators on the cabin so they need to be installed in alignment On the photo mechanical operated floor switches are shown On lifts with more than two stops magnet switches are set The procedure is the same Floor switch The electrical components on the cabin are pre installed Just the trailing cable has to be installed The trailing cable is to be led through the conduit at the side of the cabin on the counterweight side and then clamped on the fixing underneath the cabin Let the trailing cable run in the cable conduit in the upper third of the structure The length needs to be adjusted to prevent that the cable is dragging on the shaft floor when the cabin is in the lower floor j TEL a i A
Download Pdf Manuals
Related Search
Related Contents
Technaxx Imago 2014 Nissan 370Z mouse controller combo TYLT Energi 3K Copyright © All rights reserved.
Failed to retrieve file