Home
User Manual - SmokerStore
Contents
1. 5 5 un a O Taifun GT II User Manual english IMPORTANT Please read these instructions carefully before using your Taifun GT II rebuildable tank atomizer Thank you for purchasing a Taifun GT II With this product you have purchased a high guality rebuildable tank atomizer which has been designed exclusively for use with e liguid Before use it is necessary to install a coil of resistance wire e g NiCr wire and a suitable wick e g cotton silicate fiber according to the instructions of this manual Furthermore it is reguired to fill the atomizer with e liguid after coil setup If you are having trouble making a suitable coil or if you have no previous experience with rebuildable atomizers please contact your supplier or www smokerstore de After the attachment of a new coil the resistance should be measured To do this use a multimeter or a suitable battery device with resistance measurement If a short circuit is detected the atomizer must never be put into operation Short circuits can cause damage to the battery device and or batteries In this case please correct the coil or make a new coil Taifun GT II User Manual english IMPORTANT Please use only liguids which explicitly are intended for use in e cigarettes The Taifun GT II is made of high guality materials and has been thoroughly cleaned prior to delivery Cleaning before use is not necessary Any visible residues are clean water and gly
2. A13 is applied held there by the o ring A16 slots to the top of the base A1 Then the air slots are positioned above the air holes Pic 13 Now you can screw the chamber Pic 14 Unit A is now ready cap A12 to the chamber sleeve A11 Taifun GT II User Manual english Assembly of unit B f B2 x T B1 B2 Pic 17 The o ring B2 is inserted into the Pic 18 The o ring B2 should be as Pic 19 Now the tank insert B3 is pushed into Pic 20 The tank insert B3 can be tank cover B1 and ensures a good fit closely as possible in the recess the tank cover B1 pushed only from one side to the tank here later for the tank cover B1 gt wa X Pic 21 The o rings B4 B6 are attached Pic 22 It is important to make sure that Pic 23 Above the thread there is a fine groove Pic 24 The tank Insert B3 is fixed by on the topcap B5 the o ring B6 is not pulled over the in which the O Ring B6 is attached screwing the tank cover B1 with the threads of the topcap B5 topcap B5 t T m ai v 87 L i pi A 1 At ori y an t 1 B8 B9 Pic 25 Unit B is now ready Pic 26 The two units A and B will now be Pic 27 Finally the drip tip B7 with the two o Pic 28 The Taifun GT II is now fully screwed together The chimney in the rings B8 B9 is attached assembled topcap B5 seals the chamber cap A12 IMPORTANT It is recommended that you wet t
3. chamber the evaporator chamber the winding winding Pic 13 Now adjust the cotton so that Pic 14 The cotton wool now fills the Pic 15 The chamber sleeve is then pulled Pic 16 When placing the chamber cap liquid can be well received evaporator chamber well and evenly gently until it locks into place make sure that the channels remain open enough Taifun GT II User Manual VARIANT B Pic 18 The cotton is wetted with liguid Pic 17 The cotton is passed through the openings of the evaporator chamber to the and shortened laterally so that approx 0 5 gently until it locks into place outside 1 mm gets outside the evaporation chamber VARIANT C a Pic 21 The cotton should be positioned in a s shape inside the evaporator chamber Pic 22 Then the cotton is wetted with liquid gently until it locks into place VARIANT D 4 Pic 27 Using a winding tool e g a paper clip the winding is aligned Pic 25 A winding with silicate fiber e g 3mm is also possible Pic 26 In this example the fiber is taken twice and wrapped with 32 gauge NiCr wire I A AL a Pic 30 The chamber sleeve is then pulled Pic 31 Overhanging fibers are cut off on gently until it locks into place both sides Pic 29 The wireends are cut flush as possible Pic 19 The chamber sleeve is then pulled Pic 23 The chamber sleeve is then pulled english Pic 20 The cham
4. A4 17x1 5 mm o ring B4 4x1 mm o ring A5 17x1 mm o ring B5 Topcap A6 Spring B6 19x1 mm o ring A7 Countersunk screw M2 x 8mm B7 Drip tip A8 Screw M2x14mm minus B8 5x1 5 mm o ring A9 Screw M2x20mm plus B9 5x1 5 mm o ring A10 AFC Ring A11 Chamber sleeve A12 Chamber cap A13 11x1 mm o ring Taifun GT II User Manual english Assembly of unit A a nunununununu p A6 A7 A5 Pic 1 The PTFE seal A2 is inserted into Pic 2 The o rings A3 A4 and A5 willbe Pic 3 The base A1 should look like this Pic 4 First the spring A6 and then the the base A1 to reduce the air flow attached on the base A1 whenallo rings A3 A4 and A5 are countersunk screw A7 are inserted into This step is optional properly seated the 510 connection Pic 5 The countersunk screw A7 is Pic 6 Use a small screwdriver to adjust Pic 7 The two screws for the negative Pic 8 You should now easily tighten the tightened and forms the positive pole the countersunk screw A7 positive pole pole A8 and the positive pole A9 can be screws A8 A9 with your fingers so that inserted in the appropriate tubes in the they cannot fall out base A1 Pic 9 The AFC ring A10 is now pushed Pic 10 It is important to make sure that Pic 11 Now the chamber sleeve A11 is Pic 12 On the chamber cap A12 an o onto the bottom of the base A1 It will be the AFC ring A10 is inserted with the air placed on top of the base A1 ring
5. ber cap is screwed on Please make sure that the cotton is not cut off Pic 24 After screwing the cap the liguid openings should be covered by the cotton on both sides Pic 28 After tightening the wires the winding tool can be removed and the winding can be corrected again if necessary Pic 32 The fibers should reach approximately 0 5 1 mm out of the sleeve Taifun GT II User Manual english SmokerStore GmbH www smokerstore de
6. cerine used for pretreatment of o rings If you want to clean the atomizer after longer use a short rinse of all parts under warm water is sufficient Please thoroughly dry all parts before assembling the atomizer again We also recommend that prior to assembly you moisten the o rings with a little liguid or glycerine This increases the durability of the o rings and simplifies the assembly If an o ring or an insulator is damaged please replace it The necessary spare parts are partially included in delivery and can be reordered via your supplier or www smokerstore de Taifun GT II User Manual english Scope of delivery Taifun GT II 1 x Rebuildable Atomizer Taifun GT II 1 x Certificate of authenticity 1 x Drip tip GT II 1 x Sealing rings spare parts 1 x PTFE tubes air channel reduction 1 x Gift box Specifications Diameter 23mm Length without drip tip 57 4 mm Weight approx 97 g Capacity approx 5ml Material Stainless steel 1 4301 Borosilicate glass PTFE Polytetrafluorethylen Taifun GT II User Manual Attaching a coil english On the base there are two screws used to fasten the coil positive and negative pole The coil should be mounted centrally above the air outlet Please make sure the coil doesn t touch the surrounding metal parts e g chamber sleeve to prevent a short circuit The wick is guided through the coil and placed either in front of the openings of the chamber sl
7. eeve or 0 5 1 mm passed through the opening See also coil examples The chamber sleeve is inserted into the base The already mounted chamber sleeve is designed for standard coils In the optional LC W 3 2 sleeve the liquid channels are milled out wider and allow the use of a wider wick as well as a stronger liquid flow To change it just pull the chamber sleeve out of the chamber with a slight twist When attaching the coil you may a remove the chamber sleeve by pulling it out with a slight twist to prevent any damage to the base o ring or b lower the chamber sleeve into the base After attaching the coil the chamber sleeve must be carefully pulled up again until it clicks into place or lowered into the base Taifun GT II User Manual english Liguid control The chamber cap is screwed with 1 2 turns on the chamber sleeve When screwing it on is advisable to hold the chamber sleeve to prevent turning Otherwise the attached coil could move The o ring in the chamber cap seals the chamber By further screwing the chamber cap on the chamber sleeve the opening of the liquid channel will be reduced even more The correct position depends on the individual setting of the mounted coil and the wick material Tip after attaching a new coil you should turn the chamber cap as far as possible so that only a small opening is present If necessary this opening can be gradually increased later Example Liquid control
8. he o rings with liquid while assembling the Taifun GT II This allows for easier assembly of individual parts Taifun GT II User Manual english The wire sizes and materials mentioned here are only examples Other heating wires different number of turns as well as larger smaller diameter may be used Coil examples i A A i Pic 1 Make six turns with a 28 gauge NiCr Pic 2 Before attaching the coil the Pic 3 Attach the wire as centrally as Pic 4 The wire is placed under the screws wire on a winding tool with a diameter of evaporator chamber is lowered by slight possible between the two poles The wire These are then tightened carefully 2 5 mm pressure into the base and snaps there ends should be at the bottom noticeably AE 4 VS N Pic 5 Align the winding with the winding Pic 6 The wires now shorten both sides Pic 7 It is important to make sure that the Pic 8 The coil should now be exactly in the tool Then remove the winding tool with a pliers or other suitable tool ends of the wires are not touching the middle and floating around 1 1 5mm over chamber sleeve the air hole VARIANT A je 7 1 f Is r LL st Pic 9 Now you need an about 2 4 mm Pic 10 You may reduce the cotton so that Pic 11 Spread the cotton inside the Pic 12 Wet the cotton well before closing wide cotton strip which is passed through it fits tightly but can still move in the evaporator
9. maximally opened LLL 752257 277277 e k nr J a es m 2 4 Example Liquid control closed maximum Taifun GT II User Manual Airflow control english The adjustment of the airflow is supplied via the AFC ring located on the underside of the base and has two differently sized slots There are ten air holes under the AFC ring in total five on each side While on the one side the holes 1 3 5 7 and 9 are located the holes 2 4 6 8 and 10 are placed on the opposite side Through the slots in the AFC ring you can now alternately open or close another hole on each side You have the option either to adjust the air passage between one and ten open air holes Example An average airflow with 6 holes opened Three on the front and three on the back not visible in the picture Or three on the front and two on the back or one on the back and two in the front You may also centrally open all 10 holes on both sides Taifun GT II User Manual english Reducing the air channel The diameter of the air hole in the evaporator chamber is 3 mm and allows an extremely light draw at maximum open airflow control During intense pre fire or a wrong draw technigue it can theoretically happen that e liguid will drop into the air hole The opening of the air channel can be reduced to 2 mm with a sleeve made of PTFE included As a result the airflow is slightly lower and you get a small
10. p must be screwed on again lt is important to ensure that both o rings the one in the tank cover as well as the o ring of the top cap sits correct and seals the tank Note The two o rings have different sizes 19 20mm Please note the correct placement of the o rings see also assembly To use the XS tank set sold separately the standard tank has to be unscrewed and the XS tank has to be screwed on It is important to make sure that the top cap of the XS set is used because this one includes a shorter air channel For individualization various optional parts are available From left to right glass tank standard stainless steel tank standard double window tank cover standard tank cover XS tank cover stainless steel tank XS glass tank XS A matching drip tip is included Alternatively any standard 7 drip tip can be used Note The displayed Drip Tips are for illustration only and not included Taifun GT II User Manual english Adjusting the positive pole On some devices it may be necessary to adjust the positive pole of the Taifun GT II to match the pole of the device For this purpose the screw has to be screwed 1 or 2 turns with a suitable screwdriver Taifun GT II User Manual english Parts Unit A Unit B Base and evaporation chamber Tank and topcap A1 Base B1 Tank cover A2 3x 0 5 x 9mm PTFE sleeve air channel reduction B2 20x1 mm o ring A3 11x1 mm o ring B3 Glass insert
11. width of the air flow causing intensification of flavor The sleeve should be completely inserted into the air channel to prevent it from contact with the coil However it must be ensured that the PTFE sleeve remains as flush as possible with the channel and will not be pushed too far into it Note It is also possible to split the sleeve in half The second piece can be used as a spare part should the first half eventually be worn To remove the PTFE sleeve a small screwdriver or a bent paper clip is suitable Taifun GT II User Manual Filling the tank english The tank of the Taifun GT II consists of the tank cover tank insert made of borosilicate glass optional stainless steel and a top cap with the air channel and a drip tip connection When filling the tank the tank must be upside down The liguid can now be poured into the tank It is important to ensure that the liguid is filled to maximum at the level of the sealing ring Otherwise if the atomizer is screwed together liguid will be pressed into the evaporator chamber In case of overfilling the liguid passes into the air channel When screwing the tank back onto the base you should continue to keep the tank upside down Taifun GT II User Manual english Changing the tank To change the tank insert the top cap has to be removed from the tank cover The tank insert can now be removed and replaced After replacing the tank insert the top ca
Download Pdf Manuals
Related Search
Related Contents
Painéis Isolados a gás SF6 até 40.5 kV Baixe - Pioneer Brodit ProClip 213482 PRIMEPOWER HPC2500 取扱説明書 Istruzioni per l`uso Quick Reference Card Adora TE Umschlagf Copyright © All rights reserved.
Failed to retrieve file