Home

Gibraltar Mailboxes LVP000B01 Installation Guide

image

Contents

1. INSTALLATION INSTRUC For Mailbox Model VP Post Installation 1 Dig hole approximately 20 deep and 9 in diameter 2 Place the 4X4 post 18 24 in the ground Fill with concrete follow manufacturer s instructions for mixing Level and allow concrete to cure NOTE length of post above the ground should be between 48 to 54 3 Slide the post base section over the 4x4 post 4 Slide the top post section over the 4x4 post until if fits flush on the post base section HARDWARE INCLUDED 72 TREATED 4X4 PQST ACOA 8 10 O 8 10 24 HEX NUT 4 10 WASHER 24 SCREW 48 54 ABOVE GROUND 18 24 IN GROUND PAN HEAD SCREW 4 10 24 x 1 HEX HEAD SCREW io Ann FF rs INCHES BILL OF MATERIALS F ANY PRINT OF THIS PART OR PRODUCT PRIOR TO REVISION DATE 2 o 2 tU mof ome ov THE INFORMATION CONTAINED OR REFERRED TO IN THIS DRAWING IS CONFIDENTIAL AND IS THE PROPERTY OF THE SOLAR GROUP es GROUND LEVEL DRAWING NA TIONS Warning check for underground cables or pipes before digging Tools Supplies Needed 12 treated 4X4 post post hole digger concrete recommended phillips head screwdriver flat head screwdriver B open end wrench evel V v v MC0877 MATL HALF SHEET 5 9x8 5 COLOR S N A REQD PER EACH VP INSTRUCTION SHEET C OF 2 SOLA GROUP inc A GIBRALTAR COMPANY 1 15 07

Download Pdf Manuals

image

Related Search

Related Contents

  User Manual and Documentation Accessory Box Contents Start Here  Cable Company LC/LC, 10m  

Copyright © All rights reserved.
Failed to retrieve file