Home

Three D Traffic Works 527625RT Installation Guide

image

Contents

1. Innovative Traffic Safety Products INSTALLATION PROCEDURES FOR 1TD5200 SERIES BOOMERANG SURFACE MOUNT DELINEATORS USING FIXED BASE BOLT DOWN ANCHOR To assemble post or sign on base 1 Mount post over riser on base and insert two 2 hex bolts 4 20 x 2 12 through the post Attach a washer and Nyloc nut to each bolt and tighten using 7 16 socket to snug bolts If sign or vertical panel is attached to post the post must be removed from base prior to the Boomerang reboundable base with fixed base plate being anchored to the surface Please note the following prior to installation 1 Pavement surface should be clean and dry prior to installation Make sure all dirt dust even fine dust rocks and or gravel have been cleared from the surface For best results after sweeping use compressed air to blow any fine particles from the surface The bottom of the base should also be clean of any dust prior to installation Units are to be spaced evenly according to specifications required by the instructions or manuals for each individual user contractor city state or federal agency Bases manufactured by Three D Traffic Works Inc do not require flame treating To install unit assembled 1 Ao o Our recommended anchor for each unit consists of 4 each of the following VY X 3 plastic or steel anchor 2 X 3 12 Lag Screw Metal Washer Place Boomerang flexible base into bolt down plate assembly o
2. n surface and align the desired position direction you want the post sign to face Using the base plate as a template mark the four 4 holes to establish the pattern for drilling Drill four 4 holes 3 deep using a 2 bit Clean holes Using a small hammer gently tap the anchors into the holes Place base over the embedded anchors and check for proper alignment Put washer onto the lag screw Start lag screw through base hole into the anchor Use 3 4 wrench to tighten lag screw into base After securing base to surface place post or post with attached sign panel onto the Boomerang reboundable base check for proper alignment and tighten the two 2 hex bolts 1 20 x 2 12 through the post and base riser using a 7 16 socket to snug bolts 430 North Varney Street Burbank CA 91502 877 843 9757 Fax 818 841 5096 www trafficwks com

Download Pdf Manuals

image

Related Search

Related Contents

Dicas - Como cuidar de suas roupas  Senseo Senseo HD7862    Asrock 775DUAL-915GL  Manual de instalación geoTHERM Manual de Instalación  DMW-CGL1 - Panasonic  English  A comme association n°22  VX30 ENCODER V.2  

Copyright © All rights reserved.
Failed to retrieve file