Home

The Forever Cap FACLK530 Installation Guide

image

Contents

1. Step One The existing chimney must be clean and free of debris The internal and external condition must be checked for safety and repaired if necessary The chimney shall terminate above the roof line as per NFPA 211 Step Two Tie one rope to each end of a guide cone Run the guide cone up and down the chimney to clear obstructions and to prove that the necessary diameter liner will pass through the chimneys flue opening Step Three Sweep the flue of the chimney to clear debris and contaminates Step Four At the base of the chimney where the heating appliance vent connector will attach to the tee of the lining system remove sufficient amount of brick and mortar to allow access for the installation of the tee s snout Step Five Separate the tee from its snout Attach the tee to the liner with the provided fasteners Drop or pull the liner with the attach tee through the chimney until the tee rests in the base of the chimney where the brick and mortar was removed Re attach the snout and place the end cap on the bottom of the tee with provided fasters Re attach the pipe connecting the heating appliance to the tee s snout Step Six Seal the area around the tee where the brick and mortar was removed using a furnace cement product Seal all joints of the where the snout of the tee connects to the pipes which connects to the heating appliance with a high temp silicone product Step Seven Slide the top plate over the liner and place on t
2. appliance tee HF size RT onto the HF size TOT using tex screws or rivets Install the snouts of both tees as stated in steps five and six B Direct access venting cut a hole directly into the Flex All liner using an appropriate size hole saw with a pilot drill bit and power drill Remove the cutout portion of the liner To attach the liner to the appliance use UTS size tee snout Feed the UTS size draw band around the liner and into the turn buckle Tighten the draw band Apply a bead of high temp RTV silicone between the UTS size and the liner Seal the area around the liner and snout as stated in step six
3. he clay tile and center Mark the outline of the clay tile on the underside of the top plate Remove the top plate and trim to the size as marked Trim the liner so that approximately 4 liner extends above the clay tile Place a wide bead of high temp silicone around the entire top surface of the clay tile Slide the top plate over the liner and onto the silicone holding firmly in place to create a good seal Using four 4 fasteners provided screw the fasteners thru the 2 collar of the top plate and into the liner Do not over tighten the fasteners Step Eight Apply a bead of high temp silicone to the inside of the top section of liner and to the lower section of the rain cap Place the rain cap into the top section of liner and push down until the stop bead of the rain cap meets the liner Remove any excess silicone Step Nine Connect the heating appliance vent connector to the lining tee system as per local code and appliance manufacturer s written instructions Note Two pieces of Flex All liner may be joined together using the proper flex connector HF size SLV and the supplied rivets The joints must than be sealed with high temp silicone Note When additional gas or oil appliances needs to be vented into the Flex All liner the following methods are acceptable and will not void the warranty A Using a second tee with the correct size takeoff HF size TOT Install the HF size TOT tee onto the Flex All liner then connect the

Download Pdf Manuals

image

Related Search

Related Contents

LD620D Unified Label Utility-II Manual Technical  NI Vision Builder for Automated Inspection Tutorial  5010 Enterococcus sp  PARA USO DEL PERSONAL  Panamax MAX 5300 User's Manual  Nikon Camcorder D2H User's Manual    らくらくマウスⅡWireless(ワイヤレス)取扱説明書  80 Series V  Lire le dossier  

Copyright © All rights reserved.
Failed to retrieve file