Home

Speakman SB-1031 Instructions / Assembly

image

Contents

1. Instructions for Models SB 103 1 SB 1031 BN SB 103 1 PN Need Help For additional assistance or service call SPEAKMAN Company 400 Anchor Mill Road New Castle DE 19720 PHONE 800 537 2107 EMAIL customerservice speakmancompany com WEB www speakmancompany com 92 3336 R What You Need To Know Tools Required rench Pliers Screwdriver Bevo eta Groove Joint Phillips Teflon Tape Helpful Supply Lines Basin Wrench ey i Utility Knife What You Need To Know Important Notes Be sure to read instructions thoroughly before beginning installation Do not overtighten any connections or damage may occur This faucet has an operating range of 20 80 psi Safety Tips Cover your drain to prevent loss of parts Be sure to wear eye protection while cutting pipe Maintenance Your new Roman Tub Faucet is designed for years of trouble free performance Keep it looking new by cleaning it periodically with a soft cloth Avoid abrasive cleaners steel wool and harsh chemicals as these will dull the finish and void your warranty Drill holes in finished deck per diagram Note This system is intended for installations up to 2 thick I From underneath the deck insert valve body with rubber washer 1 metal washer 2 and mounting nut 3 through holes on the right COLD side From above thread flange 4 onto valve stem Tighten mounting nut 3 so that the flange 4 s
2. its flush to the surface of working area Repeat for left HOT side Note HOT side end valve is labeled 4 lt 2 Thread Handle Assembly 1 onto Flange 2 Place spout assembly 1 thru mounting hole in deck Secure spout with rubber washer 2 metal washer 3 and nut 4 Tighten nut A securely with wrench Insert Tube 1 onto spout shank 2 until it is completely seated Place clip 3 thru slots 4 Connect water supply lines to faucet inlets 2 NOTE Supply lines are not included Connect the flexible water supply hose 1 included to the bottom of valve bodies 2 as shown Align Ttube 3 to a position which will allow maximum clearance to connect hoses Carefully bend hoses to fit available space Thread the hose couplings to the sides of the Ttube 3 IMPORTANT After installation is completed turn on water supply and allow both hot and cold water to run for at least one minute each T e 0 X 0000 l 9 1 RPGO4 0397 PC BN PN 2 RPGO5 0889 HOT VALVE 3 RPGO5 0890 COLD VALVE 4 RPG45 0047 5 RPG63 0085 381 00 584 20mm wwo0 292Z ubS OL 238 14mm 7 7 195 49mm wwe 1 L94 seo 8 00 16 00 203 20 406 40mm 2 15 54 50mm WLU86 64 26 XV 1 2 14NPSM 2A

Download Pdf Manuals

image

Related Search

Related Contents

Hills FD51038 Use and Care Manual  Sunfire Classic Vacuum Tube Preamplifier Stereo Amplifier User Manual  Magnetic - inductive flowmeter type PEM  Manual - Goldair  n°30 : décembre 2012 - Ville de Gevrey  Page 1 Page 2 MCB シ リ ーズ この度、 MCBの新モデ丿~を発売 西原  KK-DH23-10取扱説明書(PDF:1620KB)    Datasheet - Quadravox, Inc.    

Copyright © All rights reserved.
Failed to retrieve file