Home
DreamLine DL-6120C-01CL Installation Guide
Contents
1. Symmetrical Model Asymmetrical Model Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Doors amp Tub Doors please visit www BathAuthority com Preparation After opening all boxes and packages read this introduction carefully Check that all of the needed parts are included in the package by marking all the components on the Detailed Diagram of Shower Door Components Examine boxes and packages for shipping damage If the unit has been damaged has a finishing defect or is missing parts please contact our customer support department within 5 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for c
2. 11 H _12 10 9 8 k i lg haj puomi min 5 1 2 we 7 i 13 4 ae J 3 joann x ty 5 i yi fe 6 14 U 4 s j A 2 7 415 ae fi 16 A2 17 18 19 Kij Packing List 01 Wall profile 2pcs 11 Middle hinge 4pcs 02 Glass profile 2pcs 12 Roller hinge top amp bottom 2sets 03 Guide rail 2pcs 13 Hinge top amp bottom 2sets 04 Glass door A A2 2pcs 14 Seal strip pre installed on part 3 2pcs 05 Glass door B B2 2pcs 15 Side anti water strip 2pcs 06 Wall anchor 8pcs 16 Roller stopper Apcs 07 Round head screw ST4 2x10 4pcs 17 Handle 2sets 08 Big flat head screw ST4 2x12 8pcs 18 Hex wrench 3mm 4mm lset 09 Big flat head screw ST4 2x40 16pcs 19 Magnetic strip 2pcs 10 Decorative cover 4sets NOTE Unpack your unit carefully and inspect it Lay it out and identify all parts using parts diagram and part list in your manual as a reference Before discarding the carton check for small hardware bags that tend to fall to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement NOTE Retain these installation instructions for future reference BUTTERFLY Rev 3 Ver 3 03 2014 Shower Door Assembly Note There are two separate Butterfly models featuring two different glass variations Please refer to the drawi
3. 1 See Fig 33 for details G H 1 I Fig 33 3 1 2 28 Mark the location for the Shelf brackets 04 according to 3 1 2 the measurements in Fig 28 and Fig 29 1 Drill the holes using 05 16 drill bit and insert the Wall kama anchors 06 3 2 See Fig 34 for details 1 NAS 5 16 s 1 3 Fig 34 Ver 1 Rev 1 20 29 Mount the Shelf brackets 04 to the wall using the Countersunk screws ST4 2x30 07 NOTE the padded set screw of the Glass bracket should be facing down Slide the upper Glass shelf 05 into the upper Shelf brackets and tighten the set screws at the bottom of the brackets Then slide the bottom Glass shelf in place Tighten the set screws on the bottom Shelf brackets as well See Fig 35 and Fig 36 for details Fig 36 Ver 1 Rev 1 21 Product maintenance To insure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface Acrylic cleaning procedure Acrylic should be cleaned with warm water and a clean nonabrasive cloth If desir
4. See Fig 11 for details Fig 11 10 Place the Side panel 01 on a flat piece of plywood or particle board Use a sharp industrial knife and a T square to score along the marked wide ends of the Side panel and continue scoring until you have fully R cut through the panel gt NU NMO N S N 7S GAMA Vhs See Fig 12 and Fig 13 for details AW QQY KINANNRA RR GI X V QQ SON SWW aaa aa a 3 5 55 8ISIODUJ 1 Ver 1 Rev 1 9 11 Take exact measurements of the fixture on the wall e from the 1 one inch line in the corner of the shower to the fixture A B C e from the bottom of the wall of the shower to the fixture E F See Fig 14 for details 1 i RE E L B Fig 14 Ver 1 Rev 1 12 Determine which Side panel 01 will be installed on the side wall with the fixture Mark the fixture location on the Side panel according to the measurements taken in Step 11 See Fig 15 for details 13 Drill the holes for the fixtures in the Side panel 01 using the proper diameter saw bit or a handheld jig saw See Fig 16 for details A D B C Fig 15 Fig 16 Ver 1 Rev 1 11 14 Attach the Center cover 10 1
5. Level base in two directions Fig 5 Mortar Plaster Fig 6 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 14 6 After the bedding material has been poured and before it sets place the shower base into the position with the drain assembly sliding over the PVC waste pipe It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base Ensure that the base is level in all directions You may need to use shims to hold the tray in the level until the bedding settles and supports the tray Remove all extra mortar See Fig 7 for details Fig 7 Waterproof Drywall Waterproof Drywall 7 Allow the bedding material to completely harden before applying weight to the bottom of the shower base Install the cement board or the wallboard above the tile flanges and secure it to the studs Put the tiles or other finishing material over the cement board leaving 1 8 gap between the bottom of the tile and the splash rim of the shower base Use caulk to fill that gap See Fig 8 and Fig 9 for details SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Fig 9 Product
6. P p W Wi 1 D1 D T J Go MODEL SPECIFICATION D in W in D1 in W1 in DLT 1130601 30 x60 30 60 15 12 DLT 1132601 32 x60 32 60 15 12 DLT 1134601 34 x60 34 60 17 12 DLT 1136601 36 x 60 36 60 18 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Right Hand Drain Configuration 3 Ww D1 GR NEJ MODEL SPECIFICATION D in W in D1 in W1 in DLT 1130602 30 x60 30 60 15 12 DLT 1132602 32 x60 32 60 15 12 DLT 1134602 34 x60 34 60 17 12 DLT 1136602 36 x60 36 60 13 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 NEO SHOWER BASE u W C peee i 4 c A A ey W B p A a MODEL SPECIFICATION W in A in B in C in DLT 2036360 36 x36 36 18 5 16 25 12 DLT 2038380 38 x38 38 20 5 16 25 12 DLT 2040400 40 x40 40 225 16 25 14 3 8 DLT 2042420 42 x42 42 24 5 16 25 14 3 8 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W in C in R in DLT 7033330 33433 33 12 21 5 8 DLT 7036360 36 x36 36 12 21 5 8 DLT 7038380 38 x38 38 12 21 5 8 SLIMLINE SHOWER BASE Rev
7. BUTTERFLY Rev 3 Ver 3 03 2014 11 13 Attach the other Glass profile 02 at the right side of the door unit and fasten it to the Guide rails 03 with the Big flat head screw ST4 2 x40 09 See Fig 16 and Fig 18 for details NOTE Make sure that the Seal strip flange on the Glass profile is pointing inside the Shower 14 Secure the right Hinges 13 inside the Guide rails 03 using the Big flat head screw ST4 2x12 08 See Fig 17 and Fig 18 for details BUTTERFLY Rev 3 Ver 3 03 2014 12 15 Attach the Roller stoppers 16 inside the top and the bottom Guide rails 03 with the Big flat head screw ST4 2x12 08 See Fig 19 for details B2 A2 Fig 18 Fig 19 BUTTERFLY Rev 3 Ver 3 03 2014 13 16 The Tub or Shower base should be installed prior to installation The Shower base should be Shower Door Installation installed according to the Shower base installation manual See Fig 20 and 21 for details Fig 20 Fig 21 BUTTERFLY Rev 3 Ver 3 03 2014 14 17 Push the Wall profiles 01 over the Glass profiles 02 on both sides Be sure that the flanges with predrilled holes are pointing in towards the shower See Fig 22 and Fig
8. BUTTERFLY Rev 3 Ver 3 03 2014 16 20 Make final adjustment if required Drill the holes through the first layer into the Wall profiles 01 and the Glass profiles 02 using O 1 8 drill bit Secure the Wall profiles and the Glass profiles with the Round head screws ST4 2x10 07 Use the raised white washer with the screw and attach the Decorative Covers 10 See Fig 27 for details 2 1 8 21 Adjust the Roller hinges 12 to make the door slide smoothly See Fig 28 for details Fig 28 BUTTERFLY Rev 3 Ver 3 03 2014 17 22 Mount the Handles 17 onto the both Glass doors B amp B2 1 05 Cover the screw holes on the Handles with the provided decorative plugs See Fig 29 for details Fig 29 2 23 Open the door and attach Side anti water 1 3 strips 15 to both vertical edges of the Glass doors The strip flange should point away from the shower faucet Attach Magnetic strips 19 to both A B vertical edges of the Glass doors B 8 B2 05 See Fig 30 for details 2 4 B2 A2 B2 Fig 30 BUTTERFLY Rev 3 Ver 3 03 2014 18 24 Apply silicone along the Wall profiles 01 as well as along the bottom Guid
9. DREAMLINE ream in style Butterfly Shower Door Base amp Backwall Kit SHOWER Door SHOWER BASE AND BACKWALLS KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page STEP 1 Install Shower Base Shower Base Installation Instruction STEP 2 Install Shower Backwalls hower Backwalls Installation Instruction STEP 3 Install Shower Door Shower Door Installation Instruction Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Doors amp Tub Doors please visit www BathAuthority com QREAMLINE ream in style BUTTERFLY SHOWER DOOR 8 TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page
10. See Fig 3 for details 4 Determine the position of both Back panels 09 NOTE a The Narrow side 2 3 4 of the Back panel cannot be trimmed and should face the center of the back wall as shown b The Wide side 3 1 8 of the Back panel must be trimmed to the size of the back wall if necessary and should face the corner See Fig 4 for details P Z e d La W Fig 3 By Fig 4 Wo 8 ZU Ver 1 Rev 1 5 Measure the Back Panel 09 Width of the Back Panel has to be less than or l equal to the distance between the center line and the corner line on the back wall in Step 3 i L lt W 2 4 If the width of the Back Panel is greater than aj the distance between the center line and the corner line on the back wall in Step 3 you have to trim the Back Panel to fit your measurement See Fig 5 for details Fig 5 6 Measure from the narrow edge of the by Back panel 09 and place a mark at a ine distance of W 2 that you measured a in Step 3 r From this mark draw a straight line by from top to bottom along the wide L edge of the Back panel 5 See Fig 6 for details Line to cut Fig 6 Ver 1 Rev 1 7 Place the Back Panel 09 onto a flat piece of plywood or particle board Use a sharp industrial knife and a T square to score a
11. R the glass 0 Sq See Fig 9 and Fig 10 for details S Bo B2 A2 2 4 SI Ic SNU B2 B2 A2 Fig 9 BUTTERFLY Rev 3 Ver 3 03 2014 9 Locate the Guide rails 03 and the Glass profile 02 Connect the left end of the Guide rails to the Glass profile using the Big flat head screws ST4 2 x40 09 See Fig 11 for details NOTICE Make sure that the Seal strip flange on the Glass profile is pointing in towards the shower B2 Door assembly 2 An pS 5 A2 Fig 11 BUTTERFLY Rev 3 Ver 3 03 2014 10 Slide the pre installed Door assembly 1 as showing in Fig 5 into the channel of the Guide rails 03 from the right side See Fig 12 and Fig 13 for details Ir 11 Secure the Hinges 13 inside the Guide rails 03 using the Big flat head screw ST4 2x12 08 See Fig 13 for details Fig 12 U X ii Nr z Fig 13 BUTTERFLY Rev 3 Ver 3 03 2014 10 12 Slide the pre installed Door assembly 2 1 3 that showing on Fig 10 into the channel of the Guide rails 03 from the right side See Fig 14 and Fig 15 for details Fig 15
12. vertically Acrylic Back Panel and Side Panel Installation Instruction at the center point along 3 the line from Step 3 and mark the z lt IS drilling holes through the predrilled x holes in the Center cover Drill the holes using 05 16 drill bit and insert the Wall Anchors 06 See Fig 17 for details 05 16 Fig 17 15 Mount the Center cover 10 to the centerline of the 1 back wall using the Countersunk screws ST4 2x30 07 Do not fully tighten the screws at this time leave Ng them loose for further installation Xe See Fig 18 and Fig 19 for details Fig 18 Ver 1 Rev 1 16 Attach the Corner cover 02 to the corner of the shower and mark the drilling holes through the predrilled holes in the Corner cover Move aside the Corner cover Drill the holes using 5 16 drill bit and insert the Wall Anchors 06 See Fig 20 and Fig 21 for details Yo Wp Fig 19 05 16 Fig 20 Ver 1 Rev 1 ATTENTION Installation of all Acrylic panels must be finished before the sealant sets for easy leveling and adjustments 17 Apply the sealant to the entire surface of the reverse side of the Back panel 09 See Fig 22 for de
13. BUTTERFLY Rev 3 Ver 3 03 2014 19 lt QREAMLINE ream in style QWALL 5 2 2 Back Panels SHOWER ACRYLIC WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Back Wall please visit www BathAuthority com Ver 1 Rev 1 Preparation 1 After opening all boxes and packages read this introduction carefully Check that all of the needed parts are included in the package by marking all the components on the Detailed Diagram of Shower Door Components Examine boxes and packages for shipping damage If the unit has been damaged has a finishing defect or has missing parts please contact our customer support department within 5 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of
14. 23 for details Fig 22 B2 A2 Fig 23 BUTTERFLY Rev 3 Ver 3 03 2014 15 18 19 Move the assembled Door unit on the Shower base or the IS Tub and butt the Wall profiles 01 up against the walls Level the Door unit vertically You can adjust position of the Door unit by slightly pulling the Glass profiles 02 out of the Wall profiles See Fig 24 and Fig 25 for details Symmetrical Model Fig 24 Trace the drilling holes on the wall through the predrilled holes in the Wall profile 01 Move the Door unit aside Drill the holes on the wall using 5 16 drill bit and insert the Wall anchors 06 Apply a bead of silicone on the wall along the drilled holes and around the holes Apply a bead of silicone on the shower base along the bottom Guide rail 03 Place the assembled Door unit back to the designated position on the Shower base or the Tub Fasten the Wall profile to the wall with the Big flat head screw ST4 2x40 09 See Fig 26 for details B2 A2 Asymmetrical Model Fig 25 1 4 2 5 l 3 6 5 16 Fig 26
15. is not responsible for code compliance standards for your project 4 Please insure that prior to the installation the installation surface is leveled and solid and will be able to support the total weight of the unit Also make sure the walls are at right angles While some adjustment in leveling of the tray is possible irregular installation surface level or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installation process IMPORTANT NOTE Dimensions provided for reference only You must measure the actual shower tray sizes before installation Allowed tolerance for center of the drain is 1 2 Tools Required ef SR 8 Tape Measure Pencil Level SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 2 SINGLE THRESHOLD SHOWER BASE Center Drain Configuration es W s W1 D1 A D Z MODEL SPECIFICATION D in W in D1 in W1 in DLT 1132320 32 x32 32 32 16 16 DLT 1136360 36 x36 36 36 15 18 DLT 1136480 36 x48 36 48 15 24 DLT 1130600 30 x60 30 60 15 30 DLT 1132600 32 60 32 60 15 30 DLT 1134600 34 60 34 60 15 30 DLT 1136600 36 x60 36 60 15 30 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Left Hand Drain Configuration
16. maintenance To insure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface To insure long lasting life for your glass shower products wipe them off after each use with a soft cloth Rinse and wipe of the glass using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scoring agent because this may scratch the surface Never use bristle brushes or abrasive sponges To assure a long lasting finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent finish peeling or corrosion After cleaning the shiny finishes rinse thoroughly and wipe dry with soft cloth Clean stainless steel surfaces at least once a week When applying stainless steel cleaner or polish work with not across the grain Never use abrasive sponge or cloth steel wool or wired brushes SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 16 DREAMLINE EXCLUSIVE LIMITED WARRANTY AS OF MAY 6 2013 This warranty extends only to the original owner end user for household use only and is not transferable to a subsequent owner This warranty ex
17. marked line on the wall in Step 7 and push the Side panel against the wall NOTE Make sure the drilled holes on the Side panel are also aligned with the fixtures on the wall See Fig 27 for details 22 Apply sealant to the entire surface of the reverse side of the other Side panel 01 See Fig 26 for details Slide the narrow edge of the other Side panel 01 behind the Corner cover 02 Align trimmed edge of the Side panel from Step 9 with the marked line on the wall in Step 7 and push the Side panel against the wall Align the top of both Side panels and the Back panel before the sealant sets Apply equal pressure to the whole surface of the Acrylic panels from top to bottom See Fig 28 for details Fig 27 N Fig 28 Ver 1 Rev 1 23 Once all panels are aligned fasten tight the Corner cover 02 to secure the Side panels 01 and Back panels 09 Cover the screw holes with the Decorative covers 08 See Fig 29 for details 24 Fasten tight the Center cover 10 to secure the Back panels 09 Cover the screw holes with the Decorative covers 08 See Fig 30 for details Fi
18. panel 2pcs 06 Wall anchor 21pcs 02 Corner cover 2pcs 07 Countersunk screw ST4 2x30 21pcs 03 Decorative edge molding 2pcs 08 Decorative cover 15pcs 04 Shelf bracket 6pcs 09 Back panel 2pcs 05 Glass shelf 2pcs 10 Center cover 1pc NOTE Unpack your unit carefully and inspect it Lay it out and identify all parts using the detailed diagram and packing list in your manual as a reference Before discarding the carton check for small hardware bags that tend to fall to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement NOTE Retain these installation instructions for future reference Ver 1 Rev 1 3 Preparation for Installation of Back Panel 1 Place a mark on the walls at a distance of 1 one inch from the corner and draw a plumb vertical line from top to bottom See Fig 1 for details NOTE Repeat this step for both corners 2 The Shower back wall kit has two Back Panels 09 Measure the back wall of the shower between the vertical lines you marked in Step 1 This distance is marked as W See Fig 2 for details Fig 1 Fig 2 Ver 1 Rev 1 3 Divide the measurement W by two and place a mark in the center of the back wall and from there draw a plumb vertical line from top to bottom This distance is shown as W 2
19. shower seat is not professionally installed on a properly reinforced wall VANITIES AND VESSEL SINKS DreamLine warrants bathroom vanities and vessel sinks to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer STATE LAWS AND THIS WARRANTY Some states provinces do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of special incidental or consequential damages so these limitations and exclusions may not apply to you This warranty gives you specific legal rights You may also have other rights which vary from state province to state province WARRANTY SERVICE The following information will be required for you to file a Warranty claim 1 Your name address and telephone number 2 Product model number 3 Brief description of problem please note that additional information such a photos may be required to fully process your warranty claim 4 Proof of purchase You may submit this information by e mail mail or fax to DreamLine Warranty Service Center 75 Hawk Road Warminster PA 18974 F 1 866 857 3638 T 1 866 731 2244 Warranty bathauthority com REAMLINE dream in style TEL 866 731 2244 FAX 866 227 1533 WWW BATHAUTHORITY COM For more information on DreamLine Shower Doors please visit www BathAuthority com
20. 3 Ver 5 07 2013 DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration W C c AN O w r MODEL SPECIFICATION W in C in DLT 1032320 32 x32 32 12 DLT 1036360 36 x36 36 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Left Hand Drain Configuration MODEL SPECIFICATION D in W in D1 in W1 in DLT 1034481 34 x48 34 48 17 12 DLT 1036481 36 x48 36 48 18 12 DLT 1036601 36 x 60 36 60 18 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Right Hand Drain Configuration w I D1 E MODEL SPECIFICATION D in W in D1 in W1 in DLT 1034482 34 x48 34 48 17 12 DLT 1036482 36 x48 36 48 18 12 DLT 1036602 36 x 60 36 60 18 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Diagram of the Shower Base in a Cross Section Finished Wall Cement board Shower Base o 2 x4 Stud Mortar Plaster Ban Drain 2 PVC Waste Pipe SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 11 Shower Base Installation Preparation 1 Ensure that the floor and the studs are at right angle Provide a 5 x5 opening in the sub floor for the drain The 2 PVC waste pipe should e
21. For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Bases_ please visit www BathAuthority com Preparation 1 Examine boxes and packages for shipping damage Carefully remove Shower base from the packaging and check for any visual defects or shipping damages If the unit has been damaged has a finishing defect or has missing parts please contact our customer support department within 5 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions 2 Install all of the required plumbing and drainage before installing the shower Use a competent and licensed if required by local code plumber for all plumbing installation 3 Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine
22. aired during the warranty period will be covered only for the remaining period of the original warranty In no event will DreamLine be liable for costs of repair or replacement of any installation material including but not limited to tiles marble etc DREAMLINE IS NOT RESPONSIBLE FOR INSTALLATION REMOVAL OR REINSTALLATION COSTS OF ANY PRODUCT REQUIRING WARRANTY SERVICES Any modification or alteration of any DreamLine products will void the warranty DreamLine product installations and repairs must be performed by either a DreamLine authorized agent or a licensed insured and experienced professional contractor installation or repairs performed by any other party shall void the warranty This warranty shall not apply to breakage or damages caused by normal wear and tear fault carelessness abuse misuse misapplication improper maintenance alteration or modification of the unit as well as chemical or natural corrosion accident fire flood act of God or any other casualty Improper care and cleaning will void the warranty Use of cleaners containing abrasive cleansers ammonia bleach acids waxes alcohol solvents or other products not recommended for chrome or similar finish glass or acrylic will void the warranty For additional product maintenance instructions please refer to product installation manual DreamLine is not responsible for any issues arising in connection with errors or omissions in information provided on DreamLine s websites T
23. charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for code compliance standards for your project This acrylic wall system is specially designed to be installed over any solid surface If you are installing the acrylic walls over existing tiles remove all loose tiles before the installation If you are installing over existing painted walls remove any loose paint Please note that some cutting and drilling may be necessary during the installation process Make sure to turn off the water supply remove faucet handles or any fixture trims protruding from the wall Clean the surface removing any soap film and dirt from all wall surfaces using regular household detergent and then wipe dry Tools Required a Tape Drill bit i T Square Caulk Measure Pencil Knife 5 16 q i Caulk ae N Phillips Level Gun Sa Hammer Screwdriver Ver 1 Rev 1 Detailed Diagram of Acrylic Shower Wall Components 2 ts 4 1 2 7 6 F g S9 So 3 62n 4 7 7 a 5 r R 6 10 ri U e 8 4 9 Packing List 01 Side
24. e Middle hinges 11 Mind the position of the Middle hinges on the glass if See Fig 4 and Fig 5 for details Fig 4 ity a Door assembly 1 A U RU aJi Fig 5 BUTTERFLY Rev 3 Ver 3 03 2014 oy 5 Place the other Glass door B2 05 and the other Glass door Z A2 04 on a flat surface The distances from the glass edge to NZ the paired holes on both sides of the Glass door are different b The side of each Glass door where the paired holes are closer to the edge should be facing each other B2 See Fig 6 for details A2 6 Attach the top and the bottom Roller hinges 12 to the left edge of the Glass door B2 05 Mind the position of the Roller hinges on the glass NOP See Fig 7 and Fig 10 for details B2 BUTTERFLY Rev 3 Ver 3 03 2014 r 3 7 Attach the top and the bottom Hinges 13 to the right edge of the Glass door A2 04 Mind the position of the Hinges on the glass R m U A See Fig 8 and Fig 10 for details a TS A2 2 k p A I J Fig 8 8 Connect the Glass door B2 05 to the Glass 1 3 door A2 04 using Middle hinges 11 A Mind the position of the Middle hinges on
25. e rail 03 See Fig 31 for details R L lt L N s gS SL B Be 4 Caulk Fig 31 Product Maintenance To ensure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface To ensure long lasting life for your glass shower products wipe them off after each use with a soft cloth Rinse and wipe off the glass using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scouring agents as this may scratch the surface Never use bristle brushes or abrasive sponges To ensure a long lasting hardware finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent finish peeling or corrosion After cleaning the shiny finishes rinse thoroughly and wipe dry with soft cloth Clean stainless steel surfaces at least once a week When applying stainless steel cleaner or polish work with not against the grain Never use an abrasive sponge or cloth steel wool or wired brushes
26. eamLine warrants shower backwalls and shower cabins to be free from defects in workmanship for a period of one 1 year from initial date of purchase by the owner end user contractor or builder from an authorized dealer SHOWER amp TUB DOORS SHOWER ENCLOSURES DreamLine warrants shower doors tub doors and shower enclosures to be free from defects in workmanship and materials under normal residential use for a period of five 5 years from the initial date of purchase by the owner end user contractor or builder from an authorized dealer Warranty for plastic strips shall be limited to one 1 year Warranty for any part in Oil Rubbed Bronze finish shall be limited to one 1 year SHOWER BASES DreamLine warrants shower bases to be free from defects in workmanship and materials under normal residential use for as long as the original consumer purchaser owns their home in which their product is installed SHOWER COLUMNS DreamLine warrants shower columns to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer SHOWER SEATS DreamLine warrants shower seats to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer Warranty shall be VOID if the
27. ed a mild non abrasive detergent may also be used Use only light pressure when cleaning Avoid rubbing dirt or grit into the surface Turn the cloth often and replace with a clean cloth frequently Dry by blotting gently with a clean dry cloth DO NOT USE Window cleaning sprays alcohol kitchen abrasive compounds or solvents such as acetone gasoline or thinners Do not use ammonia based cleaning solutions on the acrylic as it will eat into the surface and cause it to damage How do you get scratches out of Acrylic For light scratches use a buffing compound such as a car wax Use a buffer or lightly polish the surface by hand until scratches disappear TABLE OF CONTENTS Required Tools Torinstallaton corinds intros heunean Rue tieedatetstics Page 2 Detailed Diagram with Packing List eeeeeeea aaa Page 3 Preparation for installation of Back Panel 09 Pages 4 7 Preparation for installation of Side Panel 01 Pages 8 14 Back Panel and Side Panel Installation Instruction Pages 14 19 Glass Shelf 05 Installation Instruction wo ccc cece eens Pages 20 21 Ver 1 Rev 1 22 lt QREAMLINE ream in style SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice
28. g 29 Fig 30 Ver 1 Rev 1 ATTENTION Prior to the next step please be sure the part of the wall for installation of the Decorative edge molding 03 is clean dry and free from soap oil and any construction debris 25 Gently remove the plastic tape from the adhesive side of the Decorative edge molding 03 and firmly press it to the edge of the Side panel 01 from top to bottom See Fig 31 for details 26 Apply caulk along the top edges of R A the Side panels 01 and the Back ak panels 09 A Apply caulk along the connection of the bottom edges of the Side panels and bottom edges of the Back panels with the Shower base See Fig 32 for details ATTENTION Installation of your QWALL 5 Acrylic shower wall is complete If you want to install Glass shelves 05 to your Shower follow to the next step 1 Side Panel Wall 4 Decorative Molding Side Panel Decorative Molding 4 a Fig 31 Fig 32 Ver 1 Rev 1 27 Determine the desired height for the wat Glass shelves 05 and mark the LA locations on the wall 5 NOTE The Glass shelves can be installed either two in one corner or one in each Glass Shelves Installation Instruction
29. he warranty does not extend to any non DreamLine plumbing or components installed by installers end users or by any party other than DreamLine THE FOREGOING WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE BATH AUTHORITY LLC DREAMLINE AND OR SELLER DISCLAIMS ALL LIABILITY FOR SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES DREAMLINE IS NOT LIABLE FOR PERSONAL INJURIES OR DEATH TO ANY PERSON OR FOR ANY DIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGE LOSS OF USE LOSS OF TIME LOSS OF PROFITS INCONVENIENCE INCIDENTAL EXPENSES LABOR OR MATERIAL CHARGES OR ANY OTHER COSTS RESULTING FROM THE USE OF ITS PRODUCTS OR PERTAINING TO THE APPLICATION OF THE PRESENT WARRANTY OR RESULTING FROM THE REMOVAL OR REPLACEMENT OF ANY PRODUCT OR ELEMENT OR PART COVERED BY THIS WARRANTY PRODUCT WARRANTY PERIODS DreamLine is not responsible for product code compliance or for verifying building code restrictions on installation or use and any such compliance is excluded from this warranty DreamLine reserves the right to modify this warranty at any time such warranty modifications will not alter the warranty applicable at the time of sale of the products in question The warranty terms for specific products for consumer non industrial non commercial non business use only are SHOWER BACKWALL SHOWER CABINS JETTED amp STEAM Dr
30. long the marked side ends of the Back panel and continue scoring until you have fully cut through the panel See Fig 7 and Fig 8 for details z UNIW NIS NESE WG Fig 8 day Ver 1 Rev 1 Preparation for Installation of Side Panels ATTENTION If you are installing a shower door with a wall profile you can hide the edge of the Side panel 01 behind the wall profile See Fig 9 for details 8 Measure the side walls of the shower from the 1 one inch line in the corner g from Step 1 to the distance where you want Side panels 01 to end The distance is D See Fig 10 for details 1 Side Panel Wall Profile Wall Wu xX 2 Side Panel Wall Profile Wall Fig 9 Ver 1 Rev 1 9 Determine the position of both Side panels 01 D L D NOTE Line Ma Line a The narrow edge of the Side oa SE panel fits behind the corner cover and cannot be trimmed b The wide edge of the Side panel can be trimmed to the size of your measurements from Step 8 Measure from the narrow edge of the Side panel and place a mark at a distance of D that you measured in Step 8 Draw a straight line from top to bottom along the wide edge of the Side panel
31. ngs on page 1 as a visual guide for the product you purchased The Asymmetrical Butterfly model installation is depicted below These instructions can be used as a general guide for the Symmetrical Butterfly model installation However please note that it may be necessary to carefully flip the glass from one side to the other to determine the correct panel position for both models 1 Place the Glass door A 04 and the Glass door B S 05 on a flat surface The distances from the glass N edge to the paired holes on both sides of the glass doors are different The side of each Glass door where the paired holes are closer to the edge should be facing each other S See Fig 1 for details Ly i Fig 1 BUTTERFLY Rev 3 Ver 3 03 2014 2 Attach the top and the bottom Hinges 13 to the left 1 f Ign edge of the Glass door A 04 Mind the position of D the Hinges on the glass l See Fig 2 and Fig 5 for details G BN Sas l A Fig 2 yg 3 Attach the top and the bottom Roller hinges 12 to the right edge of the Glass door B 05 Mind the position of the Roller hinges on the glass ep EE BpT See Fig 3 and Fig 5 for details B LS DI I R Fig 3 BUTTERFLY Rev 3 Ver 3 03 2014 4 Connect the Glass door A 04 to the Glass 1 3 door B 05 using th
32. ode compliance standards for your project and will not accept any returns If this unit is going to be installed in a new construction please install all of the required plumbing and drainage before installing the shower Use a competent and licensed if required by local code plumber for all plumbing installation period Prior to installation please ensure that the installation surface is level and solid and will be able to support the total weight of the unit Also make sure that the walls are plumb Depending on the type of unit you are installing some adjustments in leveling may be possible However irregular installation surface level or out of square conditions can result in serious problems for your installation Please note that some adjustments and drilling may be necessary Please protect all primary surfaces of the product during installation Never set your glass down directly onto a tile floor Always use a piece of wood or cardboard to protect the bottom edge and corners of the glass Please NOTE This door has 3 4 width or out of plumb adjustment per wall profile on each side Tools Required Tape Phillips Drill bit Drill bit Caulk Measure Pencil Screwdriver O 5 16 1 8 i Caulk KW Level Gun sk Hammer Knife BUTTERFLY Rev 3 Ver 3 03 2014 2 Detailed Diagrams of Shower Door Components
33. tails Wp Fig 21 Wp Fig 22 Vo Wp Ver 1 Rev 1 18 Slide the right edge of the left Back panel 09 all the way behind the Center cover 10 and push the Back panel against the wall Slide the left edge of the right Back panel 09 all the way behind the Center cover 10 and push the Back panel against the wall as well You can adjust the position of the Back panels before the sealant sets Apply equal pressure to the whole surface of the Back panels from top to bottom See Fig 23 and Fig 24 for details Fig 24 Fig 23 Ver 1 Rev 1 02 to the corner of the shower using the Countersunk screws ST4 2x30 07 Do not fully tighten the screws at this time leave them loose for further installation 19 Mount the Corner cover 1 See Fig 25 for details 20 Apply the sealant to the entire surface of the reverse side of the Side panel 01 Also apply the sealant around the drilled holes See Fig 26 for details Fig 25 Fig 26 Ver 1 Rev 1 21 Slide the narrow edge of the Side panel 01 behind the Corner cover 02 Align trimmed edge of the Side panel from Step 9 with the
34. tends for a designated period of time so long as it remains in use in its original place of installation This warranty applies only to DreamLine products purchased from an authorized dealer in United States or Canada Proof of purchase original sales receipt from the original consumer purchase must be provided with all warranty claims IN NO EVENT SHALL THE LIABILITY OF DREAMLINE EXCEED THE PURCHASE PRICE OF THE UNIT DreamLine products must be installed by a fully insured and licensed professional Installation of DreamLine product by anyone other than fully insured licensed professionals shall VOID THE WARRANTY DreamLine recommends that such licensed professionals have experience in the installation of bathroom products Installation of certain products including without limitation glass products i e shower and tub doors by an inexperienced installer may result in glass breakage and consequently cause personal injury or death PARTS ONLY WARRANTY This warranty is extensive in that it covers replacement of all defects LABOR CHARGES AND OR DAMAGE INCURRED IN INSTALLATION REPAIR OR REPLACEMENT AS WELL AS ANY OTHER KIND OF LOSS OR DAMAGE ARE EXCLUDED COMMERCIAL USE AND OTHER EXCLUSIONS This warranty excludes all industrial commercial and business usage whose purchasers are hereby extended a one 1 year limited warranty from the date of purchase for shower and tub doors a three 3 month limited warranty from the date of purchase for vani
35. ties and sinks with all other terms of this warranty applying except the duration of the warranty DREAMLINE JETTED AND STEAM SHOWER CABINS DREAMLINE SHOWER COLUMNS AND DREAMLINE SHOWER SEATS ARE NOT INTENDED FOR COMMERCIAL USE AND THERE IS NO WARRANTY EXTENDED FOR THESE PRODUCTS FOR COMMERCIAL USE DreamLine hereby disclaims all warranties for products sold as dealer or store displays DreamLine hereby disclaims all warranties for products used outside of the United States or Canada whether expressed or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose WARRANTY TERMS DreamLine will at its election repair or replace the product found by DreamLine in its sole judgment to be defective within the warranty period under normal residential use and maintenance The replacement of a product is limited to supplying a replacement product or part same as existing or if not available comparable product DreamLine warranty obligation shall be discharged upon tender of parts replacement or repair of the product Purchaser s refusal to accept the tender terminates all warranty obligations and VOIDS THE WARRANTY Cost of freight for returning products to DreamLine for repairs or replacement under this limited warranty are the responsibility of the customer Cost of freight associated with shipping of replacement product or parts to the customer may be charged to customer Any product replaced or rep
36. xtend above the surface of the sub floor according to the drain installation instructions and the height of the Shower base Refer to the product drawings in these installation instructions for the drain location See Fig 1 and Fig 2 for details 2 PVC Waste Pipe 5 x5 Opening See Product Chart for Drain Location Fig 1 2 PVC Waste Pipe 5 x5 Opening See Product Chart for Drain Location Fig 2 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 2 Install the shower drain NOT PROVIDED according to the drain installation manual supplied with the drain See Fig 3 for details 3 Place the tray into the designated position so that the Drain Body drops around the Drain Pipe and butt the Shower Base up against the studs See Fig 4 for details Lift and lower base over the center of The drain pipe and set it into the place Fig 4 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 13 4 Level the tray and place marks on the studs above the upper edge of the tile flange See Fig 5 for details 5 Mix the bedding material Mortar Plaster etc Concrete is not recommended Apply enough bedding material to support the entire bottom of the shower base See Fig 6 for details
Download Pdf Manuals
Related Search
Related Contents
Aerocool Vs-9 Pantalla antideslumbrante de la Serie T3 Manual de instrucciones Bedienungsanleitung User manual CIN-2004 Le montage sonore estudio de mercado Copyright © All rights reserved.
Failed to retrieve file