Home
ForzaQuartz Seamless By Nature 316231-68-DS-RETROWW Installation Guide
Contents
1. IMPORTANT NOTICE DO NOT force a panel to fit a bowed or curved wall as it may break furthermore the resiliency of the panel can break the silicone bond to the wall surface ForzaQuartz www forzastone com Page 4 Installation Procedure 3 Cut the panel using a circular saw or angle grinder with a wet or dry diamond blade designated for marble or natural stone Left Side Cut the side panel to precisely fit with the back wall If the front panel does not require cutting to size proceed to step 4 1 Place panel on top of the shower base and slide it against the back wall panel Scribe mark the panel as shown cut away the excess material to allow the panel to fit precisely against the back panel Scribing and cutting the panel will provide a precise fit a L 4 Measure the openings for the shower faucet s and shower head 2 Place the wall panel finished side facing up on a flat surface Place pieces of masking tape over the area where the saw contacts the ForzaQuartz panel ANRE Dust Hazard When cutting or drilling the ForzaQuartz product use a dust collection method which prevents dust particles from going into the air Always work in a well ventilated area To keep the area well ventilated open widows and use exhaust fans Always use an OSHA approved dust mask
2. ForzaQu artz ForzaQuartz Wall Kits and Building Solutions Panels Product Warnings Safety Guidelines Required Tools Kit Contents Preparation Tips Installation Procedure Cleaning amp Maintenance Surface Repair Warranty Information q q q q h u D h y Register your warranty at www forzastone com Forz Quartz Intro ForzaQuartz If our product is properly installed and maintained as stated in these instructions it will not leak REMEMBER SAFETY FIRST IMPORTANT NOTICE ForzaQuartz makers of ForzaQuartz cannot anticipate every possible circumstance that might involve a potential hazard during the installation of our product s The warnings and instructions in this guide are therefore not all inclusive If a tool installation procedure or work method that is not specifically recommended by ForzaQuartz is used you must satisfy yourself that it is safe You should also make sure that the ForzaQuartz product s will not be damaged by the methods you choose ForzaQuartz will not be held responsible for water damage of any kind in connection with the installation of one of our ForzaQuartz bath shower panel kits WARNING To avoid product damage personal injury or even possible death carefully read understand and follow all the instructions in this installation guide before installing this product Do not use cleaning fluids or operate poser tools unless you read and understand the instruct
3. when cutting and or drilling ForzaQuartz products Note If the side panels have only one finished edge make sure that the finished edge is facing out ForzaQuartz www forzastone com Installation Procedure 6 Cut clearance holes using a router Roto zip or hole saw Drill or cut from the finished side of the panel for best results when drilling place a scrap of wood beneath the hole to ensure a clean cut 7 Dry fit the panel and make any necessary adjustments Right Side If the panel does not require cutting to size proceed to the next section 1 Place the panel on top of the shower base and slide it against the pack wall panel Scribe mark the panel as shown Cut away the excess material to allow the panel to fit precisely against the back panel Scribing and cutting the panel will provide a precise fit 2 Place the panel finished side facing up on a flat surface Place pieces of masking tape over the area where the saw contacts the ForzaQuartz panel Dust Hazard When cutting or drilling the ForzaQuartz product use a dust collection method which prevents dust particles from going into the air Always work in a well ventilated area To keep the area well ventilated open widows and use exhaust fans Always use an OSHA approved dust mask when cutting and or drilling ForzaQuartz products Note If the side panels h
4. If adequate applications ventilation is not achievable or practical use reparatory protective equipment ForzaQuartz www forzastone com Page 7 Installation Procedure N ARNING Apron Strips optional This process is not recommended for the do it If the wall and wall panel extends beyond the shower yourself homeowner base adding apron strips will provide a finished look to Using hot melt glue in place of bracing requires your installation application by a qualified installer This temporary bonding method must hold the panel to the wall during the 24 hour curing time of the silicone adhesive The hot melt glue by itself is not sufficient to bond the panel to the wall Therefore improper or inadequate application of the hot melt glue may result in insufficient bonding of the panel to the wall Due to the weight of the panel failure to follow this recommendation may allow it to detach itself from the wall causing possible injury to someone in or around the shower enclosure The two small apron strips can be cut from scraps of a panel When cutting these apron strips make sure the finished edge of the panel is facing outward 1 Measure the distance from the top of the shower base to the outside of the panel Improper installation methods may also result in water damage or other damage to floors walls or other portions of your building or home IMPORTANT NOTICE Do not use a home applicator craft typ
5. ave only one finished edge make sure that the finished edge is facing out ForzaQuartz www forzastone com Installation Procedure 3 Cut the panel using a circular saw or angle 1 Clean the backs of each panel with denatured grinder with a wet or dry diamond blade alcohol or another non oil based cleaning designated for marble or natural stone solvent Denatured Alcohol m E IMPORTANT NOTICE Do not use oil based cleaners such as mineral spirits to 4 Dry fit the panel and make any necessary clean the panels The oil in the cleaner will prevent the adjustments panel from adhering properly to the wall lt by S 2 Apply the silicone in 1 4 diameter dots every 8 to 10 inches apart over the surface of the panel Follow the silicone manufacturer s instructions and note all ventilation and installation precautions Panel Installation Note When using an industrial grade hot melt glue gun ARNING in place of bracing apply the silicone as stated in Step 2 Fumes Hazard Then apply the hot melt glue to the panel as needed and The fumes from the silicone and solvents used by the quickly press the panel firmly into place Also refer to installer can be harmful if used in an unventilated room the WARNING on the next page for hot melt glue Always work in a well ventilated area
6. ce 6 Hold the soap dish securely in place and wipe off excess silicone You will want a uniform bead on both top and bottom Installation Procedure 7 Temporarily secure the soap dish with masking tape as shown Remove the tape after approximately four hours Do not place anything on the soap dish for at least 24 hours A A Final Caulking Apply a bead of the color matched 100 silicone sealant and white silicone sealant included in the kit L A IMPORTANT NOTICE Follow the manufacturer s instructions on the tube for proper application Allow at least 24 hours for silicone to set before using the shower enclosure 1 Apply color matched 100 silicone sealant as _ shown ForzaQuartz www forzastone com 2 Apply white silicone sealant as shown This white silicone sealant is non paintable The installation is now complete DO NOT discard these installation instructions PLEASE LEAVE THEM WITH THE HOME OWNER Attaching Shower Doors and Accessories 1 Follow the mounting instructions that come with each accessory 2 Drill pilot holes where fasteners pass through the wall panels slightly larger than the fastener 3 If anchors are being used drill the hole in the panel la
7. d it in place L LY L Lg Lg ay RS 5 Remove the braces after 24 hours Installation Procedure Soap Dish Installation Optional The soap dish is a corner mount design The soap dish can be placed in either corner of the shower Note The current production soap dish is molded with a square corner as shown in the illustrations Installation of Square Corner Soap Dish 1 Select a desirable height for mounting the soap dish A height of at least 43 from the shower floor to the soap dish is recommended 2 After marking the height draw a 4 level line on both walls These lines will be used to align the top edges of the soap dish ForzaQuartz www forzastone com 3 Dry fit the soap dish prior to applying silicone If the wall is not exactly 90 degrees square it will be necessary to grind the sides of the soap dish in order to achieve proper fit using a diamond blade on your angle grinder 4 Apply silicone to the edge of the soap dish 5 Align the soap dish with the level lines and press it into pla
8. e attempted by a ForzaQuartz certified repair technician Repairs attempted by anyone other than a certified ForzaQuartz technician will void the warranty ForzaQuartz www forzastone com
9. e hot melt glue gun Using the type of glue gun will NOT hold the panels in place long enough for the silicone to bond properly to the wall 3 Install back panel 1 first Then install left hand 1 panel 2 Finally install right hand panel 3 2 Cut two pieces of the ForzaQuartz material 3 Hold the apron strips in place and scribe the angle of the shower base onto each piece Remember do not cut the finished edge yj 4 Firmly press the surface of each panel against the wall It is important to apply hand pressure to the entire surface of the panel to bond it to the wall surface ForzaQuartz www forzastone com Page 8 Installation Procedure 4 Place silicone on the back side of the apron strips 5 Attach the apron strips to the wall gt Era T ee ForzaQuartz www forzastone com Temporary Bracing Install temporary bracing to hold the three panels in place until the silicone is completely set usually 24 hours this will allow proper curing of the silicone IMPORTANT NOTICE To insure contact between the panels and walls until the silicone sets install temporary bracing after completing installation The bracing should be constructed from lengths of 2x4 s or ratcheting cargo braces Failure to brace in the manner described could keep the panels from adhering re
10. ecially when panels have a cutout in them Store unused material away from the work area to prevent accidental damage If the shower is placed over a garage or on an outside wall care must be taken to ensure that the shower is properly insulated from cold temperatures Preparation Tips Measure the width of the back wall with green board installed This measurement cannot exceed the width of the ForzaQuartz back panel If the wall opening is too large other methods or two panels will be required to cover the wall Turn off the hot and cold water supply Remove faucet handles escutcheons filler spouts and or anything mounted to the wall i e towel bars soap dishes etc Always measure the location of the plumbing cutouts from the back wall forward and from the ledge of the shower base of bathtub upward Ensure all plumbing or electrical work inside the walls is finished prior to installation of the wall panels Prepare the area with 4 13mm moisture resistant drywall or concrete board Never install our products directly on any structure that is or may become wet or damp ForzaQuartz www forzastone com Page 1 General Information Preparation Tips Cont d e Trial fit the side panels before you begin ForzaQuartz panels have a finished side and a non finished backer side The ForzaQuartz panel has a sticker or stickers attached to the non finished backer side and upon installation should be placed aga
11. edition of ANSI A117 1 requirements Grab bars must be anchored to structural support wall studs behind the panels Do not rely on the panels only for grab bar support WARNING o WARNING Indicates a potentially hazardous situation which if not avoided could result in serious injury or death Eye Protection Be sure to use all personal protective equipment to ensure your own safety To avoid eye injury always wear protective glasses with side shields when using power tools Also make sure no one else can be injured by flying particles when using power tools Fire Hazard Personal injury or death can result from a fire caused by flammable liquids or silicone sealants Cleaners or solvents can be highly explosive resulting in personal injury or even death when not used properly Clean up any flammable substance immediately Sparks or open flames can cause flammable substances to ignite DO NOT smoke while working on or near any flammable substance Solvents Hazard Follow all manufactures safety instructions for silicone sealants and denatured alcohol Alcohol vapors are both flammable and hazardous to breathe Silicone vapors may irritate eyes and nose Personal injury can result from improperly handling or use of products such as denatured alcohol Always follow the manufacturer s recommendations for the safe use of these products Ventilate any work area before beginning to apply silicone sealants cleaning agents or sol
12. f desired the filler board can extend from the top edge of the tile to the ceiling Failure to use a filler board to properly install the panels could result in water damage or other damage to floors walls or other portions of your building or home Installation Procedure Wallboard Installation If the installation of the wall panels is covering an existing all surface proceed to the ext section 1 Cut out openings for the shower faucet s and shower head Install 2 moisture resistant cementboard or greenboard over back 1 front 2 and rear 3 wall surfaces of the rough opening IMPORTANT NOTICE Install the wall board with a 1 2 gap above the shower base side lip the front edge of the shower base and the floor to prevent possible water wicking affect damage to the wall ForzaQuartz www forzastone com 2 Apply a coat of water or oil based primer sealer to all the surfaces of the cementboard or greenboard follow the manufacturers instructions Allow the primer to dry thoroughly before applying any silicone Back Panel 1 Ifthe back wall measures less than the width of the panel the panel will need to be cut to fit the opening Use a piece of cardboard or luan to create a template for the front and rear walls Make sure the template material is laying flat on top of the sh
13. h power tools or hand tools can cause serious injury or death Make sure all related circuit breakers are turned OFF Test for live circuits or wiring inside any wall where installation of the ForzaQuartz product requires cutting into a wall Electrocution Hazard Water and other liquids conduct electric current and can create a short circuit resulting in injury or death Keep all liquids away from electrical cords and power tools DO NOT create a short circuit between a source of electricity and a liquid by being in contact with both simultaneously ForzaQuartz www forzastone com General Information General Information Required Tools Circular saw with wet dry diamond blade for marble or natural stone Roto zip with natural stone bit Drill with 3 8 drill bit Diamond hole saw for natural stone to cut shower faucet shower head holes Tape measure Masking tape 2 wide works best Level Compass or dividers scribe the panel to the wall Caulking gun Clean paper towels or shop towels 2 x 4 lumber as required for bracing see Bracing instructions Ratcheting cargo bars or other adjustable bars for bracing optional Industrial grade hot glue gun and glue sticks for templating Denatured alcohol Kit Contents Confirm that all parts of this kit have been included before beginning installation Un pa ckaging Use care when opening the box so that you do not damage the panels This product is ship
14. he ForzaQuartz product the wall surface must be sealed with a water or oil based primer sealer e Complete the installation following the instructions in this manual Note If using a trim kit old tiles may need to be removed to allow a proper fit Wallpaper e All wallpaper must be removed from the area being covered Clean the wall surface to remove any dust soap scum or any other contaminants The wall surface must be dry and smooth e To ensure proper adhesion of the ForzaQuartz product the complete area must be sealed with two coats of water or oil based primer sealer e After the primer sealer is completely dry complete the installation following the instructions in this manual Masonite e Surface must be dry smooth and free of any dust soap scum or any other contaminants e To ensure proper adhesion of the ForzaQuartz product the wall surface must be sealed with a water or oil based primer sealer e After the primer sealer is completely dry complete the installation following the instructions in this manual ForzaQuartz www forzastone com Page 1 Installation Procedure Followed carefully these installation instructions will result in an easy trouble free installation of your ForzaQuartz product Any deviations additions and or deletions from the prescribed installation without prior written approval will void the warranty covering this product Not following the directions could also result in pers
15. inst the sub wall e Walls must be solid plumb and square within 1 8 of true Shim or trim the opening as required This kit has been designed with some adjustability for minor alignment problems e The mounting surface must be free of dirt film waxes or any other residues Caulking Tips e Follow the instructions on the caulking tube e When job is complete inspect all caulked areas for gaps and fill as needed e Clean up any excess silicone that was missed using denatured alcohol and a clean cloth e Be very careful not to disturb caulk joints ForzaQuartz www forzastone com Page 2 Installation Procedure Installation Procedure ForzaQuartz panels can be installed over a variety of products If you intend to apply the panels to any surface other than those described consult with a professional contractor Use the following sections when installing this product over e Sheetrock greenboard cementboard Plaster Cement concrete Old tile Wallpaper Masonite Sheetrock greenboard cementboard Surface must be dry smooth and free of any dust soap scum or any other contaminants e To ensure proper adhesion of the ForzaQuartz product the wall surface must be sealed with a water or oil based primer sealer Plaster Depending on the condition of the existing wall surface additional silicone may be required to ensure contact between the substrate and the wall panel e Sand textured or swirled finishes sm
16. ions and warnings in this and all other applicable labels or manuals Proper use of tools and the products described in this guide is your responsibility el WARRANTY This product is covered by a Limited Lifetime Warranty Refer to the Warranty section in this manual for complete details SAVE THIS MANUAL FOR FUTURE REFERENCE This manual is to be left with the warranty holder and owner Important information on cleaning maintenance and repair is contained within ForzaQuartz www forzastone com Page 1 IMPORTANT NOTICE CAUTION IMPORTANT NOTICE Indicates that equipment or property damage can result if instructions are not followed Read and Understand the Manual It is the responsibility of any individual who installs or maintains this product to fully understand and follow proper installation and maintenance procedures Be aware of the inherent dangers in the use of power tools when installing this product Read and understand all Warnings Cautions and Important Notices in the manual Work Safely DO NOT proceed if any doubt arises about the correct or safe method of performing anything found in this or other ForzaQuartz manuals The installation of this product can require using power tools Do not use power tools without adequate training if necessary hire of consult a trained professional for expert assistance before continuing Use Proper Tools Always use proper tools which a
17. onal injuries water damage and other damage to floors pipes walls and other portions of your building or home Disclaimer e The information contained in this Installation Manual is given free of charge It is based upon technical data which we believe to be reliable and is intended for use by persons having knowledge of this technical area at their own discretion and risk ForzaQuartz assumes no responsibility for results obtained or damage incurred from the use of this material either in whole or in part by the buyer e This manual will give you basic instructions for the installation of the product in a step by step sequence that will work in most types of installations If you have an installation application that is not covered in this manual please call your local ForzaQuartz distributor or contact ForzaQuartz directly for additional information about your application e Follow all installation instructions Failure to follow these instructions could result in personal injuries water damage or other damage to floors pipes walls or other portions of your building or home ForzaQuartz www forzastone com Filler Boards If an existing wall covering i e tile does not extend to a height equal to the height of the panel it will be necessary to install a filler board to that height The filler board must equal the thickness of the existing wall covering tile Usually 1 4 masonite or similar material is adequate I
18. ooth e Clean the wall surface with a damp cloth to remove any dust soap scum or any other contaminants e To ensure proper adhesion of the ForzaQuartz product the wall surface must be sealed with a water or oil based primer sealer e After the primer sealer is completely dry complete the installation following the instructions in this manual Cement concrete Depending on the condition flatness of the existing wall surface additional silicone may be required to ensure contact between the substrate and the wall panel e To ensure proper adhesion of the ForzaQuartz product the complete area must be sealed with two coats of water or oil based primer sealer e After the primer sealer is completely dry complete the installation following the instructions in this manual Old tile Depending on the condition of the existing wall surface additional silicone may be required to ensure contact between the substrate and the wall panel IMPORTANT NOTICE Old ceramic tiles if solidly adhered do not need to be removed All plastic tiles must be removed e Remove or reattach any loose ceramic tiles Old tiles and front edge ceramic tiles should be reset for appearance only e Remove any tile accessories attached to the walls e Remove the bottom row of tile and cut a ventilation gap in the substrate e Surface must be dry smooth and free of any dust soap scum or any other contaminants e To ensure proper adhesion of t
19. ower base and up against the wall Scribe mark the template as shown this will ensure the back panel fits the exact contour of the front or rear walls Cutting the back panel to precisely fit the wall is not necessary as the side panels will cover up to 1 8 gap on each side Page 3 Installation Procedure Fe ec ee 2 Place the back wall panel finished side facing 4 Cut the panel using a circular saw or angle up on a flat surface Place the template over the grinder with a wet or dry diamond blade wall panel and carefully trace the outline of the designated for marble or natural stone template n Dry fit the back panel and make any necessary adjustments Temporarily secure the back panel to the wall in order to properly fit the front and rear panels A H 3 Remove the template and place pieces of masking tape over the area where the saw contacts the ForzaQuartz panel Dust Hazard When cutting or drilling the ForzaQuartz product use a dust collection method which prevents dust particles from going into the air Always work in a well ventilated area To keep the area well ventilated open widows and use exhaust fans Always use an OSHA approved dust mask when cutting and or drilling ForzaQuartz products IMPORTANT NOTICE Any cutout for accessories should have rounded corners sharp corners can promote stress crack s
20. ped to you or your retail center after careful inspection After purchasing the kit carefully un box and inspect the product for any shipping damage that may have occurred If damage is found report it immediately to the store of purchase After inspection and during installation protect the products from construction damage by moving them to another room or area until ready to install Store panels in a flat area to avoid warp until the time of installation Do not store the panels outside of the original packaging in a vertical position Please use the model number located on the side of the box or the front of this manual when contacting us with questions concerning the installation of this unit Make sure the walls are the correct size and are in good condition Installation of damaged product will void the warranty Helpful Hints Read these instructions carefully and familiarize yourself with the various parts of the kit The variety of installations possible for this kit may require procedures other than those shown Ensure construction is correctly sized plumb and square Allow sufficient time for the parts in this kit to adjust to room temperature We do not recommend installation of this product at temperatures below 65 degrees Sawhorses with 2 x 4 cross members or a worktable are helpful during the installation process Always transport the panels vertically Use care when laying the panels flat to prevent flexing esp
21. re in good working condition during the installation of ForzaQuartz products Using tools other than those listed could adversely affect the integrity of floors pipes walls or this product and could result in water damage or other damage to floors pipes walls or other portions of your building or home Do Not Use Nails The panels mount to walls with clear silicone only Only use the supplied or recommended clear silicone to mount this product Never use hammers nails or screws Hammers nails and screws could adversely affect the integrity of this product Nails and screws could puncture the ForzaQuartz wall systems and panels resulting in water or other damage to floors pipes walls or other portions of your building or home Inspect Before Cutting Make sure no electrical wiring or plumbing is present before cutting into a wall to install any accessories Wall Conditions Inspect the walls before installing the ForzaQuartz panels Never install panels over damp walls or an existing mold conditions CAUTION Indicates a potentially hazardous situation which if not avoided may result to injury It may also be used to alert against unsafe practices Use Proper Installation Methods Follow all instructions related to wall surface preparation Failure to follow such instructions could cause the panels to detach from the wall surface after installation resulting in personal injury Failure to follow these instructions could res
22. rge enough for the head of the anchor to fit through the panel and the structural wall behind it 4 Use 100 silicone to seal any holes or joints between the accessory and the wall panel Care and Cleaning The ForzaQuartz products are stain and abrasion resistant however the finish requires reasonable care IMPORTANT NOTICE Because cleaning products change over time always check the manufacturer instructions to make sure it is compatible with quartz DO NOT use a cleaner in which the label indicates it should not be used on quartz DO NOT use spray on cleaners that require daily use without immediately rinsing with water to stop the chemical cleaning reaction because damage will result and void the warranty Day To Day Cleaning Simply wipe the surface with a clean towel to remove watermarks and residue All ForzaQuartz products can be cleaned with warm soapy water a low pH dish soap a soft cloth or Soft Scrub with a non abrasive pad Always rinse off cleaners within five minutes of application Caulking Joints Inspect caulking joints monthly for damage or any signs of separation from the mating surface Cracks in the caulking may allow water to leak into the surrounding surfaces Reapply caulking to any joint showing signs of wear or cracking Failure to inspect and repair caulking joints will void the warranty IMPORTANT NOTICE Surface Repair Light Scratches Deep Scratches or Gouges Repairs should only b
23. sulting in personal injury as well as water damage or other damage to floors walls or other portions of your building or home IMPORTANT NOTICE To prevent scratches or other damage make sure there are no nails or other foreign objects in the surface of the bracing that is placed against the panel If the horizontal braces are fastened to the vertical braces using nails or screws make sure the fasteners do not penetrate the surface of the panel Also to prevent possible damage to the walls do not apply excessive pressure to the braces Ratcheting cargo braces can also be used Installation Procedure Place two or three braces against the back wall Place two braces on panels that are 48 or less and three braces on panels greater than 48 wide AL 4 2 Place two braces against each left and right wall ForzaQuartz www forzastone com 3 Install wedge three horizontal braces six total against the left and right wall braces A H Insert small blocks between the front to rear panel braces and the back panel braces These will apply pressure to the back panel to hol
24. ult in water damage Lifting Hazard According to the National Institute for Occupational Safety and Health the recommended maximum safe lifting weight is 51lbs with all lifting conditions perfect minimal forward reach steady load close to the body straight back load between knees and shoulders and good grips To avoid personal injury always use these proper lifting techniques and use two people to move cartons weighing more than 51lbs The box containing ForzaQuartz kit can weigh in excess of 400 800 Ibs Use the appropriate lifting devices to move the load Always use two people when lifting heavy or bulky cartons DO NOT attempt to lift objects that are too heavy WHEN CARRYING A HEAVY LOAD GET HELP Slipping Hazard Do not install this product in the presence of water Installing this product without drying all surfaces or in the presence of water could cause you to slip and fall due to wet floors or spilled fluids Personal injury can result from slips or falls Before installation dry all surfaces including the floor with a cloth or paper towel Clean up all water or spilled fluids immediately Tripping Hazard Personal injury can result from tripping over power cords tools or other items DO NOT leave items lying around the work area Personal Protection Be sure to use all personal protective equipment such as sturdy work boots preferably with steel toes gloves and hart hat if necessary to ensure your own safet
25. vents Fumes Hazard The fumes from the silicone and solvents used by the installer can be harmful if used in an unventilated room Always work in a well ventilated area To keep the area well ventilated open windows and use exhaust fans If adequate ventilation is not achievable or practical use respiratory protective equipment Dust Hazard When cutting or drilling ForzaQuartz products use a dust collection method which prevents dust particles from going into the air Always work in a well ventilated area Always use an OSHA approved dust mask when cutting or drilling ForzaQuartz products WARNING WARNING Indicates a potentially hazardous situation which if not avoided could result in serious injury or death Power Tool Hazard To prevent personal injury or possible death always follow the electrical safety recommendations of the power tool s manufacturer Do not use power tools in an unsafe manner Power tools should only be connected to a circuit protected by a ground fault circuit interrupter GFI Shock Hazard Never use electric power tools around water condensation or other liquids Electric shock can cause severe burns significant injuries and even death If an extension cord is required always use an OSHA approved extension cord Power cords should only be connected to a circuit protected by a ground fault circuit interrupter GFI Electrical Shock Hazard Contracting live electrical wiring wit
26. y To prevent possible damage to your hearing always wear ear protection such as earmuffs of earplugs when working around power tools ForzaQuartz www forzastone com Page 1 Safety Guidelines _ CAUTION CAUTION Indicates a potentially hazardous situation which if not avoided may result to injury It may also be used to alert against unsafe practices Cutting Hazard The installation of ForzaQuartz product may require using power tools Keep hands away from the cutting edge of any tool used in the installation of our product Placing fingers in or around the cutting blades could result in serious personal injury Sharp Edge Hazard After cutting the edge of a ForzaQuartz panel it can be sharp Wear protective gloves to prevent personal injury Room Temperature Allow ForzaQuartz panels and silicone sealants to adjust to room temperature for at least six hours before installation The panels should be installed at temperatures no less than 65 F Panels should not be installed in areas where the temperature may drop below freezing 32 F Failure to follow this recommendation could adversely affect the silicone sealants which holds the panels to the wall If the panels are not correctly adhered to the walls they may fall off causing possible injury to someone in or around the shower enclosure Grab Bars We recommend that shower compartments be equipped with support grab bars that comply with the most recent
Download Pdf Manuals
Related Search
Related Contents
Sony VAIO VPCEB27FD Jabra LINK™ 220 Jabra LINK™ 220a 0 - ATP Messtechnik Enterasys SmartSwitch 9000 Expansion Module 取扱説明書 Copyright © All rights reserved.
Failed to retrieve file